SlideShare a Scribd company logo
1 of 20
Download to read offline
Lighting the MacArthur Bridge
©DennisMcGrath2008
The Free Bridge Opened 1912 Walkway, 1917 Roadway, 1928 Trains
Ideation/concept:DennisMcGrath2008
The MacArthur Bridge Today Steel Through Deck Truss
A Visible Industrial Thread in Our Civic Landscape
Four Season’s Hotel at Night
River View Four Season’s Restaurant & Lobby
Quebec’s 400th Anniversary Commissioned Film Artist Robert Lepage
The Image Mill A Transformation of the Ordinary
Malcolm W. Martin Memorial Park
Chouteau Lake & Greenway Proposed Project
Before After
©DennisMcGrath2008
Hawthorne + Steel Bridge: Portland, OR
Illuminating The MacArthur Bridge The Southern Terminus
Hawthorne + Steel Bridge: Portland, OR
Warm white LED spots - up light each vertical steel chord.
1 2 3
DMX sequencing and photocell trigger will allow the "show" to occur.
Lighting Truss To Movement Of Trains
1 2 3
Full dimming capability via wireless DMX controls.
Fully Illuminated Bridge 7 Minute Intervals
1 2 3
Set glow at 40% output until train passes & switches to full output.
Movement of Last Car Triggers “Lights – Off”
1 2 3
1 2 3
Cost for Lighting the Bridge:
Both sides: $1,000,000 installed.
Lighting materials are estimated to be $400,000.
One side: $750,000 installed.
Save about $100,000 in materials, $150,000 in installation.
1 2 3
Power Consumption = 13kw Lighting both sides:
Energy consumption = 35,000kwh per year
(12 hours per day, 365 days per year, average 60% output).
If the rate is 05 cents per kwh, that's $1,750 per year, under $5 per night.
Pedestrian Observation Platforms at Piers
River Powered
1 2 3
©DennisMcGrath2008
River Powered

More Related Content

What's hot

Energy Corridor - Residual Elevation and Flood Risk
Energy Corridor - Residual Elevation and Flood RiskEnergy Corridor - Residual Elevation and Flood Risk
Energy Corridor - Residual Elevation and Flood RiskDavis Tolman
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationT.Y. Lin International
 
sree saravana foundations- Dhanam Selvi Garden -guduvanchery
sree saravana foundations- Dhanam Selvi Garden -guduvancherysree saravana foundations- Dhanam Selvi Garden -guduvanchery
sree saravana foundations- Dhanam Selvi Garden -guduvancherybobby R
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects City of Corona
 

What's hot (8)

Improve Plan
Improve PlanImprove Plan
Improve Plan
 
Replace Plan
Replace PlanReplace Plan
Replace Plan
 
Energy Corridor - Residual Elevation and Flood Risk
Energy Corridor - Residual Elevation and Flood RiskEnergy Corridor - Residual Elevation and Flood Risk
Energy Corridor - Residual Elevation and Flood Risk
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
sree saravana foundations- Dhanam Selvi Garden -guduvanchery
sree saravana foundations- Dhanam Selvi Garden -guduvancherysree saravana foundations- Dhanam Selvi Garden -guduvanchery
sree saravana foundations- Dhanam Selvi Garden -guduvanchery
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 

Viewers also liked

Online Privacy Lilyana Ruiz
Online Privacy Lilyana RuizOnline Privacy Lilyana Ruiz
Online Privacy Lilyana Ruizlilyanariz
 
The Oath of Office Bill (Version2)
The Oath of Office Bill (Version2)The Oath of Office Bill (Version2)
The Oath of Office Bill (Version2)German Failano, Jr
 
Ejercicios Psicomotrices.
Ejercicios Psicomotrices. Ejercicios Psicomotrices.
Ejercicios Psicomotrices. yenny maestre
 
The Senate Oath of Office Bill (Final Version)
The Senate Oath of Office Bill (Final Version)The Senate Oath of Office Bill (Final Version)
The Senate Oath of Office Bill (Final Version)German Failano, Jr
 
SSP 107 Unit 1 Test Revised
SSP 107 Unit 1 Test RevisedSSP 107 Unit 1 Test Revised
SSP 107 Unit 1 Test RevisedBrittany Petree
 
Staff Member of the Year 2014 Nomination
Staff Member of the Year 2014 NominationStaff Member of the Year 2014 Nomination
Staff Member of the Year 2014 NominationBrittany Petree
 
Etapas de la negociacion
Etapas de la negociacionEtapas de la negociacion
Etapas de la negociacionErika Lorena
 
Speaking test evaluation sheet
Speaking test evaluation sheetSpeaking test evaluation sheet
Speaking test evaluation sheetErasmus+
 

Viewers also liked (13)

Online Privacy Lilyana Ruiz
Online Privacy Lilyana RuizOnline Privacy Lilyana Ruiz
Online Privacy Lilyana Ruiz
 
pai yu hsuan cv
pai yu hsuan cvpai yu hsuan cv
pai yu hsuan cv
 
Hermès 20150911 fr
Hermès 20150911 frHermès 20150911 fr
Hermès 20150911 fr
 
The Oath of Office Bill (Version2)
The Oath of Office Bill (Version2)The Oath of Office Bill (Version2)
The Oath of Office Bill (Version2)
 
Ejercicios Psicomotrices.
Ejercicios Psicomotrices. Ejercicios Psicomotrices.
Ejercicios Psicomotrices.
 
The Senate Oath of Office Bill (Final Version)
The Senate Oath of Office Bill (Final Version)The Senate Oath of Office Bill (Final Version)
The Senate Oath of Office Bill (Final Version)
 
SSP 107 Unit 1 Test Revised
SSP 107 Unit 1 Test RevisedSSP 107 Unit 1 Test Revised
SSP 107 Unit 1 Test Revised
 
Staff Member of the Year 2014 Nomination
Staff Member of the Year 2014 NominationStaff Member of the Year 2014 Nomination
Staff Member of the Year 2014 Nomination
 
Quasi Senator Bill #3
Quasi Senator Bill #3Quasi Senator Bill #3
Quasi Senator Bill #3
 
Etapas de la negociacion
Etapas de la negociacionEtapas de la negociacion
Etapas de la negociacion
 
Ejercicios de activacion pensamiento creativo
Ejercicios de activacion pensamiento creativoEjercicios de activacion pensamiento creativo
Ejercicios de activacion pensamiento creativo
 
Luxembourg 2017
Luxembourg 2017Luxembourg 2017
Luxembourg 2017
 
Speaking test evaluation sheet
Speaking test evaluation sheetSpeaking test evaluation sheet
Speaking test evaluation sheet
 

Similar to LightingMcBridge_PKN_011410

Tempe Town Lake Pedestrian Bridge Construction 5 19 11
Tempe Town Lake Pedestrian Bridge Construction 5 19 11Tempe Town Lake Pedestrian Bridge Construction 5 19 11
Tempe Town Lake Pedestrian Bridge Construction 5 19 11City of Tempe, Arizona
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Stephen Bolduc
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineFilipe Mello
 
Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgewilliam perrin
 
Streetlifepresentation
StreetlifepresentationStreetlifepresentation
StreetlifepresentationSimon Lapinski
 
Cassilis Hydro Electric Scheme Slide Presentation August 2006
Cassilis Hydro Electric Scheme Slide Presentation August 2006Cassilis Hydro Electric Scheme Slide Presentation August 2006
Cassilis Hydro Electric Scheme Slide Presentation August 2006Engineers Australia
 
NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)Nikhil Yadav
 

Similar to LightingMcBridge_PKN_011410 (12)

Tempe Town Lake Pedestrian Bridge
Tempe Town Lake Pedestrian BridgeTempe Town Lake Pedestrian Bridge
Tempe Town Lake Pedestrian Bridge
 
Tempe Town Lake Pedestrian Bridge Construction 5 19 11
Tempe Town Lake Pedestrian Bridge Construction 5 19 11Tempe Town Lake Pedestrian Bridge Construction 5 19 11
Tempe Town Lake Pedestrian Bridge Construction 5 19 11
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010
 
Chase Tower
Chase TowerChase Tower
Chase Tower
 
My publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazineMy publication Tunnels and Tunnelling magazine
My publication Tunnels and Tunnelling magazine
 
Islington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridgeIslington council presentation on Wharfdale Road bridge
Islington council presentation on Wharfdale Road bridge
 
AGC Presentation_Final_12.6.11(2)
AGC Presentation_Final_12.6.11(2)AGC Presentation_Final_12.6.11(2)
AGC Presentation_Final_12.6.11(2)
 
field visit to Victoria dam
field visit to Victoria damfield visit to Victoria dam
field visit to Victoria dam
 
Streetlifepresentation
StreetlifepresentationStreetlifepresentation
Streetlifepresentation
 
Cassilis Hydro Electric Scheme Slide Presentation August 2006
Cassilis Hydro Electric Scheme Slide Presentation August 2006Cassilis Hydro Electric Scheme Slide Presentation August 2006
Cassilis Hydro Electric Scheme Slide Presentation August 2006
 
NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)NikhilYadav ( Training ppt)
NikhilYadav ( Training ppt)
 
Bigdig project
Bigdig projectBigdig project
Bigdig project
 

LightingMcBridge_PKN_011410