By Bachtiar Rizqi
IT
12 August 2016
August 12 │ Lab Project 2
Background
• As part of Assessment of Global Project to build laboratory facility representative
in Asia
• To covered demand of Laboratory need for Trial, Experiment and Develop new
Product of Coating Chemicals
• Business Needs
August 12 │ Lab Project 3
Challenges
Project Management
Timeline
Indonesia Infrastructure
August 12 │ Lab Project 4
Issues in Fishbone
Lab Project
Indonesia
IT not involved at Kick
off Meeting
Tight Timeline
Due date
End of October
Short interval of request
network installation and
implementation
Design network maps
based on final layout
Lack of Information
Project Manager not
aware of Important IT
Process need
Required time for
Procurement devices
(network, workstation
devices)
Network core
installation
Network demographyc in
Indonesia
August 12 │ Lab Project 5
Conclusion
Based on Fish bones process,
- Meeting and talk with Project Manager with advise from network team
- Decide to the best option and reliable of business needs with considering the cost
• Access @site solution. It’s VPN Tunnel solution (Based on Indonesia Infrastructure)
Pros : No WAN cost, Low cost Implement, support SAP Print, IPT phones, E-mail,
Files share.
Cons : Support will be handled by Global IT team, need extra time for troubleshoot
if any issues found
Current situation?
Thank you for
your attention
Bachtiar Rizqi Metiardi

More Related Content

Similar to Milestones project

Built around answering questions
Built around answering questionsBuilt around answering questions
Built around answering questions
Larry Smarr
 
APNIC Training and Technical Assistance
APNIC Training and Technical AssistanceAPNIC Training and Technical Assistance
APNIC Training and Technical Assistance
APNIC
 
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Smart ERP Solutions, Inc.
 
IT Engineer
IT EngineerIT Engineer
IT Engineer
Mohammed Riyas VP
 
Campus networking
Campus networkingCampus networking
Campus networking
Jisc
 
GurudasBhondkar5055
GurudasBhondkar5055GurudasBhondkar5055
GurudasBhondkar5055
Gurudas Bhondkar
 
JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...
JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...
JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...
JBossArchitectForum
 
Automation
AutomationAutomation
Automation
rajni singal
 
Project Plan
Project PlanProject Plan
Project Plan
Mohammad Yousef
 
SIC Finale Status Report August 6.pptx
SIC Finale Status Report August 6.pptxSIC Finale Status Report August 6.pptx
SIC Finale Status Report August 6.pptx
Shaista Ansari
 
Introduction to Lectures in Apple iClub at DA-IICT
Introduction to Lectures in Apple iClub  at DA-IICTIntroduction to Lectures in Apple iClub  at DA-IICT
Introduction to Lectures in Apple iClub at DA-IICT
Nitesh Bhatia
 
Steering comittee nov 1 2013
Steering comittee nov 1 2013Steering comittee nov 1 2013
Steering comittee nov 1 2013
Darin Hobbs
 
tip oopt pse-summit2017
tip oopt pse-summit2017tip oopt pse-summit2017
tip oopt pse-summit2017
domenico di mola
 
Mohan2015_resume
Mohan2015_resumeMohan2015_resume
Mohan2015_resume
Mohan Pol
 
From Renamer Plugin to Polyglot IDE
From Renamer Plugin to Polyglot IDEFrom Renamer Plugin to Polyglot IDE
From Renamer Plugin to Polyglot IDE
intelliyole
 
Management project
Management projectManagement project
Management project
gusfaleo firnando
 
SiLA: Making the standard fit for the future and adapting an open-source coll...
SiLA: Making the standard fit for the future and adapting an open-source coll...SiLA: Making the standard fit for the future and adapting an open-source coll...
SiLA: Making the standard fit for the future and adapting an open-source coll...
Gáspár Incze
 
Using Archivemedia to preserve research data
Using Archivemedia to preserve research dataUsing Archivemedia to preserve research data
Using Archivemedia to preserve research data
ARDC
 
AMIA Presentation 2013 -- Richmond, VA
AMIA Presentation 2013 -- Richmond, VAAMIA Presentation 2013 -- Richmond, VA
AMIA Presentation 2013 -- Richmond, VA
miwayokoyama
 
APAN 52: APNIC Report
APAN 52: APNIC ReportAPAN 52: APNIC Report
APAN 52: APNIC Report
APNIC
 

Similar to Milestones project (20)

Built around answering questions
Built around answering questionsBuilt around answering questions
Built around answering questions
 
APNIC Training and Technical Assistance
APNIC Training and Technical AssistanceAPNIC Training and Technical Assistance
APNIC Training and Technical Assistance
 
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
Case Study: Upgrade Strategies for PeopleSoft Financials and Supply Chain 9.1
 
IT Engineer
IT EngineerIT Engineer
IT Engineer
 
Campus networking
Campus networkingCampus networking
Campus networking
 
GurudasBhondkar5055
GurudasBhondkar5055GurudasBhondkar5055
GurudasBhondkar5055
 
JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...
JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...
JBoss Architect Meetup - December 2013 - JBoss Fuse in Vodafone’s Global Inte...
 
Automation
AutomationAutomation
Automation
 
Project Plan
Project PlanProject Plan
Project Plan
 
SIC Finale Status Report August 6.pptx
SIC Finale Status Report August 6.pptxSIC Finale Status Report August 6.pptx
SIC Finale Status Report August 6.pptx
 
Introduction to Lectures in Apple iClub at DA-IICT
Introduction to Lectures in Apple iClub  at DA-IICTIntroduction to Lectures in Apple iClub  at DA-IICT
Introduction to Lectures in Apple iClub at DA-IICT
 
Steering comittee nov 1 2013
Steering comittee nov 1 2013Steering comittee nov 1 2013
Steering comittee nov 1 2013
 
tip oopt pse-summit2017
tip oopt pse-summit2017tip oopt pse-summit2017
tip oopt pse-summit2017
 
Mohan2015_resume
Mohan2015_resumeMohan2015_resume
Mohan2015_resume
 
From Renamer Plugin to Polyglot IDE
From Renamer Plugin to Polyglot IDEFrom Renamer Plugin to Polyglot IDE
From Renamer Plugin to Polyglot IDE
 
Management project
Management projectManagement project
Management project
 
SiLA: Making the standard fit for the future and adapting an open-source coll...
SiLA: Making the standard fit for the future and adapting an open-source coll...SiLA: Making the standard fit for the future and adapting an open-source coll...
SiLA: Making the standard fit for the future and adapting an open-source coll...
 
Using Archivemedia to preserve research data
Using Archivemedia to preserve research dataUsing Archivemedia to preserve research data
Using Archivemedia to preserve research data
 
AMIA Presentation 2013 -- Richmond, VA
AMIA Presentation 2013 -- Richmond, VAAMIA Presentation 2013 -- Richmond, VA
AMIA Presentation 2013 -- Richmond, VA
 
APAN 52: APNIC Report
APAN 52: APNIC ReportAPAN 52: APNIC Report
APAN 52: APNIC Report
 

Milestones project

  • 2. August 12 │ Lab Project 2 Background • As part of Assessment of Global Project to build laboratory facility representative in Asia • To covered demand of Laboratory need for Trial, Experiment and Develop new Product of Coating Chemicals • Business Needs
  • 3. August 12 │ Lab Project 3 Challenges Project Management Timeline Indonesia Infrastructure
  • 4. August 12 │ Lab Project 4 Issues in Fishbone Lab Project Indonesia IT not involved at Kick off Meeting Tight Timeline Due date End of October Short interval of request network installation and implementation Design network maps based on final layout Lack of Information Project Manager not aware of Important IT Process need Required time for Procurement devices (network, workstation devices) Network core installation Network demographyc in Indonesia
  • 5. August 12 │ Lab Project 5 Conclusion Based on Fish bones process, - Meeting and talk with Project Manager with advise from network team - Decide to the best option and reliable of business needs with considering the cost • Access @site solution. It’s VPN Tunnel solution (Based on Indonesia Infrastructure) Pros : No WAN cost, Low cost Implement, support SAP Print, IPT phones, E-mail, Files share. Cons : Support will be handled by Global IT team, need extra time for troubleshoot if any issues found Current situation?
  • 6. Thank you for your attention Bachtiar Rizqi Metiardi