Low Latency Connectivity Service
Product Department
Copyright © 2015 CTG. All rights Reserved.
Ultra Low Latency Connectivity
Hong Kong
Shenzhen
Shanghai
Tokyo
London
Chicago
New York
Singapore
Frankfurt Moscow
Los Angeles
 CTG offers extremely low latency connectivity with various speed and enhanced reliability for
time-sensitive financial customers in order to meet their ultra-fast transactions requirement
Copyright © 2015 CTG. All rights Reserved.
Service Availability
Singapore
Beijing
London
Frankfurt
Chicago
New York
Hong Kong
Shenzhen
Hong Kong
SH - CHI
HK - NY
HK - LON
HK – SGP
SH - SGP
SH - TOK
Shanghai
Moscow
Los Angeles
TOK - CHI
HK-MOS
Shenzhen
Tokyo
TOK - NY
SH - NYHK - FRK
SH - FRK
SH - HK
SH - LON
SZ – HK HK - LA
HK - CHI
Copyright © 2015 CTG. All rights Reserved.
Round Trip Delay Table (POP-to-POP only)
Region No. Connection
Expected
Latency*
Guaranteed
Latency
China-US
1 Shanghai – Chicago 156ms 160ms
2 Shanghai – New York 173ms 177ms
3 Hong Kong – Chicago 173ms 177ms
4 Hong Kong – New York 189ms 193ms
5 Hong Kong – Los Angeles 141ms 145ms
Japan-US
6 Tokyo – Chicago 126ms 130ms
7 Tokyo – New York 142ms 146ms
China-Euro
8 Shanghai – Frankfurt 161ms 165ms
9 Shanghai – London 166ms 170ms
10 Hong Kong – Frankfurt 170ms 174ms
11 Hong Kong – London 175ms 179ms
12 Hong Kong – Moscow 133ms 137ms
Inner Asia
13 Shenzhen – Hong Kong 2ms 4ms
14 Shanghai – Hong Kong 27ms 29ms
15 Shanghai – Singapore 54ms 56ms
16 Shanghai – Tokyo 31ms 33ms
17 Hong Kong – Singapore 31ms 33ms
• Expected Latency Figures are based on SDH loopback test (Bandwidth: E1, round trip delay)
• Expected Latency Figures are only obtained from test between the selected POP in each city
Copyright © 2015 CTG. All rights Reserved.
Chicago
U.S.
China
Hillsboro
Shanghai
TPE
Primary Routing
Latency: 156ms
CLS
Chongming
Shanghai – Chicago
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Chicago
U.S.
China
Hillsboro
Shanghai
TPE
Primary Routing
Latency: 173ms
CLS
Chongming
New York
Updated: 03-APR-2015
New Route: Shanghai – New York
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
U.S.
China
Harbour
Pointe
Seattle
Hong Kong
Tokyo
SJC
PC-1
Japan
Chikura
Chicago
Primary Routing
Latency:173ms
Chung Hom Kok
Updated: 14-APR-2015
New Route: Hong Kong – Chicago
Ajigaura
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
New York
U.S.
China
Harbour
Pointe
Seattle
Hong Kong
Tokyo
SJC
PC-1
Japan
Chikura
Chicago
Primary Routing
Latency:189ms
Chung Hom Kok
Updated: 03-APR-2015
New Route: Hong Kong – New York
Ajigaura
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
New Route: Hong Kong – Los Angeles
U.S.
China
Hong Kong
Unity
Japan
Primary Routing
Latency: 141ms
Chung Hom Kok
Los Angeles
Updated: 14-APR-2015
Chikura
SJC
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
New Route: Tokyo – Chicago
Chicago
U.S.
China
Harbour Pointe
Tokyo
PC-1
Primary Routing
Latency: 126ms
Japan
CLS
Seattle
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
New Route: Tokyo – New York
Chicago
U.S.
China
Harbour Pointe
Tokyo
PC-1
Primary Routing
Latency: 142ms
Japan
CLS
Seattle
New York
Updated: 03-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Frankfurt
Primary Routing
Latency: 161ms
Beijing
Shanghai
Erenhot
Moscow
Stockholm
China
Russia
Sweden
Germany
Mongolia
Shanghai – Frankfurt (Transit-Mongolia)
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Primary Routing
Latency: 166ms
Beijing
Shanghai
Erenhot
Moscow
Stockholm
China
Russia
Sweden
London
U.K.
Mongolia
Shanghai – London (Transit-Mongolia)
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Frankfurt
Primary Routing
Latency: 170ms
Beijing
Hong Kong
Erenhot
Moscow
Stockholm
China
Russia
Sweden
Germany
Mongolia
Updated: 14-APR-2015
Hong Kong – Frankfurt (Transit-Mongolia)
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
London
Primary Routing
Latency: 175ms
Hong Kong
U.K.
Beijing
Erenhot
Moscow
Stockholm
China
Russia
Sweden
Mongolia
Updated: 14-APR-2015
Hong Kong – London (Transit-Mongolia)
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Primary Routing
Latency: 133ms
Beijing
Hong Kong
Erenhot
Moscow
China
Russia
Mongolia
Updated: 14-APR-2015
Hong Kong – Moscow (Transit-Mongolia)
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Shenzhen
Hong Kong
Island
Primary Routing
Latency: 2msNew Territories
Kowloon
Hong Kong
Shenzhen – Hong Kong (Terrestrial Cable)
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Shanghai
Jinhua
Hangzhou
Nanping
Shenzhen
Hong Kong
Guangzhou
Primary Routing
Latency:
27ms
Huzhou
Wuhu
Anqing
Jiujiang
Nanchang
Jian
Ganzhou
Shanghai – Hong Kong (Terrestrial Cable)
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
China
Shantou
APCN-2
Singapore
Primary Routing
Latency: 54ms
Shanghai
Hong Kong
Malaysia
Shanghai – Singapore
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
China
Japan
Maruyama
Chongming
Shanghai
TPE
Chikura
Kitaibaraki
Tokyo
Primary Routing
Latency: 31ms
Shanghai – Tokyo
Updated: 14-APR-2015
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
China
Shantou
Hong Kong
EAC
Singapore
Primary Routing
Latency: 31ms
Updated: 14-APR-2015
Hong Kong – Singapore (Equinix)
**Resilience options can be provided on individual case basis
Copyright © 2015 CTG. All rights Reserved.
Why CTG Low Latency Solutions
Hong Kong
Singapore
 SGX Data Center:
 SGX data center, Keppei Digi Hub, 25 Serangoon North Avenue 5,
Singapore 554914
 HKEx Data Center:
 1 Chun Ying Street, Tseung Kwan O Industrial Estate, Tseung Kwan O,
New Territories, Hong Kong
CT PoP in Same Building
CT PoP in Same Building
 CTG transmission POPs reach into Securities Exchange Data Centers or local famous Financial
Data Centers
 Financial Data Center:
 60 Hudson St., New York, NY
CT PoP in Same Building
 Financial Data Center:
 Tokyo Chuo Center 1/F E-Room, 6-2-15 Toyosu Koto-Ku, Tokyo
Japan 135-0061
Tokyo
CT PoP in Same Building
New York
*CTG is one of the Founding Members
in HKEx NG Data Centre in Tseung
Kwan O
**Extra latency will be introduced due to inner city optical fiber transmission
Copyright © 2015 CTG. All rights Reserved.
Why CTG Low Latency Solutions
 Industry-leading latency figures in the following directions
Route Latency Detail Remarks
Hong Kong – New York
189ms Via SJC+PC-1 CTG offer
198ms via TPE CTG offer
218ms via AAG Other SP offer
205ms via EAC+UNITY Other SP offer
196ms via IA+PC-1 Other SP offer
Hong Kong – Shenzhen
2ms HK to SZ directly CTG offer
8-10ms via Guangzhou Other SP offer
Shanghai – Singapore
54ms APCN2 via Shantou CTG offer
58ms via EAC Other SP offer
60ms via IA Other SP offer
62ms APCN2 via Hong Kong Other SP offer
Hong Kong – London
175ms via Mongolia terrestrial cable CTG offer
180ms via Mongolia terrestrial cable Other SP offer
Copyright © 2015 CTG. All rights Reserved.
Service Features
• Competitive SLA pledge: Strict SLA commitment, including not only latency but also MTTR, Service
Delivery Date and etc.
• Industry-leading service availability: Effective network resilience options with auto-recovery
configuration from failover-switch, achieving immediate restoration with availability 99.9% or above
• Ease of use: Low latency circuits can be provided via standard and widely available Ethernet interface
• High Service Security: Dedicated circuits provided through physical separation based on SDH/SONNET
• Scalable Bandwidth: Various bandwidth rates from 2Mbps to 10Gbps for your need without extra
equipment
• Proximity Colo with major Financial Exchanges: China Telecom Global is one of the Founding Members of
HKEx Data Centre in Hong Kong; We also deployed transmission POP within the same building of SGX data
center in Singapore
• Global One-Stop Service: Dedicated account manager, project manager and service support engineer are
assigned to you. Project progress report will be provided

Low Latency Connectivity Service

  • 1.
    Low Latency ConnectivityService Product Department
  • 2.
    Copyright © 2015CTG. All rights Reserved. Ultra Low Latency Connectivity Hong Kong Shenzhen Shanghai Tokyo London Chicago New York Singapore Frankfurt Moscow Los Angeles  CTG offers extremely low latency connectivity with various speed and enhanced reliability for time-sensitive financial customers in order to meet their ultra-fast transactions requirement
  • 3.
    Copyright © 2015CTG. All rights Reserved. Service Availability Singapore Beijing London Frankfurt Chicago New York Hong Kong Shenzhen Hong Kong SH - CHI HK - NY HK - LON HK – SGP SH - SGP SH - TOK Shanghai Moscow Los Angeles TOK - CHI HK-MOS Shenzhen Tokyo TOK - NY SH - NYHK - FRK SH - FRK SH - HK SH - LON SZ – HK HK - LA HK - CHI
  • 4.
    Copyright © 2015CTG. All rights Reserved. Round Trip Delay Table (POP-to-POP only) Region No. Connection Expected Latency* Guaranteed Latency China-US 1 Shanghai – Chicago 156ms 160ms 2 Shanghai – New York 173ms 177ms 3 Hong Kong – Chicago 173ms 177ms 4 Hong Kong – New York 189ms 193ms 5 Hong Kong – Los Angeles 141ms 145ms Japan-US 6 Tokyo – Chicago 126ms 130ms 7 Tokyo – New York 142ms 146ms China-Euro 8 Shanghai – Frankfurt 161ms 165ms 9 Shanghai – London 166ms 170ms 10 Hong Kong – Frankfurt 170ms 174ms 11 Hong Kong – London 175ms 179ms 12 Hong Kong – Moscow 133ms 137ms Inner Asia 13 Shenzhen – Hong Kong 2ms 4ms 14 Shanghai – Hong Kong 27ms 29ms 15 Shanghai – Singapore 54ms 56ms 16 Shanghai – Tokyo 31ms 33ms 17 Hong Kong – Singapore 31ms 33ms • Expected Latency Figures are based on SDH loopback test (Bandwidth: E1, round trip delay) • Expected Latency Figures are only obtained from test between the selected POP in each city
  • 5.
    Copyright © 2015CTG. All rights Reserved. Chicago U.S. China Hillsboro Shanghai TPE Primary Routing Latency: 156ms CLS Chongming Shanghai – Chicago Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 6.
    Copyright © 2015CTG. All rights Reserved. Chicago U.S. China Hillsboro Shanghai TPE Primary Routing Latency: 173ms CLS Chongming New York Updated: 03-APR-2015 New Route: Shanghai – New York **Resilience options can be provided on individual case basis
  • 7.
    Copyright © 2015CTG. All rights Reserved. U.S. China Harbour Pointe Seattle Hong Kong Tokyo SJC PC-1 Japan Chikura Chicago Primary Routing Latency:173ms Chung Hom Kok Updated: 14-APR-2015 New Route: Hong Kong – Chicago Ajigaura **Resilience options can be provided on individual case basis
  • 8.
    Copyright © 2015CTG. All rights Reserved. New York U.S. China Harbour Pointe Seattle Hong Kong Tokyo SJC PC-1 Japan Chikura Chicago Primary Routing Latency:189ms Chung Hom Kok Updated: 03-APR-2015 New Route: Hong Kong – New York Ajigaura **Resilience options can be provided on individual case basis
  • 9.
    Copyright © 2015CTG. All rights Reserved. New Route: Hong Kong – Los Angeles U.S. China Hong Kong Unity Japan Primary Routing Latency: 141ms Chung Hom Kok Los Angeles Updated: 14-APR-2015 Chikura SJC **Resilience options can be provided on individual case basis
  • 10.
    Copyright © 2015CTG. All rights Reserved. New Route: Tokyo – Chicago Chicago U.S. China Harbour Pointe Tokyo PC-1 Primary Routing Latency: 126ms Japan CLS Seattle Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 11.
    Copyright © 2015CTG. All rights Reserved. New Route: Tokyo – New York Chicago U.S. China Harbour Pointe Tokyo PC-1 Primary Routing Latency: 142ms Japan CLS Seattle New York Updated: 03-APR-2015 **Resilience options can be provided on individual case basis
  • 12.
    Copyright © 2015CTG. All rights Reserved. Frankfurt Primary Routing Latency: 161ms Beijing Shanghai Erenhot Moscow Stockholm China Russia Sweden Germany Mongolia Shanghai – Frankfurt (Transit-Mongolia) Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 13.
    Copyright © 2015CTG. All rights Reserved. Primary Routing Latency: 166ms Beijing Shanghai Erenhot Moscow Stockholm China Russia Sweden London U.K. Mongolia Shanghai – London (Transit-Mongolia) Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 14.
    Copyright © 2015CTG. All rights Reserved. Frankfurt Primary Routing Latency: 170ms Beijing Hong Kong Erenhot Moscow Stockholm China Russia Sweden Germany Mongolia Updated: 14-APR-2015 Hong Kong – Frankfurt (Transit-Mongolia) **Resilience options can be provided on individual case basis
  • 15.
    Copyright © 2015CTG. All rights Reserved. London Primary Routing Latency: 175ms Hong Kong U.K. Beijing Erenhot Moscow Stockholm China Russia Sweden Mongolia Updated: 14-APR-2015 Hong Kong – London (Transit-Mongolia) **Resilience options can be provided on individual case basis
  • 16.
    Copyright © 2015CTG. All rights Reserved. Primary Routing Latency: 133ms Beijing Hong Kong Erenhot Moscow China Russia Mongolia Updated: 14-APR-2015 Hong Kong – Moscow (Transit-Mongolia) **Resilience options can be provided on individual case basis
  • 17.
    Copyright © 2015CTG. All rights Reserved. Shenzhen Hong Kong Island Primary Routing Latency: 2msNew Territories Kowloon Hong Kong Shenzhen – Hong Kong (Terrestrial Cable) Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 18.
    Copyright © 2015CTG. All rights Reserved. Shanghai Jinhua Hangzhou Nanping Shenzhen Hong Kong Guangzhou Primary Routing Latency: 27ms Huzhou Wuhu Anqing Jiujiang Nanchang Jian Ganzhou Shanghai – Hong Kong (Terrestrial Cable) Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 19.
    Copyright © 2015CTG. All rights Reserved. China Shantou APCN-2 Singapore Primary Routing Latency: 54ms Shanghai Hong Kong Malaysia Shanghai – Singapore Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 20.
    Copyright © 2015CTG. All rights Reserved. China Japan Maruyama Chongming Shanghai TPE Chikura Kitaibaraki Tokyo Primary Routing Latency: 31ms Shanghai – Tokyo Updated: 14-APR-2015 **Resilience options can be provided on individual case basis
  • 21.
    Copyright © 2015CTG. All rights Reserved. China Shantou Hong Kong EAC Singapore Primary Routing Latency: 31ms Updated: 14-APR-2015 Hong Kong – Singapore (Equinix) **Resilience options can be provided on individual case basis
  • 22.
    Copyright © 2015CTG. All rights Reserved. Why CTG Low Latency Solutions Hong Kong Singapore  SGX Data Center:  SGX data center, Keppei Digi Hub, 25 Serangoon North Avenue 5, Singapore 554914  HKEx Data Center:  1 Chun Ying Street, Tseung Kwan O Industrial Estate, Tseung Kwan O, New Territories, Hong Kong CT PoP in Same Building CT PoP in Same Building  CTG transmission POPs reach into Securities Exchange Data Centers or local famous Financial Data Centers  Financial Data Center:  60 Hudson St., New York, NY CT PoP in Same Building  Financial Data Center:  Tokyo Chuo Center 1/F E-Room, 6-2-15 Toyosu Koto-Ku, Tokyo Japan 135-0061 Tokyo CT PoP in Same Building New York *CTG is one of the Founding Members in HKEx NG Data Centre in Tseung Kwan O **Extra latency will be introduced due to inner city optical fiber transmission
  • 23.
    Copyright © 2015CTG. All rights Reserved. Why CTG Low Latency Solutions  Industry-leading latency figures in the following directions Route Latency Detail Remarks Hong Kong – New York 189ms Via SJC+PC-1 CTG offer 198ms via TPE CTG offer 218ms via AAG Other SP offer 205ms via EAC+UNITY Other SP offer 196ms via IA+PC-1 Other SP offer Hong Kong – Shenzhen 2ms HK to SZ directly CTG offer 8-10ms via Guangzhou Other SP offer Shanghai – Singapore 54ms APCN2 via Shantou CTG offer 58ms via EAC Other SP offer 60ms via IA Other SP offer 62ms APCN2 via Hong Kong Other SP offer Hong Kong – London 175ms via Mongolia terrestrial cable CTG offer 180ms via Mongolia terrestrial cable Other SP offer
  • 24.
    Copyright © 2015CTG. All rights Reserved. Service Features • Competitive SLA pledge: Strict SLA commitment, including not only latency but also MTTR, Service Delivery Date and etc. • Industry-leading service availability: Effective network resilience options with auto-recovery configuration from failover-switch, achieving immediate restoration with availability 99.9% or above • Ease of use: Low latency circuits can be provided via standard and widely available Ethernet interface • High Service Security: Dedicated circuits provided through physical separation based on SDH/SONNET • Scalable Bandwidth: Various bandwidth rates from 2Mbps to 10Gbps for your need without extra equipment • Proximity Colo with major Financial Exchanges: China Telecom Global is one of the Founding Members of HKEx Data Centre in Hong Kong; We also deployed transmission POP within the same building of SGX data center in Singapore • Global One-Stop Service: Dedicated account manager, project manager and service support engineer are assigned to you. Project progress report will be provided