Agenda
 Topic                                      Presenter
1. Introduction by organizer - PKNP         Tuan Hj Sabri

2. Presentation by Department of            Pn Azuri Azizah
   Environment Pahang
3. Presentation by AELB                     Tuan Hj Yasin

4. Radiation Safety by Nuclear              Dr Idris Besar
   Malaysia
5. Presentation by Nuclear Malaysia         Dr Idris Besar

6. Presentation by Lynas Malaysia           Nick Curtis


7. Question & Answer                        Panel



                                      -2-
Introduction

 Objectives of briefing:
   To clarify the role of Department of Environment (DOE),
   Atomic Energy Licensing Board (AELB) & Nuclear Malaysia
   To explain why DOE & AELB approved Lynas project
   To provide information and assurance on radiation safety
   To share information about Lynas




                               -3-
PKNP’s History
  A State Government Agency.
  Established in 1965 to promote economic growth and
  development in the State .
  Has been actively involved in the development of new growth
  centre and industrial sectors especially focus on manufacturing.
  Manufacturing Projects Approved (1987 – 2008)
           No. of Projects                   – 421
           Total Investment                  – RM25 Billion
           Foreign Direct Investment         – RM14 Billion
           Domestic Direct Investment        – RM10 Billion
           Workforce                         – 65,000
                                      (Source: MIDA)



                                -4-
PKNP is the ‘One Stop Agency’ in manufacturing
sector for Pahang


                                     PKNP                 LOCAL AUTHORITIES

                                                        Technical dept. commentary
                                                        Endorsement by Local authority:
            Site Location                                 a) Approval of building plans
 INVESTOR   Infrastructure Requirement                    b) Approval for commencement
                                                             of works
            Layout Buildings/Plans
                                                          c) Certificate of completions
                                                             and compliance issuance.
                                                             (CCC)

                                     MIDA
                               Applications of Manufacturing
                               Licenses & incentives




                                         -5-
Lynas operations require Licenses, Permits &
Approvals from 11 Government Departments
Companies
                                                       State
Commission            MIDA             MITI                             MPK           DOE          AELB           DOSH         Custom
                                                    Government
of Malaysia

Incorporation of
  the company


                   Manufacturing
                     License

                                   Manufacturing
                     ** MIDA         License
                     consults
                     AELB &
                       DOE                          Approve Siting


                                                                     Building and
                                                                     Development
                                   Export Permit                         Plan


                                                                                                Manufacturing                  Sales Tax
                                                                                    EIA & QRA
                                                                                                License & RIA                   License

                                   Import License                                                                 Plant &
                                                                                                                 Machinery
                                                                                                                Installation
                                                                                                                  Permit




                                                                      -6-
Lynas operation has to satisfy more than 20 types of
Approvals, Licenses and Conditions
1.    Environmental Impact Assessment approval by                11.   RMP, Medical Surveillance Plan and Transport
      DOE                                                              Management Plan approval from AELB
2.    Quantitative Risk Assessment approval by DOE               12.   Decontamination & Decommissioning Plan
3.    Public consultation for EIA is not required by DOE               approval from AELB
      . However, Lynas has voluntarily carried out               13.   Closure or Abandonment Plan approval from the
      community engagement sessions involving                          AELB and DOE
      neighbouring industries, govt agencies and the
      Malaysian Nature Society.                                  14.   Class A Milling Licence obtained for Siting &
                                                                       Construction Phases from AELB
4.    Project approval from the State Government
5.    Project review & Letter of No Objection from state         15.   Class A Milling Licence for Pre-Operation and
      technical agencies including Dept of Drainage and                Operation Phases from AELB
      Irrigation, Dept of Works, Dept of Fisheries, Dept         16.   Certificates of Fitness for all equipment &
      of Minerals and Geoscience, Dept of Occupational                 machinery from DOSH
      Safety and Health
                                                                 17.   Monthly monitoring of river water quality, ambient
6.    Approval of EMP for construction phase by DOE                    air quality, boundary noise and groundwater
7.    Approval of EMP for operations phase by DOE                      quality and reporting to DOE
8.    Approval of Onsite Emergency Response Plan by              18.   Requirement for 12 months of radiological
      DOE                                                              monitoring data and reporting to AELB
9.    Approval of Offsite Emergency Response Plan                19.   Radiation Protection Officer and Licensing
      including for Port of Kuantan by DOE                             Requirements with AELB
10.   Written Approvals for wastewater treatment plant,          20.   Notification to the Dept of Minerals and
      sewage treatment plant, waste gas treatment                      Geosciences for import of concentrate from
      system and residue storage facility from DOE and                 Australia.
      AELB



                                                           -7-
Agenda
 Topic                                      Presenter
1. Introduction                             Tuan Hj Sabri

2. Presentation by Department of            Pn Azuri Azizah
   Environment Pahang
3. Presentation by AELB                     Tuan Hj Yasin

4. Talk on Radiation Safety                 Dr Idris Besar

5. Presentation by Nuclear Malaysia         Dr Idris Besar

6. Presentation by Lynas Malaysia           Nick Curtis

7. Question and Answer                      Panel




                                      -8-
Lynas malaysia public communication july 13 2009  pknp presentation

More Related Content

Similar to Lynas malaysia public communication july 13 2009 pknp presentation

CV
CVCV
Generic slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CISGeneric slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CIS
Zhenya85
 
PROFILE
PROFILEPROFILE
Cpcl
CpclCpcl
Cpcl
CpclCpcl
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
НАЕК «Енергоатом»
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
Ukrainian Nuclear Society
 
Environmental clearance from moef
Environmental clearance from moefEnvironmental clearance from moef
Environmental clearance from moef
Property Document Verification
 
Vmc excutive summaryaug
Vmc excutive summaryaugVmc excutive summaryaug
Vmc excutive summaryaug
VietnamMining
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
Mohammad Naushad
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
George Requerme
 
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S MishraServices Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
Himanshu Shekhar Mishra
 
Annexure-2.pdf
Annexure-2.pdfAnnexure-2.pdf
Annexure-2.pdf
ParasaramSrinivas
 
Frontier Markets Fund Managers
Frontier Markets Fund ManagersFrontier Markets Fund Managers
Frontier Markets Fund Managers
Global Infrastructure Basel Foundation
 
JICA Solar Project
JICA Solar ProjectJICA Solar Project
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
Guhan Visagan
 
North American Energy May 2012 Investor Presentation
North American Energy May 2012 Investor PresentationNorth American Energy May 2012 Investor Presentation
North American Energy May 2012 Investor Presentation
Company Spotlight
 
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
ferdinand teodoro
 
Southern chemicals
Southern chemicalsSouthern chemicals
Southern chemicals
Kinshook Chaturvedi
 
Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010
UNIDO SA
 

Similar to Lynas malaysia public communication july 13 2009 pknp presentation (20)

CV
CVCV
CV
 
Generic slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CISGeneric slides: AMEC in the Middle East, Africa and CIS
Generic slides: AMEC in the Middle East, Africa and CIS
 
PROFILE
PROFILEPROFILE
PROFILE
 
Cpcl
CpclCpcl
Cpcl
 
Cpcl
CpclCpcl
Cpcl
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
Environmental clearance from moef
Environmental clearance from moefEnvironmental clearance from moef
Environmental clearance from moef
 
Vmc excutive summaryaug
Vmc excutive summaryaugVmc excutive summaryaug
Vmc excutive summaryaug
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
 
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S MishraServices Offered by Chartered Engineer | Approved Valuer H S Mishra
Services Offered by Chartered Engineer | Approved Valuer H S Mishra
 
Annexure-2.pdf
Annexure-2.pdfAnnexure-2.pdf
Annexure-2.pdf
 
Frontier Markets Fund Managers
Frontier Markets Fund ManagersFrontier Markets Fund Managers
Frontier Markets Fund Managers
 
JICA Solar Project
JICA Solar ProjectJICA Solar Project
JICA Solar Project
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
North American Energy May 2012 Investor Presentation
North American Energy May 2012 Investor PresentationNorth American Energy May 2012 Investor Presentation
North American Energy May 2012 Investor Presentation
 
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
2382-FERDINAND G. TEODORO-E&I QC SUPERVISOR.DOCX
 
Southern chemicals
Southern chemicalsSouthern chemicals
Southern chemicals
 
Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010Mthombo petro sa sesakho magadla 2010
Mthombo petro sa sesakho magadla 2010
 

More from Lynas Malaysia

Free trade? One mining firm begs to differ the australian 22 may
Free trade? One mining firm begs to differ   the australian 22 mayFree trade? One mining firm begs to differ   the australian 22 may
Free trade? One mining firm begs to differ the australian 22 may
Lynas Malaysia
 
AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...
AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...
AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...Lynas Malaysia
 
Lynas Receives Temporary Operating License from AELB
Lynas Receives Temporary Operating License from AELBLynas Receives Temporary Operating License from AELB
Lynas Receives Temporary Operating License from AELBLynas Malaysia
 
Ksu visits opposition false allegations 14 dec 2011
Ksu visits opposition false allegations 14 dec 2011Ksu visits opposition false allegations 14 dec 2011
Ksu visits opposition false allegations 14 dec 2011
Lynas Malaysia
 
Lynas Dispels Myths
Lynas Dispels Myths Lynas Dispels Myths
Lynas Dispels Myths
Lynas Malaysia
 
Lynas JV announcement
Lynas JV announcementLynas JV announcement
Lynas JV announcement
Lynas Malaysia
 
Reply letter from MP Fuziah Salleh to Nick Curtis
Reply letter from MP Fuziah Salleh to Nick CurtisReply letter from MP Fuziah Salleh to Nick Curtis
Reply letter from MP Fuziah Salleh to Nick Curtis
Lynas Malaysia
 
Lynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentation
Lynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentationLynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentation
Lynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentation
Lynas Malaysia
 
Lynas malaysia public communication july 13 2009 aelb presentation
Lynas malaysia public communication july 13 2009  aelb presentationLynas malaysia public communication july 13 2009  aelb presentation
Lynas malaysia public communication july 13 2009 aelb presentationLynas Malaysia
 
Lynas malaysia public communication july 13 2009 doe presentation
Lynas malaysia public communication july 13 2009  doe presentationLynas malaysia public communication july 13 2009  doe presentation
Lynas malaysia public communication july 13 2009 doe presentation
Lynas Malaysia
 
Lynas Concentration Plant
Lynas Concentration PlantLynas Concentration Plant
Lynas Concentration Plant
Lynas Malaysia
 
Public Briefing on Lynas Malaysia
Public Briefing on Lynas MalaysiaPublic Briefing on Lynas Malaysia
Public Briefing on Lynas Malaysia
Lynas Malaysia
 

More from Lynas Malaysia (13)

Free trade? One mining firm begs to differ the australian 22 may
Free trade? One mining firm begs to differ   the australian 22 mayFree trade? One mining firm begs to differ   the australian 22 may
Free trade? One mining firm begs to differ the australian 22 may
 
AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...
AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...
AELB mengumumkan kelulusan lesen operasi sementara untuk Loji Bahan-Bahan Maj...
 
Lynas Receives Temporary Operating License from AELB
Lynas Receives Temporary Operating License from AELBLynas Receives Temporary Operating License from AELB
Lynas Receives Temporary Operating License from AELB
 
Ksu visits opposition false allegations 14 dec 2011
Ksu visits opposition false allegations 14 dec 2011Ksu visits opposition false allegations 14 dec 2011
Ksu visits opposition false allegations 14 dec 2011
 
Lynas Dispels Myths
Lynas Dispels Myths Lynas Dispels Myths
Lynas Dispels Myths
 
Lynas JV announcement
Lynas JV announcementLynas JV announcement
Lynas JV announcement
 
Reply letter from MP Fuziah Salleh to Nick Curtis
Reply letter from MP Fuziah Salleh to Nick CurtisReply letter from MP Fuziah Salleh to Nick Curtis
Reply letter from MP Fuziah Salleh to Nick Curtis
 
Lynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentation
Lynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentationLynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentation
Lynas Malaysia Public Communication July 13 2009 - Nuclear Malaysia presentation
 
Lynas malaysia public communication july 13 2009 aelb presentation
Lynas malaysia public communication july 13 2009  aelb presentationLynas malaysia public communication july 13 2009  aelb presentation
Lynas malaysia public communication july 13 2009 aelb presentation
 
Lynas malaysia public communication july 13 2009 doe presentation
Lynas malaysia public communication july 13 2009  doe presentationLynas malaysia public communication july 13 2009  doe presentation
Lynas malaysia public communication july 13 2009 doe presentation
 
LAMP Refinery Process
LAMP Refinery ProcessLAMP Refinery Process
LAMP Refinery Process
 
Lynas Concentration Plant
Lynas Concentration PlantLynas Concentration Plant
Lynas Concentration Plant
 
Public Briefing on Lynas Malaysia
Public Briefing on Lynas MalaysiaPublic Briefing on Lynas Malaysia
Public Briefing on Lynas Malaysia
 

Lynas malaysia public communication july 13 2009 pknp presentation

  • 1.
  • 2. Agenda Topic Presenter 1. Introduction by organizer - PKNP Tuan Hj Sabri 2. Presentation by Department of Pn Azuri Azizah Environment Pahang 3. Presentation by AELB Tuan Hj Yasin 4. Radiation Safety by Nuclear Dr Idris Besar Malaysia 5. Presentation by Nuclear Malaysia Dr Idris Besar 6. Presentation by Lynas Malaysia Nick Curtis 7. Question & Answer Panel -2-
  • 3. Introduction Objectives of briefing: To clarify the role of Department of Environment (DOE), Atomic Energy Licensing Board (AELB) & Nuclear Malaysia To explain why DOE & AELB approved Lynas project To provide information and assurance on radiation safety To share information about Lynas -3-
  • 4. PKNP’s History A State Government Agency. Established in 1965 to promote economic growth and development in the State . Has been actively involved in the development of new growth centre and industrial sectors especially focus on manufacturing. Manufacturing Projects Approved (1987 – 2008) No. of Projects – 421 Total Investment – RM25 Billion Foreign Direct Investment – RM14 Billion Domestic Direct Investment – RM10 Billion Workforce – 65,000 (Source: MIDA) -4-
  • 5. PKNP is the ‘One Stop Agency’ in manufacturing sector for Pahang PKNP LOCAL AUTHORITIES Technical dept. commentary Endorsement by Local authority: Site Location a) Approval of building plans INVESTOR Infrastructure Requirement b) Approval for commencement of works Layout Buildings/Plans c) Certificate of completions and compliance issuance. (CCC) MIDA Applications of Manufacturing Licenses & incentives -5-
  • 6. Lynas operations require Licenses, Permits & Approvals from 11 Government Departments Companies State Commission MIDA MITI MPK DOE AELB DOSH Custom Government of Malaysia Incorporation of the company Manufacturing License Manufacturing ** MIDA License consults AELB & DOE Approve Siting Building and Development Export Permit Plan Manufacturing Sales Tax EIA & QRA License & RIA License Import License Plant & Machinery Installation Permit -6-
  • 7. Lynas operation has to satisfy more than 20 types of Approvals, Licenses and Conditions 1. Environmental Impact Assessment approval by 11. RMP, Medical Surveillance Plan and Transport DOE Management Plan approval from AELB 2. Quantitative Risk Assessment approval by DOE 12. Decontamination & Decommissioning Plan 3. Public consultation for EIA is not required by DOE approval from AELB . However, Lynas has voluntarily carried out 13. Closure or Abandonment Plan approval from the community engagement sessions involving AELB and DOE neighbouring industries, govt agencies and the Malaysian Nature Society. 14. Class A Milling Licence obtained for Siting & Construction Phases from AELB 4. Project approval from the State Government 5. Project review & Letter of No Objection from state 15. Class A Milling Licence for Pre-Operation and technical agencies including Dept of Drainage and Operation Phases from AELB Irrigation, Dept of Works, Dept of Fisheries, Dept 16. Certificates of Fitness for all equipment & of Minerals and Geoscience, Dept of Occupational machinery from DOSH Safety and Health 17. Monthly monitoring of river water quality, ambient 6. Approval of EMP for construction phase by DOE air quality, boundary noise and groundwater 7. Approval of EMP for operations phase by DOE quality and reporting to DOE 8. Approval of Onsite Emergency Response Plan by 18. Requirement for 12 months of radiological DOE monitoring data and reporting to AELB 9. Approval of Offsite Emergency Response Plan 19. Radiation Protection Officer and Licensing including for Port of Kuantan by DOE Requirements with AELB 10. Written Approvals for wastewater treatment plant, 20. Notification to the Dept of Minerals and sewage treatment plant, waste gas treatment Geosciences for import of concentrate from system and residue storage facility from DOE and Australia. AELB -7-
  • 8. Agenda Topic Presenter 1. Introduction Tuan Hj Sabri 2. Presentation by Department of Pn Azuri Azizah Environment Pahang 3. Presentation by AELB Tuan Hj Yasin 4. Talk on Radiation Safety Dr Idris Besar 5. Presentation by Nuclear Malaysia Dr Idris Besar 6. Presentation by Lynas Malaysia Nick Curtis 7. Question and Answer Panel -8-