A short summary of existing repetitive project scheduling techniques reviewing how they tackle, model, and solve repetitive scheduling problems in construction projects by considering the following: 1. What method or tool is used? (graphical method, linear programming, simulation, object-oriented programming, dynamic programming? 2. Can it model non-typical activities? 3. Can it model non-repetitive activities? 4. Can it maintain continuity in resource utilization or eliminate idle time? 5. Can it model or introduce interruption in workflow or schedule work break in advance? 6. Can it model soft logic among repetitive units?