KINGS AND PROPHETS
The Importance of Leadership II
THE IMPORTANCE OF LEADERSHIP II
 In 2014, we did ”The importance of Leadership: a study in the book of
Judges”. The principle seen and taught in Judges is that leadership is
needed. People need to be led and Good and Bad outcomes spring from
“good” or “bad” leadership. These events occurred early in the development
of Israel as a nation. After the solid lead of both Moses and Joshua, the
people struggled to find firm footing. So they clamored for a ‘King’ to be
like other nations. Saul failed them, David is now past on. Solomon has left
them with a divided kingdom. It is in turmoil. The now northern kingdom
of Israel and the southern kingdom of Judah will both be challenged with
finding strong faithful leaders after Solomon’s Reign. How do they do?
What does God do in an attempt to guide them along?
The Importance of Leadership: a study in Judges – Rewind and Review.
Lessons learned from both good and bad Leaders
So why do we need leaders? Isaiah 53:6
Selfish or Selfless? Is there a single quality/character trait that can identify good and bad leaders? If so, I believe that it
is this it. A good captain will always go down with the ship. A bad one; well…, we’ve all heard of these cases.
Israel after Joshua, failed to stay focused on God. The new generation was not taught. This resulted in two fatal
consequences. 1) 2)
The system for Judges as leaders had already been established and they did attempt to do the job. But what do we
learn in Judges 2: 16-19
Othniel and Ehud brought peace, law and order. They offered early corrective stability.
In Deborah, we see strong faith, wisdom and the respect of many. She was a leader of leaders.
Barak had a combination of humility and courage. Jael was not a leader by ordination, yet displayed leadership in her
actions.
Gideon became a leader, not by choice, but by necessity and God’s call. He responded with a unique form of
leadership. His style was one of deliberate caution and thoughtfulness.
Abimelech was brash, scheming, and reckless.
Jephthah (son of a harlot) put the group above self-interest. He lived by the principle of the greater
good.
Sampson – Not only is he the hardest Judge to understand, He is most likely the hardest biblical
personality period to nail down. After much study and discernment, guided by the Word of God, I now
conclude that he was indeed a consistently faithful and spirit led leader for most of his life. He had two
major error sexually, one early on with the harlot and the other at the end of his ministry and life with
Delilah.
Micah had a heart for God, but he was self-willed and self-deceived. His actions led an entire tribe’s
deception and the eventual infection of the entire nation.
Lastly, when met with a national tragedy, the leadership made both great and horrific choices. The good
ones included the hand of God. God was unfortunately left out of the decision making process in the
bad ones.
THE ROLE OF THE PROPHET
End of the life of David
 1 Kings chap 1
 Rebellious Adonijah attempts to reign
 Nathan the Prophet give David
guidance
 Solomon is rightly anointed as King.
End of the life of Solomon
 1 Kings chap 11
 Solomon’s sin has cause God to
remove him from leadership
 God raises up Jeroboam
 Ahijah the Prophet is sent to confirm
God’s will in replacing Solomon
 The Kingdom is divided
 Shemaiah the Prophet confirms to
Rehoboam God’s plan for him in the
south and Jeroboam in the north.
Historic Background of people and events
David’s son Absalom led a revolt against him. He has now passed.
David’s faithful team during that time was Zadok and Abiathar the Priests, Joab the Military leader and
Nathan the Prophet.
David is now of advanced age and dying. His now eldest son is Adonijah. He is self-willed and assumes
the role of next King. He is said to be a honorable/good man. It is also noted that David is aware of his
intentions. However, he remains neutral. He does not endorse him nor does he advise against him.
Abishag, a Shulamite young woman is given to David for his care.
Adonijah gets a host of soldiers on his side for the ready to take over power, but more important several
key leaders of David join with him. This includes, Joab and Abiathar.
However, Zadok and Nathan both stay faithfully committed to David.
Adonijah holds a Feast where intends to launch his CAMPAIGN to overthrown the government.
He invite many including his all the tribe of Judah and his brother’s (David’s remaining son’s) with the
exception of Solomon.
He did not invite Zadok and Nathan or King David’s mighty faithful soldiers.
Meanwhile, Nathan seeing all that is occurring goes to Bethsheba. He tells her to let King David know and
that he needs to step in to stop this as to keep the promise of establishing Solomon as King. He is afraid
that Adonijah would kill her and Solomon.
David steps up and restores order as King. He declares that Solomon is his choice as successor.
Adonijah learns of this and recognizes that his attempt has failed. He now fears that he will
be targeted by Solomon for revenge because of his coup attempt. Solomon tells him that if he acts
responsibly and with honor he would be fine, but if he rebels he would be killed.
After David dies, Adonijah goes to Bethsheba. He wants her to ask King Solomon to give him Abishag for
a wife.
Solomon views this as a threat to his throne. To him, it violated the promise of honorable behavior. He saw
it as wicked. He has his brother Adonijah executed.
Solomon the deals with Joab and Shimei
Joab – the military leader formerly loyal to King David during the time of Saul and even during the
revolt of Absalom.
Yet, He for whatever reason, made the decision to side with Adonijah is his revolt against David and
the attempt to undercut Solomon.
Joab had BLOOD on his hands. Not regarding his battles in war but his execution of Amasa and less
so, Absalom.
Why did the above information lead to his execution early in the reign of Solomon?
Shimei – of the tribe of Levi, was loyal to King Saul. When David became King, he initially openly
rejected David. He later came onboard and allied/supported David. Despite this, King David did not
trust him. He told this to Solomon.
Solomon informs him at the start of his reign that he is not trusted but that he would let him live as
long as he stays confined to his home. Unfortunately, after 3 years of compliance he lives to Gath,
soon to return.
Solomon learns of his breaking of the deal and has him Executed
The Last Days of King Solomon
Sad ending to a productive and glorious reign. After much achievement and national stability, Solomon’s time
ended tragically. The Bible informs us that in his later/older years, He turned his heart towards the gods of his
pagan wives. He began to worship and love them and turned away from God. Because of this , God took the
kingdom away from him.
God keeps his word and promises. Because of this and his love for David, He would keep the House of David in
Jerusalem (Judah). This naturally leads to the DIVIDED kingdom. This is HIS Legacy!
Jeroboam – a non relative servant in the house of Solomon. He rose to a position of trust and rank. God sent the
Prophet Ahijah to inform him that the Kingdom would be taken from Solomon upon his death. He was told that
he would be given the northern ten tribes and Solomon’s blood line would be given one., the aforementioned
southern tribe of Judah. This would go to Solomon’s son Rehoboam.
Solomon would seek to kill Jeroboam until his own death. Jeroboam remained away in Egypt until Solomon’s
death.
Like Father, Like Son? Lessons NOT Learned
Apparently, Solomon had been mistreating and governing certain people within the kingdom.
Some of his led advisors attempted to guide the new King Rehoboam to consider handling the people
with gentleness, compassion and mercy. Jeroboam was also involved in the attempt to give godly advise to
Rehoboam.
Name the critical concept (take-away lesson to learn) in the advise they offered. We will follow these
themes throughout our study as key guidelines to good leadership.
Rehoboam rejected this advise and came down hard on the people. Describe the group that he rejected
and compare to the group that he followed. He doubled down HARSHLY.
Rehoboam sent in Adoram (his enforcer) to squash the uprising but they stone him. The people have
turned against the heavy handed king.
He then assembles the Southern tribes and plans to go against Jeroboam and the northern tribes. God
send in the Prophet Shemaiah to tell him NOT to do this thing. This time he listens.
DOWNFALL!
King Jeroboam (Northern 10 tribes)
He built places of worship in Shechem and Penuel.
He then concludes that this would return the hearts of the people back to Jerusalem and then back to the
house of David. He concludes that this would lead the people to return loyalty to King Rehoboam.
This has him to believe that he would then be targeted and killed.
Jeroboam has two golden calves created. He tells the people that there was NO need to go to Jerusalem. He
set up one in Bethel and another in Dan.
He credits the IDOLS for getting them out of Egyptian bondage.
He ordained the 15th day in the 8th Month – devised IN HIS OWN HEART! {God ordained the 7th mo}
This thing was a SIN for the Nation
God sends a Prophet from Judah up to Bethel with a message
He delivers the word of the Lord to King Jeroboam. It is essentially a prophecy and a curse.
He speaks directly to the Altar. He states that a future King will be born in the house of David.
This Josiah would offer on the Altar the bones of the priest that burned offerings on it. What is going on here? The
sign given to verify this was…. ’the altar will be rent and the ashes poured out’.
The King’s hand withered. The alter was rent and the ashes poured out. He says to the prophet, “entreat now the face
of the Lord ‘your’ God, and pray for me. The Prophet did, and the Kings’ hand was restored.
Jeroboam invites the prophet to come back for dinner but he declines in obedience to the word of God.
However, when an old prophet heard that he was there, he sent his son’s to invite him. When he was told that the
prophet declined, he lied and told him that GOD sent him a message telling him to have dinner.
The unnamed prophet believed him. God, seeing his disobedience, informed him that he would be punished. On the
way back to Judah, he is killed by a lion. As prophesied, his body would not be laid to rest with his forefathers. He
would be laid in the site of the tempting/lying prophet.
Jeroboam would continue on in his idolatry. He made priest of men not called to be priest.
King Jeroboam’s child became ill. He sends his wife to seek out a word from God from Ahijah.
He sends her in disguise so as NOT to be known. Why?
God informs Ahijah. When she arrives, he immediately calls her out.
His GOD given message is this. I exalted you to by King of My people. I gave it to you but you have NOT sought
be as my servant David. You have done worst than any before you. You have made idols and provoked me to
anger and cast me behind your back.
When your feet again hits your city, your child shall die. Israel shall mourn for the child.
The Lord shall punish Israel. He will uproot her and scatter her beyond the river.
He shall give them up BECAUSE of the SIN of Jeroboam who made Israel sin!
HIS LEADERSHIP as the Northern Kingdom set them up for inevitable failure.
A Nation SET – UP to FAIL (Northern Israel)
Judah’s Twinkle of HOPE in the midst of rebellious guidance. (Southern Kingdom)
King Rehoboam ruled the southern kingdom of Judah without the hand of God.
It is stated that he “did evil in the eyes of the Lord”. Greater than those who had come before him.
He built places of Idol worship wherever he could. But moreover, he allowed and/or began Temple
Sodomy. This may be the issue that made his actions ‘above all that his father’s’ in regards to sin.
2 Chronicles 2:11 Because of the outright spiritual adultery of Jeroboam in the north, faithful and
Committed Priest and Levites, fled Israel to Judah and Jerusalem.
This strengthened Judah for a space of 3 years. What long term effect do you see happen
Because of this? Specifically, Fake priest in the North and some TRUE godly priest in the South.
Israel and Judah warred between each other during the reigns of Jeroboam and Rehoboam
2 Chronicles 13 ** v4
** Abijam (Abijah) did have brief positive noteworthy stance
Rehoboam reigned selfishly. He put his own needs and desires above that of God and the people.
1 Kings 14:22
Because of his rebellion and guidance the people followed and the nation was out of the will of God.
We learn that the King of Egypt invades Judah. Is there any clue in the Kings passage to indicate who
authorized this action? Confirmation of this is found in 2 Chronicles 12.
All of the Gold and precious items that Solomon had in his house and in the Lord’s temple were taken.
Rehoboam replaces these things with items of brass and has them secured with the chief of Guards.
How do we explain and interpret this action?
It may be his means of Atonement.
Rehoboam dies and his son Abijam (Abijah) reigns after him. **
His time was short lived as he did evil and walked not after God or the ways of David.
He continue the warring with Israel. The importance of a REMNANT! **
REHOBOAM’S REIGN: BAD SPRINKLED WITH A
BIT OF GOOD
1 Kings 14:21 - 28
 At age 41 begin his reign
 Reigned in Judah for 17 years
 Built high places
 Judah did evil during this time
 Egypt raided and looted in the 5th yr.
 Rehoboam replaces stolen treasures
with brass
2 Chronicles 11:5-14; 12:1-12
 Fortified cities, strengthened himself
 Ignored God. The people followed.
 Good Priest and Levites from north
arrived. They strengthened Judah for 3
years.
 God sent the Egyptian raid
 Prophet Shemaiah's message
 Rehoboam is Humbled
God’s Will in the lives of Man
The debate has waged and will continue to be debated regarding God’s Will
Particularly – Where does God’s will and Man’s free will meet and end?
Does God’s will supplant man’s choice. Does it apply to an individual or man-kind as a unit
Let’s look at the cases in this study thus-far
Jeroboam (Israel) Rehoboam (Judah)
God’s hand of blessing was placed on God’s hand was removed from
Not God’s Special Location God’s Special HOLY Location
Does EVIL Does EVIL
Near Complete Rejection Rejection with a Remnant
Rebellious Jeroboam Killed by God Humbled Rehoboam allowed to die in office
War between North (Israel) and South (Judah)
God fights against (kills) Jeroboam God fights with Abijam/Abijah
Questions:
Does God favor Judah because it is his “Heart” a blessed HOLY land? Deut. 11:12
Does he favor it because Abijam is Righteous? Does he do it DESPITE his personal evil doings?
If God’s Hand was off Judah and he GUARANTEED blessing to Israel. Why did thing go the way that they
did?
You see both things are in play. God does have a will. His will is done!
Yet we also have Free Will.
God’s wisdom is such that he can accomplish his will WITHOUT forcing individuals. Obedience and action
on the part of some can and will counter the disobedience of others. Yet, God’s will and his INTEGRITY
stays intact. All of his promises are IF…THEN arrangements. He keeps HIS WORD!
A Good King comes forth! (South) 1Kings 15:9-24 2 Chronicles 14/15/16
After Abijam, his son Asa comes to power.
He reforms the nation and changes direction back towards the ways of God.
His Grandmother, Maachah *, was deeply pagan. She worshipped pagan gods and even her personal idol.
The righteous king Asa destroyed them all, including his mother’s
He also banished the practice of temple prostitution and kicked out the sodomites.
To this end, the bible says that he “did right in the eyes of the Lord”.
He brought into the house the Lord, precious items of Gold and vessels from his families wealth.
He failed however, to remove the high places throughout the land.
Note * She was also Abijam’s (grand)mother. Why is this noteworthy?
Asa has military victory when invaded by Ethiopians
Why was he successful against this invasion? 2 Chron. 14:11
A Word from the Prophet. What was his message? 2 Chron. 15:1-7 How did Asa respond?
After the reforms, peace followed.
When war broke out between Judah and Israel, what did Asa do?
What do you think about that decision?
How did it compare to the decision and choice he made when Ethiopia invaded?
Why do you suppose he acted different against Israel?
Key Verse: 2 Chronicles 16:9
How did God inform Asa of his wrong choice?
What was the results of his Self-Reliance?
Asa was angered. He did not like the message from the prophet and had him placed in prison.
Asa would then ‘Suppress’ some of the people.
In the 39th year of his reign, he becomes crippled.
He dies in the 41st year of his reign.
Lessons learned from the life of this GOOD king!
Let’s Discuss. God wants us to remember his past blessing/guidance.
God wants willing vessels to work through to show his power and to do his will.
We sinners, do both good and bad / obey and disobey, as we serve Him.
It is up to us how we respond to God’s correction.
Be sober-minded and alert. Your adversary the devil prowls around like a roaring lion, seeking someone
to devour. 1 Peter 5:8
WHAT TO WATCH FOR – WARNING!
The Enemy is on the Prowl looking to entrap and destroy us!
What to KNOW about God! - Challenge
For the eyes of the LORD run to and fro throughout the whole earth, to shew himself strong in the
behalf of them whose heart is perfect toward him. 2 Chronicles 16:9
The Heavenly Father, Giver of Life, is actively looking to use those
Willing to be used. He wants to show his power through US!
Another GOOD KING in the South! 2 CHRONICLES 17
Jehoshaphat ruled after his father Asa
He did right in the eyes of the Lord
He walked after David and sought the Lord
He did not follow after idols and false gods
He built up the cities and strengthened the military
He sanctioned the priest to go out and begin teaching the people
The fear of the Lord came among the people. The land was blessed and other nations
Recognized this blessing and protection.
Meanwhile…. More Sin and Chaos up North! 1 Kings 16
After the reign and death of Jeroboam in Israel, legacy continues in his descendants
Nadab did evil and walked in the ways of Jeroboam his father. The people followed.
Baasha followed the same path. Continued the war against Asa. God sent a prophet to speak against him.
Informs him that his ”Posterity” would not last.
Elah, Baasha’s son, came next in line. Ruled 2 years. Again, Did evil. His chief military leader was Zimri.
Zimri rose up against him. Elah’s rule was short-lived. Why is this significant? How did God use Zimri to fulfill
prophecy?
Omri outlasted Tibni in the divided northern kingdom. His reign was 12 years and is described as evil,
greater than those that came before him.
NO REST – NO PEACE – WAR – UPHEAVEL – BETRAYAL – All the effects of rejecting GOD!
North and South Alliance: 2 Chronicles 18
Guided by Self-will/Prophets/Angels/Spirits
Jehoshaphat and Ahab come together to go against a common adversary
Jehoshaphat rightly suggest that GOD should be involved in their decision
Ahab agrees and they inquire counsel from a host of Prophets (400 men)
The Prophets give the “go ahead”. Jehoshaphat wants to ensure balance. He ask if any other
prophet was available. Ahab knows of a person ‘who he hates’ as he “always” prophesied against
him.
Micaiah does bring a message. “I will say what God said”. He then says , ’ I see all of Israel scattered
and without a LEADER”. Why did Ahab take offense?
The Prophet tells of his vision from heaven. The LORD is on his Throne. God ask the host of angelic
beings around him, “Who shall ENTICE king Ahab to go out against Ramothgilead? One volunteer
stand up. He would go out as a Lying spirit in the mouth of all the king’s prophets.
Results and Outcomes
Ahab has Micaiah placed in Custody
Jehoshaphat and Ahab proceed as planned. They invade the enemy.
However, Ahab goes in in disguise. He does not want to be recognized as the king. Why?
The King of Syria tells his men to seek out the King of Israel – Ahab.
They encounter Jehoshaphat king of Judah instead. What does he do? What was the results?
“At random, by chance”, (God’s sovereign rule) Ahab is hit in a space between the armor wounding him. He later
dies of this injury.
Lessons learned in these events. Prayer before decision making
Obtaining Godly counsel
Avoiding and recognizing bad advise
Using wisdom and heeding it when known. Be willing to change course
What do we make of the fact that God sent out a “Lying Spirit”? Is it a act of TEMPTING?
Was he manipulating Ahab? James 1:13
So, Who is to blame for the death of AHAB? Is it God’s or is it Ahab’s?
Here are the facts as presented.
Ahab came up with the idea of attacking Ramothgiliead
He had made an alliance with the King of Judah, who was righteous and blessed of God.
This may have given him a false sense of assumed victory. Bottom-line, It was IDEA.
It was not HIS idea to ‘enquire of the Lord” to see if he should invade. He did agree when prompted
He called on his “YES men” Prophets whom he knew would give him the OK.
He avoided calling the one prophet whom he knew told the truth.
When the truthful prophet gave what essentially and effectively was a WARNING to NOT DO THIS. He ignored
it and proceeded anyhow. What proof / clue do we have that even Ahab himself knew that he should not have
proceeded? He knew that GOD was ACTUALLY attempting to STOP him.
God, however, knew that he would NOT heed the message. God knew that this would be his death.
Conclusion
God’s will was done (punishing a evil and wicked king, who led the people further astray.
God used Ahab’s own pride and ignorance against him. For he trusted his yesmen (and I believe
falsely assumed protection and blessing from his alliance with godly Jehoshaphat.)
Ahab allowed his self-willed arrogance to blind him with ambition.
Prior to his pulling the trigger on actually going ahead with the plan, GOD sends a crystal clear
message explaining that it was a LYING SPIRIT from the THRONE OF GOD enticing him to go ahead.
This was his opportunity to CHANGE HIS PLAN.
Ahab COULD have avoided death on that day and in that matter if he would have HEEDED.
GOD’s Punishment - GOD’S Will – GOD’S – Guiding hand, Yet Ahab’s choice!
Ahab, Jezabel and Baal vs Elijah and GOD! 1 Kings 16 to 18
During Ahab’s reign he made allegiance with enemies of Israel
He married an evil woman who became his Queen.
He encouraged all to worship, trust and follow Baal. A false god, but one worshipped by the pagans.
The pagan credited Baal with their success – specifically, controlling weather and blessing the harvest.
Enter Elijah, God’s prophet. He confronts King Ahab and tells him that there would be no rain or dew for years until
the Lord God speaks it. God then tells Elijah to flee and hide. God would provide food and water. First by the
unexpected care of Ravens. This would be followed by an poor widow and her child.
During the drought, God keeps his promise and Elijah is cared for and protected. During the stay with the widow,
her son dies. Elijah’s heartfelt plea to the Lord for his grace. God resurrects the boy and the faithful woman knows
for a fact that Elijah was a true man of God.
After 3 years, God tells Elijah that it is now time to challenge Ahab.
He goes to find the king, but he first meets with another prophet – Obadiah.
He ask Obadiah to inform Ahab that Elijah wants to meet him but Obadiah is afraid to do so. He fears how Ahab
and Jezebel would react. He informs him that Jezebel had many prophets killed and how he himself, hid and cared
for 50 of them.
Elijah assures him that God was with him and that he would be faithful to show up as promised.
Elijah keeps his word and does meet with the evil king Ahab.
The king ask, ’are you the one that brought trouble to the land’. Elijah puts the blame right on the King. He
tells the king that it was his fault for leading the people into worship of the false god Baal.
He then tells him to gather up all of the prophets of Baal to the site at Mt Carmel. When they and all the
people of Israel come, Elijah tells them that now was it time for them choose. Who will you follow, The Living
and true God of their fathers or the false idol god, Baal.
The Challenge – both he and the prophets of Baal would be given a bull to sacrifice and pit with wood.
Neither would have fire. Elijah would call on the one true living God and the prophets of Baal would call out
to him. The God that start the fire to cook the offering would be recognized as the true God. Who will win?
Who were the people betting on? Who will the people chose to follow?
The Prophets of Baal go first. Despite all of their efforts they get NO RESPONSE for their god.
They beg, wale, beat and cut themselves to no avail. The more they do so, the more Elijah mocks them.
After their failed attempt. It is Elijah’s turn.
He prepares the offering using 12 stones to represent the tribes of Israel. He built it in the name of God.
He instructed them to dig a trench around it. He then had it and the wood saturated with water x 3.
He offers prayer to God. He acknowledges the forefathers. He asked that the people’s eyes would be opened to see
that he is the ONE and Only God. That they would then repeat and turn to Him.
God ignites the fire and everything is burnt up, even the water in the trench! The people’s eyes are opened and they
do repent. Elijah then executed the false prophets of Baal.
As promised, God brings the Rain, ending the drought. Ahab is humbled and returned to his home where evil
Jezebel awaits
Jezebel learns about the events involving Elijah and sends him a message
Upon hearing her threat, Elijah is filled with fear and flees. At a certain point, he has his assistant stay behind. Where
do they go?
Why does he state, “Take my life, for I am no better than my fathers”?
God once again sustains him miraculously. He then travels 40 days and nights until he was at Mount Horeb.
God then asked him, ”What are you doing here?”. Elijah pleads his case. He voices that he has been a strong and
zealous prophet to the people but they have rejected and killed your prophets and now seek to kill me. “I am the
only one left”.
Where is GOD?
God instructs Elijah to go out of the cave and onto the mountain. He tells him that HE, God would pass by.
Then, a mighty destructive wind goes by.
Next, a powerful Earthquake. Soon, followed by a Fire. In each we are told, “but GOD was NOT in the ___!
Then after all of these fear invocative demonstrations, GOD arrives in a STILL SMALL VOICE. Elijah recognized his
voice. He covered his face and went out to the mouth of the cave. Again, God asked, What are you doing here? He
again bemoans that he has faithfully served God, yet the people reject and the he is the only one left faithful.
He tells Elijah to return. He was to anoint Hazael king of Aram and Jehu king of Judah. He was also to find Elisha, and
place him as the new prophet of Israel. Jehu would put to death any that escaped Hazael and Elisha would put to
death any that escaped Jehu. 1Kings 19:15-17
He informed Elijah that he in fact, was NOT the only faithful servant. That there were reserved 7000 in Israel, who had
not bowed a knee to Baal and mouth had not kissed him!
Lessons to learn…
God wanted Elijah to know that he was NOT in the loud destructive and threatening things.
Therefore, he should not have feared. Jezebel was that loud threat, and likewise should not have been feared.
God was in the still small voice. Elijah, lost focus. He failed to listen, hear from, and wait for God to instruct him.
He just ran.
I believe that Elijah knew this soon after fleeing. This may be why he was DEPRESSED. Not for being pursued by
Jezebel, but over the guilt and shame in knowing that he should not have fled.
God is patient and kind to his servant. Despite Elijah’s short coming, God has a new assigment.
He has more things for him to accomplish.
Covetousness, Greed, and Political Corruption
Naboth is the owner of valuable land. King Ahab had his eye on it and wanted to get it.
Naboth declined Ahab’s offer to buy it. Naboth honored his inheritance above financial gain.
He would not cave to political pressure. Ahab went home defeated. He whined to his wife.
Jezebel took control. Paraphrase – ‘You are king – take what you want”. She crafted a letter and sent it to local
elites and political leaders. The plan was to bring Naboth to a meeting. She had them place 2 false witnesses to
lie about him. He is falsely accused and falsely convicted and stoned to death.
God sends Elijah back to confront Ahab about this devious acts.
It is prophesized that he would die at the same spot as Naboth was stoned. It was also stated that his family line
would end and that Jezebel would die by the wall in Jezreel. Her body would be eaten by wild dogs.
Upon hearing, Ahab is humbled and has a repented heart. God acknowledges this heart felt act.
Lessons learned in these events
Ahab was NO leader! Despite being king. He allowed Jezebel to take the lead.
He married the daughter of a foreign kingdom and took on her idol worship. He promoted Baal worship
Ahab and Jezebel broke many of the 10 commandments of God.
# 1 # 2 # 4 # 6 # 8 # 9 #10 All of these were broken in just the 3 chapters
Jezebel was 100% pagan. She was pure evil and motivated by power, gain, and operated with violence.
The people of Israel willingly followed. They are not innocent victims. They pay the price for following bad leaders.
Despite what could be seen as Elijah’s prior ’failure’, God did not hesitate to go to Elijah as his servant.
Elijah did not fear confronting Ahab.
God shows his mercy by giving Ahab credit for showing true repentance.
LIFE UP NORTH AFTER AHAB
2 Kings Chapter One
 The Northern Kigdom of Israel
 God deals with Ahab’s descendant
 King Ahaziah’s rebellion through the
Prophet Elijah
2 Chronicles Chapter 20
 The Southern Kingdom of Judah
 Follow the End of the Reign of Good
King Jehosaphat
Up North…. After Ahab’s Death 2 Kings Chapter 1
He son, Ahaziah follows in the footsteps of Ahab and after the ways of Jeroboam.
As things would go, He is injured and is fearing death.
He call for a word from a false god to give insight. He deploys staff to seek out this advise.
Knowing this, God has Elijah intercede the messenger. He tells him to go back to the king with a question
“Why are asking for help from a false idol, why not ask the God of Israel? Don’t I exist?” Paraphrase
Ahaziah does not like this. He sends him back and God destroys the leader and his 50 men.
Ahaziah sends a second set of 50 with another leader and the same thing happens.
Ahaziah is not phased. He sends a 3rd group. But this leader tells Elijah, ’I don’t want to end up like the other
messengers. So, God tells Elijah to return to Ahaziah with the group and deliver the messege directly to the King.
Upon delivering the message, he proclaims that he will truly die.
The king dies as stated.
What are we to learn from this story as it is told and how it is laid out in this manner?
What was the purpose of having group 1 and 2 to go back to the king with the Question?
Was it a ‘Crossroad’ event?
What does Crossroad events show us about God?
Is it significant that the first 2 groups were destroyed? If so, why and what to learn from it?
Why was the 3rd group not destroyed?
What evidence do we have to suggest Ahaziah was NOT going to repent?
Lastly, in terms of Legacy. Who does all of this rebellion in the north trace back to?
Down South Good King Jehosaphat comes to an end – Good, not Perfect! 2
Chronicles 20
Recall in chapter 18, King Jehosaphat agreed to help evil Ahab up north to fight their common
enemy.
He used good judgment in seeking out godly consult (remember the lying spirit from God)? It all
worked out as God would have it and ultimately Ahab came to his death.
However, in the telling of the story we did not know if it was God’s will for Jehosphat to help at all.
Well, we find that out in chapter 19.
The Prophet Jehu informs the good King by asking, “Should thou help the ungodly, and love them
that hate the Lord?” This showed God’s displeasure.
God promised his wrath. In this chapter, the Ammonites and Moabites come to invade
Word arrives that an invasion is pending. King Jehosaphat calls for a national fast.
Jehosaphat then offers up to God prayer and guidance. He was humbled.
He acknowledged God for who he is and for what he has done.
He asked that God would intervene on their behalf in dealing with the ongoing threat.
Jahaziel the Prophet offered comfort. You and the people need not worry. God’s got this!
The various factions of the invading armies will proceed to fight and kill each other!!
The children of Judah took plunder for 3 days and on the 4th day worshipped the Lord.
He walked in the ways of his father Asa and reigned for 25 years. He did good in the eyes of the Lord.
Yet, the high places were not taken down and he agreed to fight along side Ahab , which was NOT in the
will of the Lord. Here we learn why the high places were not removed. Why?
God did punish him. He had a ship building venture that was joined into with Ahab. God destroyed the
fleet of ships at sea as means of his wrath.
TWO KINGS, TWO DIFFERENT PATHS
AND OUTCOMES
Ahaziah (Northern) from Ahab
 Did Evil
 Rebelled against God
 Served Idols
 Elijah the prophet spoke against
 This king would not repeat and would
not call on God when he had the
opportunity to do so.
 Failed Leader
Jehosaphat (Southern)
 Did Good
 Respected and obeyed God
 Served God
 Jehu the prophet rebuked him
 Jahaziel the prophet guided him
 This king called upon God when in
trouble
 Successful Leader
All GOOD things come to an end, Judah goes astray in the south (2 Chron
21)
After the death of Good King Jehosaphat, he is succeeded by his son Jehoram.
Jehosaphat had 6 other sons. The king left each of them much wealth.
Jehoram was given the kingdom, but would have them executed. Why do you think he did this?
Instead of modeling his life after his father, he chose to follow the ways of AHAB.
One likely reason was the influence of his wife, Ahab’s daughter.
Despite his evil leadership, God would NOT abandon Judah – being faithful to his word of promise to king
David.
Southern Kingdom begins to CRUMBLE
Apparently, two separate non Israelite people groups were living under the reign of Judah
The two were the people of EDOM and of LIBNAH.
However, because of the new King Jehoram and his actions they both revolt.
Jehoram without explaination rose up against Edom and slayed a host of them. This began their revolt.
This was likely enough to see to provoke Libnah to also decide to part ways with Judah.
Elijah writes a letter to the evil king. In it he points out that he had departed from the ways of
Jehosphat, his grandfather Asa and king David. Instead deciding to walk evil in the way of Ahab and
Jeroboam and the children of Israel up north.
He accused them of going WHORING AFTER. Again this is Spiritual adultery to God. He calls him out
for killing his brothers.
Because of these things – God tells him that he would be stricken with a very specific illness.
Why do you think God would be so specific in telling him how he would die and what he would
die from?
He would also suffer foreign invasion.
His kingdom would suffer financial and material loss.
His family would also be destroyed except for one son, Jehoahaz
He suffered two years and then died. He reigned 8 years.
He was not honored by the people.
He was buried in Jerusalem but not in the sepulcres with his Fathers.
He is succeeded by, his son and then his mother. Both did EVIL before God.
As God had promised, he sent his servant Jehu to punish. * 1 Kings 19:16
Ahaziah : Next in line Down South 2 Chronicles 22
The people made Jehoram’s only surviving son, Ahaziah the next king of Judah.
He followed after the ways of his now dead father and still alive mother Athaliah.
Athaliah followed after Ahab in the north along with many wicked counselors
Ahaziah was 42 y/o when he was installed. He was influenced and guided by the above.
He joined forces with Ahab’s son, Jehoram, to battle a common enemy.
This was unfortunate. For this was the anointed time of God to deal with Ahab’s descendants.
Recall how God told Elijah to crown the king of Syria and to anoint Jehu. Jehu would be used to destroy
the house of Ahab. Well, Jehoram would be injured and would die.
By joining forces and aligning with him, Ahaziah would be executed himself.
This did NOT need to occur, but did occur because of his poor choices.
Another EVIL women – Athaliah: Power over Family
After the death of her son, Athaliah sets about to kill her own son’s children and any male heir to the
throne. In her mind, she wanted the throne and actively eliminated all potential threats.
Jehoshabeath, the daughter of the deceased king hid her brother Joash.
Apparently, Athaliah did not know about him. So, she take reigns of the kingdom and had a briet stint in
power. Joash remained safe and in hidding until the treat of Athaliah was gone.
He was hid within the House of God for six years. This is interesting for 3 reasons. Hint. 1) Faith 2) Behavior
of the unholy 3) Crossroads
During these 6 years, Jehoiada the priest along with other faithful Priest and Levites were strengthened.
Then went throughout Judah and found the faithful. These would be mobilized to take back the kingdom
and place it back in line with king David and with the Will of God.
With the military and much of the people behind them, they made their move. Evil Queen Athaliah hear
the uproar and considered it “treason”. She would be killed. Jaash would be rightfully placed in office and
anointed king in Judah.
The Good Priest Jehoiada – Takes the Lead. 2 Chron. 23
After organizing and orchestrating the take-over and putting the right king in David’s seat, He made
commitments, more strongly covenants with the people, the king, and with God.
First on the to-do list – Destroy the presence of Baal.
He restored the offices and function of the house of Judah as set up by David.
He restored burnt offerings. The Law of Moses. Worship. Law and Order.
He placed the king back on the Throne of David.
Results – The People Rejoiced.
Questions. Why did the people not step up before? Why did they follow the ways of Jehoram in the first
place? What does this say about us as humans?
God keeps his promise – Ahab’s line is CUT OFF and Jehu is the new King up North!
2 Kings Chapters 9 and 10
Just as Elijah was told, Elisha is now the Prophet. He anoints Jehu as new king.
Jehu is now the King in Israel
As prophesied, He would be the one to put an end to the evil rule of Ahab and Jezebel.
The current king Joram is engaged in battle with Syria. He was injured and returned to Jezreel to heal.
Joram sees his approach and sends messenger to see if he came in peace.
Joram, king of Israel and Ahaziah, king of Judah gather to meet Jehu on the battlefield.
Jehu informed them that they did no deserve PEACE because of their sins and the acts of Ahab and Jezebel. They
Jehu would die in the field that was stolen from Naboth.
Ahaziah would attempt escape – but would fail. He too would die at Jehu’s hand.
Queen Jezebel would be next.
Ahab family Round-Up!
After the two Kings and Queen Jezebel are disposed of, Jehu turns his attention to wiping out all of the
descendants of Ahab.
So, Jehu sent letters out to the leaders in Jezreel. He told them to locate the 70 remaining male descendants
of Ahab and to choose the best of the lot. They were to then place that son on Ahab’s throne to crown as
their king. They would then challenge Jehu in battle to see which team would win control of the northern
kingdom of Israel. But the leaders were afraid for they could not get volunteers from Ahab’s family.
So, he gives a new challenge. Since they won’t fight me. You prove that you are on my side.
Go and hunt down all of them, kill them and bring me their heads.
They complied. All gathered at the gate of the city where the piles of heads were laid.
Jehu announced that he was doing God’s will and then proceeded to eliminate the remaining followers of
Ahab.
Jehu destroys the remnant of Baal
Jehu then gathers all the priest of Baal. How did he get them to come into his presence?
Was he a Baal worshipper? Did his plan work?
He was very selective. He made sure that NO non followers of Baal would come.
Once all gathered for their solemn day of worship and sacrifice to Baal, Jehu had 80 soldiers gathered on
the outskirts.
This was a trap. While the Baal worshippers were engaged in the religious ceremony, Jehu instructed the
men to enter in to kill them. He threated the lives of the executioners if they let any escape.
He then destroyed all of the idols and alters of Baal.
Unfortunately, Jehu did not FAITHFULLY serve God from his heart.
He would go on to resume the Idolatry of Jeroboam.
Joash: The ‘Leader’ who needed a Leader
2 Chronicles 24
During the life and under the guidance of Jehoiada the Priest, King Joash did good.
He was a boy when he began, He reigned for 40 years.
Jehoiada not only took down all the Baal, He restored worship to God.
Joash was moved to restore the house of God. He even questioned Jehoiada as to why the
Levites have not yet responded.
Through his efforts money was raised to restored and rebuild the things of God and the people
rejoiced. They restored burnt offerings unto the Lord.
Unfortunately, Jehoiada passed. After this, other influencers surrounded Joash.
They brought up the idea of returning to idol worship. He FOLLOWED their advise.
Prophets of God are sent to correct them but they rejected.
They stoned Jehoiada’s son – Zechariah. King Joash approved the execution.
The Lord God of Heaven holds him accountable.
God sends his wrath via the people of Syria and King Hazael. He uses them to attack Judah
The princes of Judah were killed. King Joash was left to die but was killed by his own servants.
So Joash is given a MIXED grade report card. NOT all BAD / Not all GOOD.
He did some good on his own initiative but seemed to lean on the guidance of others.
He was highly influenced. More of a follower than TRUE Leader!
Yet, accountable as he clearly made his own decisions.
Why is King Hazael important? You should remember him!
Elijah passes baton to Elisha
Just as God had ordered. Elijah ordained his replacement
Many at Bethel seemed to know that something was going to happen but not quite sure of the details
The same thing occurs at Jericho.
Fifty son’s of Prophet’s met Elijah and Elisha at the Jordan.
After they get to the Jordan River. Elijah demonstrated the power of God. He ask the young Elisha
if he could do anything for him. Elisha request if for a double portion of his gift.
The sign of if this would be given would be if God allowed him to see his departure.
They would soon be separated by a heavenly host of fiery horse and chariot. Elijah would be taken to
Heaven and Elisha would see the whole event.
What clues do we get showing that Elisha did indeed inherit the double portion he requested?
Mockery punished
Some youth disrespect Elisha.
What did they mean? “Go up, Bald head, Go up”
Were they picking on him for the physical look only?
Was it because he was perceived as UNCLEAN?
Was it because of his position as a servant of God , and therefore a rejection of GOD?
He then places a curse on them
We learn that 2 Bears come out and over 40 of them suffer physical injury.
What lesson was intended to be made and learned by them?
Is there a lesson for us in this event?
Is there a modern equal in how we are to respond or has this been changed?
Heb. 10:30 Matt. 5:39 Rom 12 1 Tim. 6 and 2 Pet. 3
Elisha’s Ministry: 2 Kings 4
Social service intervention
One of the wives of the Prophet’s presents to Elisha and informs him that her husband has died.
Making matters worst is that he left behind a significant amount of debt. The debt collectors are now coming
to her for payment.
Utilizing the wisdom of Solomon and power of Elijah, Elisha asked her what did she have in her household
(of value). She states that she has one jar of oil. He has her go to all of the local households to collect every
possible spare Jar. Her son helps to gather and place in the her house.
Elisha then fills every container from the one container that she had. (sound familiar?)
What else does this sound similar to? HINT Think new testament.
Once they are all filled, he instructs her to go and sale the newly produced oil to the public and use the
profit to pay off the creditors.
Hospitality rewarded by Gratitude
Elisha is now introduced to couple. The wife is described as a Shunammite.
She has a great heart for service and hospitality. She and her husband provide meals and housing for Elisha
and his servant every time he is in the area.
Elisha wants to show his appreciation. He has his servant call for her to ask what she may need.
She has no request. However, the servant observes that her husband is old and that she was childless. Elisha
calls for her and when she arrives he tells her that she will be a mother by next year. “Don’t lie to thy
servant”, she replies. What do you make of this action and her response?
As prophesied, the woman does indeed give birth to a child.
As fate would have it, one day the child becomes ill and dies.
The woman takes immediate action. She places him on the bed where Elisha slept. She then goes to her
husband and tells him to send for the Prophet Elisha. He does not act. Why?
The Woman mounts a donkey with her servant and tells him to go straight way to the Prophet and not
to slow down unless she says so. What does her actions show about her?
Elisha sees her from afar and tells his servant to go find out if there was a problem with the husband or
the child. She tells the servant that there is not a problem
When she gets to Elisha, she falls to his feet and is distressed. She says, “I told you not to deceive me”.
Elisha learns that the child has died. He instructs the servant to return to him and to place the prophets
staff on the child’s face. The woman is not satisfied if Elisha does not come along. The initial attempts
to bring to child to life fails.
Elisha then goes to the boy and lays on him. He is brought back to life! Sound familiar??
Famine and Bad stew, made anew!
Back at Gilgal, there is a famine in the land.
Some of the son’s of Prophets needing food, go and gather vegetation to add to stew.
When they eat it, they soon realize that what was put in it was not edible and likely poison.
Elisha tells them to add flour to it and when they did – they were able to eat.
Then a traveling man came with 20 barley loaves. Elisha tells them to distribute this among the people. The
men ask in disbelief, that is NOT enough to feed a hundred in need.
Elisha says to do it as this is what the Lord instructs. He says that there will be plenty of leftovers
Sound Familiar?
Tests of FAITH!
A courageous and honored military leader in Syria has Leprosy. His name was Naaman.
His loved ones would love for him to be healed. There is a young Israelite maiden who suggest that he
would be healed by a prophet of the Lord.
The King of Syria likes the idea and arranges for a message and payment be delivered to the King of Israel
to request help in this matter. Strongly suggest this to be Jehoram. Jehu is not anointed King until chapter
9.
The King of Israel’s response was of suspicion. He thought it was a plot to start a war between the nations.
What was his reason to think this way? This showed his spiritual state!
Elisha hears of the Kings response and goes to him with a plan of faith. He tells them to have Naaman
come. He would demonstrate that Lord of Israel is the God of all.
When Naaman arrives, Elisha tells his servants to instruct Naaman to go the Jordan river and to
dip/submerge in the river seven times.
Naaman is OFFENDED!
In his mind this request and the procedure of bathing in the Jordan was fruitless.
He had in HIS mind how Elisha should heal him. His EXPECTATIONS.
He reasoned that there were better water sources in his homeland. Why in the dirty Jordan?
This made Naaman very angry. He stormed off to head back home to Syria.
Yet, His own servants reasoned differently. They say to him, ‘If the Prophet would gave you a complicated list
of things to do to get healed, you would have done it. Why not do the simple task?” **
He relents. He goes and does it ELISHA’S way. Guess what?! It works!!!
Naaman is healed. It is said that his skin becomes as a young child’s.
Gratitude and Deception
Naaman is so pleased that he wants to go beyond what his King had give to their King.
He offered direct gifts and payment to Elisha in thanks for his miraculous healing.
He does acknowledge that Elisha’s God is like none-other.
Elisha declines the gifts. Naaman then ask if he could load as much dirt/soil as two mules could carry. He
stated that he would not worship the gods of his land. Elisha says “go in peace”.
Naaman leaves but Gehazi follows after him. He tells Naanam that things have changed. He says that
Elisha does now want his payment. He tells him that two sons of the prophets were in need.
Naaman agrees to the payment. Gehazi returns to Elisha and is asked, “where have you been?”
Gehazi says that he has not gone anywhere. Elisha knows that this is not true. How?
What was the consequence of Gehazi’s lies and actions?
LESSONS LEARNED from NAAMAN AND GEHAZI
The young maiden knew that the God of Israel and his prophet could heal Naaman
King Jeroboam showed that he was faithless and estranged from God. Syrian King had more faith.
The Syrian’s did not have the STIGMA against Lepers as was in Israel. Why?
Is this Good or Bad?
Naaman was not a man of faith but did learn about faith and of the power of God.
He thought he needed to do things his way. But did he TRULY learn the lesson??
**How does this relate to the GOSPEL and RELIGION?
Does he get healed on the inside, as he did on the outside?
How do we explain Gehazi’s fall from Grace?
He had been a dutiful and faithful servant.
Was this a brief lapse in judgment or evidence of his character?
Did the curse of Leprosy bring him back to God, or push him further away?
Could the Jordan river miracle be symbolic of the NEW TESTAMENT practice of Water Baptism?
More Elisha Miracles and Encounters- 2 Kings 6 and 7
The son’s of the Prophet’s ran out of living space. The request was to add more by building.
One of them lost the head of a IRON AXE when it fell off and into the Jordan.
It as borrowed and the man was concerned that he lost it and it would need to be replaced
Elisha has a stick that he threw in the water and this action causes the IRON AXE head to float to the
surface to be easily retrieved.
Elisha is aware of the plans of the King of Aram to invade Israel. He informs the king of this plot.
The king of Aram is certain that he has a trader giving away his secret plans to the enemy.
One of his servants tells him that it is because Elisha, Prophet of the God of Israel can know and tell of
the things that you speak while you are in your bedroom.
The Aramean king wants the head of Elisha. He sends a host to get him in Dothan.
When he is found there, it appears that the Prophet is outnumbered and doomed.
His servant is fearful but Elisha assures him that all is well and not to fear. He then prays,
“Lord – open his eyes that he may see”.
God allows the servant to see a vast host of angelic power in their presence.
Elisha prays that the army would be blinded. He then leads them to the King of Israel. The
king is not sure what to do with them and ask Elisha if it was ok to kill them. He says not to.
He tells them to feed them and return them to their king. They do not invade them again.
Questions: Why is God by way of Elisha giving warning to Jehoram?
What does this say about God?
In this story and the one with Naaman, who showed true LEADERSHIP, the
prophet or the king? Explain
After passage of time, the region is experiencing a significant famine.
While traveling, King Jehoram encounters a woman who begs and pleads for help.
His response…. Both leaderless and faithless.
He does however, asked her what her specific issue of concern is.
Her response is shocking!! In the midst of the inflationary times, she makes a deal with another woman.
They agree to cannibalizing their children. In an horrific exchange one child to be offered on one day and
the other the next.
Apparently, this woman followed through and killed her own son for a meal but on the next day the other
woman did not follow through.
Hearing this the king is deeply troubled and moved to tear his clothes. He then in a real sense, puts
bounty out on Elisha. He wants the prophet’s head. Why is he blaming Elisha for the state of things in
Israel?
Elisha is again provided with supernatural revelation (information from God). He knows that they coming
to kill him.
What does he mean when he says, “Calamity is from the lord, why should I wait for the Lord any
longer?
What does this say about him?
Elisha then tells the officer of the kings court that the economy will recover, yet they would not be
able to experience the turn-around. Why?
A group of hopeless Lepers decide to take desperate action. You can say that it was a suicide mission
like it would be in a death by cop act.
Yet, a miracle occurred. Before they arrived at the enemies gates, the enemy had abandoned their
place fully stocked.
They begin to indulge and keep all of the materials for themselves but good conscience keeps them
right before God. They decide to inform King Jehoram of the good fortune.
Again, Jehoram believes this is a trap.
His men intervene and with logic convinces the king to allow a small team to go and check things out.
They reason that things are desperate and that all if Israel is doomed otherwise.
Upon doing so, the scout team confirmed that the Arameans had indeed fled and left quickly without
care.
The king allows the people to go into the Aramean camp. Just as Elisha predicted, the king’s officer who
he spoke to would not benefit from the new economy. He is trampled to death by the people.
Lessons Learned in Chapters 6 and 7
God cares about the small and seemingly unimportant things in the lives of his people.
If important to you, it just may be important to God. He cares and is mindful.
Miracles are used to show his power and to get us to acknowledge him and to come to him.
No miracle is done just to do. It is a means to bring one to truth and to trust.
Elisha wanted his servant to know that God had their back when he prayed that they were not out
numbered. He allowed him to see that surrounding chariots of fire backing them up.
God showed mercy to the Aramean’s. He treated them with hospitality and allowed them to return home
unharmed. How, does this compared times of Israel’s outright rebellion?
What does the story of the women say about the state of the spiritual life of the Israelite
People at this point?
End of Elisha’s Ministry 2 Kings 13
During this time, Jehu’s son, Jehoahaz ruled in the north and Joash’s son Amaziah ruled in the south.
Jehoahaz did evil in the sight of God. He followed Jeroboam, not his father Jehu.
He made the people sin and the anger of the Lord was kindled against them.
Once again, God used foreign enemies as his tool to punish. Syrian kings Hazael and his son Benhadad
At some point Jehoahaz sought out the Lord and the Lord heard him and intervened. Yet, he and the people failed
to repent and continued idol worship. His army was depleted and he died.
His son, Jehoash ruled after him. He did evil. In the south, a good king Jehoash ruled.
Elisha was ill and dying. Jehoash of Israel went to him. Elisha assisted him with the battle against Aram.
However, Elisha used a bow and arrows to determine his success. He only provided partial victory. Why?
Elisha dies and is buried. What happens when a man is thrown in his tomb?
Hazael harrassed Jehoahaz thoughout, but God’s grace gave Joash some victory ? Why
Fighting between Brothers 2 Kings 14/ 2 Chron 25
While things were not great in Israel, Judah has had more positive outcomes
After a fairly good king in Joash, his son Amaziah ruled. He also started out good
He ruled 29 years. Yet, he failed to take down the high places and the people continued idolatry
He killed those who killed his father but not the son’s, he followed Moses law. He had victory over the
Edomites.
Amaziah attempted to work with Johoash in Israel but the northern king did not trust him. He accused him of
“Pride” He led an attack on his kinship in Judah. He captured Amaziah and took wealth from the house of the
Lord.
Explain how God use both?
During Jeroboam II, the prophet Jonah was active in the north

KingsandProphets2.pptx

  • 1.
    KINGS AND PROPHETS TheImportance of Leadership II
  • 2.
    THE IMPORTANCE OFLEADERSHIP II  In 2014, we did ”The importance of Leadership: a study in the book of Judges”. The principle seen and taught in Judges is that leadership is needed. People need to be led and Good and Bad outcomes spring from “good” or “bad” leadership. These events occurred early in the development of Israel as a nation. After the solid lead of both Moses and Joshua, the people struggled to find firm footing. So they clamored for a ‘King’ to be like other nations. Saul failed them, David is now past on. Solomon has left them with a divided kingdom. It is in turmoil. The now northern kingdom of Israel and the southern kingdom of Judah will both be challenged with finding strong faithful leaders after Solomon’s Reign. How do they do? What does God do in an attempt to guide them along?
  • 3.
    The Importance ofLeadership: a study in Judges – Rewind and Review. Lessons learned from both good and bad Leaders So why do we need leaders? Isaiah 53:6 Selfish or Selfless? Is there a single quality/character trait that can identify good and bad leaders? If so, I believe that it is this it. A good captain will always go down with the ship. A bad one; well…, we’ve all heard of these cases. Israel after Joshua, failed to stay focused on God. The new generation was not taught. This resulted in two fatal consequences. 1) 2) The system for Judges as leaders had already been established and they did attempt to do the job. But what do we learn in Judges 2: 16-19 Othniel and Ehud brought peace, law and order. They offered early corrective stability. In Deborah, we see strong faith, wisdom and the respect of many. She was a leader of leaders. Barak had a combination of humility and courage. Jael was not a leader by ordination, yet displayed leadership in her actions. Gideon became a leader, not by choice, but by necessity and God’s call. He responded with a unique form of leadership. His style was one of deliberate caution and thoughtfulness.
  • 4.
    Abimelech was brash,scheming, and reckless. Jephthah (son of a harlot) put the group above self-interest. He lived by the principle of the greater good. Sampson – Not only is he the hardest Judge to understand, He is most likely the hardest biblical personality period to nail down. After much study and discernment, guided by the Word of God, I now conclude that he was indeed a consistently faithful and spirit led leader for most of his life. He had two major error sexually, one early on with the harlot and the other at the end of his ministry and life with Delilah. Micah had a heart for God, but he was self-willed and self-deceived. His actions led an entire tribe’s deception and the eventual infection of the entire nation. Lastly, when met with a national tragedy, the leadership made both great and horrific choices. The good ones included the hand of God. God was unfortunately left out of the decision making process in the bad ones.
  • 5.
    THE ROLE OFTHE PROPHET End of the life of David  1 Kings chap 1  Rebellious Adonijah attempts to reign  Nathan the Prophet give David guidance  Solomon is rightly anointed as King. End of the life of Solomon  1 Kings chap 11  Solomon’s sin has cause God to remove him from leadership  God raises up Jeroboam  Ahijah the Prophet is sent to confirm God’s will in replacing Solomon  The Kingdom is divided  Shemaiah the Prophet confirms to Rehoboam God’s plan for him in the south and Jeroboam in the north.
  • 6.
    Historic Background ofpeople and events David’s son Absalom led a revolt against him. He has now passed. David’s faithful team during that time was Zadok and Abiathar the Priests, Joab the Military leader and Nathan the Prophet. David is now of advanced age and dying. His now eldest son is Adonijah. He is self-willed and assumes the role of next King. He is said to be a honorable/good man. It is also noted that David is aware of his intentions. However, he remains neutral. He does not endorse him nor does he advise against him. Abishag, a Shulamite young woman is given to David for his care. Adonijah gets a host of soldiers on his side for the ready to take over power, but more important several key leaders of David join with him. This includes, Joab and Abiathar. However, Zadok and Nathan both stay faithfully committed to David.
  • 7.
    Adonijah holds aFeast where intends to launch his CAMPAIGN to overthrown the government. He invite many including his all the tribe of Judah and his brother’s (David’s remaining son’s) with the exception of Solomon. He did not invite Zadok and Nathan or King David’s mighty faithful soldiers. Meanwhile, Nathan seeing all that is occurring goes to Bethsheba. He tells her to let King David know and that he needs to step in to stop this as to keep the promise of establishing Solomon as King. He is afraid that Adonijah would kill her and Solomon. David steps up and restores order as King. He declares that Solomon is his choice as successor. Adonijah learns of this and recognizes that his attempt has failed. He now fears that he will be targeted by Solomon for revenge because of his coup attempt. Solomon tells him that if he acts responsibly and with honor he would be fine, but if he rebels he would be killed. After David dies, Adonijah goes to Bethsheba. He wants her to ask King Solomon to give him Abishag for a wife. Solomon views this as a threat to his throne. To him, it violated the promise of honorable behavior. He saw it as wicked. He has his brother Adonijah executed.
  • 8.
    Solomon the dealswith Joab and Shimei Joab – the military leader formerly loyal to King David during the time of Saul and even during the revolt of Absalom. Yet, He for whatever reason, made the decision to side with Adonijah is his revolt against David and the attempt to undercut Solomon. Joab had BLOOD on his hands. Not regarding his battles in war but his execution of Amasa and less so, Absalom. Why did the above information lead to his execution early in the reign of Solomon? Shimei – of the tribe of Levi, was loyal to King Saul. When David became King, he initially openly rejected David. He later came onboard and allied/supported David. Despite this, King David did not trust him. He told this to Solomon. Solomon informs him at the start of his reign that he is not trusted but that he would let him live as long as he stays confined to his home. Unfortunately, after 3 years of compliance he lives to Gath, soon to return. Solomon learns of his breaking of the deal and has him Executed
  • 9.
    The Last Daysof King Solomon Sad ending to a productive and glorious reign. After much achievement and national stability, Solomon’s time ended tragically. The Bible informs us that in his later/older years, He turned his heart towards the gods of his pagan wives. He began to worship and love them and turned away from God. Because of this , God took the kingdom away from him. God keeps his word and promises. Because of this and his love for David, He would keep the House of David in Jerusalem (Judah). This naturally leads to the DIVIDED kingdom. This is HIS Legacy! Jeroboam – a non relative servant in the house of Solomon. He rose to a position of trust and rank. God sent the Prophet Ahijah to inform him that the Kingdom would be taken from Solomon upon his death. He was told that he would be given the northern ten tribes and Solomon’s blood line would be given one., the aforementioned southern tribe of Judah. This would go to Solomon’s son Rehoboam. Solomon would seek to kill Jeroboam until his own death. Jeroboam remained away in Egypt until Solomon’s death.
  • 10.
    Like Father, LikeSon? Lessons NOT Learned Apparently, Solomon had been mistreating and governing certain people within the kingdom. Some of his led advisors attempted to guide the new King Rehoboam to consider handling the people with gentleness, compassion and mercy. Jeroboam was also involved in the attempt to give godly advise to Rehoboam. Name the critical concept (take-away lesson to learn) in the advise they offered. We will follow these themes throughout our study as key guidelines to good leadership. Rehoboam rejected this advise and came down hard on the people. Describe the group that he rejected and compare to the group that he followed. He doubled down HARSHLY. Rehoboam sent in Adoram (his enforcer) to squash the uprising but they stone him. The people have turned against the heavy handed king. He then assembles the Southern tribes and plans to go against Jeroboam and the northern tribes. God send in the Prophet Shemaiah to tell him NOT to do this thing. This time he listens.
  • 11.
    DOWNFALL! King Jeroboam (Northern10 tribes) He built places of worship in Shechem and Penuel. He then concludes that this would return the hearts of the people back to Jerusalem and then back to the house of David. He concludes that this would lead the people to return loyalty to King Rehoboam. This has him to believe that he would then be targeted and killed. Jeroboam has two golden calves created. He tells the people that there was NO need to go to Jerusalem. He set up one in Bethel and another in Dan. He credits the IDOLS for getting them out of Egyptian bondage. He ordained the 15th day in the 8th Month – devised IN HIS OWN HEART! {God ordained the 7th mo} This thing was a SIN for the Nation
  • 12.
    God sends aProphet from Judah up to Bethel with a message He delivers the word of the Lord to King Jeroboam. It is essentially a prophecy and a curse. He speaks directly to the Altar. He states that a future King will be born in the house of David. This Josiah would offer on the Altar the bones of the priest that burned offerings on it. What is going on here? The sign given to verify this was…. ’the altar will be rent and the ashes poured out’. The King’s hand withered. The alter was rent and the ashes poured out. He says to the prophet, “entreat now the face of the Lord ‘your’ God, and pray for me. The Prophet did, and the Kings’ hand was restored. Jeroboam invites the prophet to come back for dinner but he declines in obedience to the word of God. However, when an old prophet heard that he was there, he sent his son’s to invite him. When he was told that the prophet declined, he lied and told him that GOD sent him a message telling him to have dinner. The unnamed prophet believed him. God, seeing his disobedience, informed him that he would be punished. On the way back to Judah, he is killed by a lion. As prophesied, his body would not be laid to rest with his forefathers. He would be laid in the site of the tempting/lying prophet. Jeroboam would continue on in his idolatry. He made priest of men not called to be priest.
  • 13.
    King Jeroboam’s childbecame ill. He sends his wife to seek out a word from God from Ahijah. He sends her in disguise so as NOT to be known. Why? God informs Ahijah. When she arrives, he immediately calls her out. His GOD given message is this. I exalted you to by King of My people. I gave it to you but you have NOT sought be as my servant David. You have done worst than any before you. You have made idols and provoked me to anger and cast me behind your back. When your feet again hits your city, your child shall die. Israel shall mourn for the child. The Lord shall punish Israel. He will uproot her and scatter her beyond the river. He shall give them up BECAUSE of the SIN of Jeroboam who made Israel sin! HIS LEADERSHIP as the Northern Kingdom set them up for inevitable failure. A Nation SET – UP to FAIL (Northern Israel)
  • 14.
    Judah’s Twinkle ofHOPE in the midst of rebellious guidance. (Southern Kingdom) King Rehoboam ruled the southern kingdom of Judah without the hand of God. It is stated that he “did evil in the eyes of the Lord”. Greater than those who had come before him. He built places of Idol worship wherever he could. But moreover, he allowed and/or began Temple Sodomy. This may be the issue that made his actions ‘above all that his father’s’ in regards to sin. 2 Chronicles 2:11 Because of the outright spiritual adultery of Jeroboam in the north, faithful and Committed Priest and Levites, fled Israel to Judah and Jerusalem. This strengthened Judah for a space of 3 years. What long term effect do you see happen Because of this? Specifically, Fake priest in the North and some TRUE godly priest in the South. Israel and Judah warred between each other during the reigns of Jeroboam and Rehoboam 2 Chronicles 13 ** v4 ** Abijam (Abijah) did have brief positive noteworthy stance
  • 15.
    Rehoboam reigned selfishly.He put his own needs and desires above that of God and the people. 1 Kings 14:22 Because of his rebellion and guidance the people followed and the nation was out of the will of God. We learn that the King of Egypt invades Judah. Is there any clue in the Kings passage to indicate who authorized this action? Confirmation of this is found in 2 Chronicles 12. All of the Gold and precious items that Solomon had in his house and in the Lord’s temple were taken. Rehoboam replaces these things with items of brass and has them secured with the chief of Guards. How do we explain and interpret this action? It may be his means of Atonement. Rehoboam dies and his son Abijam (Abijah) reigns after him. ** His time was short lived as he did evil and walked not after God or the ways of David. He continue the warring with Israel. The importance of a REMNANT! **
  • 16.
    REHOBOAM’S REIGN: BADSPRINKLED WITH A BIT OF GOOD 1 Kings 14:21 - 28  At age 41 begin his reign  Reigned in Judah for 17 years  Built high places  Judah did evil during this time  Egypt raided and looted in the 5th yr.  Rehoboam replaces stolen treasures with brass 2 Chronicles 11:5-14; 12:1-12  Fortified cities, strengthened himself  Ignored God. The people followed.  Good Priest and Levites from north arrived. They strengthened Judah for 3 years.  God sent the Egyptian raid  Prophet Shemaiah's message  Rehoboam is Humbled
  • 17.
    God’s Will inthe lives of Man The debate has waged and will continue to be debated regarding God’s Will Particularly – Where does God’s will and Man’s free will meet and end? Does God’s will supplant man’s choice. Does it apply to an individual or man-kind as a unit Let’s look at the cases in this study thus-far Jeroboam (Israel) Rehoboam (Judah) God’s hand of blessing was placed on God’s hand was removed from Not God’s Special Location God’s Special HOLY Location Does EVIL Does EVIL Near Complete Rejection Rejection with a Remnant Rebellious Jeroboam Killed by God Humbled Rehoboam allowed to die in office
  • 18.
    War between North(Israel) and South (Judah) God fights against (kills) Jeroboam God fights with Abijam/Abijah Questions: Does God favor Judah because it is his “Heart” a blessed HOLY land? Deut. 11:12 Does he favor it because Abijam is Righteous? Does he do it DESPITE his personal evil doings? If God’s Hand was off Judah and he GUARANTEED blessing to Israel. Why did thing go the way that they did? You see both things are in play. God does have a will. His will is done! Yet we also have Free Will. God’s wisdom is such that he can accomplish his will WITHOUT forcing individuals. Obedience and action on the part of some can and will counter the disobedience of others. Yet, God’s will and his INTEGRITY stays intact. All of his promises are IF…THEN arrangements. He keeps HIS WORD!
  • 19.
    A Good Kingcomes forth! (South) 1Kings 15:9-24 2 Chronicles 14/15/16 After Abijam, his son Asa comes to power. He reforms the nation and changes direction back towards the ways of God. His Grandmother, Maachah *, was deeply pagan. She worshipped pagan gods and even her personal idol. The righteous king Asa destroyed them all, including his mother’s He also banished the practice of temple prostitution and kicked out the sodomites. To this end, the bible says that he “did right in the eyes of the Lord”. He brought into the house the Lord, precious items of Gold and vessels from his families wealth. He failed however, to remove the high places throughout the land. Note * She was also Abijam’s (grand)mother. Why is this noteworthy?
  • 20.
    Asa has militaryvictory when invaded by Ethiopians Why was he successful against this invasion? 2 Chron. 14:11 A Word from the Prophet. What was his message? 2 Chron. 15:1-7 How did Asa respond? After the reforms, peace followed. When war broke out between Judah and Israel, what did Asa do? What do you think about that decision? How did it compare to the decision and choice he made when Ethiopia invaded? Why do you suppose he acted different against Israel? Key Verse: 2 Chronicles 16:9
  • 21.
    How did Godinform Asa of his wrong choice? What was the results of his Self-Reliance? Asa was angered. He did not like the message from the prophet and had him placed in prison. Asa would then ‘Suppress’ some of the people. In the 39th year of his reign, he becomes crippled. He dies in the 41st year of his reign. Lessons learned from the life of this GOOD king! Let’s Discuss. God wants us to remember his past blessing/guidance. God wants willing vessels to work through to show his power and to do his will. We sinners, do both good and bad / obey and disobey, as we serve Him. It is up to us how we respond to God’s correction.
  • 22.
    Be sober-minded andalert. Your adversary the devil prowls around like a roaring lion, seeking someone to devour. 1 Peter 5:8 WHAT TO WATCH FOR – WARNING! The Enemy is on the Prowl looking to entrap and destroy us! What to KNOW about God! - Challenge For the eyes of the LORD run to and fro throughout the whole earth, to shew himself strong in the behalf of them whose heart is perfect toward him. 2 Chronicles 16:9 The Heavenly Father, Giver of Life, is actively looking to use those Willing to be used. He wants to show his power through US!
  • 23.
    Another GOOD KINGin the South! 2 CHRONICLES 17 Jehoshaphat ruled after his father Asa He did right in the eyes of the Lord He walked after David and sought the Lord He did not follow after idols and false gods He built up the cities and strengthened the military He sanctioned the priest to go out and begin teaching the people The fear of the Lord came among the people. The land was blessed and other nations Recognized this blessing and protection.
  • 24.
    Meanwhile…. More Sinand Chaos up North! 1 Kings 16 After the reign and death of Jeroboam in Israel, legacy continues in his descendants Nadab did evil and walked in the ways of Jeroboam his father. The people followed. Baasha followed the same path. Continued the war against Asa. God sent a prophet to speak against him. Informs him that his ”Posterity” would not last. Elah, Baasha’s son, came next in line. Ruled 2 years. Again, Did evil. His chief military leader was Zimri. Zimri rose up against him. Elah’s rule was short-lived. Why is this significant? How did God use Zimri to fulfill prophecy? Omri outlasted Tibni in the divided northern kingdom. His reign was 12 years and is described as evil, greater than those that came before him. NO REST – NO PEACE – WAR – UPHEAVEL – BETRAYAL – All the effects of rejecting GOD!
  • 25.
    North and SouthAlliance: 2 Chronicles 18 Guided by Self-will/Prophets/Angels/Spirits Jehoshaphat and Ahab come together to go against a common adversary Jehoshaphat rightly suggest that GOD should be involved in their decision Ahab agrees and they inquire counsel from a host of Prophets (400 men) The Prophets give the “go ahead”. Jehoshaphat wants to ensure balance. He ask if any other prophet was available. Ahab knows of a person ‘who he hates’ as he “always” prophesied against him. Micaiah does bring a message. “I will say what God said”. He then says , ’ I see all of Israel scattered and without a LEADER”. Why did Ahab take offense? The Prophet tells of his vision from heaven. The LORD is on his Throne. God ask the host of angelic beings around him, “Who shall ENTICE king Ahab to go out against Ramothgilead? One volunteer stand up. He would go out as a Lying spirit in the mouth of all the king’s prophets.
  • 26.
    Results and Outcomes Ahabhas Micaiah placed in Custody Jehoshaphat and Ahab proceed as planned. They invade the enemy. However, Ahab goes in in disguise. He does not want to be recognized as the king. Why? The King of Syria tells his men to seek out the King of Israel – Ahab. They encounter Jehoshaphat king of Judah instead. What does he do? What was the results? “At random, by chance”, (God’s sovereign rule) Ahab is hit in a space between the armor wounding him. He later dies of this injury. Lessons learned in these events. Prayer before decision making Obtaining Godly counsel Avoiding and recognizing bad advise Using wisdom and heeding it when known. Be willing to change course What do we make of the fact that God sent out a “Lying Spirit”? Is it a act of TEMPTING? Was he manipulating Ahab? James 1:13
  • 27.
    So, Who isto blame for the death of AHAB? Is it God’s or is it Ahab’s? Here are the facts as presented. Ahab came up with the idea of attacking Ramothgiliead He had made an alliance with the King of Judah, who was righteous and blessed of God. This may have given him a false sense of assumed victory. Bottom-line, It was IDEA. It was not HIS idea to ‘enquire of the Lord” to see if he should invade. He did agree when prompted He called on his “YES men” Prophets whom he knew would give him the OK. He avoided calling the one prophet whom he knew told the truth. When the truthful prophet gave what essentially and effectively was a WARNING to NOT DO THIS. He ignored it and proceeded anyhow. What proof / clue do we have that even Ahab himself knew that he should not have proceeded? He knew that GOD was ACTUALLY attempting to STOP him. God, however, knew that he would NOT heed the message. God knew that this would be his death.
  • 28.
    Conclusion God’s will wasdone (punishing a evil and wicked king, who led the people further astray. God used Ahab’s own pride and ignorance against him. For he trusted his yesmen (and I believe falsely assumed protection and blessing from his alliance with godly Jehoshaphat.) Ahab allowed his self-willed arrogance to blind him with ambition. Prior to his pulling the trigger on actually going ahead with the plan, GOD sends a crystal clear message explaining that it was a LYING SPIRIT from the THRONE OF GOD enticing him to go ahead. This was his opportunity to CHANGE HIS PLAN. Ahab COULD have avoided death on that day and in that matter if he would have HEEDED. GOD’s Punishment - GOD’S Will – GOD’S – Guiding hand, Yet Ahab’s choice!
  • 29.
    Ahab, Jezabel andBaal vs Elijah and GOD! 1 Kings 16 to 18 During Ahab’s reign he made allegiance with enemies of Israel He married an evil woman who became his Queen. He encouraged all to worship, trust and follow Baal. A false god, but one worshipped by the pagans. The pagan credited Baal with their success – specifically, controlling weather and blessing the harvest. Enter Elijah, God’s prophet. He confronts King Ahab and tells him that there would be no rain or dew for years until the Lord God speaks it. God then tells Elijah to flee and hide. God would provide food and water. First by the unexpected care of Ravens. This would be followed by an poor widow and her child. During the drought, God keeps his promise and Elijah is cared for and protected. During the stay with the widow, her son dies. Elijah’s heartfelt plea to the Lord for his grace. God resurrects the boy and the faithful woman knows for a fact that Elijah was a true man of God. After 3 years, God tells Elijah that it is now time to challenge Ahab. He goes to find the king, but he first meets with another prophet – Obadiah. He ask Obadiah to inform Ahab that Elijah wants to meet him but Obadiah is afraid to do so. He fears how Ahab and Jezebel would react. He informs him that Jezebel had many prophets killed and how he himself, hid and cared for 50 of them.
  • 30.
    Elijah assures himthat God was with him and that he would be faithful to show up as promised. Elijah keeps his word and does meet with the evil king Ahab. The king ask, ’are you the one that brought trouble to the land’. Elijah puts the blame right on the King. He tells the king that it was his fault for leading the people into worship of the false god Baal. He then tells him to gather up all of the prophets of Baal to the site at Mt Carmel. When they and all the people of Israel come, Elijah tells them that now was it time for them choose. Who will you follow, The Living and true God of their fathers or the false idol god, Baal. The Challenge – both he and the prophets of Baal would be given a bull to sacrifice and pit with wood. Neither would have fire. Elijah would call on the one true living God and the prophets of Baal would call out to him. The God that start the fire to cook the offering would be recognized as the true God. Who will win? Who were the people betting on? Who will the people chose to follow?
  • 31.
    The Prophets ofBaal go first. Despite all of their efforts they get NO RESPONSE for their god. They beg, wale, beat and cut themselves to no avail. The more they do so, the more Elijah mocks them. After their failed attempt. It is Elijah’s turn. He prepares the offering using 12 stones to represent the tribes of Israel. He built it in the name of God. He instructed them to dig a trench around it. He then had it and the wood saturated with water x 3. He offers prayer to God. He acknowledges the forefathers. He asked that the people’s eyes would be opened to see that he is the ONE and Only God. That they would then repeat and turn to Him. God ignites the fire and everything is burnt up, even the water in the trench! The people’s eyes are opened and they do repent. Elijah then executed the false prophets of Baal. As promised, God brings the Rain, ending the drought. Ahab is humbled and returned to his home where evil Jezebel awaits
  • 32.
    Jezebel learns aboutthe events involving Elijah and sends him a message Upon hearing her threat, Elijah is filled with fear and flees. At a certain point, he has his assistant stay behind. Where do they go? Why does he state, “Take my life, for I am no better than my fathers”? God once again sustains him miraculously. He then travels 40 days and nights until he was at Mount Horeb. God then asked him, ”What are you doing here?”. Elijah pleads his case. He voices that he has been a strong and zealous prophet to the people but they have rejected and killed your prophets and now seek to kill me. “I am the only one left”.
  • 33.
    Where is GOD? Godinstructs Elijah to go out of the cave and onto the mountain. He tells him that HE, God would pass by. Then, a mighty destructive wind goes by. Next, a powerful Earthquake. Soon, followed by a Fire. In each we are told, “but GOD was NOT in the ___! Then after all of these fear invocative demonstrations, GOD arrives in a STILL SMALL VOICE. Elijah recognized his voice. He covered his face and went out to the mouth of the cave. Again, God asked, What are you doing here? He again bemoans that he has faithfully served God, yet the people reject and the he is the only one left faithful. He tells Elijah to return. He was to anoint Hazael king of Aram and Jehu king of Judah. He was also to find Elisha, and place him as the new prophet of Israel. Jehu would put to death any that escaped Hazael and Elisha would put to death any that escaped Jehu. 1Kings 19:15-17 He informed Elijah that he in fact, was NOT the only faithful servant. That there were reserved 7000 in Israel, who had not bowed a knee to Baal and mouth had not kissed him!
  • 34.
    Lessons to learn… Godwanted Elijah to know that he was NOT in the loud destructive and threatening things. Therefore, he should not have feared. Jezebel was that loud threat, and likewise should not have been feared. God was in the still small voice. Elijah, lost focus. He failed to listen, hear from, and wait for God to instruct him. He just ran. I believe that Elijah knew this soon after fleeing. This may be why he was DEPRESSED. Not for being pursued by Jezebel, but over the guilt and shame in knowing that he should not have fled. God is patient and kind to his servant. Despite Elijah’s short coming, God has a new assigment. He has more things for him to accomplish.
  • 35.
    Covetousness, Greed, andPolitical Corruption Naboth is the owner of valuable land. King Ahab had his eye on it and wanted to get it. Naboth declined Ahab’s offer to buy it. Naboth honored his inheritance above financial gain. He would not cave to political pressure. Ahab went home defeated. He whined to his wife. Jezebel took control. Paraphrase – ‘You are king – take what you want”. She crafted a letter and sent it to local elites and political leaders. The plan was to bring Naboth to a meeting. She had them place 2 false witnesses to lie about him. He is falsely accused and falsely convicted and stoned to death. God sends Elijah back to confront Ahab about this devious acts. It is prophesized that he would die at the same spot as Naboth was stoned. It was also stated that his family line would end and that Jezebel would die by the wall in Jezreel. Her body would be eaten by wild dogs. Upon hearing, Ahab is humbled and has a repented heart. God acknowledges this heart felt act.
  • 36.
    Lessons learned inthese events Ahab was NO leader! Despite being king. He allowed Jezebel to take the lead. He married the daughter of a foreign kingdom and took on her idol worship. He promoted Baal worship Ahab and Jezebel broke many of the 10 commandments of God. # 1 # 2 # 4 # 6 # 8 # 9 #10 All of these were broken in just the 3 chapters Jezebel was 100% pagan. She was pure evil and motivated by power, gain, and operated with violence. The people of Israel willingly followed. They are not innocent victims. They pay the price for following bad leaders. Despite what could be seen as Elijah’s prior ’failure’, God did not hesitate to go to Elijah as his servant. Elijah did not fear confronting Ahab. God shows his mercy by giving Ahab credit for showing true repentance.
  • 37.
    LIFE UP NORTHAFTER AHAB 2 Kings Chapter One  The Northern Kigdom of Israel  God deals with Ahab’s descendant  King Ahaziah’s rebellion through the Prophet Elijah 2 Chronicles Chapter 20  The Southern Kingdom of Judah  Follow the End of the Reign of Good King Jehosaphat
  • 38.
    Up North…. AfterAhab’s Death 2 Kings Chapter 1 He son, Ahaziah follows in the footsteps of Ahab and after the ways of Jeroboam. As things would go, He is injured and is fearing death. He call for a word from a false god to give insight. He deploys staff to seek out this advise. Knowing this, God has Elijah intercede the messenger. He tells him to go back to the king with a question “Why are asking for help from a false idol, why not ask the God of Israel? Don’t I exist?” Paraphrase Ahaziah does not like this. He sends him back and God destroys the leader and his 50 men. Ahaziah sends a second set of 50 with another leader and the same thing happens. Ahaziah is not phased. He sends a 3rd group. But this leader tells Elijah, ’I don’t want to end up like the other messengers. So, God tells Elijah to return to Ahaziah with the group and deliver the messege directly to the King.
  • 39.
    Upon delivering themessage, he proclaims that he will truly die. The king dies as stated. What are we to learn from this story as it is told and how it is laid out in this manner? What was the purpose of having group 1 and 2 to go back to the king with the Question? Was it a ‘Crossroad’ event? What does Crossroad events show us about God? Is it significant that the first 2 groups were destroyed? If so, why and what to learn from it? Why was the 3rd group not destroyed? What evidence do we have to suggest Ahaziah was NOT going to repent? Lastly, in terms of Legacy. Who does all of this rebellion in the north trace back to?
  • 40.
    Down South GoodKing Jehosaphat comes to an end – Good, not Perfect! 2 Chronicles 20 Recall in chapter 18, King Jehosaphat agreed to help evil Ahab up north to fight their common enemy. He used good judgment in seeking out godly consult (remember the lying spirit from God)? It all worked out as God would have it and ultimately Ahab came to his death. However, in the telling of the story we did not know if it was God’s will for Jehosphat to help at all. Well, we find that out in chapter 19. The Prophet Jehu informs the good King by asking, “Should thou help the ungodly, and love them that hate the Lord?” This showed God’s displeasure. God promised his wrath. In this chapter, the Ammonites and Moabites come to invade
  • 41.
    Word arrives thatan invasion is pending. King Jehosaphat calls for a national fast. Jehosaphat then offers up to God prayer and guidance. He was humbled. He acknowledged God for who he is and for what he has done. He asked that God would intervene on their behalf in dealing with the ongoing threat. Jahaziel the Prophet offered comfort. You and the people need not worry. God’s got this! The various factions of the invading armies will proceed to fight and kill each other!! The children of Judah took plunder for 3 days and on the 4th day worshipped the Lord. He walked in the ways of his father Asa and reigned for 25 years. He did good in the eyes of the Lord. Yet, the high places were not taken down and he agreed to fight along side Ahab , which was NOT in the will of the Lord. Here we learn why the high places were not removed. Why? God did punish him. He had a ship building venture that was joined into with Ahab. God destroyed the fleet of ships at sea as means of his wrath.
  • 42.
    TWO KINGS, TWODIFFERENT PATHS AND OUTCOMES Ahaziah (Northern) from Ahab  Did Evil  Rebelled against God  Served Idols  Elijah the prophet spoke against  This king would not repeat and would not call on God when he had the opportunity to do so.  Failed Leader Jehosaphat (Southern)  Did Good  Respected and obeyed God  Served God  Jehu the prophet rebuked him  Jahaziel the prophet guided him  This king called upon God when in trouble  Successful Leader
  • 43.
    All GOOD thingscome to an end, Judah goes astray in the south (2 Chron 21) After the death of Good King Jehosaphat, he is succeeded by his son Jehoram. Jehosaphat had 6 other sons. The king left each of them much wealth. Jehoram was given the kingdom, but would have them executed. Why do you think he did this? Instead of modeling his life after his father, he chose to follow the ways of AHAB. One likely reason was the influence of his wife, Ahab’s daughter. Despite his evil leadership, God would NOT abandon Judah – being faithful to his word of promise to king David.
  • 44.
    Southern Kingdom beginsto CRUMBLE Apparently, two separate non Israelite people groups were living under the reign of Judah The two were the people of EDOM and of LIBNAH. However, because of the new King Jehoram and his actions they both revolt. Jehoram without explaination rose up against Edom and slayed a host of them. This began their revolt. This was likely enough to see to provoke Libnah to also decide to part ways with Judah. Elijah writes a letter to the evil king. In it he points out that he had departed from the ways of Jehosphat, his grandfather Asa and king David. Instead deciding to walk evil in the way of Ahab and Jeroboam and the children of Israel up north. He accused them of going WHORING AFTER. Again this is Spiritual adultery to God. He calls him out for killing his brothers. Because of these things – God tells him that he would be stricken with a very specific illness.
  • 45.
    Why do youthink God would be so specific in telling him how he would die and what he would die from? He would also suffer foreign invasion. His kingdom would suffer financial and material loss. His family would also be destroyed except for one son, Jehoahaz He suffered two years and then died. He reigned 8 years. He was not honored by the people. He was buried in Jerusalem but not in the sepulcres with his Fathers. He is succeeded by, his son and then his mother. Both did EVIL before God. As God had promised, he sent his servant Jehu to punish. * 1 Kings 19:16
  • 46.
    Ahaziah : Nextin line Down South 2 Chronicles 22 The people made Jehoram’s only surviving son, Ahaziah the next king of Judah. He followed after the ways of his now dead father and still alive mother Athaliah. Athaliah followed after Ahab in the north along with many wicked counselors Ahaziah was 42 y/o when he was installed. He was influenced and guided by the above. He joined forces with Ahab’s son, Jehoram, to battle a common enemy. This was unfortunate. For this was the anointed time of God to deal with Ahab’s descendants. Recall how God told Elijah to crown the king of Syria and to anoint Jehu. Jehu would be used to destroy the house of Ahab. Well, Jehoram would be injured and would die. By joining forces and aligning with him, Ahaziah would be executed himself. This did NOT need to occur, but did occur because of his poor choices.
  • 47.
    Another EVIL women– Athaliah: Power over Family After the death of her son, Athaliah sets about to kill her own son’s children and any male heir to the throne. In her mind, she wanted the throne and actively eliminated all potential threats. Jehoshabeath, the daughter of the deceased king hid her brother Joash. Apparently, Athaliah did not know about him. So, she take reigns of the kingdom and had a briet stint in power. Joash remained safe and in hidding until the treat of Athaliah was gone. He was hid within the House of God for six years. This is interesting for 3 reasons. Hint. 1) Faith 2) Behavior of the unholy 3) Crossroads During these 6 years, Jehoiada the priest along with other faithful Priest and Levites were strengthened. Then went throughout Judah and found the faithful. These would be mobilized to take back the kingdom and place it back in line with king David and with the Will of God. With the military and much of the people behind them, they made their move. Evil Queen Athaliah hear the uproar and considered it “treason”. She would be killed. Jaash would be rightfully placed in office and anointed king in Judah.
  • 48.
    The Good PriestJehoiada – Takes the Lead. 2 Chron. 23 After organizing and orchestrating the take-over and putting the right king in David’s seat, He made commitments, more strongly covenants with the people, the king, and with God. First on the to-do list – Destroy the presence of Baal. He restored the offices and function of the house of Judah as set up by David. He restored burnt offerings. The Law of Moses. Worship. Law and Order. He placed the king back on the Throne of David. Results – The People Rejoiced. Questions. Why did the people not step up before? Why did they follow the ways of Jehoram in the first place? What does this say about us as humans?
  • 49.
    God keeps hispromise – Ahab’s line is CUT OFF and Jehu is the new King up North! 2 Kings Chapters 9 and 10 Just as Elijah was told, Elisha is now the Prophet. He anoints Jehu as new king. Jehu is now the King in Israel As prophesied, He would be the one to put an end to the evil rule of Ahab and Jezebel. The current king Joram is engaged in battle with Syria. He was injured and returned to Jezreel to heal. Joram sees his approach and sends messenger to see if he came in peace. Joram, king of Israel and Ahaziah, king of Judah gather to meet Jehu on the battlefield. Jehu informed them that they did no deserve PEACE because of their sins and the acts of Ahab and Jezebel. They Jehu would die in the field that was stolen from Naboth. Ahaziah would attempt escape – but would fail. He too would die at Jehu’s hand. Queen Jezebel would be next.
  • 50.
    Ahab family Round-Up! Afterthe two Kings and Queen Jezebel are disposed of, Jehu turns his attention to wiping out all of the descendants of Ahab. So, Jehu sent letters out to the leaders in Jezreel. He told them to locate the 70 remaining male descendants of Ahab and to choose the best of the lot. They were to then place that son on Ahab’s throne to crown as their king. They would then challenge Jehu in battle to see which team would win control of the northern kingdom of Israel. But the leaders were afraid for they could not get volunteers from Ahab’s family. So, he gives a new challenge. Since they won’t fight me. You prove that you are on my side. Go and hunt down all of them, kill them and bring me their heads. They complied. All gathered at the gate of the city where the piles of heads were laid. Jehu announced that he was doing God’s will and then proceeded to eliminate the remaining followers of Ahab.
  • 51.
    Jehu destroys theremnant of Baal Jehu then gathers all the priest of Baal. How did he get them to come into his presence? Was he a Baal worshipper? Did his plan work? He was very selective. He made sure that NO non followers of Baal would come. Once all gathered for their solemn day of worship and sacrifice to Baal, Jehu had 80 soldiers gathered on the outskirts. This was a trap. While the Baal worshippers were engaged in the religious ceremony, Jehu instructed the men to enter in to kill them. He threated the lives of the executioners if they let any escape. He then destroyed all of the idols and alters of Baal. Unfortunately, Jehu did not FAITHFULLY serve God from his heart. He would go on to resume the Idolatry of Jeroboam.
  • 52.
    Joash: The ‘Leader’who needed a Leader 2 Chronicles 24 During the life and under the guidance of Jehoiada the Priest, King Joash did good. He was a boy when he began, He reigned for 40 years. Jehoiada not only took down all the Baal, He restored worship to God. Joash was moved to restore the house of God. He even questioned Jehoiada as to why the Levites have not yet responded. Through his efforts money was raised to restored and rebuild the things of God and the people rejoiced. They restored burnt offerings unto the Lord. Unfortunately, Jehoiada passed. After this, other influencers surrounded Joash. They brought up the idea of returning to idol worship. He FOLLOWED their advise. Prophets of God are sent to correct them but they rejected.
  • 53.
    They stoned Jehoiada’sson – Zechariah. King Joash approved the execution. The Lord God of Heaven holds him accountable. God sends his wrath via the people of Syria and King Hazael. He uses them to attack Judah The princes of Judah were killed. King Joash was left to die but was killed by his own servants. So Joash is given a MIXED grade report card. NOT all BAD / Not all GOOD. He did some good on his own initiative but seemed to lean on the guidance of others. He was highly influenced. More of a follower than TRUE Leader! Yet, accountable as he clearly made his own decisions. Why is King Hazael important? You should remember him!
  • 54.
    Elijah passes batonto Elisha Just as God had ordered. Elijah ordained his replacement Many at Bethel seemed to know that something was going to happen but not quite sure of the details The same thing occurs at Jericho. Fifty son’s of Prophet’s met Elijah and Elisha at the Jordan. After they get to the Jordan River. Elijah demonstrated the power of God. He ask the young Elisha if he could do anything for him. Elisha request if for a double portion of his gift. The sign of if this would be given would be if God allowed him to see his departure. They would soon be separated by a heavenly host of fiery horse and chariot. Elijah would be taken to Heaven and Elisha would see the whole event. What clues do we get showing that Elisha did indeed inherit the double portion he requested?
  • 55.
    Mockery punished Some youthdisrespect Elisha. What did they mean? “Go up, Bald head, Go up” Were they picking on him for the physical look only? Was it because he was perceived as UNCLEAN? Was it because of his position as a servant of God , and therefore a rejection of GOD? He then places a curse on them We learn that 2 Bears come out and over 40 of them suffer physical injury. What lesson was intended to be made and learned by them? Is there a lesson for us in this event? Is there a modern equal in how we are to respond or has this been changed? Heb. 10:30 Matt. 5:39 Rom 12 1 Tim. 6 and 2 Pet. 3
  • 56.
    Elisha’s Ministry: 2Kings 4 Social service intervention One of the wives of the Prophet’s presents to Elisha and informs him that her husband has died. Making matters worst is that he left behind a significant amount of debt. The debt collectors are now coming to her for payment. Utilizing the wisdom of Solomon and power of Elijah, Elisha asked her what did she have in her household (of value). She states that she has one jar of oil. He has her go to all of the local households to collect every possible spare Jar. Her son helps to gather and place in the her house. Elisha then fills every container from the one container that she had. (sound familiar?) What else does this sound similar to? HINT Think new testament. Once they are all filled, he instructs her to go and sale the newly produced oil to the public and use the profit to pay off the creditors.
  • 57.
    Hospitality rewarded byGratitude Elisha is now introduced to couple. The wife is described as a Shunammite. She has a great heart for service and hospitality. She and her husband provide meals and housing for Elisha and his servant every time he is in the area. Elisha wants to show his appreciation. He has his servant call for her to ask what she may need. She has no request. However, the servant observes that her husband is old and that she was childless. Elisha calls for her and when she arrives he tells her that she will be a mother by next year. “Don’t lie to thy servant”, she replies. What do you make of this action and her response? As prophesied, the woman does indeed give birth to a child. As fate would have it, one day the child becomes ill and dies. The woman takes immediate action. She places him on the bed where Elisha slept. She then goes to her husband and tells him to send for the Prophet Elisha. He does not act. Why?
  • 58.
    The Woman mountsa donkey with her servant and tells him to go straight way to the Prophet and not to slow down unless she says so. What does her actions show about her? Elisha sees her from afar and tells his servant to go find out if there was a problem with the husband or the child. She tells the servant that there is not a problem When she gets to Elisha, she falls to his feet and is distressed. She says, “I told you not to deceive me”. Elisha learns that the child has died. He instructs the servant to return to him and to place the prophets staff on the child’s face. The woman is not satisfied if Elisha does not come along. The initial attempts to bring to child to life fails. Elisha then goes to the boy and lays on him. He is brought back to life! Sound familiar??
  • 59.
    Famine and Badstew, made anew! Back at Gilgal, there is a famine in the land. Some of the son’s of Prophets needing food, go and gather vegetation to add to stew. When they eat it, they soon realize that what was put in it was not edible and likely poison. Elisha tells them to add flour to it and when they did – they were able to eat. Then a traveling man came with 20 barley loaves. Elisha tells them to distribute this among the people. The men ask in disbelief, that is NOT enough to feed a hundred in need. Elisha says to do it as this is what the Lord instructs. He says that there will be plenty of leftovers Sound Familiar?
  • 60.
    Tests of FAITH! Acourageous and honored military leader in Syria has Leprosy. His name was Naaman. His loved ones would love for him to be healed. There is a young Israelite maiden who suggest that he would be healed by a prophet of the Lord. The King of Syria likes the idea and arranges for a message and payment be delivered to the King of Israel to request help in this matter. Strongly suggest this to be Jehoram. Jehu is not anointed King until chapter 9. The King of Israel’s response was of suspicion. He thought it was a plot to start a war between the nations. What was his reason to think this way? This showed his spiritual state! Elisha hears of the Kings response and goes to him with a plan of faith. He tells them to have Naaman come. He would demonstrate that Lord of Israel is the God of all. When Naaman arrives, Elisha tells his servants to instruct Naaman to go the Jordan river and to dip/submerge in the river seven times. Naaman is OFFENDED!
  • 61.
    In his mindthis request and the procedure of bathing in the Jordan was fruitless. He had in HIS mind how Elisha should heal him. His EXPECTATIONS. He reasoned that there were better water sources in his homeland. Why in the dirty Jordan? This made Naaman very angry. He stormed off to head back home to Syria. Yet, His own servants reasoned differently. They say to him, ‘If the Prophet would gave you a complicated list of things to do to get healed, you would have done it. Why not do the simple task?” ** He relents. He goes and does it ELISHA’S way. Guess what?! It works!!! Naaman is healed. It is said that his skin becomes as a young child’s.
  • 62.
    Gratitude and Deception Naamanis so pleased that he wants to go beyond what his King had give to their King. He offered direct gifts and payment to Elisha in thanks for his miraculous healing. He does acknowledge that Elisha’s God is like none-other. Elisha declines the gifts. Naaman then ask if he could load as much dirt/soil as two mules could carry. He stated that he would not worship the gods of his land. Elisha says “go in peace”. Naaman leaves but Gehazi follows after him. He tells Naanam that things have changed. He says that Elisha does now want his payment. He tells him that two sons of the prophets were in need. Naaman agrees to the payment. Gehazi returns to Elisha and is asked, “where have you been?” Gehazi says that he has not gone anywhere. Elisha knows that this is not true. How? What was the consequence of Gehazi’s lies and actions?
  • 63.
    LESSONS LEARNED fromNAAMAN AND GEHAZI The young maiden knew that the God of Israel and his prophet could heal Naaman King Jeroboam showed that he was faithless and estranged from God. Syrian King had more faith. The Syrian’s did not have the STIGMA against Lepers as was in Israel. Why? Is this Good or Bad? Naaman was not a man of faith but did learn about faith and of the power of God. He thought he needed to do things his way. But did he TRULY learn the lesson?? **How does this relate to the GOSPEL and RELIGION? Does he get healed on the inside, as he did on the outside? How do we explain Gehazi’s fall from Grace? He had been a dutiful and faithful servant. Was this a brief lapse in judgment or evidence of his character? Did the curse of Leprosy bring him back to God, or push him further away? Could the Jordan river miracle be symbolic of the NEW TESTAMENT practice of Water Baptism?
  • 64.
    More Elisha Miraclesand Encounters- 2 Kings 6 and 7 The son’s of the Prophet’s ran out of living space. The request was to add more by building. One of them lost the head of a IRON AXE when it fell off and into the Jordan. It as borrowed and the man was concerned that he lost it and it would need to be replaced Elisha has a stick that he threw in the water and this action causes the IRON AXE head to float to the surface to be easily retrieved. Elisha is aware of the plans of the King of Aram to invade Israel. He informs the king of this plot. The king of Aram is certain that he has a trader giving away his secret plans to the enemy. One of his servants tells him that it is because Elisha, Prophet of the God of Israel can know and tell of the things that you speak while you are in your bedroom. The Aramean king wants the head of Elisha. He sends a host to get him in Dothan.
  • 65.
    When he isfound there, it appears that the Prophet is outnumbered and doomed. His servant is fearful but Elisha assures him that all is well and not to fear. He then prays, “Lord – open his eyes that he may see”. God allows the servant to see a vast host of angelic power in their presence. Elisha prays that the army would be blinded. He then leads them to the King of Israel. The king is not sure what to do with them and ask Elisha if it was ok to kill them. He says not to. He tells them to feed them and return them to their king. They do not invade them again. Questions: Why is God by way of Elisha giving warning to Jehoram? What does this say about God? In this story and the one with Naaman, who showed true LEADERSHIP, the prophet or the king? Explain
  • 66.
    After passage oftime, the region is experiencing a significant famine. While traveling, King Jehoram encounters a woman who begs and pleads for help. His response…. Both leaderless and faithless. He does however, asked her what her specific issue of concern is. Her response is shocking!! In the midst of the inflationary times, she makes a deal with another woman. They agree to cannibalizing their children. In an horrific exchange one child to be offered on one day and the other the next. Apparently, this woman followed through and killed her own son for a meal but on the next day the other woman did not follow through. Hearing this the king is deeply troubled and moved to tear his clothes. He then in a real sense, puts bounty out on Elisha. He wants the prophet’s head. Why is he blaming Elisha for the state of things in Israel? Elisha is again provided with supernatural revelation (information from God). He knows that they coming to kill him.
  • 67.
    What does hemean when he says, “Calamity is from the lord, why should I wait for the Lord any longer? What does this say about him? Elisha then tells the officer of the kings court that the economy will recover, yet they would not be able to experience the turn-around. Why? A group of hopeless Lepers decide to take desperate action. You can say that it was a suicide mission like it would be in a death by cop act. Yet, a miracle occurred. Before they arrived at the enemies gates, the enemy had abandoned their place fully stocked. They begin to indulge and keep all of the materials for themselves but good conscience keeps them right before God. They decide to inform King Jehoram of the good fortune. Again, Jehoram believes this is a trap.
  • 68.
    His men interveneand with logic convinces the king to allow a small team to go and check things out. They reason that things are desperate and that all if Israel is doomed otherwise. Upon doing so, the scout team confirmed that the Arameans had indeed fled and left quickly without care. The king allows the people to go into the Aramean camp. Just as Elisha predicted, the king’s officer who he spoke to would not benefit from the new economy. He is trampled to death by the people.
  • 69.
    Lessons Learned inChapters 6 and 7 God cares about the small and seemingly unimportant things in the lives of his people. If important to you, it just may be important to God. He cares and is mindful. Miracles are used to show his power and to get us to acknowledge him and to come to him. No miracle is done just to do. It is a means to bring one to truth and to trust. Elisha wanted his servant to know that God had their back when he prayed that they were not out numbered. He allowed him to see that surrounding chariots of fire backing them up. God showed mercy to the Aramean’s. He treated them with hospitality and allowed them to return home unharmed. How, does this compared times of Israel’s outright rebellion? What does the story of the women say about the state of the spiritual life of the Israelite People at this point?
  • 70.
    End of Elisha’sMinistry 2 Kings 13 During this time, Jehu’s son, Jehoahaz ruled in the north and Joash’s son Amaziah ruled in the south. Jehoahaz did evil in the sight of God. He followed Jeroboam, not his father Jehu. He made the people sin and the anger of the Lord was kindled against them. Once again, God used foreign enemies as his tool to punish. Syrian kings Hazael and his son Benhadad At some point Jehoahaz sought out the Lord and the Lord heard him and intervened. Yet, he and the people failed to repent and continued idol worship. His army was depleted and he died. His son, Jehoash ruled after him. He did evil. In the south, a good king Jehoash ruled. Elisha was ill and dying. Jehoash of Israel went to him. Elisha assisted him with the battle against Aram. However, Elisha used a bow and arrows to determine his success. He only provided partial victory. Why? Elisha dies and is buried. What happens when a man is thrown in his tomb? Hazael harrassed Jehoahaz thoughout, but God’s grace gave Joash some victory ? Why
  • 71.
    Fighting between Brothers2 Kings 14/ 2 Chron 25 While things were not great in Israel, Judah has had more positive outcomes After a fairly good king in Joash, his son Amaziah ruled. He also started out good He ruled 29 years. Yet, he failed to take down the high places and the people continued idolatry He killed those who killed his father but not the son’s, he followed Moses law. He had victory over the Edomites. Amaziah attempted to work with Johoash in Israel but the northern king did not trust him. He accused him of “Pride” He led an attack on his kinship in Judah. He captured Amaziah and took wealth from the house of the Lord. Explain how God use both? During Jeroboam II, the prophet Jonah was active in the north