MOHAMMED MUSTAFA AWAD
Date of Birth: Oct 14th, 1989 Telephone: + (966) 597455765
Place of Birth: Amman, Jordan
Current Place: Riyadh, Saudi Arabia
Marital Status: Single E-mail: civil.eng1989@hotmail.com
EDUCATION
Jordan University of Science and Technology, Faculty of Engineering
Amman, Jordan May 2012
 Bachelor of Civil Engineering
 GPA : 70.5%, Good Grade
Ahmad Toqan Secondary School
Amman, Jordan July 2007
 Received Tawjihi Certificate with an average of 94 %.
RELEVANT COURSES
 Primavera P6 from Jordan Engineers Association
Sep. 2011 & primavera 6.8.2 course in 2015
 Quantity Surveying from Jordan Engineers Association Oct. 2010
RELEVANT SKILLS
Languages Arabic and English
Computer Applications
Engineering Software
 Superior experience in 2D design and drafting with AutoCAD.
 High experience with PROKON Structural Analysis and Design.
Planning Software:
 Gained high experience in organizing and summarizing data into Excel 2010 as
professional level; Excel sheets for Analysis & Design Equations of beams, slabs and
columns.
 Gained high experience in organizing and summarizing data into Microsoft project
as professional level, prepare time Schedule for casting, Delivery and Erection as per
site conditions and client requirements.
 Gained experience in organizing and summarizing data into Primavera 6.8.2 as
professional level, make activity Schedules and resources of projects in different
enterprises for casting, Delivery and Erection stages of precast elements (HCS,
Stairs, Cladding panels , TT slabs, Solid Slab and Fence)
 Practice with Eli-Plan data base to summarising data for precast elements.
 Presented several presentations with PowerPoint.
Design Codes
Gained a high level of expertise using the following codes:
 Jordan Specification Code (JSC) - Used Primarily.
 American Concrete Institute Code (ACI-M08) - Used Secondarily.
 The Uniform Building Code (UBC)
 The American Association of State Highway and Transportation Officials (AASHTO).
 American Society for Testing and Materials (ASTM).
Driving License Driving since 2009
Private Car Owned
EXPERIENSES:
 Sep 2013- Current Riyadh, Saudi Arabia
Project Coordination Engineer at AL FANAR BUILDING SYSYTEM
(PRECAST)
Job Description:
-Study Projects directly after getting the approval and before starting elements
production then prepare time Schedule for casting, Delivery and Erection at site as
per client requirements.
-Prepare Manufactured, Delivery and Erection Plans and time frames.
- Give status updates, Monitoring, and introduce suggestions of time schedules using
Microsoft project as per site condition.
- Make and prepare Invoices, Claims and Variation orders.
- Make and prepare Daily, Weekly and Monthly reports which are show the percent
of works accomplishment.
- Attending public meetings to discuss projects.
Jun 2012- Sep 2013 Amman, Jordan
Quantity Surveyor Engineer at Rhodes Precast Concrete
Job Description:
-Make Invoices and Study the quantities for 294 Schools projects in Iraq
- analysing outcomes and writing detailed progress reports and Charts.
- scheduling material and equipment purchases and delivery and check materials if
its within specification or not
- managing the changes, as the client may change their mind about the design,
and ensuring relevant parties are notified of changes in the project
- ensuring that a project runs smoothly and that the structure is completed on time
and within budget.
        
 
  REFERENCES
- Eng.Wael Saad (00966-552295441)
Projects Manager for Alfanar precast concrete.
- Eng. Zakria Mali (00962-795056008)
Head of Civil Engineers at Rhodes precast concrete.
MOHD AWAD update
MOHD AWAD update
MOHD AWAD update

MOHD AWAD update

  • 1.
    MOHAMMED MUSTAFA AWAD Dateof Birth: Oct 14th, 1989 Telephone: + (966) 597455765 Place of Birth: Amman, Jordan Current Place: Riyadh, Saudi Arabia Marital Status: Single E-mail: civil.eng1989@hotmail.com EDUCATION Jordan University of Science and Technology, Faculty of Engineering Amman, Jordan May 2012  Bachelor of Civil Engineering  GPA : 70.5%, Good Grade Ahmad Toqan Secondary School Amman, Jordan July 2007  Received Tawjihi Certificate with an average of 94 %. RELEVANT COURSES  Primavera P6 from Jordan Engineers Association Sep. 2011 & primavera 6.8.2 course in 2015  Quantity Surveying from Jordan Engineers Association Oct. 2010 RELEVANT SKILLS Languages Arabic and English Computer Applications Engineering Software  Superior experience in 2D design and drafting with AutoCAD.  High experience with PROKON Structural Analysis and Design.
  • 2.
    Planning Software:  Gainedhigh experience in organizing and summarizing data into Excel 2010 as professional level; Excel sheets for Analysis & Design Equations of beams, slabs and columns.  Gained high experience in organizing and summarizing data into Microsoft project as professional level, prepare time Schedule for casting, Delivery and Erection as per site conditions and client requirements.  Gained experience in organizing and summarizing data into Primavera 6.8.2 as professional level, make activity Schedules and resources of projects in different enterprises for casting, Delivery and Erection stages of precast elements (HCS, Stairs, Cladding panels , TT slabs, Solid Slab and Fence)  Practice with Eli-Plan data base to summarising data for precast elements.  Presented several presentations with PowerPoint. Design Codes Gained a high level of expertise using the following codes:  Jordan Specification Code (JSC) - Used Primarily.  American Concrete Institute Code (ACI-M08) - Used Secondarily.  The Uniform Building Code (UBC)  The American Association of State Highway and Transportation Officials (AASHTO).  American Society for Testing and Materials (ASTM). Driving License Driving since 2009 Private Car Owned EXPERIENSES:  Sep 2013- Current Riyadh, Saudi Arabia Project Coordination Engineer at AL FANAR BUILDING SYSYTEM (PRECAST) Job Description: -Study Projects directly after getting the approval and before starting elements production then prepare time Schedule for casting, Delivery and Erection at site as per client requirements. -Prepare Manufactured, Delivery and Erection Plans and time frames. - Give status updates, Monitoring, and introduce suggestions of time schedules using Microsoft project as per site condition. - Make and prepare Invoices, Claims and Variation orders. - Make and prepare Daily, Weekly and Monthly reports which are show the percent of works accomplishment. - Attending public meetings to discuss projects.
  • 3.
    Jun 2012- Sep2013 Amman, Jordan Quantity Surveyor Engineer at Rhodes Precast Concrete Job Description: -Make Invoices and Study the quantities for 294 Schools projects in Iraq - analysing outcomes and writing detailed progress reports and Charts. - scheduling material and equipment purchases and delivery and check materials if its within specification or not - managing the changes, as the client may change their mind about the design, and ensuring relevant parties are notified of changes in the project - ensuring that a project runs smoothly and that the structure is completed on time and within budget.              REFERENCES - Eng.Wael Saad (00966-552295441) Projects Manager for Alfanar precast concrete. - Eng. Zakria Mali (00962-795056008) Head of Civil Engineers at Rhodes precast concrete.