Maple Quays
Canada Water Case Study
 R E S I D E N T I A L                 G Y M        &     S P A



                                           Barratt Homes East London
                                           Canada Water is located on the south bank of the
                                           Thames between Greenwich and Shad Thames.
                                           It is currently in the midst of a phenomenal
                                           regeneration programme.


The new master plan is focused on creating a vibrant canal side community of 2,000 new homes, a large
proportion of which are being built by preferred developer partner, Barratt Homes.

Their latest scheme, Maple Quays, occupies a prime position in the Canada Water footprint, sitting just
a 30 second walk from Canada Water Underground station.

The scheme is being built and released in phases, with the latest building, Fairmont House, due for
launch at the end of July 2010.

Maple Quays boasts cutting-edge urban architecture combined with modern style. Residents can enjoy
living spaces that are flexible and open-plan, a concierge service and now a state-of-the-art gymnasium,
designed and fitted out by motive8.

Due to its substantial floor plate, the gym offers a comprehensive and spacious workout environment. A
large, mirrored stretching area allows residents to warm up and cool down in comfort whilst a full range
of cardio equipment caters for all levels of fitness including treadmills, upright and recumbent bikes,
Concept2 rowers and x-trainers.of varying sizes.

This fantastic space also enabled the supply of a blend of
Life Fitness Signature and Circuit Series strength equipment,
providing both amateur and more accustomed gym users
with maximum choice and flexibility.




www.m8group.co.uk/gym-design                       info@m8group.co.uk                  0800 028 0198

More Related Content

What's hot

The palm islands
The palm islandsThe palm islands
The palm islands
PrÎya MöhâpAtrå
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008
WhitneyWilson
 
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Istabraq Al Janabi
 
CalMac - Excellence in Technology and Innovation submission
CalMac - Excellence in Technology and Innovation submissionCalMac - Excellence in Technology and Innovation submission
CalMac - Excellence in Technology and Innovation submissionJohn Gray
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDMWilliam Grogan
 
Palm island Construction with Management 5 Ms
Palm island Construction with Management 5 MsPalm island Construction with Management 5 Ms
Palm island Construction with Management 5 Ms
Gargi Kapadia
 
Melbourne slide show
Melbourne slide showMelbourne slide show
Melbourne slide showwlmos
 
Palm island ppt
Palm island pptPalm island ppt
Palm island ppt
Pritham Priths
 
Parklands, Essex (MaxiGreen Project) by John Meehan
Parklands, Essex (MaxiGreen Project) by John MeehanParklands, Essex (MaxiGreen Project) by John Meehan
Parklands, Essex (MaxiGreen Project) by John Meehan
Jayne Rogers
 
1282927519Leaflet-204
1282927519Leaflet-2041282927519Leaflet-204
1282927519Leaflet-204Obada Alsaqqa
 
3. palm jumeirah final
3. palm jumeirah final3. palm jumeirah final
3. palm jumeirah final
adib ankon
 
Concept & Construction of PALM ISLAND
Concept & Construction of PALM ISLANDConcept & Construction of PALM ISLAND
Concept & Construction of PALM ISLAND
JASHU JASWANTH
 
Presentation: Electric Metals (July 2011)
Presentation: Electric Metals (July 2011)Presentation: Electric Metals (July 2011)
Presentation: Electric Metals (July 2011)
Rocky Mountain Rare Metal Belt
 
Agua y Cambio Climático 1 glacier melt
Agua y Cambio Climático 1 glacier meltAgua y Cambio Climático 1 glacier melt
Agua y Cambio Climático 1 glacier meltaguaycambioclimatico
 
Sheet9 Appendix
Sheet9 AppendixSheet9 Appendix

What's hot (20)

The palm islands
The palm islandsThe palm islands
The palm islands
 
artificial island
artificial islandartificial island
artificial island
 
The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008
 
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...Soil Densification is a Strategic Need for the Palm Island Development Sustai...
Soil Densification is a Strategic Need for the Palm Island Development Sustai...
 
Selected_Work-reduced
Selected_Work-reducedSelected_Work-reduced
Selected_Work-reduced
 
CalMac - Excellence in Technology and Innovation submission
CalMac - Excellence in Technology and Innovation submissionCalMac - Excellence in Technology and Innovation submission
CalMac - Excellence in Technology and Innovation submission
 
Feasibility Report - CREDM
Feasibility Report - CREDMFeasibility Report - CREDM
Feasibility Report - CREDM
 
Palm island Construction with Management 5 Ms
Palm island Construction with Management 5 MsPalm island Construction with Management 5 Ms
Palm island Construction with Management 5 Ms
 
Melbourne slide show
Melbourne slide showMelbourne slide show
Melbourne slide show
 
Palm jumeirah
Palm jumeirah Palm jumeirah
Palm jumeirah
 
linked in PPT
linked in PPTlinked in PPT
linked in PPT
 
Palm island ppt
Palm island pptPalm island ppt
Palm island ppt
 
Parklands, Essex (MaxiGreen Project) by John Meehan
Parklands, Essex (MaxiGreen Project) by John MeehanParklands, Essex (MaxiGreen Project) by John Meehan
Parklands, Essex (MaxiGreen Project) by John Meehan
 
1282927519Leaflet-204
1282927519Leaflet-2041282927519Leaflet-204
1282927519Leaflet-204
 
3. palm jumeirah final
3. palm jumeirah final3. palm jumeirah final
3. palm jumeirah final
 
Concept & Construction of PALM ISLAND
Concept & Construction of PALM ISLANDConcept & Construction of PALM ISLAND
Concept & Construction of PALM ISLAND
 
Presentation: Electric Metals (July 2011)
Presentation: Electric Metals (July 2011)Presentation: Electric Metals (July 2011)
Presentation: Electric Metals (July 2011)
 
Kaec
KaecKaec
Kaec
 
Agua y Cambio Climático 1 glacier melt
Agua y Cambio Climático 1 glacier meltAgua y Cambio Climático 1 glacier melt
Agua y Cambio Climático 1 glacier melt
 
Sheet9 Appendix
Sheet9 AppendixSheet9 Appendix
Sheet9 Appendix
 

M8 case study canada water

  • 1. Maple Quays Canada Water Case Study R E S I D E N T I A L G Y M & S P A Barratt Homes East London Canada Water is located on the south bank of the Thames between Greenwich and Shad Thames. It is currently in the midst of a phenomenal regeneration programme. The new master plan is focused on creating a vibrant canal side community of 2,000 new homes, a large proportion of which are being built by preferred developer partner, Barratt Homes. Their latest scheme, Maple Quays, occupies a prime position in the Canada Water footprint, sitting just a 30 second walk from Canada Water Underground station. The scheme is being built and released in phases, with the latest building, Fairmont House, due for launch at the end of July 2010. Maple Quays boasts cutting-edge urban architecture combined with modern style. Residents can enjoy living spaces that are flexible and open-plan, a concierge service and now a state-of-the-art gymnasium, designed and fitted out by motive8. Due to its substantial floor plate, the gym offers a comprehensive and spacious workout environment. A large, mirrored stretching area allows residents to warm up and cool down in comfort whilst a full range of cardio equipment caters for all levels of fitness including treadmills, upright and recumbent bikes, Concept2 rowers and x-trainers.of varying sizes. This fantastic space also enabled the supply of a blend of Life Fitness Signature and Circuit Series strength equipment, providing both amateur and more accustomed gym users with maximum choice and flexibility. www.m8group.co.uk/gym-design info@m8group.co.uk 0800 028 0198