Portfolio
Project Description
➔ The purpose of this project is to develop a
platform used by nonprofit organizations to
conduct fundraising campaigns.
➔ The platform is based upon event-based
fundraising. The platform allows fundraising
organizations to equip door-to-door sales
persons with a mobile app which is used both
to accept one-time contributions and to sell
products and services.
➔ It has built-in payment process, multi-tenancy,
admin panel and mobile APP for iOS and
Android.
Fan Club
Duration 2016-2018
Team size 5
Platform: Mobile
(Android&IOS)
Tools & technologies: ASP
MVC, C#, SQL, HTML, JavaScript,
CSS, AngularJs.
Keep more profit Track your sales
Huge list of sellers and ability to
set a trade between them
% ability to set for each
transaction and gaining the profit
Club’s profile contains all
transaction history and stats
Sell products
Every fan club has its product
that can be registered in system
and sold
Register your fan club and sell
its products
Project Description
➔ Work-Force Automation Platform is a
platform for organization and automation of
pieces of work. These pieces of work are
backed by different type of entities such as
forms or actions over users. Forms can be
any kind of activity that an user can do and
fill a form as an evidence.Thus the
inspection can be provided
➔ Each fulfillment of a form generates a
capture (the document filled with data of
inspector).
➔ The users can gain new knowledge passing
the Trainings, subscribing to new Programs
with Jobs
➔ The platform allows us to create specific
workflows linked to specific forms. Such
workflows will provide the lifecycle of the
related captures. A specific form data could
be captured using a different workflow, if a
workflow id is specified.
Earning
Duration 2017-2018
Team size 8
Platform: Mobile (Android)
Tools & technologies: ASP.Net Zero, MS SQL Server, C#,
WEB.API, JavaScript, jQuery, HTML, CSS, Firebase
Notifications, AWS, WFE
New knowledge is available for everyone
Learn
Pass the trainings and get
certificate
Subscribe to programs with
different activities (inspections,
social, charity) and get your
experience
Inspect
Fill the forms and submit them
for validation
Get the job and new
opportunity
LVIVITY
Project timeline
201820172015 2019
Paper inspection
replace need
searching for new
approaches
Lvivity starts to develop the platform
Platform goes in production for trade
network for inspections
Training, Job, Certification system
integration and validation
Governments and charity
organizations using our system
Water Supply regulation
Project description
➔Project API to integrate the valve with
any kind of water supply system and
makes i safe, controlled and
automated.
➔A brass lead-free ball can be
controlled directly from your device
due to our app that allows you setting
up each valve for different location in
one or as many as you want locations
(house, office and any facility that
need a water supply).
Duration 2017-2018
Team size 5
Platform: Mobile (Android and
IOS), WEB
Tools & technologies: ASP.Net
Zero, HTML, WFE, Xamarin iOS
and Android
Features
Cloud-based Web and
Mobile Apps
Integrated Water Meter
Reading AMI Endpoint
The cloud-based web and mobile apps
enable you and your team to monitor and
control water use from anywhere. Set up
real-time notifications, manage unlimited
users, export billing reports, give tenant
access, configure leak and burst event
actions, and more.
The valve integrates with many professional
water meters, both Pulse and Absolute
encoded models. Using the integrated WiFi
or LoRa transceiver, we wirelessly transmit
your meter data to the cloud throughout the
day.
Detect Leaks and
Prevent Damage
Get leak, burst, and moisture detection and
enable automatic shut off when using a
compatible water meter or wireless leak
detector. Stop water damage before it
happens, giving your properties more
damage protection than ever before.
Project Description
➔ The name iMYRA means “I Manage Your Real
Estate Activity”. The whole idea behind this
project is yo make your life easier by
combining many of the tasks you use in
several separate applications or programs
into one location – iMYRA’s capable hands.
➔ With help of iMYRA you can manage all your
processes in one place: creating contacts
with all needed information, creating Home
Evaluations, send reports for better
communication with the client, create
contracts, have access to latest real estate
news and have detailed notification process
to keep you posted about all important
things
IMYRA
Duration 2016-2018
Team size 5
Platform: Mobile (Android& IOS), WEB
Tools & technologies: ASP.NET MVC, ASP.NET MVC Zero,
Angular 5, Xamarin, C#, .NET, SQL Server
Sellers and buyers
contact list
Every user can have a massive
list of contact and can have a
communication channel with
them depending on the action
(sell, buy)
After successful negotiation with
the partner, you can sign
according to legislation and all
standarts. You can store it in
system and be sure of it’s
secure
Estimate the home
Every realtor can evaluate a
home with a help of IMYRA
forms. With 100 of parameters in
each the exact price can be
easily calculated. List defects
and show them on picture
redactor
Create and sign the contract
Project Description
➔ The aim of project is to secure token
transactions for gaming activities
➔ Review the security of the transaction and
gaming account
➔ Evaluate the risk of the transaction based of
tokens number and balance of the user,
transaction history etc
➔ Store transactions into blockchain
➔ Admin page with manual approving scheme
for risky transactions
Sgame
Duration 2018
Team size 4
Platform: Mobile (Android and
IOS), WEB
Tools & technologies: ASP
.NET, Core 2.0, Smart Contracts
(solidity). Nethereum Web3,
Ganache cli
Public API Admin
Method that allows to gather
data from user profiles and get
all recorded
Defining risk level
Smart Contracts are created and
managed.
The admin page contains all the
stats and administrative tools
TxQuery
Transaction with risk level over
limit should be manually
reviewed and Approved or
Denied. All approved
transactions go for blockchain
record (Nethereum)
Healthcare
Project Description
➔Purpose of this project was to develop a
healthcare mobile app as well as web-portal
where users will be able to track their blood
pressure, health indicators, appointments, do a
statistic of every part of measurement. Also this
application can predict some risks in health
indicators and send notification messages.
Low T
Duration 2017
Team size 3
Platform: Mobile (Android)
Tools & technologies: WEB API,
C#, .NET, Xamarin Android, AWS
Collect the indicators for
each patient
Low T Center is designed so
men can walk in, take a quick
blood test, and know whether or
not testosterone therapy is right
for them in about 20 minutes.
Register everything in the app
App indicates the deviation that
is critical and suggests the exact
time for next visit to a doctor
Detect the danger
During continuous gathering the
data about a patient the app
defines weighted average state
of body
Observe and plan visits
➔ “FIFA 18 Ultimate Trading Robot (UTR)” has
just launched. It enables you to make coins at
the click of a button, meaning you actually
require no trading knowledge. By looking at
the purchase history you can learn how to
trade manually for the first time, you’ll be able
to make coins and learn how to trade, even if
you currently know nothing about trading, by
clicking one single button.
Project Description
Find other players Get coins
On EA market players had to
sped much time before to trade
and get coins on respective
cards
Just earn them and have them
listed. That’s all
Trade player cards
Make the trade completely
automatic after setting the price
ranges and other searching
options
Project Description
➔ Lean-Case is one of the few online resources
to create your own startup projects.
➔ The website is designed to calculate the
profitability of projects.
➔ The Lean-Case system was constructed in
such a way that it takes into account all
economic indicators so that its calculations are
still accurate many years ahead.
Customized business plan Make better decisions faster
Apply our templates, models,
drivers and benchmarks to
standardize and supercharge
your business planning
Delight Investors and Partners
with the best growth scenario for
your business
Manage metrics which matter
Design business models based
on metrics which matter most.
Unlock untapped potential in
shaping and validating them.
3D tour
Project Description
➔ the project allows to do 3D tour for any
building
➔ the data for each view can be uploaded and
seen in pin format on the scheme of the shop
➔ uploading inspection data to 3D tour
➔ Saving pictures and data
3D tour
Duration 2016-2018
Team size 4
Platform: Mobile (Android & IOS), WEB
Tools & technologies: ASP.Net Zero, MS SQL Server, C#,
WEB.API, JavaScript, jQuery, HTML, CSS, Firebase
Notifications
Outside
Make the 3D map of the building
and the territory
For each view you can attach
table with information and
pictures
Inside
Pin each view to the scheme of
the building
Multiple views
Workflow Engine
Project Description
➔ WorkflowEngine.NET is a component that
adds workflow functionality to your application.
It can be fully integrated with the application,
or be implemented as a specific stand-alone
service (such as a web service).
➔ Document approval system
➔ Adding workflow to your application with
minimal changes to the code
➔ The process of challenging and / or frequent
requirement changes
➔ In case some modules or applications need to
change the documents' status
Project description
➔e-Screening is quick and easy with
eHealthTrac. Patients self screen, on an iPad
or tablet, during triage and you find out
immediately whether the patient needs a care
plan. The Provider eScreening dashboard
offers easy to read color coded results.
➔The app works in clinic conditions when a
medical worker can define with the app and
questions-answers if the patient has a problem
➔Patient cannot skip the questions
➔Result submitted synced with web-portal and
thus can be immediately evaluated
eHealth
Duration 2018
Team size 4
Platform: Mobile ( IOS), WEB
Tools & technologies: ASP.Net Zero, MS SQL Server, C#,
WEB.API, JavaScript, jQuery, HTML, CSS, Xamarin
Mental Health and Addiction Submitted and Synced
It’s not all the time visible when there is
something wrong with the patient. The app
helps to prevent lots of issues with mental
health
The screenings are synced right after submitting.
Different forms for different
mental issues
Numerous categories with different forms.
Only finished can be submitted
Project description
➔iCrypt allows you to freely send and receive
text and multimedia messages that are 100%
secure. Other text applications leave your data
open to be stolen. Let iCrypt protect what you
say!
➔With the custom pin you can set your own
passphrase that will be requested each time
you use iCrypt. Passphrase is also used to
enhance the encryption strange of the data on
the device
➔Creating group chats is a breeze with iCrypt.
Simply start a new group, add your friends and
you are instantly ready to start chatting
securely with your friends
➔Easily share your photos and location with
others with a click of a button. iCrypt has a
variety of sharing buttons to help your friends
navigate where you are, stay up to date with
your travels and more!
ICrypt
Duration 2016
Team size 2
Platform: Mobile ( IOS), WEB
Tools & technologies: IOS Native, C++, C#, .Net
Screenshot Notification
Want to know if someone saved one of your
timed based messages? With iCrypt you can
be instantly alerted if someone takes a
screenshot of your messages.
Remote Message Removal
Have you ever sent a message where
moments later you regret that you sent it?
iCrypt gives you the ability to remotely delete
your messages from other people's devices.
Instantly.
Each Message Expires!
Want to set time limit on one of the messages you
send? No problem. Just select how much time you
want to give before the message disappears and
click send. Easy as that!
Cryptocurrency wallet
Project description
➔Like a bank account it contains transactions
from one wallet to another
➔This wallet support almost all the popular
cryptocurrencies
➔This digital wallet created for receiving money
for job done and paying for trainings within
job-platform
➔The money which is stored in Coinpayments
wallet is acceptable by hundreds and
thousands of online stores for shopping
purpose.
➔Each detailed transaction displayed and
tracked
➔Free to use
Project description
➔The iComplyICO Prefacto Compliance
Protocol is the world’s first and only solution to
verify compliance on secondary trades over
blockchain. Verifying each transaction at the
protocol layer ensures that potential issuers
are flagged and addressed ‘prefacto’, before
the immutable trade occurs.
➔iComplyICO’s Prefacto Compliance Protocol is
currently available for the Ethereum blockchain
Lawyers, Accountants,
Developers, and Advisors
Whether you are a developer looking to
license your smart contract, a lawyer looking
to transform your business, or a consultant
trying to sift through potential ICOs, the
service provider directory will ensure you get a
vetted deal flow from clients who want to do
their ICO right.
iComply for Investors
Using proprietary, zero-knowledge proof
technology, iComplyID gives you portable
KYC, where you own your personal data and
have the power to see who is trying to access
your information. Manage your wallets with an
interactive dashboard and features such as lost
and stolen wallet reporting, compliance
scoring, and tax report generation
The ICO Issuer Dashboard
This powerful dashboard enables the ICO issuer
to collaborate with their own legal, compliance,
business, and financial advisors to structure their
offering, build a whitelist, and monitor compliance
during live secondary trading. We do not charge
tokens or consulting fees but rather have an
attractive SaaS pricing model.

Lvivity Product Development Portfolio

  • 1.
  • 3.
    Project Description ➔ Thepurpose of this project is to develop a platform used by nonprofit organizations to conduct fundraising campaigns. ➔ The platform is based upon event-based fundraising. The platform allows fundraising organizations to equip door-to-door sales persons with a mobile app which is used both to accept one-time contributions and to sell products and services. ➔ It has built-in payment process, multi-tenancy, admin panel and mobile APP for iOS and Android.
  • 4.
    Fan Club Duration 2016-2018 Teamsize 5 Platform: Mobile (Android&IOS) Tools & technologies: ASP MVC, C#, SQL, HTML, JavaScript, CSS, AngularJs.
  • 5.
    Keep more profitTrack your sales Huge list of sellers and ability to set a trade between them % ability to set for each transaction and gaining the profit Club’s profile contains all transaction history and stats Sell products Every fan club has its product that can be registered in system and sold Register your fan club and sell its products
  • 7.
    Project Description ➔ Work-ForceAutomation Platform is a platform for organization and automation of pieces of work. These pieces of work are backed by different type of entities such as forms or actions over users. Forms can be any kind of activity that an user can do and fill a form as an evidence.Thus the inspection can be provided ➔ Each fulfillment of a form generates a capture (the document filled with data of inspector). ➔ The users can gain new knowledge passing the Trainings, subscribing to new Programs with Jobs ➔ The platform allows us to create specific workflows linked to specific forms. Such workflows will provide the lifecycle of the related captures. A specific form data could be captured using a different workflow, if a workflow id is specified.
  • 8.
    Earning Duration 2017-2018 Team size8 Platform: Mobile (Android) Tools & technologies: ASP.Net Zero, MS SQL Server, C#, WEB.API, JavaScript, jQuery, HTML, CSS, Firebase Notifications, AWS, WFE New knowledge is available for everyone
  • 9.
    Learn Pass the trainingsand get certificate Subscribe to programs with different activities (inspections, social, charity) and get your experience Inspect Fill the forms and submit them for validation Get the job and new opportunity
  • 10.
    LVIVITY Project timeline 201820172015 2019 Paperinspection replace need searching for new approaches Lvivity starts to develop the platform Platform goes in production for trade network for inspections Training, Job, Certification system integration and validation Governments and charity organizations using our system
  • 12.
  • 13.
    Project description ➔Project APIto integrate the valve with any kind of water supply system and makes i safe, controlled and automated. ➔A brass lead-free ball can be controlled directly from your device due to our app that allows you setting up each valve for different location in one or as many as you want locations (house, office and any facility that need a water supply).
  • 14.
    Duration 2017-2018 Team size5 Platform: Mobile (Android and IOS), WEB Tools & technologies: ASP.Net Zero, HTML, WFE, Xamarin iOS and Android
  • 15.
  • 16.
    Cloud-based Web and MobileApps Integrated Water Meter Reading AMI Endpoint The cloud-based web and mobile apps enable you and your team to monitor and control water use from anywhere. Set up real-time notifications, manage unlimited users, export billing reports, give tenant access, configure leak and burst event actions, and more. The valve integrates with many professional water meters, both Pulse and Absolute encoded models. Using the integrated WiFi or LoRa transceiver, we wirelessly transmit your meter data to the cloud throughout the day. Detect Leaks and Prevent Damage Get leak, burst, and moisture detection and enable automatic shut off when using a compatible water meter or wireless leak detector. Stop water damage before it happens, giving your properties more damage protection than ever before.
  • 18.
    Project Description ➔ Thename iMYRA means “I Manage Your Real Estate Activity”. The whole idea behind this project is yo make your life easier by combining many of the tasks you use in several separate applications or programs into one location – iMYRA’s capable hands. ➔ With help of iMYRA you can manage all your processes in one place: creating contacts with all needed information, creating Home Evaluations, send reports for better communication with the client, create contracts, have access to latest real estate news and have detailed notification process to keep you posted about all important things
  • 19.
    IMYRA Duration 2016-2018 Team size5 Platform: Mobile (Android& IOS), WEB Tools & technologies: ASP.NET MVC, ASP.NET MVC Zero, Angular 5, Xamarin, C#, .NET, SQL Server
  • 20.
    Sellers and buyers contactlist Every user can have a massive list of contact and can have a communication channel with them depending on the action (sell, buy) After successful negotiation with the partner, you can sign according to legislation and all standarts. You can store it in system and be sure of it’s secure Estimate the home Every realtor can evaluate a home with a help of IMYRA forms. With 100 of parameters in each the exact price can be easily calculated. List defects and show them on picture redactor Create and sign the contract
  • 23.
    Project Description ➔ Theaim of project is to secure token transactions for gaming activities ➔ Review the security of the transaction and gaming account ➔ Evaluate the risk of the transaction based of tokens number and balance of the user, transaction history etc ➔ Store transactions into blockchain ➔ Admin page with manual approving scheme for risky transactions
  • 24.
    Sgame Duration 2018 Team size4 Platform: Mobile (Android and IOS), WEB Tools & technologies: ASP .NET, Core 2.0, Smart Contracts (solidity). Nethereum Web3, Ganache cli
  • 25.
    Public API Admin Methodthat allows to gather data from user profiles and get all recorded Defining risk level Smart Contracts are created and managed. The admin page contains all the stats and administrative tools TxQuery Transaction with risk level over limit should be manually reviewed and Approved or Denied. All approved transactions go for blockchain record (Nethereum)
  • 26.
  • 27.
    Project Description ➔Purpose ofthis project was to develop a healthcare mobile app as well as web-portal where users will be able to track their blood pressure, health indicators, appointments, do a statistic of every part of measurement. Also this application can predict some risks in health indicators and send notification messages.
  • 28.
    Low T Duration 2017 Teamsize 3 Platform: Mobile (Android) Tools & technologies: WEB API, C#, .NET, Xamarin Android, AWS
  • 29.
    Collect the indicatorsfor each patient Low T Center is designed so men can walk in, take a quick blood test, and know whether or not testosterone therapy is right for them in about 20 minutes. Register everything in the app App indicates the deviation that is critical and suggests the exact time for next visit to a doctor Detect the danger During continuous gathering the data about a patient the app defines weighted average state of body Observe and plan visits
  • 31.
    ➔ “FIFA 18Ultimate Trading Robot (UTR)” has just launched. It enables you to make coins at the click of a button, meaning you actually require no trading knowledge. By looking at the purchase history you can learn how to trade manually for the first time, you’ll be able to make coins and learn how to trade, even if you currently know nothing about trading, by clicking one single button. Project Description
  • 32.
    Find other playersGet coins On EA market players had to sped much time before to trade and get coins on respective cards Just earn them and have them listed. That’s all Trade player cards Make the trade completely automatic after setting the price ranges and other searching options
  • 35.
    Project Description ➔ Lean-Caseis one of the few online resources to create your own startup projects. ➔ The website is designed to calculate the profitability of projects. ➔ The Lean-Case system was constructed in such a way that it takes into account all economic indicators so that its calculations are still accurate many years ahead.
  • 36.
    Customized business planMake better decisions faster Apply our templates, models, drivers and benchmarks to standardize and supercharge your business planning Delight Investors and Partners with the best growth scenario for your business Manage metrics which matter Design business models based on metrics which matter most. Unlock untapped potential in shaping and validating them.
  • 38.
  • 39.
    Project Description ➔ theproject allows to do 3D tour for any building ➔ the data for each view can be uploaded and seen in pin format on the scheme of the shop ➔ uploading inspection data to 3D tour ➔ Saving pictures and data
  • 40.
    3D tour Duration 2016-2018 Teamsize 4 Platform: Mobile (Android & IOS), WEB Tools & technologies: ASP.Net Zero, MS SQL Server, C#, WEB.API, JavaScript, jQuery, HTML, CSS, Firebase Notifications
  • 41.
    Outside Make the 3Dmap of the building and the territory For each view you can attach table with information and pictures Inside Pin each view to the scheme of the building Multiple views
  • 42.
  • 43.
    Project Description ➔ WorkflowEngine.NETis a component that adds workflow functionality to your application. It can be fully integrated with the application, or be implemented as a specific stand-alone service (such as a web service). ➔ Document approval system ➔ Adding workflow to your application with minimal changes to the code ➔ The process of challenging and / or frequent requirement changes ➔ In case some modules or applications need to change the documents' status
  • 46.
    Project description ➔e-Screening isquick and easy with eHealthTrac. Patients self screen, on an iPad or tablet, during triage and you find out immediately whether the patient needs a care plan. The Provider eScreening dashboard offers easy to read color coded results. ➔The app works in clinic conditions when a medical worker can define with the app and questions-answers if the patient has a problem ➔Patient cannot skip the questions ➔Result submitted synced with web-portal and thus can be immediately evaluated
  • 47.
    eHealth Duration 2018 Team size4 Platform: Mobile ( IOS), WEB Tools & technologies: ASP.Net Zero, MS SQL Server, C#, WEB.API, JavaScript, jQuery, HTML, CSS, Xamarin
  • 48.
    Mental Health andAddiction Submitted and Synced It’s not all the time visible when there is something wrong with the patient. The app helps to prevent lots of issues with mental health The screenings are synced right after submitting. Different forms for different mental issues Numerous categories with different forms. Only finished can be submitted
  • 51.
    Project description ➔iCrypt allowsyou to freely send and receive text and multimedia messages that are 100% secure. Other text applications leave your data open to be stolen. Let iCrypt protect what you say! ➔With the custom pin you can set your own passphrase that will be requested each time you use iCrypt. Passphrase is also used to enhance the encryption strange of the data on the device ➔Creating group chats is a breeze with iCrypt. Simply start a new group, add your friends and you are instantly ready to start chatting securely with your friends ➔Easily share your photos and location with others with a click of a button. iCrypt has a variety of sharing buttons to help your friends navigate where you are, stay up to date with your travels and more!
  • 52.
    ICrypt Duration 2016 Team size2 Platform: Mobile ( IOS), WEB Tools & technologies: IOS Native, C++, C#, .Net
  • 53.
    Screenshot Notification Want toknow if someone saved one of your timed based messages? With iCrypt you can be instantly alerted if someone takes a screenshot of your messages. Remote Message Removal Have you ever sent a message where moments later you regret that you sent it? iCrypt gives you the ability to remotely delete your messages from other people's devices. Instantly. Each Message Expires! Want to set time limit on one of the messages you send? No problem. Just select how much time you want to give before the message disappears and click send. Easy as that!
  • 54.
  • 55.
    Project description ➔Like abank account it contains transactions from one wallet to another ➔This wallet support almost all the popular cryptocurrencies ➔This digital wallet created for receiving money for job done and paying for trainings within job-platform ➔The money which is stored in Coinpayments wallet is acceptable by hundreds and thousands of online stores for shopping purpose. ➔Each detailed transaction displayed and tracked ➔Free to use
  • 58.
    Project description ➔The iComplyICOPrefacto Compliance Protocol is the world’s first and only solution to verify compliance on secondary trades over blockchain. Verifying each transaction at the protocol layer ensures that potential issuers are flagged and addressed ‘prefacto’, before the immutable trade occurs. ➔iComplyICO’s Prefacto Compliance Protocol is currently available for the Ethereum blockchain
  • 59.
    Lawyers, Accountants, Developers, andAdvisors Whether you are a developer looking to license your smart contract, a lawyer looking to transform your business, or a consultant trying to sift through potential ICOs, the service provider directory will ensure you get a vetted deal flow from clients who want to do their ICO right. iComply for Investors Using proprietary, zero-knowledge proof technology, iComplyID gives you portable KYC, where you own your personal data and have the power to see who is trying to access your information. Manage your wallets with an interactive dashboard and features such as lost and stolen wallet reporting, compliance scoring, and tax report generation The ICO Issuer Dashboard This powerful dashboard enables the ICO issuer to collaborate with their own legal, compliance, business, and financial advisors to structure their offering, build a whitelist, and monitor compliance during live secondary trading. We do not charge tokens or consulting fees but rather have an attractive SaaS pricing model.