Mobile phones equipped with GPS have become indispensable tools, fundamentally altering how we navigate and interact with the world. The integration of Global Positioning System (GPS) technology into smartphones has transformed them from simple communication devices into sophisticated navigation aids, location-based service platforms, and powerful data collection tools. This technology relies on a network of satellites orbiting the Earth, which transmit signals that are picked up by the GPS receiver in a mobile phone. By calculating the time it takes for these signals to arrive from multiple satellites, the phone can pinpoint its exact location with remarkable accuracy, a capability that has a wide range of applications beyond just providing directions.