LINDINGER
INSPECTION SERVICES PVT. LTD. An ISO 17020 accredited company.
Introduction
We take pleasure to introduce ourselves as an international independent inspection, testing and certification
company. The core activity of LISPL is inspection, monitoring of trade and shipments, testing and certification
of raw materials, agricultural products, processed food and beverages like tea and coffee, metals and
minerals, organic and inorganic chemicals, petroleum, petro-chemicals, fertilizers, dyes and intermediates,
drugs and pharmaceuticals, engineering goods, consumer goods, industrial equipment, food and dairy
products, vegetable oils and fatty acids, waters, environmental assessment, and a legitimate trade facilitator
etc.
History
Lindinger Inspection Companies was founded in 1956 by Mr. Joseph L Lindinger, who was focusing on
Transparent & trust worthy inspection services to various clients.
In 2009, LISPL was founded in India and the company’s head quarters was started off in Kochi, Kerala.
Services
1. Industrial Services
We have a comprehensive list of services to help manufacturing processes run smoothly, right from fabricating
components to finished products for consumers. we have services such as material testing, product
certification, metallurgy and process design, in-plant and operational support, quality control, and
management systems certification. Our experts are apt at helping you build a better, stronger, more
competitive and profitable business.
Engineering Inspection:
Vendor Assessment / Pre-qualification / Shop Survey
Assessment:
To check & report vendor's capacity and capability for delivering the ordered goods within the given time
frame, based on the actual survey of his works, verification of technical capabilities & commercial
documents.
Pre-qualification / Shop Survey:
To check & report vendor's compliance to requirements for the stipulated by the order placing organization.
Procurements of Plant Machinery & Equipment :
Document verification
Testing & checking of equipment
Witnessing of performance tests
Completeness check
Inspection of packing and marking
Container stuffing & sealing supervision
On site Project Monitoring :
Construction supervision
Expediting & progress reporting
Witnessing of commissioning of equipments
Process pipeline inspection on destructive testing (Vessels, heat
exchangers, Trayed reactors, Valves, Structural fabrication,
Fired boilers & Furnaces, Shop fabricated piping, Drilling
equipment, etc.)
On site QA /QC :
Stage wise & final inspection of equipments, structures
manufactured at site performance test witness, hydro/pneumatic
pressure test witness, laboratory test witness
Completeness check (Switchgear, Electric motors, Transformers,
Generators, Motor Control Centers, DCS systems, etc.)
Project Expediting :
Independent follow ups & periodic to meet the target reporting
on progress of the project.
2. Oil & Gas
We provide a non-destructive condition assessment and pipeline inspection program which helps to extend
the useful life of oil and gas pipelines.
Our Services include :
Crude oil and Petroleum products tankers
Seagoing barges
Offshore Lightering Services
Inland and river barges
Land, Shore tank, Terminal Storage Centers
ISO containers
Petroleum pipelines
Tank cars
Petroleum refineries
Chemical plants
Refining and Distribution
Marine & Cargo Surveys :
On/Off hire survey
Draft and deadweight survey
Break bulk survey
Cargo measurement
Inspection of sampling of cargoes prior shipments
Inspection of sampling of cargoes prior to discharge and during
course of discharge
Investigation into marine casualties
Survey under general average
P&I investigation
Quantity & Quality inspection - pre-shipment, during discharge,
post discharge
Liquid Cargo :
Crude, Petroleum & Petrochemicals, LPG/LNG,
Lubes, Ammonia, Phosphoric acid, all types of edible oils,
molasses - Quantity / Quality inspections
Inspection and sampling of shore tanks & vessel tanks prior
loading / discharge
Witnessing and analysis of cargoes prior shipment
Continuous attendance during operations
Containers :
Dry Certification for cargo/seaworthiness
On/Off hire/ direct interchange
Inspection for light and water tightness
Inspection- Pre/Post repairs as per IICL standards
Superintendence during stuffing/de-stuffing and storage inspection
Seal inspection prior discharge/post loading
Seal inspection during discharge/ loading at ship's side
Preparation of documents, bay plan
Inspection for chocking/bracing/cargo securing arrangement
Tank Callibaration Reefer :
Pre-trip inspection
Pre-shipment inspection of reefer cargo
Superintendence during stuffing/ de-stuffing
Preparation of E.I.R. upon loading on board
3. Power & Energy
We offer assessment, verification, inspection and audits in this sector with support of testing and training of
staff, LISPL Services can ensure your power plants are built and operated in a safe, dependable and sustainable
fashion. We help achieve such goals in major energy sectors, power generation, solar, biofuels, and wind. With
skills and know-how in fossil fuel and renewable energy development, LISPL will partner with you from the
design stage to implementation and beyond, providing expert consulting and professional services to mitigate
risk, shorter lead time to market and a competitive edge with a comprehensive suite of testing, inspection and
certification programs.
Our Services include :
Conventional power plant design and planning auditing and
inspection services
Conventional power plant EPC auditing and inspection services
Conventional power plant component auditing and inspection
services
Auditing and inspection services for conventional power plant
owners and operators Inspection in nuclear facilities and
research laboratories
Biomass auditing and inspection services
Geothermal energy auditing and inspection services,
Hydropower auditing and inspection services
Solar Power - Photovoltaics (PV) auditing and inspection services,
Solar power - Solar thermal auditing and inspection services,
Wind power auditing and inspection services
Monitor waveform during power interruption
Monitor KWH and check load balance of the system
Check performance and safety of UPS and electrical installation
in buildings
Check the response time of UPS systems in the event of power
failure
Check overheating of components in the electrical power system
Check operation of protection relays
Fault diagnosis of protection relays on-site and in-house
Check the protection performance of protection relays
4. Agriculture and Food Inspection
We reduce business risks with various solutions for every aspect of your agricultural and food supply chains by
safeguarding your interests from a primary production point to the point of processing or custody transfer. We
have expertise to ensure correct storage, shipping, packing and distribution of commodities, food ingredients
and food products, ensuring quality and safety throughout the diverse supply chains. We provide inspection of
high commercial value agricultural cargo shipments, along with quality control, field inventory confirmation
and many other related services, thus protecting the value of bulk cargo agricultural commodity products. One
of the strengths of our approach is that we offer a truly global service while still being able to meet local
needs.
Pre-shipment Inspection :
Pre-shipment inspection of agro products, oils, engineering &
manufactured goods, mineral & ores including volume,
weight and quality as per specifications.
Certificate of origin.
Pre-shipment inspection of refrigerated cargoes.
Grain lightening operations
Cargo out-turn supervision of discharge and delivery of cargo,
claim control services.
Supervision of carting and loading of cargo.
Pre-shipment inspection or PSI, is an important and reliable
quality control method for checking goods' quality while
clients buy from the suppliers.
Agricultural Product Cargo and Inventory Inspection :
Cargo Certification and Inspection.
Cargo Sampling and Testing.
Cargo Weight and Quality Verification.
Loss Control, Investigation, Calibration.
5. Consumer Products
With experienced, professional and skilled inspectors; we are able to do the inspection services on all types of
consumer goods. We understand regulations and standards for every product. Usually visual inspection is
performed at the products’ storage place. The main target of inspection is checking quantity, visual quality and
packing of products according to shipping documentation and Customer’s specification. Our inspection services
helps to highlight defects as early as possible, so that businesses can make changes where necessary and avoid
the cost of disruptions in the production or supply of products.
We offer world class experience, expertise and the latest technologies. As a result, we provide the highest
standards of quality and integrity. Laboratory analysis can be carried out as per Customer’s request.
By adopting our inspection services, you will :
Forecast the delivery date
Reduce your risk of receiving inferior or defective goods
Save traveling and labour cost
Our Services include :
Pre-shipment Inspection
During production inspection, packing and marking samples for laboratory analysis and sealing
Loading Supervision
Pre-production Inspection Advisory & other specific services on request
Factory Audit
6. Chemical / Mineral inspection
Surveying mineral and chemical industries
Draft survey
Sampling of all types of bulk cargoes
Surveying of all types of bulk cargoes
Surveying silver foam materials including iron ore, magnesia
Surveying raw chemicals
Surveying the poisons
Damage survey
Supervision on loading and discharging the ship and container
Surveying the ship warehouse and container before loading
Quantitative surveys, supervision on weighting by scale
Sample preparation for analysis and testing for determining
the elements
Reviewing the purchasing agreement and supervising
Reviewing the export products such as tar and sulfur
percentage as requested
7. Laboratory Testing
Our range of laboratory testing services include food testing, heavy metal test, microbiological testing and
many more. We have high quality testing equipments through which we ensure the quality of the products.
The methods adopted are of International standards. The main objective is to provide the most efficient cost
effective approach to problem solving in the concerned areas.
Our strategy focuses on the following key growth activities :
Qualified and experienced human resources
Wide range of sophisticated instrumentation
Precise, accurate and prompt results
8. Training and Development
We offer training and development Services to ensure that you get fit for the challenges of the job. At LISPL,
we offer tailored programs and services for vocational training, on-the-job training, qualification of job seekers,
and personnel management. With varied seminars, courses, and conferences and more than qualified
speakers, you will find the right solution for your training needs.
Major projects
by LISPL
Sr.No. Client Supplier Scope Material Description
1 Mahalaxmi International Mahalaxmi International Final Inspection of Flanges Flanges (Pipe Fittings)
2 Ion Exchange India Ltd. Delta Techno cast Pvt. Ltd., Rajkot
Witnessing of poring & final
inspection
Disc Castings
3 Sterling Quality Services, UK The Punjab Steel Works, India
Review of tube drawing &
final inspection
Regeneration Heater
4 M/s.FCB – KCP Ltd., Chennai M/s.FCB – KCP Ltd., Chennai
Design review & Drawing
approval, Stage and Final
inspection
Water Tube Boilers
5
Deepak Fertilisers & Petro
Chemicals Corporation Ltd
Deepak Fertilisers & Petro
Chemicals Corporation Ltd, Mumbai
(Ammonia Plant Shutdown)
Supervising, Witnessing &
Overseeing NDT Inspection,
Hydro Testing, Painting, &
Radiography.
Heat Exchangers, Boilers, Piping,
Pressure vessels, Structurals,
Control Panels, Transformers,
Actuators etc.
6 Asiatic Oxygen Ltd, Asiatic Oxygen Ltd, Mumbai
Design review & Drawing
approval, Stage and Final
inspection
Liquid Nitrogen Storage Tank
7 HAMON D'HONDT S.A Prakash Steelage Ltd, Gujrat
Review of tube drawing
& final inspection
Duplex Tubes
Sr.No. Client Supplier Scope Material Description
8
Deepak Fertilisers &
Petro Chemicals
Corporation Ltd
Deepak Fertilisers & Petro
Chemicals Corporation Ltd,
Mumbai (Methanol Plant
Shutdown)
Supervising, Witnessing & Overseeing
NDT Inspection, Hydro Testing,
Painting, & Radiography.
Heat Exchangers, Boilers, Piping,
Pressure vessels, Structurals, Control
Panels, Transformers, Actuators etc.
9
Gannon Dunkerley & Co
Ltd
Gannon Dunkerley & Co Ltd
for Reliance Petroleum Ltd
site, Jamnagar
Stage wise & Final Inspection
Heat Exchangers, Boilers, Piping,
Pressure vessels, Structurals, Control
Panels, Transformers, Actuators etc.
10 Tirumalai Chemicals Tirumalai Chemicals
Design review & Drawing approval,
Stage and Final inspection
Pressure Vessels
11 HAMON D'HONDT S.A
Heavy Metals & Tubes Ltd,
Gujrat
Raw material Inspection, tube drawing
witnessing, hydro test, &
Packing Inspection
Carbon Steel Seamless Tubes
(Fully Killed)
12
Ion Exchange India Ltd,
Dubai Project
Shop Floor Ion Exchnage,
Mumbai
Design review & Drawing approval,
Stage and Final inspection
Mechanical Equipments
13
Ion Exchange India Ltd,
Dubai Project
Flowserve India Controls Pvt
Ltd
Witnessing Disc Poring & Casting
Inspection
Butterfly Valve Disc
14
Ion Exchange India
Ltd/Nadhira Enterprises
Delvalve
Witnessing Disc Poring & Casting
Inspection
Valves
Sr.No. Client Supplier Scope Material Description
15
Gulf Piping Company W.L.
L
Gulf Piping Company W.L. L
Piping Inspection (welding &
coating)
Cross country pipeline
16
Gulf Piping Company W.L.
L
Gulf Piping Company W.L. L Welding & Coating Inspection 38" Dia * 300 kms
17 Tecnimont S.p.A Tecnimont S.p.A Welding & Coating Inspection 26" Dia * 856kms
18 Essar Oil Ltd
Essar Oil Refinery Project Site,
Vadinar
TPI services for Inspection &
Supervision of Refurbishment
Activities
Heat Exchangers, Boilers, Piping,
Pressure vessels, Structurals, Control
Panels, Transformers, Actuators etc.
19 DAELIM Saudi Arabia Co Inox India Ltd, Gujrat.
Stage & Final Inspection
(Welding & Coating)
Nitrogen Storage Vessel
20 LANCO Infrastructure Co
LANCO Infrastructure Co for
Udupi Project
Painting/Coating Inspection Misc Structural Items(5Lacks sqmtr)
21
Sterling Quality Services,
UK
Southern Lubrication Ltd, India
Final inspection of Lubricating
Equipments & performance
test.
Oil Lubricat System
Sr.No. Client Supplier Scope Material Description
22
S. Subrahmanyan Construction Co
Pvt. Ltd
S. Subrahmanyan Construction
Co Pvt. Ltd
Inspection of Stainless Steel
Trays
Steel Tiles
23 DAELIM Saudi Arabia Co Prakash Steelage Ltd
Raw material Inspection,
witnessing hydro test, &
Packing Inspection
Seamless Tubes
24 Petrofac International LLC, Dubai
Turkmengas (South Yoloten Gas
Field Development Project,
Turkmenistan)
Stage & Final Inspection
(Transformers)
Oil Immersed Distribution
Transformers
25 DAELIM Saudi Arabia Co Ampo Valves India, Ltd
Corrossion monitoring &
Calibration of Pressure safety
valves.
Valves
26 Petrofac International LLC, Dubai
ADCO (ASAB Full Field
Development Project)
Painting/Coating Inspection Seamless Line Pipe
27 HAMON D'HONDT S.A Chandan Steel Ltd, India
Raw material Inspection, tube
drawing witnessing, hydro
test, & Packing Inspection
Seamless Tubes
LISPL Manpower
LISPL is having a knowledgeable office staff with proven and trusted inspection backgrounds.
Having a comprehensive understanding of industry specifications, client requirements and
inspection responsibility, LISPL staff works proficiently and have been able to provide the highest
quality of inspection services to the various industries.
We have 148 number of qualified engineers in which there are 111 Mechanical engineers with
DME, BEME, B Tech, CSWIP, B GAS 2, NDT level 2, ASNT degrees. There are 26 Electrical
engineers having D. EEE degree and there are 11 Civil engineers having DCE degree.
LISPL India
operations
Coimbatore
Vishakhapatnam
Indore
Jabalpur
Delhi
LINDINGER GLOBAL
LINDINGER INSPECTION ENGINEERS, INC.
Through time-tested experience, the LINDINGER INSPECTION COMPANIES have been able to provide the highest quality of
inspection services to various Clients throughout the Gulf Coast region of the United States. Lindinger has headquarters in
Houston, Texas, and affiliate offices in Asia, Europe, Italy, Mexico, and South Africa.
Knowledgeable Lindinger staff have proven and trusted inspection backgrounds with a comprehensive understanding of industry
specifications and Client requirements.
LINDINGER INSPECTION SERVICES (MIDDLE EAST)
LINDINGER INSPECTION SERVICES’ office is centrally located in Dubai, United
Arab Emirates. Inspection coverage areas include India, Oman, Qatar, Saudi Arabia, and UAE.
Lindinger provides Quality Third Party Inspection and Consulting services to Clients in the
Middle East for Industrial, Chemical, Petrochemical, Fertilizer, & Infrastructure projects.
Lindinger Inspection Services was awarded its ISO 9001:2000 accreditation through ANAB.
LINDINGER INSPECTION SERVICES U.K.
With a combination of technical expertise and an unusually high level of service, LINDINGER INSPECTION SERVICES UK has
established its position as an inspection and expediting company with a difference. LINDINGER UK maintains a team of highly
qualified inspectors and expeditors with experience in all the major industry sectors. In areas where combinations of language,
culture and local legislation are unhelpful, LINDINGER UK has a network of carefully selected associate companies, working to our
extremely high standards.
AFFILIATIONS
National Associate of Corrosion Engineers (NACE)
American Welding Society (AWS)
American Petroleum Institute (API)
American Inspection Society (AIS)
Association of Plant Inspection Professionals (APIP)
APIP Texas Training Consortium (ATTC)
SERVICES
Mechanical Equipment, Rotating Equipment, Electrical Equipment, Protective Coatings, Packaged Equipment
Clients
Current Projects
Telecom Operations in Maharashtra, Gujarat and Kerala circles.
Currently operations in progress in telecom sector, engineering sector and commodities sector.
65%5%
30%
Telecom – 65%
Engineering – 5%
Commodities – 30%
Project in pipeline
We are on board with Indian Oil Corporation Ltd. For the inspection required in Instrumented Pig technology.
Instrumented Pigs (IPIG) are the devices which are used for inline inspection of long distance buried pipelines.
Inline inspection helps in monitoring the good health of pipelines and also their increased residual life. Indian
Oil R & D, in association with BARC, Mumbai have developed 12”, 14” and 24” sizes of IPIG and caliper pig
(CPIG).
Plans have been made to develop tools for inspection of all sizes of liquid and gas pipelines.
Why LISPL?
Lindinger offers valued customers a truly independent service with emphasis on quick response, attention to
detail and competent execution adding value to customer needs and maintaining a good and long lasting
business relationship.
LISPL is a NABCB accredited organization. ( ISO 17020, “ requirements for the operation of various types of
bodies performing inspection”)
Our system works on a transparency and business ethics.
We have a strong base of quality management system through which we audit our auditors at site. (field
audit, means audit on auditors.)
Key People
Mr. Sanjiv Sanghavi
Founder Director
He has a vast knowledge in all types of inspection techniques. He is a professional in management.
He has an in-depth knowledge in engineering, finance and general administration.
Mr. Suresh S.
M.D. of LISPL, presently he heads the headquarters of LISPL at Kochi, Kerala.
He has an experience of more than 30 years in all the field of inspection and certification- specialized in
agricultural, minerals, industrial, consumer goods, petroleum-petro chemicals, chemicals, quality management
systems, laboratory testing.
He has in-depth expertise in fraud investigation, a trainer of business ethics and a proven team leader.
Certification
Vision
Our vision is to reach out to every part in India and expand our services to various industrial segments, using
our standards and become the most trusted name and a brand in quality and inspection.
Mission
Committed to stringent quality measures and standard, LISPL processes and services are maintained to the
internationally accepted standards, with absolute business ethics.
LISPL adopts a focus approach to all assignments and maintains unbiased professionalism through high
integrity, dedication and strict confidentiality.
Thank you

Lindinger Inspection Services Pvt. Ltd Company Profile

  • 1.
    LINDINGER INSPECTION SERVICES PVT.LTD. An ISO 17020 accredited company.
  • 2.
    Introduction We take pleasureto introduce ourselves as an international independent inspection, testing and certification company. The core activity of LISPL is inspection, monitoring of trade and shipments, testing and certification of raw materials, agricultural products, processed food and beverages like tea and coffee, metals and minerals, organic and inorganic chemicals, petroleum, petro-chemicals, fertilizers, dyes and intermediates, drugs and pharmaceuticals, engineering goods, consumer goods, industrial equipment, food and dairy products, vegetable oils and fatty acids, waters, environmental assessment, and a legitimate trade facilitator etc. History Lindinger Inspection Companies was founded in 1956 by Mr. Joseph L Lindinger, who was focusing on Transparent & trust worthy inspection services to various clients. In 2009, LISPL was founded in India and the company’s head quarters was started off in Kochi, Kerala.
  • 3.
    Services 1. Industrial Services Wehave a comprehensive list of services to help manufacturing processes run smoothly, right from fabricating components to finished products for consumers. we have services such as material testing, product certification, metallurgy and process design, in-plant and operational support, quality control, and management systems certification. Our experts are apt at helping you build a better, stronger, more competitive and profitable business. Engineering Inspection: Vendor Assessment / Pre-qualification / Shop Survey Assessment: To check & report vendor's capacity and capability for delivering the ordered goods within the given time frame, based on the actual survey of his works, verification of technical capabilities & commercial documents. Pre-qualification / Shop Survey: To check & report vendor's compliance to requirements for the stipulated by the order placing organization.
  • 4.
    Procurements of PlantMachinery & Equipment : Document verification Testing & checking of equipment Witnessing of performance tests Completeness check Inspection of packing and marking Container stuffing & sealing supervision On site Project Monitoring : Construction supervision Expediting & progress reporting Witnessing of commissioning of equipments Process pipeline inspection on destructive testing (Vessels, heat exchangers, Trayed reactors, Valves, Structural fabrication, Fired boilers & Furnaces, Shop fabricated piping, Drilling equipment, etc.) On site QA /QC : Stage wise & final inspection of equipments, structures manufactured at site performance test witness, hydro/pneumatic pressure test witness, laboratory test witness Completeness check (Switchgear, Electric motors, Transformers, Generators, Motor Control Centers, DCS systems, etc.) Project Expediting : Independent follow ups & periodic to meet the target reporting on progress of the project.
  • 5.
    2. Oil &Gas We provide a non-destructive condition assessment and pipeline inspection program which helps to extend the useful life of oil and gas pipelines. Our Services include : Crude oil and Petroleum products tankers Seagoing barges Offshore Lightering Services Inland and river barges Land, Shore tank, Terminal Storage Centers ISO containers Petroleum pipelines Tank cars Petroleum refineries Chemical plants Refining and Distribution
  • 6.
    Marine & CargoSurveys : On/Off hire survey Draft and deadweight survey Break bulk survey Cargo measurement Inspection of sampling of cargoes prior shipments Inspection of sampling of cargoes prior to discharge and during course of discharge Investigation into marine casualties Survey under general average P&I investigation Quantity & Quality inspection - pre-shipment, during discharge, post discharge Liquid Cargo : Crude, Petroleum & Petrochemicals, LPG/LNG, Lubes, Ammonia, Phosphoric acid, all types of edible oils, molasses - Quantity / Quality inspections Inspection and sampling of shore tanks & vessel tanks prior loading / discharge Witnessing and analysis of cargoes prior shipment Continuous attendance during operations
  • 7.
    Containers : Dry Certificationfor cargo/seaworthiness On/Off hire/ direct interchange Inspection for light and water tightness Inspection- Pre/Post repairs as per IICL standards Superintendence during stuffing/de-stuffing and storage inspection Seal inspection prior discharge/post loading Seal inspection during discharge/ loading at ship's side Preparation of documents, bay plan Inspection for chocking/bracing/cargo securing arrangement Tank Callibaration Reefer : Pre-trip inspection Pre-shipment inspection of reefer cargo Superintendence during stuffing/ de-stuffing Preparation of E.I.R. upon loading on board
  • 8.
    3. Power &Energy We offer assessment, verification, inspection and audits in this sector with support of testing and training of staff, LISPL Services can ensure your power plants are built and operated in a safe, dependable and sustainable fashion. We help achieve such goals in major energy sectors, power generation, solar, biofuels, and wind. With skills and know-how in fossil fuel and renewable energy development, LISPL will partner with you from the design stage to implementation and beyond, providing expert consulting and professional services to mitigate risk, shorter lead time to market and a competitive edge with a comprehensive suite of testing, inspection and certification programs.
  • 9.
    Our Services include: Conventional power plant design and planning auditing and inspection services Conventional power plant EPC auditing and inspection services Conventional power plant component auditing and inspection services Auditing and inspection services for conventional power plant owners and operators Inspection in nuclear facilities and research laboratories Biomass auditing and inspection services Geothermal energy auditing and inspection services, Hydropower auditing and inspection services Solar Power - Photovoltaics (PV) auditing and inspection services, Solar power - Solar thermal auditing and inspection services, Wind power auditing and inspection services Monitor waveform during power interruption Monitor KWH and check load balance of the system Check performance and safety of UPS and electrical installation in buildings Check the response time of UPS systems in the event of power failure Check overheating of components in the electrical power system Check operation of protection relays Fault diagnosis of protection relays on-site and in-house Check the protection performance of protection relays
  • 10.
    4. Agriculture andFood Inspection We reduce business risks with various solutions for every aspect of your agricultural and food supply chains by safeguarding your interests from a primary production point to the point of processing or custody transfer. We have expertise to ensure correct storage, shipping, packing and distribution of commodities, food ingredients and food products, ensuring quality and safety throughout the diverse supply chains. We provide inspection of high commercial value agricultural cargo shipments, along with quality control, field inventory confirmation and many other related services, thus protecting the value of bulk cargo agricultural commodity products. One of the strengths of our approach is that we offer a truly global service while still being able to meet local needs.
  • 11.
    Pre-shipment Inspection : Pre-shipmentinspection of agro products, oils, engineering & manufactured goods, mineral & ores including volume, weight and quality as per specifications. Certificate of origin. Pre-shipment inspection of refrigerated cargoes. Grain lightening operations Cargo out-turn supervision of discharge and delivery of cargo, claim control services. Supervision of carting and loading of cargo. Pre-shipment inspection or PSI, is an important and reliable quality control method for checking goods' quality while clients buy from the suppliers. Agricultural Product Cargo and Inventory Inspection : Cargo Certification and Inspection. Cargo Sampling and Testing. Cargo Weight and Quality Verification. Loss Control, Investigation, Calibration.
  • 12.
    5. Consumer Products Withexperienced, professional and skilled inspectors; we are able to do the inspection services on all types of consumer goods. We understand regulations and standards for every product. Usually visual inspection is performed at the products’ storage place. The main target of inspection is checking quantity, visual quality and packing of products according to shipping documentation and Customer’s specification. Our inspection services helps to highlight defects as early as possible, so that businesses can make changes where necessary and avoid the cost of disruptions in the production or supply of products. We offer world class experience, expertise and the latest technologies. As a result, we provide the highest standards of quality and integrity. Laboratory analysis can be carried out as per Customer’s request. By adopting our inspection services, you will : Forecast the delivery date Reduce your risk of receiving inferior or defective goods Save traveling and labour cost Our Services include : Pre-shipment Inspection During production inspection, packing and marking samples for laboratory analysis and sealing Loading Supervision Pre-production Inspection Advisory & other specific services on request Factory Audit
  • 13.
    6. Chemical /Mineral inspection Surveying mineral and chemical industries Draft survey Sampling of all types of bulk cargoes Surveying of all types of bulk cargoes Surveying silver foam materials including iron ore, magnesia Surveying raw chemicals Surveying the poisons Damage survey Supervision on loading and discharging the ship and container Surveying the ship warehouse and container before loading Quantitative surveys, supervision on weighting by scale Sample preparation for analysis and testing for determining the elements Reviewing the purchasing agreement and supervising Reviewing the export products such as tar and sulfur percentage as requested
  • 14.
    7. Laboratory Testing Ourrange of laboratory testing services include food testing, heavy metal test, microbiological testing and many more. We have high quality testing equipments through which we ensure the quality of the products. The methods adopted are of International standards. The main objective is to provide the most efficient cost effective approach to problem solving in the concerned areas. Our strategy focuses on the following key growth activities : Qualified and experienced human resources Wide range of sophisticated instrumentation Precise, accurate and prompt results 8. Training and Development We offer training and development Services to ensure that you get fit for the challenges of the job. At LISPL, we offer tailored programs and services for vocational training, on-the-job training, qualification of job seekers, and personnel management. With varied seminars, courses, and conferences and more than qualified speakers, you will find the right solution for your training needs.
  • 15.
    Major projects by LISPL Sr.No.Client Supplier Scope Material Description 1 Mahalaxmi International Mahalaxmi International Final Inspection of Flanges Flanges (Pipe Fittings) 2 Ion Exchange India Ltd. Delta Techno cast Pvt. Ltd., Rajkot Witnessing of poring & final inspection Disc Castings 3 Sterling Quality Services, UK The Punjab Steel Works, India Review of tube drawing & final inspection Regeneration Heater 4 M/s.FCB – KCP Ltd., Chennai M/s.FCB – KCP Ltd., Chennai Design review & Drawing approval, Stage and Final inspection Water Tube Boilers 5 Deepak Fertilisers & Petro Chemicals Corporation Ltd Deepak Fertilisers & Petro Chemicals Corporation Ltd, Mumbai (Ammonia Plant Shutdown) Supervising, Witnessing & Overseeing NDT Inspection, Hydro Testing, Painting, & Radiography. Heat Exchangers, Boilers, Piping, Pressure vessels, Structurals, Control Panels, Transformers, Actuators etc. 6 Asiatic Oxygen Ltd, Asiatic Oxygen Ltd, Mumbai Design review & Drawing approval, Stage and Final inspection Liquid Nitrogen Storage Tank 7 HAMON D'HONDT S.A Prakash Steelage Ltd, Gujrat Review of tube drawing & final inspection Duplex Tubes
  • 16.
    Sr.No. Client SupplierScope Material Description 8 Deepak Fertilisers & Petro Chemicals Corporation Ltd Deepak Fertilisers & Petro Chemicals Corporation Ltd, Mumbai (Methanol Plant Shutdown) Supervising, Witnessing & Overseeing NDT Inspection, Hydro Testing, Painting, & Radiography. Heat Exchangers, Boilers, Piping, Pressure vessels, Structurals, Control Panels, Transformers, Actuators etc. 9 Gannon Dunkerley & Co Ltd Gannon Dunkerley & Co Ltd for Reliance Petroleum Ltd site, Jamnagar Stage wise & Final Inspection Heat Exchangers, Boilers, Piping, Pressure vessels, Structurals, Control Panels, Transformers, Actuators etc. 10 Tirumalai Chemicals Tirumalai Chemicals Design review & Drawing approval, Stage and Final inspection Pressure Vessels 11 HAMON D'HONDT S.A Heavy Metals & Tubes Ltd, Gujrat Raw material Inspection, tube drawing witnessing, hydro test, & Packing Inspection Carbon Steel Seamless Tubes (Fully Killed) 12 Ion Exchange India Ltd, Dubai Project Shop Floor Ion Exchnage, Mumbai Design review & Drawing approval, Stage and Final inspection Mechanical Equipments 13 Ion Exchange India Ltd, Dubai Project Flowserve India Controls Pvt Ltd Witnessing Disc Poring & Casting Inspection Butterfly Valve Disc 14 Ion Exchange India Ltd/Nadhira Enterprises Delvalve Witnessing Disc Poring & Casting Inspection Valves
  • 17.
    Sr.No. Client SupplierScope Material Description 15 Gulf Piping Company W.L. L Gulf Piping Company W.L. L Piping Inspection (welding & coating) Cross country pipeline 16 Gulf Piping Company W.L. L Gulf Piping Company W.L. L Welding & Coating Inspection 38" Dia * 300 kms 17 Tecnimont S.p.A Tecnimont S.p.A Welding & Coating Inspection 26" Dia * 856kms 18 Essar Oil Ltd Essar Oil Refinery Project Site, Vadinar TPI services for Inspection & Supervision of Refurbishment Activities Heat Exchangers, Boilers, Piping, Pressure vessels, Structurals, Control Panels, Transformers, Actuators etc. 19 DAELIM Saudi Arabia Co Inox India Ltd, Gujrat. Stage & Final Inspection (Welding & Coating) Nitrogen Storage Vessel 20 LANCO Infrastructure Co LANCO Infrastructure Co for Udupi Project Painting/Coating Inspection Misc Structural Items(5Lacks sqmtr) 21 Sterling Quality Services, UK Southern Lubrication Ltd, India Final inspection of Lubricating Equipments & performance test. Oil Lubricat System
  • 18.
    Sr.No. Client SupplierScope Material Description 22 S. Subrahmanyan Construction Co Pvt. Ltd S. Subrahmanyan Construction Co Pvt. Ltd Inspection of Stainless Steel Trays Steel Tiles 23 DAELIM Saudi Arabia Co Prakash Steelage Ltd Raw material Inspection, witnessing hydro test, & Packing Inspection Seamless Tubes 24 Petrofac International LLC, Dubai Turkmengas (South Yoloten Gas Field Development Project, Turkmenistan) Stage & Final Inspection (Transformers) Oil Immersed Distribution Transformers 25 DAELIM Saudi Arabia Co Ampo Valves India, Ltd Corrossion monitoring & Calibration of Pressure safety valves. Valves 26 Petrofac International LLC, Dubai ADCO (ASAB Full Field Development Project) Painting/Coating Inspection Seamless Line Pipe 27 HAMON D'HONDT S.A Chandan Steel Ltd, India Raw material Inspection, tube drawing witnessing, hydro test, & Packing Inspection Seamless Tubes
  • 19.
    LISPL Manpower LISPL ishaving a knowledgeable office staff with proven and trusted inspection backgrounds. Having a comprehensive understanding of industry specifications, client requirements and inspection responsibility, LISPL staff works proficiently and have been able to provide the highest quality of inspection services to the various industries. We have 148 number of qualified engineers in which there are 111 Mechanical engineers with DME, BEME, B Tech, CSWIP, B GAS 2, NDT level 2, ASNT degrees. There are 26 Electrical engineers having D. EEE degree and there are 11 Civil engineers having DCE degree.
  • 20.
  • 21.
    LINDINGER GLOBAL LINDINGER INSPECTIONENGINEERS, INC. Through time-tested experience, the LINDINGER INSPECTION COMPANIES have been able to provide the highest quality of inspection services to various Clients throughout the Gulf Coast region of the United States. Lindinger has headquarters in Houston, Texas, and affiliate offices in Asia, Europe, Italy, Mexico, and South Africa. Knowledgeable Lindinger staff have proven and trusted inspection backgrounds with a comprehensive understanding of industry specifications and Client requirements. LINDINGER INSPECTION SERVICES (MIDDLE EAST) LINDINGER INSPECTION SERVICES’ office is centrally located in Dubai, United Arab Emirates. Inspection coverage areas include India, Oman, Qatar, Saudi Arabia, and UAE. Lindinger provides Quality Third Party Inspection and Consulting services to Clients in the Middle East for Industrial, Chemical, Petrochemical, Fertilizer, & Infrastructure projects. Lindinger Inspection Services was awarded its ISO 9001:2000 accreditation through ANAB. LINDINGER INSPECTION SERVICES U.K. With a combination of technical expertise and an unusually high level of service, LINDINGER INSPECTION SERVICES UK has established its position as an inspection and expediting company with a difference. LINDINGER UK maintains a team of highly qualified inspectors and expeditors with experience in all the major industry sectors. In areas where combinations of language, culture and local legislation are unhelpful, LINDINGER UK has a network of carefully selected associate companies, working to our extremely high standards. AFFILIATIONS National Associate of Corrosion Engineers (NACE) American Welding Society (AWS) American Petroleum Institute (API) American Inspection Society (AIS) Association of Plant Inspection Professionals (APIP) APIP Texas Training Consortium (ATTC) SERVICES Mechanical Equipment, Rotating Equipment, Electrical Equipment, Protective Coatings, Packaged Equipment
  • 22.
  • 23.
    Current Projects Telecom Operationsin Maharashtra, Gujarat and Kerala circles. Currently operations in progress in telecom sector, engineering sector and commodities sector. 65%5% 30% Telecom – 65% Engineering – 5% Commodities – 30%
  • 24.
    Project in pipeline Weare on board with Indian Oil Corporation Ltd. For the inspection required in Instrumented Pig technology. Instrumented Pigs (IPIG) are the devices which are used for inline inspection of long distance buried pipelines. Inline inspection helps in monitoring the good health of pipelines and also their increased residual life. Indian Oil R & D, in association with BARC, Mumbai have developed 12”, 14” and 24” sizes of IPIG and caliper pig (CPIG). Plans have been made to develop tools for inspection of all sizes of liquid and gas pipelines.
  • 25.
    Why LISPL? Lindinger offersvalued customers a truly independent service with emphasis on quick response, attention to detail and competent execution adding value to customer needs and maintaining a good and long lasting business relationship. LISPL is a NABCB accredited organization. ( ISO 17020, “ requirements for the operation of various types of bodies performing inspection”) Our system works on a transparency and business ethics. We have a strong base of quality management system through which we audit our auditors at site. (field audit, means audit on auditors.) Key People Mr. Sanjiv Sanghavi Founder Director He has a vast knowledge in all types of inspection techniques. He is a professional in management. He has an in-depth knowledge in engineering, finance and general administration. Mr. Suresh S. M.D. of LISPL, presently he heads the headquarters of LISPL at Kochi, Kerala. He has an experience of more than 30 years in all the field of inspection and certification- specialized in agricultural, minerals, industrial, consumer goods, petroleum-petro chemicals, chemicals, quality management systems, laboratory testing. He has in-depth expertise in fraud investigation, a trainer of business ethics and a proven team leader.
  • 26.
  • 27.
    Vision Our vision isto reach out to every part in India and expand our services to various industrial segments, using our standards and become the most trusted name and a brand in quality and inspection. Mission Committed to stringent quality measures and standard, LISPL processes and services are maintained to the internationally accepted standards, with absolute business ethics. LISPL adopts a focus approach to all assignments and maintains unbiased professionalism through high integrity, dedication and strict confidentiality.