The document provides updates on the March-April 2016 interior and exterior renovation of McCracken Hall. Areas being worked on included finishing the brick on a new addition, installing windows, and constructing a new north entrance. Renovated spaces will include student lounges on the second and third floors, a student affairs area on the first floor, and recreation and sport pedagogy offices. New features included elevators in the center of the main building, an open space between the third and fourth floors, and a green roof. The renovation was scheduled to be completed in December 2016.