KwikGate Pty Ltd is an engineering consultancy and equipment supplier located in North Bondi, NSW, Australia that has been operating since 1990. It provides general engineering services such as project engineering, instrumentation and control design, and hazard studies. It also specializes in areas including safety engineering, industrial gas applications, flow meter design, custody transfer metering, burner management systems, and thermowell design. The document outlines KwikGate's capabilities and services across these areas of specialized engineering.
Put Agile to the Test: A Case Study for Test Agility on a Large IT ProjectTechWell
Agile practices, although applicable to a variety of situations, are most commonly applied to IT projects, generally for software development. Can you apply agile methods to just part of a software implementation project? Todd Jones presents this case study where agile techniques were applied to the testing phase of a multiyear, multimillion-dollar IT program that included replacing a legacy system, new software development, creation of a new enterprise data model and document management solution, and complex financial balancing. After briefly describing the challenges faced by the organization, Todd covers each guiding principle from the Agile Manifesto, describes the practical approach he used to implement agile techniques, and shows information radiators that were used to track velocity and demonstrate progress to program stakeholders. Todd outlines the key benefits this brought to the business as well as lessons the team learned along the way. Leave with a greater appreciation for the testing complexity of a large-scale software implementation, a better understanding of agile practices and lessons learned, and practical techniques and tracking tools you can apply to your current project.
This document provides guidance on non-intrusive inspection (NII) of pressure vessels and pipelines as an alternative to internal visual inspection (IVI). It discusses determining when NII is appropriate based on an integrity review considering the equipment profile, risk assessments, structural assessments, and operational experience. The document outlines the decision process for selecting and planning NII methods, evaluating results, and documentation requirements. The objective is to provide a consistent approach to justify and implement NII to reduce costs and hazards compared to IVI while still obtaining necessary information to ensure safe operation.
La manufactura estudia los procesos de fabricación mecánica con precisión dimensional. La producción puede ser manual o mecánica. Cuando se necesita mayor volumen, se implementa la división de trabajo donde cada trabajador realiza una pequeña parte de la tarea. Los procesos de fabricación incorporan y transforman las materias primas hasta lograr el producto terminado. Se describen tornos, taladros, fresadoras y prensas excéntricas e hidráulicas, identificando sus partes y funciones principales.
Features:
1.Complete AL frame design, ultra-thin & ultra-light
2.Hollow out design, high light transmittance
3.Easy installation and maintenance
4.Cabinet with no fan design, low noise, low power consumption
5.High gray grade、high refresh rate、high brightness
6.IP65(front), high protection level
7.Cabinet and module front/rear maintenance can be realized
Este documento describe los drenajes longitudinales, que son zanjas que se disponen a lo largo de carreteras u otros elementos para interceptar flujos de agua. Existen dos tipos principales de drenajes longitudinales: cunetas laterales y zanjas de coronación. El drenaje es un aspecto crítico para el éxito de las infraestructuras, ya que el agua puede dañar y arruinar estructuras; por lo tanto, el sistema de drenaje debe cumplir su función con un diseño mínimo para evitar un exceso de costos iniciales
La semiótica estudia todos los fenómenos culturales como sistemas de signos. Tiene sus orígenes en las perspectivas de Ferdinand de Saussure y Charles Sanders Peirce. La semiótica en la arquitectura analiza los signos arquitectónicos que comunican la función y finalidad de los edificios de manera funcional y estética. La semiótica arquitectónica se divide en cinco ramas: el signo arquitectónico, la denotación, la connotación, los códigos tipológicos, y la creación arquitect
Put Agile to the Test: A Case Study for Test Agility on a Large IT ProjectTechWell
Agile practices, although applicable to a variety of situations, are most commonly applied to IT projects, generally for software development. Can you apply agile methods to just part of a software implementation project? Todd Jones presents this case study where agile techniques were applied to the testing phase of a multiyear, multimillion-dollar IT program that included replacing a legacy system, new software development, creation of a new enterprise data model and document management solution, and complex financial balancing. After briefly describing the challenges faced by the organization, Todd covers each guiding principle from the Agile Manifesto, describes the practical approach he used to implement agile techniques, and shows information radiators that were used to track velocity and demonstrate progress to program stakeholders. Todd outlines the key benefits this brought to the business as well as lessons the team learned along the way. Leave with a greater appreciation for the testing complexity of a large-scale software implementation, a better understanding of agile practices and lessons learned, and practical techniques and tracking tools you can apply to your current project.
This document provides guidance on non-intrusive inspection (NII) of pressure vessels and pipelines as an alternative to internal visual inspection (IVI). It discusses determining when NII is appropriate based on an integrity review considering the equipment profile, risk assessments, structural assessments, and operational experience. The document outlines the decision process for selecting and planning NII methods, evaluating results, and documentation requirements. The objective is to provide a consistent approach to justify and implement NII to reduce costs and hazards compared to IVI while still obtaining necessary information to ensure safe operation.
La manufactura estudia los procesos de fabricación mecánica con precisión dimensional. La producción puede ser manual o mecánica. Cuando se necesita mayor volumen, se implementa la división de trabajo donde cada trabajador realiza una pequeña parte de la tarea. Los procesos de fabricación incorporan y transforman las materias primas hasta lograr el producto terminado. Se describen tornos, taladros, fresadoras y prensas excéntricas e hidráulicas, identificando sus partes y funciones principales.
Features:
1.Complete AL frame design, ultra-thin & ultra-light
2.Hollow out design, high light transmittance
3.Easy installation and maintenance
4.Cabinet with no fan design, low noise, low power consumption
5.High gray grade、high refresh rate、high brightness
6.IP65(front), high protection level
7.Cabinet and module front/rear maintenance can be realized
Este documento describe los drenajes longitudinales, que son zanjas que se disponen a lo largo de carreteras u otros elementos para interceptar flujos de agua. Existen dos tipos principales de drenajes longitudinales: cunetas laterales y zanjas de coronación. El drenaje es un aspecto crítico para el éxito de las infraestructuras, ya que el agua puede dañar y arruinar estructuras; por lo tanto, el sistema de drenaje debe cumplir su función con un diseño mínimo para evitar un exceso de costos iniciales
La semiótica estudia todos los fenómenos culturales como sistemas de signos. Tiene sus orígenes en las perspectivas de Ferdinand de Saussure y Charles Sanders Peirce. La semiótica en la arquitectura analiza los signos arquitectónicos que comunican la función y finalidad de los edificios de manera funcional y estética. La semiótica arquitectónica se divide en cinco ramas: el signo arquitectónico, la denotación, la connotación, los códigos tipológicos, y la creación arquitect
Instrument & Control with 15 Years of Experience in product and project development PMP. I hold a Valid B1 Visa to USA
Onsite Client Visit (USA)
Project Management
Client Communication
Milestone Completion
Task Allocation
Team Management
SPI intools Interface
This document provides a summary of Amit M. Ghule's qualifications and experience. It outlines his 11 years of experience in process engineering roles for oil, gas, chemical and petrochemical projects. It also lists his technical skills in areas like process engineering, simulation, project management, procurement and commissioning. Finally, it provides details of his educational qualifications and professional training.
The document describes Vestas' Project Execution Model (PEM), which provides a standard project stage-gate model for executing projects. The PEM includes governing principles, project organization structures, roles and responsibilities, and tools and systems to support project management. It outlines the key stages in a project from idea development through to serial production and validation. The presentation provides an overview of the PEM for attendees and shows how it standardizes Vestas' approach to managing projects from concept to market.
Projektets grundprincipper, roller og ansvarsområder – Vestas’ projektmodel -...Mediehuset Ingeniøren Live
Vestas har udviklet en projekteksekveringsmodel til at understøtte deres projekter og sikre, at de gennemføres efter de ledende principper i Vestas’ Way to Market. Et vigtigt aspekt er her grundprincipper for projektledelsen, generiske projektroller og klare ansvarsområder. Indlægget vil blive afviklet af Vestas' Senior Project Manager, Eskil Fjord Pedersen og PMO specialist, Peter Færge-Broberg.
Srini Sundaram has over 30 years of experience in engineering, design, and project management for instrumentation and control systems. He has worked on numerous projects in industries including oil and gas, mining, petrochemicals, and more. His resume outlines his extensive experience as a lead engineer on projects with responsibilities like developing P&IDs, managing schedules and budgets, and overseeing instrumentation and control design.
The document provides guidance on Codify's peer review process. It describes the 6 main steps: 1) Planning, 2) Overview, 3) Review, 4) Meeting, 5) Rework, and 6) Review & Audit. Key activities include assigning roles, announcing the review, conducting an optional work product overview, performing independent reviews and submitting defect logs, consolidating logs, determining if a review meeting is needed, discussing issues in the meeting, reworking the product, and final verification. Appendices include process diagrams, forms, checklists, and lists of work products and roles.
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
Shrikant Kathale is an instrumentation design engineer with over 8 years of experience in oil and gas projects. He has worked on projects in Dubai for Dodsal Engineering and in Abu Dhabi for Petrofac International. He has extensive experience using instrumentation design tools like Smart Plant Instrumentation to generate deliverables such as loop diagrams, cable schedules, and datasheets. He is proficient in software like AutoCAD, MS Office, and Oracle database. Currently he is working in Dubai as an instrumentation design engineer for Dodsal Engineering, where his responsibilities include reviewing and preparing instrumentation documentation.
Entrion provides vendor surveillance and inspection services globally to ensure on-time delivery of quality equipment. They have over 100 experienced professionals located near major manufacturers who perform risk-based inspections during key stages such as design, fabrication, testing, and installation. This helps identify issues early to prevent delays and ensure operational readiness. Entrion has successfully supported many projects in industries like offshore drilling, refining, and shipping. Their standardized processes and global network allow them to provide a cost-effective 59% savings over alternative inspection options.
Mark Ikonen has over 30 years of experience in quality assurance and welding inspection roles across various industries. He has extensive experience developing and implementing quality management systems, reviewing vendor documentation, coordinating inspections, and resolving non-conformances. Ikonen holds numerous qualifications in quality management, welding inspection, occupational health and safety, and assessment and training. He has worked on projects globally for companies including Fluor, McConnell Dowell, and Melbourne Water.
Genisision is an Australian company that provides engineering, project services, and decision making products and services. They have expertise in areas such as management, planning, engineering, construction, commissioning, and operations. Genisision uses its proprietary Calgeni decision making software to help clients make well-informed decisions. The company serves clients in industries like resources, construction, and refineries.
Dream Catcher provides concise summaries in 3 sentences or less that provide the high level and essential information from the document. The document provides information about Dream Catcher, an energy and technical talent development company based in Asia. It outlines Dream Catcher's training portfolio and services, which include courses in offshore engineering, project management, discipline engineering, and more. It also lists Dream Catcher's clients and track record of oil and gas training programs conducted over the years for companies in the industry.
The document provides a proposal from Unicorn Solutions (Pvt) Limited for consultancy services to support the salt industry in Pakistan in adopting improved quality assurance and quality control practices for salt iodization. The proposal outlines Unicorn's experience and capabilities, as well as a three-stage approach to conducting a needs assessment, implementing required resources such as trainings and equipment, and producing documentation and additional trainings. It also describes the project management methodologies Unicorn would employ, such as issue management, time and cost management, resource management, and quality management.
Teq Diligent is Product Engineering partner that systematically delivers measurable business value from concept to realization and sustenance.
Teq Diligent addresses the needs of PRODUCT ENGINEERING SERVICES in the field of ELECTRONICS & EMBEDDED by partnering AT ANY STAGE of product realization process with REQUIRED CAPACITY.
Asset corrosion management cui - masterclass 2018Marcep Inc.
The course content will cover why CUI has become a major problem in today's context and also cover various
corrosion mechanisms which affect the insulated piping/ equipment and the major parameters which influence the
rate of degradation. The course will cover various NDE methods available and successfully used to detect CUI. The
participant will also learn the strategies for defining scope of work for detecting CUI based on RBI (Risk Based
Inspection) approach. The NACE RP 0198 and API RP 583 will be discussed in detail and so also the leaning from
various published case studies on CUI.
With the Fujitsu’s Automated Business Process Discovery & Visualization service, we aim to help solve one of the biggest challenges faced by companies embarking on a process improvement and governance initiative – illuminating the exposure to inefficiencies, non-compliance, fraud, legal, and other business value leakage issues lying hidden in operational workflows.
The document provides guidelines for project handover from contractors to the University of Newcastle's Infrastructure and Facilities Services. It outlines requirements for connection and commissioning, licenses and certificates, post-completion maintenance, training, and provision of as-built documentation including asset lists, manuals, drawings and other information. The guidelines are intended to help ensure an efficient transfer of ownership and smooth operation of facilities after project completion.
This document provides an overview of N_Arc Consulting, an Indian advisory, engineering, and project management company operating in the power sector. It outlines the company's background, objectives, sectors represented, and scope of services which include power transmission, distribution, renewable energy, and energy efficiency. It then describes in detail the services provided for power transmission projects, including planning studies, transmission network design, procurement support, construction supervision, and more. Examples of completed domestic and international power transmission projects are also listed.
ABB Roadshow - Westpoint, NE 6-27-13 Technology PlanningRobSarfi
The document presents a technology roadmap for small utilities developed by Boreas Group. It discusses developing a roadmap in 5 steps: preparation, planning, interviews/workshops, analysis and development, and presentation. The roadmap addresses key elements like performance benchmarking, opportunity assessment, implementation plan, risk mitigation, and organizational requirements. It provides examples of technology phasing and a sample roadmap table of contents covering various technology systems and processes. Observations on critical success factors, project success factors, and challenges like organizational resources, management, and technology future-proofing are also highlighted.
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Energy Construction Forum
This presentation discusses driving capital projects in oil and gas to best-in-class execution. Global investment in oil and gas projects over the next two decades is anticipated to be in the trillions. However, many projects historically face cost overruns and schedule delays. Both internal factors like planning and external factors like regulations can impact projects. Operators can improve performance through standardized modularization, new business models, collaboration, and innovation to reduce risks and potentially accelerate projects.
Integrating Essential Components of Digital Twin for Energy IndustryIRJET Journal
This document discusses integrating essential components of a digital twin for the energy industry. It begins by describing the current state, where engineering design data is often handled manually between disciplines, leading to inconsistencies and rework. This is challenging for efficient asset operation. The future state envisions an integrated engineering environment where design tools are connected and data flows consistently between them. A central data warehouse would store all project data, serving as the foundation for a digital twin that could optimize asset performance over the lifecycle. Effectively managing engineering data is crucial to implement technologies like digital twins that improve safety, efficiency and sustainability in the oil and gas sector.
Instrument & Control with 15 Years of Experience in product and project development PMP. I hold a Valid B1 Visa to USA
Onsite Client Visit (USA)
Project Management
Client Communication
Milestone Completion
Task Allocation
Team Management
SPI intools Interface
This document provides a summary of Amit M. Ghule's qualifications and experience. It outlines his 11 years of experience in process engineering roles for oil, gas, chemical and petrochemical projects. It also lists his technical skills in areas like process engineering, simulation, project management, procurement and commissioning. Finally, it provides details of his educational qualifications and professional training.
The document describes Vestas' Project Execution Model (PEM), which provides a standard project stage-gate model for executing projects. The PEM includes governing principles, project organization structures, roles and responsibilities, and tools and systems to support project management. It outlines the key stages in a project from idea development through to serial production and validation. The presentation provides an overview of the PEM for attendees and shows how it standardizes Vestas' approach to managing projects from concept to market.
Projektets grundprincipper, roller og ansvarsområder – Vestas’ projektmodel -...Mediehuset Ingeniøren Live
Vestas har udviklet en projekteksekveringsmodel til at understøtte deres projekter og sikre, at de gennemføres efter de ledende principper i Vestas’ Way to Market. Et vigtigt aspekt er her grundprincipper for projektledelsen, generiske projektroller og klare ansvarsområder. Indlægget vil blive afviklet af Vestas' Senior Project Manager, Eskil Fjord Pedersen og PMO specialist, Peter Færge-Broberg.
Srini Sundaram has over 30 years of experience in engineering, design, and project management for instrumentation and control systems. He has worked on numerous projects in industries including oil and gas, mining, petrochemicals, and more. His resume outlines his extensive experience as a lead engineer on projects with responsibilities like developing P&IDs, managing schedules and budgets, and overseeing instrumentation and control design.
The document provides guidance on Codify's peer review process. It describes the 6 main steps: 1) Planning, 2) Overview, 3) Review, 4) Meeting, 5) Rework, and 6) Review & Audit. Key activities include assigning roles, announcing the review, conducting an optional work product overview, performing independent reviews and submitting defect logs, consolidating logs, determining if a review meeting is needed, discussing issues in the meeting, reworking the product, and final verification. Appendices include process diagrams, forms, checklists, and lists of work products and roles.
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale
Shrikant Kathale is an instrumentation design engineer with over 8 years of experience in oil and gas projects. He has worked on projects in Dubai for Dodsal Engineering and in Abu Dhabi for Petrofac International. He has extensive experience using instrumentation design tools like Smart Plant Instrumentation to generate deliverables such as loop diagrams, cable schedules, and datasheets. He is proficient in software like AutoCAD, MS Office, and Oracle database. Currently he is working in Dubai as an instrumentation design engineer for Dodsal Engineering, where his responsibilities include reviewing and preparing instrumentation documentation.
Entrion provides vendor surveillance and inspection services globally to ensure on-time delivery of quality equipment. They have over 100 experienced professionals located near major manufacturers who perform risk-based inspections during key stages such as design, fabrication, testing, and installation. This helps identify issues early to prevent delays and ensure operational readiness. Entrion has successfully supported many projects in industries like offshore drilling, refining, and shipping. Their standardized processes and global network allow them to provide a cost-effective 59% savings over alternative inspection options.
Mark Ikonen has over 30 years of experience in quality assurance and welding inspection roles across various industries. He has extensive experience developing and implementing quality management systems, reviewing vendor documentation, coordinating inspections, and resolving non-conformances. Ikonen holds numerous qualifications in quality management, welding inspection, occupational health and safety, and assessment and training. He has worked on projects globally for companies including Fluor, McConnell Dowell, and Melbourne Water.
Genisision is an Australian company that provides engineering, project services, and decision making products and services. They have expertise in areas such as management, planning, engineering, construction, commissioning, and operations. Genisision uses its proprietary Calgeni decision making software to help clients make well-informed decisions. The company serves clients in industries like resources, construction, and refineries.
Dream Catcher provides concise summaries in 3 sentences or less that provide the high level and essential information from the document. The document provides information about Dream Catcher, an energy and technical talent development company based in Asia. It outlines Dream Catcher's training portfolio and services, which include courses in offshore engineering, project management, discipline engineering, and more. It also lists Dream Catcher's clients and track record of oil and gas training programs conducted over the years for companies in the industry.
The document provides a proposal from Unicorn Solutions (Pvt) Limited for consultancy services to support the salt industry in Pakistan in adopting improved quality assurance and quality control practices for salt iodization. The proposal outlines Unicorn's experience and capabilities, as well as a three-stage approach to conducting a needs assessment, implementing required resources such as trainings and equipment, and producing documentation and additional trainings. It also describes the project management methodologies Unicorn would employ, such as issue management, time and cost management, resource management, and quality management.
Teq Diligent is Product Engineering partner that systematically delivers measurable business value from concept to realization and sustenance.
Teq Diligent addresses the needs of PRODUCT ENGINEERING SERVICES in the field of ELECTRONICS & EMBEDDED by partnering AT ANY STAGE of product realization process with REQUIRED CAPACITY.
Asset corrosion management cui - masterclass 2018Marcep Inc.
The course content will cover why CUI has become a major problem in today's context and also cover various
corrosion mechanisms which affect the insulated piping/ equipment and the major parameters which influence the
rate of degradation. The course will cover various NDE methods available and successfully used to detect CUI. The
participant will also learn the strategies for defining scope of work for detecting CUI based on RBI (Risk Based
Inspection) approach. The NACE RP 0198 and API RP 583 will be discussed in detail and so also the leaning from
various published case studies on CUI.
With the Fujitsu’s Automated Business Process Discovery & Visualization service, we aim to help solve one of the biggest challenges faced by companies embarking on a process improvement and governance initiative – illuminating the exposure to inefficiencies, non-compliance, fraud, legal, and other business value leakage issues lying hidden in operational workflows.
The document provides guidelines for project handover from contractors to the University of Newcastle's Infrastructure and Facilities Services. It outlines requirements for connection and commissioning, licenses and certificates, post-completion maintenance, training, and provision of as-built documentation including asset lists, manuals, drawings and other information. The guidelines are intended to help ensure an efficient transfer of ownership and smooth operation of facilities after project completion.
This document provides an overview of N_Arc Consulting, an Indian advisory, engineering, and project management company operating in the power sector. It outlines the company's background, objectives, sectors represented, and scope of services which include power transmission, distribution, renewable energy, and energy efficiency. It then describes in detail the services provided for power transmission projects, including planning studies, transmission network design, procurement support, construction supervision, and more. Examples of completed domestic and international power transmission projects are also listed.
ABB Roadshow - Westpoint, NE 6-27-13 Technology PlanningRobSarfi
The document presents a technology roadmap for small utilities developed by Boreas Group. It discusses developing a roadmap in 5 steps: preparation, planning, interviews/workshops, analysis and development, and presentation. The roadmap addresses key elements like performance benchmarking, opportunity assessment, implementation plan, risk mitigation, and organizational requirements. It provides examples of technology phasing and a sample roadmap table of contents covering various technology systems and processes. Observations on critical success factors, project success factors, and challenges like organizational resources, management, and technology future-proofing are also highlighted.
Contractor Track: Need for Speed - Project Acceleration, Tech Trends, Logisti...Energy Construction Forum
This presentation discusses driving capital projects in oil and gas to best-in-class execution. Global investment in oil and gas projects over the next two decades is anticipated to be in the trillions. However, many projects historically face cost overruns and schedule delays. Both internal factors like planning and external factors like regulations can impact projects. Operators can improve performance through standardized modularization, new business models, collaboration, and innovation to reduce risks and potentially accelerate projects.
Integrating Essential Components of Digital Twin for Energy IndustryIRJET Journal
This document discusses integrating essential components of a digital twin for the energy industry. It begins by describing the current state, where engineering design data is often handled manually between disciplines, leading to inconsistencies and rework. This is challenging for efficient asset operation. The future state envisions an integrated engineering environment where design tools are connected and data flows consistently between them. A central data warehouse would store all project data, serving as the foundation for a digital twin that could optimize asset performance over the lifecycle. Effectively managing engineering data is crucial to implement technologies like digital twins that improve safety, efficiency and sustainability in the oil and gas sector.
Integrating Essential Components of Digital Twin for Energy Industry
KwikGate Capability Statement
1. KWIKGATE PTY LTD
ENGINEERING DESIGN & EQUIPMENT SUPPLY
ENGINEERING CONSULTANCY
KWIKGATE PTY LTD
UNIT 1, 106 MURRIVERIE RD, NORTH BONDI, NSW
AUSTRALIA
ABN 72 050 816 227
TELEPHONE: +61 421 050 858
EMAIL: KwikGate@gmail.com
CAPABILITY
STATEMENT
1990-2015
2. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 2 OF 6
CONTENTS
1 GENERAL ENGINEERING SERVICES................................................................................. 3
1.1 Project Engineering ....................................................................................................................................3
1.2 Instrument & Control Basic Design ............................................................................................................3
1.3 Hazard and Operability Study ....................................................................................................................3
1.4 Instrument & Control Detail Design...........................................................................................................4
2 SPECIALISED ENGENEERING............................................................................................ 5
2.1 Engineering Procedures and Standards......................................................................................................5
2.2 Safety Engineering......................................................................................................................................5
2.3 Industrial Gases Applications......................................................................................................................5
2.4 Flow-Meter Design & Supply .....................................................................................................................5
2.5 Custody Transfer Meters / Performance, Material Balance Meters.............................................................6
2.6 Burner Management System .....................................................................................................................6
2.7 Thermowell Stress Calculations & Design.................................................................................................6
2.8 Measurement & Control Troubleshooting ..................................................................................................6
3. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 3 OF 6
1 GENERAL ENGINEERING SERVICES
1.1 Project Engineering
Project Planning
Project Scope of Work definition
Project Performance definition
Project Estimating
Tender preparation
Equipment data sheet preparation
Equipment specifications
Equipment enquires
Technical bid evaluations
Commercial bid evaluations
Purchase requisitions
Vendor correspondence
Vendor equipment expediting
Vendor equipment inspections
Vendor progress reports
Vendor document review /
approval
Monthly project progress reports
Monthly cost monitoring and control
Contract and sub-contract
administration
Claims preparation and management
Construction specification
preparation
Construction enquires
Prepare organizational charts
Procedure preparation
Review As-Built documentation
Collate project data books
Conduct Project E&I design reviews
Plant upgrade studies
Coordination with overseas suppliers
Assist with obtaining Statutory
Authority approvals
1.2 Instrument & Control Basic Design
Control Concept / Philosophy
Basic List of Measurement Points
Basic Instrument Data Sheets
Standard Instrument Process
Connection
Project Standard Instrument
Requirements
Cause & Effect Matrices
Control Block Diagram
Instrument/Control Input to Basic
PFD’s and P&ID’s
HAZOP
1.3 Hazard and Operability Study
HAZOP / What-If Analysis
Procedure and documents
preparation
HAZOP organization
HAZOP chairing
HAZOP Job sheet expediting
HAZOP Review report
4. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 4 OF 6
1.4 Instrument & Control Detail Design
Scope of Works
Equipment specifications
Equipment Data Sheets
Equipment Calculations
Equipment Vendor QA & Document Requirements
Equipment Vendor Inspections
Instrument Loop Diagrams
Instrument Hook-up Diagrams
Functional Logic Diagrams
Functional Description
Safeguarding Narrative
PFD’s and P&ID’s
Cable Schedules
Termination Schedules
Equipment Mounting Details
Installation Schedules
Hazardous Area Dossier
Operating Manuals
Training Manuals
Performance Testing Criteria and Measurement
5. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 5 OF 6
2 SPECIALISED ENGENEERING
2.1 Engineering Procedures and Standards
Development of Standard
Engineering Procedures
Development of Standard
Engineering Work Instructions
Development of Standard
Engineering Specifications
Development of Standard Engineering
Forms
Development of Standard Engineering
Data Sheets
Development of Standard Engineering
Drawings
2.2 Safety Engineering
HSE Legislation and Risk
Assessment
Safety Audits and Inspections
Flammable Atmosphere Design &
Inspections
HAZOP Facilitation
Oxygen Hazard Flammability
Risk Assessment (OHFRA)
Relief Valve Sizing
2.3 Industrial Gases Applications
Hydrogen and Oxygen Expertise
Artificial Atmospheres
Oxygen Enrichment and
Dissolution
Fuel / Oxygen Gas Burners
Generator Cooling
N2 & CO2 Inertisation
N2 & CO2 Blanketing
Gas and Liquid Hydrocarbon Line
Clearance
LNG Storage Tank Oxygen &
Moisture Removal & Cool-Down
2.4 Flow-Meter Design & Supply
Flow-Metering Orifice Plates
Restriction Orifice Plates
Small Bore Orifice Plates
Plate Thickness Calculation
Plate Noise Calculation
Multi-Hole Restriction Plates
6. KwikGate Pty Limited – Capability Statement
This document is subject to Copyright and is Confidential. It must not be disclosed to others, reproduced or stored in a
retrieval system or transmitted in any form or by any means without the written consent of KwikGate Pty Limited.
PAGE 6 OF 6
2.5 Custody Transfer Meters / Performance, Material Balance Meters
Custody Transfer Meter Design
Custody Transfer Meter
Verification
Custody Transfer Meter
Measurement Uncertainty
Prediction
Invoice / Performance / Material
Balance Meters Design and Supply
Development of Plant / Equipment
Performance Test Procedures
2.6 Burner Management System
BMS Design
BMS Review
Valve Train Design & Supply
2.7 Thermowell Stress Calculations & Design
2.8 Measurement & Control Troubleshooting