              What is Your CEQA
              Threshold?
Infill Impediments


 Discouraging Factors                            Development Incentives
       Development costs                          and Improvement of
       Lack of comparables                        Playing Field
       Inadequate incentives                         Density bonuses
       Incompatible land uses                        Low cost redevelopment land
       Adjacent SF uses                              CEQA exemptions and plan-
       Small parcel sizes                             level EIRs covering infill
       Confusing zoning                              Crime reduction
       Suburban setbacks                             Improved streetscapes
       Uncertain design review                       Improved open space
       Excessive parking ratios                      Revised zoning codes
       Crime concerns                                Neighborhood communication
       Environmental conditions                      Permit process efficiency

Mejias, Luis and Keakin, Elizabeth. 2008. Redevelopment and Revitalilzation
Along Urban Arterials (from the Developer’s Perspective)
Perfect World Scenario
Streamlining of Urban Infill EIRs

 Program EIR (CCR §15168)


 Master EIR (§§PRC 21157 – 21158.5, CCR §15175)
Program EIR
 Designate infill development land uses and formulate
  community-driven development intensity standards
 Use specific plan or similar area plan in desired infill target
  areas

CEQA:
 In the Program EIR, state intent to use to streamline
 Find consistent projects “within the scope” of the Program
  EIR or
 Simplify and focus subsequent environmental documents
  on consistent projects


Guidelines Section 15168
Master EIR

Listing infill developments or development sites as
 “subsequent projects” in a Master EIR for a plan or
 program (e.g., General Plan, Redevelopment Plan)
Include type, minimum/maximum intensity,
 location, per Guidelines §15176(b)

CEQA:
Cover infill subsequent projects in the Master EIR
Seek to find consistent projects “within the scope” or
Limit additional environmental documentation
CEQA Infill Exemption


Inside city limits, §15332 is
 available.
2007 Book of Lists Survey:
    100+ cities used it in 2005 and/or 2006
    From 1 to 250 times
    (2 or 3 times per day?)
Only applies to cities, which
 causes much consternation for
 counties
Qualifying Criteria


    (a) The project is consistent with the applicable general plan
designation and all applicable general plan policies as well as
with applicable zoning designation and regulations.

    (b) The proposed development occurs within city limits on a project
        site of no more than five acres substantially surrounded by urban
        uses.

    (c) The project site has no value as habitat for endangered, rare or
threatened species.

    (d) Approval of the project would not result in any significant effects
        relating to traffic, noise, air quality, or water quality.

    (e) The site can be adequately served by all required utilities and
public services.
CEQA Exemption for Infill


Either:
    at least 10 percent of housing will be sold to moderate
     income families
    not less than 10 percent of housing will be rented to low
     income families
    not less than 5 percent of housing will be rented to very-low
     income families or
    the developer has paid or will pay “in-lieu fees” pursuant to
     ordinance in amounts sufficient to ensure the development
     of such units
CEQA Exemption for Infill

 PRC Section 21159.24 creates an exemption applicable where
  the project is:
     residential on infill site
     not more than four acres in total area
     in an urbanized area
     100 or fewer residential units
     not including any single-level building exceeding 100,000
      square feet
     within one-half mile of a major transit stop
     higher density infill housing
     community-level environmental review was completed
      within 5 years prior to project application completeness
      determination, and
Bankers Hills CEQA Case

 Project (San Diego):
     14-story, 14-unit residential building on 1.9 ac.
     Abutting uses: Balboa Park, condo tower
     Consistent with GP and zoning
     Busy traffic intersection nearby

 Relevant Causes of Action:
     Not substantially surrounded by urban uses (park)
     Not consistent with the General Plan
     Significant traffic impacts would occur
     Balboa Park and congestion = “unusual circumstances”
Banker’s Hill Decision

 Proper use of Class 32 affirmed based on City’s substantial
  evidence
 Balboa Park considered an urban use
 Findings of no significant impacts on traffic, noise, AQ, WQ
  based on substantial evidence
 Conclusion that no significant impacts occurred because of
  unusual circumstances affirmed after considering fair
  argument (park and congestion were not “unusual” in
  urban setting)


Banker’s Hill, Hillcrest, Park West Community Preservation
v. City of San Diego, 4th Appellate District, May 8, 2006
SB 375 Streamlining


 RTP EIR addresses SCS. If an
  APS is prepared simultaneously,
  RTP EIR can also cover it.
 Infill projects can benefit from
  CEQA streamlining, if they
  qualify
Projects Consistent with SCS/APS


Qualifications:
 Residential project or mixed-use
  with no more than 25% non-
  residential
 Consistent with SCS/APS with
  EIR (land use designation,
  density, building intensity,
  applicable policies)
 CEQA Benefit: Need not repeat
  growth-inducing and GHG
  effects from cars and light
  trucks, nor include a less dense
  alternative to reduce GHG
Transit Priority Projects

Basic qualifications to be a TPP:
 At least 50% residential use, with a minimum net
  density of 20 units/ac
 If commercial use is included, it must have an FAR of
  at least 0.75
 Located within ½ mile of major transit stop or high-
  quality transit corridor in the RTP
Basic TTP – Approve with SCEA


Qualify for Sustainable
  Communities EA:
 Incorporate all feasible
  mitigation, performance
  standards, or criteria in EIR
TPP Qualifying for Exemption


Complete CEQA exemption, if meets basic
  qualifications, plus:
 Maximum of 8 acres or 200 dwelling units
  served by existing utilities
 No significant historic resources effect
 15% more energy efficient and 25% improved
  water conservation, and
Community Programs and Plans

 Designate infill development areas as a special use in a
  General Plan, Community Plan, or zoning program
 Set sideboards for land use types and development
  parameters

CEQA:
 Cover infill development in the GP EIR, Community Plan
  EIR, or EIR on zoning program
 Use §21083.3/§15183 to exempt covered issues, and
  cover only what is peculiar to the site or project, not
  previously analyzed, substantially more severe now
SB 226/CEQA 15183.3

Pub. Res. Code 21094.5:
   Establishes streamlining method for any defined “infill project”
    located:
      in an “urban area” in a city or county
      on a previously developed site or a vacant site that is 75%
       contiguous to urban parcel
      in a area subject to a prior “planning level decision” (i.e., a
       general plan, community plan, specific plan, or zoning) for
       which an EIR was certified
SB 226/CEQA 15183.3

 An eligible infill project must satisfy both of the following:
     Any of these three conditions:
       Be consistent with an adopted “sustainable communities
        strategy” (SCS) or an “alternative planning strategy” (APS)
       Consist of a “small walkable community project” (as defined)
       In a community without an adopted SCS or APS, have a
        residential density of more than 20 du/acre or a FAR of at
        least 75%
     All applicable statewide performance standards adopted
      pursuant to Pub. Res. Code 21094.5.5 (to be effective 1/1/13)
Plan for Infill in Advance

 Plan ahead for infill, regardless of planning vehicle
 Quickly coordinate local plans with SCS to add SB
  375 streamlining as a possible strategy
 Take advantage of existing “regular” CEQA
  streamlining provisions for later projects. Lead
  public education campaign during the planning
  process to help community understand the strategy
 Promote community benefits, gain community
  support
 Also, use Class 32 exemption in cities, if it applies
Recent CEQA Movements

In 2012, it is all about what did not pass.
  CEQA  relief for High Speed Rail
  CEQA relief for LA Communication Systems

  Aggressive expansion of AB 900 – CEQA relief for
   Leadership Projects.
Get ready folks, CEQA reform/modernization/
 enhancement/streamlining it is coming!
AB 900

• Leadership Project” includes:
  –   A residential, retail, commercial, sports, cultural,
      entertainment, or recreational project that:
       Is located on an infill site
       Is consistent with any Sustainable Communities Strategy or
        Alternative Planning Strategy adopted by an MPO pursuant
        to SB 375
       Achieves LEED Silver or better
       Achieves a “transportation efficiency” 10% greater than for
        comparable projects

More Related Content

Viewers also liked

Romanian mobility report ppt
 Romanian mobility report ppt Romanian mobility report ppt
Romanian mobility report pptNicoleta Mocan
 
Final Romanian mobility report
Final Romanian mobility reportFinal Romanian mobility report
Final Romanian mobility reportNicoleta Mocan
 
ROMANIAN SURVEY ON FOREIGN FOOD
ROMANIAN SURVEY ON FOREIGN FOODROMANIAN SURVEY ON FOREIGN FOOD
ROMANIAN SURVEY ON FOREIGN FOODNicoleta Mocan
 
Raport de activitate Polonia
Raport de activitate Polonia Raport de activitate Polonia
Raport de activitate Polonia Nicoleta Mocan
 
WordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールから
WordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールからWordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールから
WordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールからKitani Kimiya
 
Romanian popular costumes
 Romanian popular costumes Romanian popular costumes
Romanian popular costumesNicoleta Mocan
 
WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015
WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015
WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015Kitani Kimiya
 
Efectos migratorios en los países de destino
Efectos migratorios en los países de destinoEfectos migratorios en los países de destino
Efectos migratorios en los países de destinoraquel-espin
 

Viewers also liked (18)

Romanian mobility report ppt
 Romanian mobility report ppt Romanian mobility report ppt
Romanian mobility report ppt
 
H031 13 leucoplasia
H031 13 leucoplasiaH031 13 leucoplasia
H031 13 leucoplasia
 
Nico Calavita Panel 2
Nico Calavita Panel 2Nico Calavita Panel 2
Nico Calavita Panel 2
 
Scott Polikov Panel 1
Scott Polikov Panel 1Scott Polikov Panel 1
Scott Polikov Panel 1
 
Final Romanian mobility report
Final Romanian mobility reportFinal Romanian mobility report
Final Romanian mobility report
 
ROMANIAN SURVEY ON FOREIGN FOOD
ROMANIAN SURVEY ON FOREIGN FOODROMANIAN SURVEY ON FOREIGN FOOD
ROMANIAN SURVEY ON FOREIGN FOOD
 
Raport de activitate Polonia
Raport de activitate Polonia Raport de activitate Polonia
Raport de activitate Polonia
 
Kathleen Head Panel 2
Kathleen Head Panel 2Kathleen Head Panel 2
Kathleen Head Panel 2
 
Howard Blackson Panel 3
Howard Blackson Panel 3Howard Blackson Panel 3
Howard Blackson Panel 3
 
Scott Polikov Panel 3
Scott Polikov Panel 3Scott Polikov Panel 3
Scott Polikov Panel 3
 
Kathleen head ppt
Kathleen head pptKathleen head ppt
Kathleen head ppt
 
WordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールから
WordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールからWordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールから
WordCamp Kansai 2016 ハンズオン- -基本機能をおさらいしよう! WordPress のインストールから
 
Romanian popular costumes
 Romanian popular costumes Romanian popular costumes
Romanian popular costumes
 
RECIPE BOOK
RECIPE BOOKRECIPE BOOK
RECIPE BOOK
 
Vivian Kahn Panel 2
Vivian Kahn Panel 2Vivian Kahn Panel 2
Vivian Kahn Panel 2
 
Vivian Kahn Panel 1
Vivian Kahn Panel 1Vivian Kahn Panel 1
Vivian Kahn Panel 1
 
WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015
WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015
WordCamp Kansai 2015 - 京都大学における WordPress を利用した多言語情報発信と管理運用 #wck2015
 
Efectos migratorios en los países de destino
Efectos migratorios en los países de destinoEfectos migratorios en los países de destino
Efectos migratorios en los países de destino
 

Similar to Kristin Blackson Panel 3

Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa Nisenson
 
Unleashing commercial-scale renewable energy with feed-in tariffs
Unleashing commercial-scale renewable energy with feed-in tariffsUnleashing commercial-scale renewable energy with feed-in tariffs
Unleashing commercial-scale renewable energy with feed-in tariffsClean Coalition
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11MairaNoor4
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Wallace Roberts & Todd
 
NJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNew Jersey Future
 
Unleashing local dispatchable solar
Unleashing local dispatchable solarUnleashing local dispatchable solar
Unleashing local dispatchable solarClean Coalition
 
Davenport Green Week Presentation
Davenport Green Week PresentationDavenport Green Week Presentation
Davenport Green Week Presentationprdrueke
 
Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09Kim Mitchell
 
Final_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetterFinal_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetterKenneth Rosales
 
California’s New Affordable Housing Laws – Part Two
California’s New Affordable Housing Laws – Part TwoCalifornia’s New Affordable Housing Laws – Part Two
California’s New Affordable Housing Laws – Part TwoMeyers Nave
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Aconex
 
Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Kim Fowler, MCIP, RPP
 
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape
 

Similar to Kristin Blackson Panel 3 (20)

Lisa stormcon presentation number one ieca
Lisa stormcon presentation number one iecaLisa stormcon presentation number one ieca
Lisa stormcon presentation number one ieca
 
Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance. Staff Report on Modifications to Planned Development Ordinance.
Staff Report on Modifications to Planned Development Ordinance.
 
Unleashing commercial-scale renewable energy with feed-in tariffs
Unleashing commercial-scale renewable energy with feed-in tariffsUnleashing commercial-scale renewable energy with feed-in tariffs
Unleashing commercial-scale renewable energy with feed-in tariffs
 
LEED ND Squalicum Lofts
LEED ND Squalicum LoftsLEED ND Squalicum Lofts
LEED ND Squalicum Lofts
 
BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11BUILDING SERVICES AND SYSTEMS CHAPTER 11
BUILDING SERVICES AND SYSTEMS CHAPTER 11
 
Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2Advancing Sustainability in Discretionary Review 2
Advancing Sustainability in Discretionary Review 2
 
Low Impact Development - Call to Action
Low Impact Development - Call to ActionLow Impact Development - Call to Action
Low Impact Development - Call to Action
 
NJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality Antonicello
 
Public and Private Applications for LEED-ND
Public and Private Applications for LEED-NDPublic and Private Applications for LEED-ND
Public and Private Applications for LEED-ND
 
Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009Monterey Park Economic Strategic Planning Workshop 9 May 2009
Monterey Park Economic Strategic Planning Workshop 9 May 2009
 
San Rafael Parking Lot Guidelines
San Rafael Parking Lot GuidelinesSan Rafael Parking Lot Guidelines
San Rafael Parking Lot Guidelines
 
Unleashing local dispatchable solar
Unleashing local dispatchable solarUnleashing local dispatchable solar
Unleashing local dispatchable solar
 
Davenport Green Week Presentation
Davenport Green Week PresentationDavenport Green Week Presentation
Davenport Green Week Presentation
 
Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09Leed Goals And Strategies 2.3.09
Leed Goals And Strategies 2.3.09
 
green streets_richards
green streets_richardsgreen streets_richards
green streets_richards
 
Final_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetterFinal_SierraClubLP_SSF_DSAP_CommentLetter
Final_SierraClubLP_SSF_DSAP_CommentLetter
 
California’s New Affordable Housing Laws – Part Two
California’s New Affordable Housing Laws – Part TwoCalifornia’s New Affordable Housing Laws – Part Two
California’s New Affordable Housing Laws – Part Two
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...
 
Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015Neighbourhood-Planning--Design-Standards-combined-June-2015
Neighbourhood-Planning--Design-Standards-combined-June-2015
 
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
BlueScape 2022 Update: CEQA Air Quality & Greenhouse Gas Impact Studies Webin...
 

Kristin Blackson Panel 3

  • 1. CEQA HOW TO MAKE CEQA MORE INNOVATIVE FOR THE 21ST CENTURY?
  • 2. Helpful? Unhelpful? Needs Work? What is Your CEQA Threshold?
  • 3. Infill Impediments  Discouraging Factors Development Incentives  Development costs and Improvement of  Lack of comparables Playing Field  Inadequate incentives  Density bonuses  Incompatible land uses  Low cost redevelopment land  Adjacent SF uses  CEQA exemptions and plan-  Small parcel sizes level EIRs covering infill  Confusing zoning  Crime reduction  Suburban setbacks  Improved streetscapes  Uncertain design review  Improved open space  Excessive parking ratios  Revised zoning codes  Crime concerns  Neighborhood communication  Environmental conditions  Permit process efficiency Mejias, Luis and Keakin, Elizabeth. 2008. Redevelopment and Revitalilzation Along Urban Arterials (from the Developer’s Perspective)
  • 5. Streamlining of Urban Infill EIRs  Program EIR (CCR §15168)  Master EIR (§§PRC 21157 – 21158.5, CCR §15175)
  • 6. Program EIR  Designate infill development land uses and formulate community-driven development intensity standards  Use specific plan or similar area plan in desired infill target areas CEQA:  In the Program EIR, state intent to use to streamline  Find consistent projects “within the scope” of the Program EIR or  Simplify and focus subsequent environmental documents on consistent projects Guidelines Section 15168
  • 7. Master EIR Listing infill developments or development sites as “subsequent projects” in a Master EIR for a plan or program (e.g., General Plan, Redevelopment Plan) Include type, minimum/maximum intensity, location, per Guidelines §15176(b) CEQA: Cover infill subsequent projects in the Master EIR Seek to find consistent projects “within the scope” or Limit additional environmental documentation
  • 8. CEQA Infill Exemption Inside city limits, §15332 is available. 2007 Book of Lists Survey:  100+ cities used it in 2005 and/or 2006  From 1 to 250 times  (2 or 3 times per day?) Only applies to cities, which causes much consternation for counties
  • 9. Qualifying Criteria (a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. (c) The project site has no value as habitat for endangered, rare or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. (e) The site can be adequately served by all required utilities and public services.
  • 10. CEQA Exemption for Infill Either:  at least 10 percent of housing will be sold to moderate income families  not less than 10 percent of housing will be rented to low income families  not less than 5 percent of housing will be rented to very-low income families or  the developer has paid or will pay “in-lieu fees” pursuant to ordinance in amounts sufficient to ensure the development of such units
  • 11. CEQA Exemption for Infill  PRC Section 21159.24 creates an exemption applicable where the project is:  residential on infill site  not more than four acres in total area  in an urbanized area  100 or fewer residential units  not including any single-level building exceeding 100,000 square feet  within one-half mile of a major transit stop  higher density infill housing  community-level environmental review was completed within 5 years prior to project application completeness determination, and
  • 12. Bankers Hills CEQA Case  Project (San Diego):  14-story, 14-unit residential building on 1.9 ac.  Abutting uses: Balboa Park, condo tower  Consistent with GP and zoning  Busy traffic intersection nearby  Relevant Causes of Action:  Not substantially surrounded by urban uses (park)  Not consistent with the General Plan  Significant traffic impacts would occur  Balboa Park and congestion = “unusual circumstances”
  • 13. Banker’s Hill Decision  Proper use of Class 32 affirmed based on City’s substantial evidence  Balboa Park considered an urban use  Findings of no significant impacts on traffic, noise, AQ, WQ based on substantial evidence  Conclusion that no significant impacts occurred because of unusual circumstances affirmed after considering fair argument (park and congestion were not “unusual” in urban setting) Banker’s Hill, Hillcrest, Park West Community Preservation v. City of San Diego, 4th Appellate District, May 8, 2006
  • 14. SB 375 Streamlining  RTP EIR addresses SCS. If an APS is prepared simultaneously, RTP EIR can also cover it.  Infill projects can benefit from CEQA streamlining, if they qualify
  • 15. Projects Consistent with SCS/APS Qualifications:  Residential project or mixed-use with no more than 25% non- residential  Consistent with SCS/APS with EIR (land use designation, density, building intensity, applicable policies)  CEQA Benefit: Need not repeat growth-inducing and GHG effects from cars and light trucks, nor include a less dense alternative to reduce GHG
  • 16. Transit Priority Projects Basic qualifications to be a TPP:  At least 50% residential use, with a minimum net density of 20 units/ac  If commercial use is included, it must have an FAR of at least 0.75  Located within ½ mile of major transit stop or high- quality transit corridor in the RTP
  • 17. Basic TTP – Approve with SCEA Qualify for Sustainable Communities EA:  Incorporate all feasible mitigation, performance standards, or criteria in EIR
  • 18. TPP Qualifying for Exemption Complete CEQA exemption, if meets basic qualifications, plus:  Maximum of 8 acres or 200 dwelling units served by existing utilities  No significant historic resources effect  15% more energy efficient and 25% improved water conservation, and
  • 19. Community Programs and Plans  Designate infill development areas as a special use in a General Plan, Community Plan, or zoning program  Set sideboards for land use types and development parameters CEQA:  Cover infill development in the GP EIR, Community Plan EIR, or EIR on zoning program  Use §21083.3/§15183 to exempt covered issues, and cover only what is peculiar to the site or project, not previously analyzed, substantially more severe now
  • 20. SB 226/CEQA 15183.3 Pub. Res. Code 21094.5:  Establishes streamlining method for any defined “infill project” located:  in an “urban area” in a city or county  on a previously developed site or a vacant site that is 75% contiguous to urban parcel  in a area subject to a prior “planning level decision” (i.e., a general plan, community plan, specific plan, or zoning) for which an EIR was certified
  • 21. SB 226/CEQA 15183.3  An eligible infill project must satisfy both of the following:  Any of these three conditions:  Be consistent with an adopted “sustainable communities strategy” (SCS) or an “alternative planning strategy” (APS)  Consist of a “small walkable community project” (as defined)  In a community without an adopted SCS or APS, have a residential density of more than 20 du/acre or a FAR of at least 75%  All applicable statewide performance standards adopted pursuant to Pub. Res. Code 21094.5.5 (to be effective 1/1/13)
  • 22. Plan for Infill in Advance  Plan ahead for infill, regardless of planning vehicle  Quickly coordinate local plans with SCS to add SB 375 streamlining as a possible strategy  Take advantage of existing “regular” CEQA streamlining provisions for later projects. Lead public education campaign during the planning process to help community understand the strategy  Promote community benefits, gain community support  Also, use Class 32 exemption in cities, if it applies
  • 23. Recent CEQA Movements In 2012, it is all about what did not pass.  CEQA relief for High Speed Rail  CEQA relief for LA Communication Systems  Aggressive expansion of AB 900 – CEQA relief for Leadership Projects. Get ready folks, CEQA reform/modernization/ enhancement/streamlining it is coming!
  • 24. AB 900 • Leadership Project” includes: – A residential, retail, commercial, sports, cultural, entertainment, or recreational project that:  Is located on an infill site  Is consistent with any Sustainable Communities Strategy or Alternative Planning Strategy adopted by an MPO pursuant to SB 375  Achieves LEED Silver or better  Achieves a “transportation efficiency” 10% greater than for comparable projects