KHASIMSA SHAIK
Sr. SAP ABAP Consultant
E-mail : khasimsa@gmail.com
Mobile: +966 - 54 369 6896(KSA)
+91-8985 001 786(India)
Professional Experience
Having around 8 years of experience in ERP as SAP-ABAP consultant (Including 2+ years of onsite experience at KSA, Dubai, UK).
Seeking value added responsibilities and involvement in new challenges in a highly competitive and reputed organization.
Professional Summary
 Having exposure in understanding SAP R/3 system and experience in ABAP/4 programming techniques.
 Developed Classical, Interactive and ABAP List Viewer (ALV) Reports.
 Developed ALV reports using classes and methods (OOPS).
 Uploaded data from legacy system into SAP system using BDC (Session method, Call Transaction, LSMW).
 Worked on SAP SCRIPTS, SMART FORMS and Adobe forms.
 Worked on WORKFLOW objects.
 Experience in Enhancements using User-Exits, Business addins.
 Having work experience on ALE, IDOCs and RFC FM’s, Interfaces and BAPI’s.
 Having work experience in Module pool programming.
 Worked on Performance Tuning on Developed objects.
 Exposure to SD, MM and FI, WM, PM, PP, QM, HCM and PS modules.
 Exposure on UI5 and FIORI.
 Interfacing between SAP and other NON SAP systems.
 Worked with Solution manager Tool.
 Worked with WinSCP and Putty tools which are used to move files from one directory to another directory in SAP from
local system to Application server.
 Strong team player to meet the project deadlines.
Professional Experience
 Working as Principal Consultant in NTTDATA GDS Pvt Ltd (Intelligroup Asia Pvt ltd ), Hyderabad From Mar’ 2010 to Till
date. (Currently Working with Technology Control Company at Riyadh, Saudi Arabia).
 Worked as Associate consultant in HCL Technologies, Chennai & Noida from May’ 2008 to Feb 2010.
Certifications
 Successfully completed SAP HANA certification - SAP Certified Technology Associate.
Educational Background
 B.TECH with Computer science and Information Technology from JNTU, Vijayawada (2001 - 2005), INDIA.
Projects Profile
Project #11
Client: AL-Kamal Imports Office
Module: SD/MM/FI/PM/HCM
Type of Project: Support
Location: Saudi Arabia.
Description: AL KAMAL IMPORT OFFICE COMPANY LTD is a hospital and health care company based out of Al Kamal Building
Beside United Doctors Hospital Near Cornich, A, JEDDAH, Saudi Arabia.
 Worked as a Senior Technical Consultant at onsite and coordinating with the functional team and end users to finalize the
Functional requirements.
 Developed reports on SD, PM, MM, FI and HR modules.
 Developed the new report ZIW13 with standard functionalities of IW13 and with additional columns for Serialization data.
 Developed transaction ZBINS which shows bin details for the spare parts available in the system.
 Implemented enhancement to handle work order (IW32) approval limits for the approvers.
 Uploaded Equipment task list data via IA01 transaction using BDC methods.
 Developed Equipment classification report which takes object type as input and will display all equipment number and its
classification data in ALV format.
 Developed report and its form to show details of payable invoices stocks.
 Preparing unit test plans on the developed objects.
 Handled all the enhancements and new developments.
 Documented all the custom developments.
Project #10
Client: Adwan marketing Groups (www.adwanmarketing.com)
Module: SD/MM/FI
Type of Project: Implementation
Location: Saudi Arabia.
Description: Adwan Marketing Co. has been a prime source of Electrical Materials & Test Instruments to the Saudi Market since
1978 , and during the past few years the Company expanded its operations by opening new branches in Qatar and UAE. Having
experience of serving the Electrical Construction Industries, Electrical power utilities, Instrumentation & Petrochemical Industries
and Oil & Gas Industrial Projects as a supplier of quality products.
Responsibilities & Recently developed objects:
 Working as a Technical lead at onsite and coordinating with the functional team and end users to finalize the get the
Functional requirements.
 Developed forms of Quotation, Sales Order, Invoice, Delivery, Purchase order.
 Developed HR reports like End of service report, payslip.
 Developed BDC programs to upload all HR infotypes.
 Developed Custom reports of SD, FI modules.
 Coordinated with offshore technical consultants and delivered the objects on time.
Project #9
Client: Tarwada Cargo Transport (www.tarwada.ae)
Module: SD/MM/FI
Type of Project: Implementation
Location: Dubai.
Description: TCT carry all types of cargo locally and across the border. From cold stuffs and breakables, to cars and construction
material. TCT have the full range of cargo vehicles at your disposal, including container trucks, car carriers, refrigeration trucks, flat
beds, low beds and tippers.
Responsibilities & Recently developed objects:
 Working as a Technical lead at onsiteand coordinating with the functional team and end users to finalize the get the
Functional requirements.
 Developed cheque printing form.
 Implemented GPS process in the transaction VT02n.
 Developed Quotation and invoice forms from scratch which contains dynamic approval signatures.
 Currently working on HR object developments.
Project #8
Client: Orion Carbons (www.orioncarbons.com)
Module: SD/MM/FI
Type of Project: Development and Support.
Location : Offshore.
Description: Orion Engineered Carbons is one of the world’s leading suppliers of Carbon Black deriving from Evonik (Degussa).
With more than 100 years of industry experience, we offer standard and high-performance products for Rubber, Coatings, Printing
Inks, Polymers and other applications
Responsibilities & Recently developed objects:
 Working as a Team lead at offshore and coordinating with the onsite team to get the Functional requirements.
 Working on all support tickets
 Working on New developments and enhancements.
 Designed the enhancement to combine the invoices for different forwarding agents.
 Modifying the 19 smart forms to print the contact details with different languages.
 Mentoring the new consultants on ABAP.
Project #7
Client: Al Faisaliah Group (www.alfaisaliah.com)
Module: SD/MM/FI
Type of Project: BW Implementation
Location : Riyadh , Saudi Arabia.
Description: Al Faisaliah Group (AFG) is a major diversified enterprise based in Saudi Arabia and operating across the Middle East.
Established in 1970, the Group has grown to become one of the top Saudi companies, and is also one of the fastest-growing
organisations in the country.
Responsibilities & Recently developed objects:
 Coordinating with the client and onsite/offshore team about the requirements.
 Analyzed the existing ECC reports.
 Created the 45 Function modules to support BI extractions for the existing ECC reports.
 Enhanced the BI data sources to add the additional functionality to the BI extractions.
 Trained the users to user the BI reports though BEX explorer.
 Involved in testing the BI reports with the user though BEX explorer.
Project #6
Client: Almarai Baby foods (www.almarai.com)
Module: MM/WM/PM/QM/PP
Type of Project: Implementation
Location : Riyadh , Saudi Arabia.
Description: Almarai is based in Riyadh, the capital of the Kingdom of Saudi Arabia. Its network spans the Arabian Peninsula,
leading and influencing the agricultural, dairy processing and food distribution industries.
Responsibilities & Recently developed objects:
 Analyzing Functional specifications and Preparing & modifying technical specifications.
 Developed a customer exit for VL31N to restrict the inbound delivery creation for unpacked materials.
 Developed templates for the internet service of LM00 transaction. Worked to modify the templates to suit the screens for
Intermac RF device, Generated the Labels for the storage bin from Intemec printer.
 Developed a ALV report to display the status of the IDOC.
 Developed Enhancement points to customize the user requirements.
 Developed outbound interfaces which interact with Proleit system.
 Developed inbound interfaces which get data from Proleit and update the same in SAP.
 Developed a BDC Program to upload the BOM details though CS01 Transaction.
Project #5
Client: BSI (London)
Module: Technical Upgrade (At onsite)
Type of Project: Production Support & Development
Location : London, United Kingdom.
Description: Since its foundation in 1901 as the Engineering Standards Committee, BSI Group has grown into a leading global
business services organization providing standards-based solutions in more than 150 countries.
Responsibilities & Recently developed objects:
 Handled all dumps occurred in the new ECC6 system.
 Worked on all note corrections Via SPAU Transaction code.
 Corrected the Z programs from Unicode errors.
 Developed a BDC program to add the user properties to SU01
Project #4
Client: Siemens Industrial Turbo machinery (SIT) (www.siemens.com/energy)
Module: WM/PS/SD/MM
Type of Project: Production Support & Development
Location : Offshore.
Description: Siemens Industrial Turbo machinery (SIT) Ltd in Lincoln, designs, manufactures, installs and provides life-time support
for world-class gas turbines for Industrial Power Generation and the Oil and Gas Industry.
Responsibilities & Recently developed objects:
 Analyzing Functional specifications.
 Preparing & modifying technical specifications.
 Preparing technical effort estimation for the new developments.
 Preparing Unit Test Plans for the developed objects.
 Queue management in Touch paper ticketing system.
 Developed overhaul error report using ALV interactive.
 Developed ALV report for all sales document flow details.
 Developed ALV interactive report for MRP requirement report.
 Created Secondary index to the field CATSPS-PERNR to improve the performance of CAT5 Job as per the SAP Note.
 Implemented USER-EXIT MC45AFZZ to copy Header level (VBAK-PS_PSP_PNR) WBS Element value to its Items (VBAP-
PS_PSP_PNR) for the TCODE VA01.
 Developed a print program and smartforms to print Labels Via Intermec printer using Intermac code.
 Automated 12 PS transactions to download the output data overnight on business working days.
 Attending weekly and monthly reviews on all support calls.
Project #3
Client: NBCU (GE) (http://www.nbcuni.com/)
Module: FI/CO
Type of Project: Production Support & Development
Location : Offshore.
Description: NBC Universal is media client based out across the world.
Responsibilities:
 Daily used to update the interface status report twice in a day to client.
 Monitoring the jobs, IDOCS and Application server files.
 Handling the enhancements and new developments.
 Queue management in Kintana ticketing system.
 Worked on Winscp and Putty (Unix Tool) tools to clean and move the application server files from one location to another
location.
 Enhanced the material master outbound IDOC with two custom fields.
 Recently developed a search help enhancement for CJ03 Transaction.
Project #2
Client: Armstrong (http://www.armstrong.com/)
Module: SD, MM, FI/CO
Type of Project: Production Support & Development
Description:Armstrong Floor Products: AFP is a worldwide leader in manufacturing and marketing of residential and commercial
floor products. Armstrong and its family of brands -- Armstrong, Bruce® and Robbins® -- offer the most extensive portfolio of
flooring products available.
Responsibilities:
As a team member my responsibilities includes
 Analyzing functional specifications.
 Preparing and modifying the Technical Design Specification for the assigned objects.
 Preparing Unit Test Plans for the developed objects.
 Handled all kind of production support tickets.
 Developed a new transaction for AFP shipment reservation tool using module pool programming.
 Developed RFC function modules using classes and methods which are used in AFP Shipment reservation tool.
 Developed reports using OOPS.
 Worked on break fix and enhancement tickets.
 Implemented various SAP Notes.
 Attended in weekly discussion for status on open tickets.
Project #1
Client: ZEP ( http://www.zepinc.com/ )
Module: FI/CO
Type of Project: Implementation
Description:Zep Inc. (NYSE: ZEP) is a leading provider of specialty chemical products to a wide variety of industrial, institutional
and retail customers.
Responsibilities & Recently Developed objects:
 Developed conversion program for customer master data using call transaction method with two table controls (Bank
details and credit card details)
 Developed customer master inbound interface which process the file coming from third party and post the data using
BDC.
 Implemented BADI for storing the customer master data on application server before saving data in R/3 data base.
 Developed smart forms for dunning in both US and Canadian languages.
 Preparing Unit Test Plans for the developed objects.
 Used performance-tuning tools like Runtime Analysis to increase the performance of the object.
(KHASIMSA SHAIK)

Khasimsa Shaik_7 - ABAP_KSA Resume

  • 1.
    KHASIMSA SHAIK Sr. SAPABAP Consultant E-mail : khasimsa@gmail.com Mobile: +966 - 54 369 6896(KSA) +91-8985 001 786(India) Professional Experience Having around 8 years of experience in ERP as SAP-ABAP consultant (Including 2+ years of onsite experience at KSA, Dubai, UK). Seeking value added responsibilities and involvement in new challenges in a highly competitive and reputed organization. Professional Summary  Having exposure in understanding SAP R/3 system and experience in ABAP/4 programming techniques.  Developed Classical, Interactive and ABAP List Viewer (ALV) Reports.  Developed ALV reports using classes and methods (OOPS).  Uploaded data from legacy system into SAP system using BDC (Session method, Call Transaction, LSMW).  Worked on SAP SCRIPTS, SMART FORMS and Adobe forms.  Worked on WORKFLOW objects.  Experience in Enhancements using User-Exits, Business addins.  Having work experience on ALE, IDOCs and RFC FM’s, Interfaces and BAPI’s.  Having work experience in Module pool programming.  Worked on Performance Tuning on Developed objects.  Exposure to SD, MM and FI, WM, PM, PP, QM, HCM and PS modules.  Exposure on UI5 and FIORI.  Interfacing between SAP and other NON SAP systems.  Worked with Solution manager Tool.  Worked with WinSCP and Putty tools which are used to move files from one directory to another directory in SAP from local system to Application server.  Strong team player to meet the project deadlines. Professional Experience  Working as Principal Consultant in NTTDATA GDS Pvt Ltd (Intelligroup Asia Pvt ltd ), Hyderabad From Mar’ 2010 to Till date. (Currently Working with Technology Control Company at Riyadh, Saudi Arabia).  Worked as Associate consultant in HCL Technologies, Chennai & Noida from May’ 2008 to Feb 2010. Certifications  Successfully completed SAP HANA certification - SAP Certified Technology Associate. Educational Background  B.TECH with Computer science and Information Technology from JNTU, Vijayawada (2001 - 2005), INDIA.
  • 2.
    Projects Profile Project #11 Client:AL-Kamal Imports Office Module: SD/MM/FI/PM/HCM Type of Project: Support Location: Saudi Arabia. Description: AL KAMAL IMPORT OFFICE COMPANY LTD is a hospital and health care company based out of Al Kamal Building Beside United Doctors Hospital Near Cornich, A, JEDDAH, Saudi Arabia.  Worked as a Senior Technical Consultant at onsite and coordinating with the functional team and end users to finalize the Functional requirements.  Developed reports on SD, PM, MM, FI and HR modules.  Developed the new report ZIW13 with standard functionalities of IW13 and with additional columns for Serialization data.  Developed transaction ZBINS which shows bin details for the spare parts available in the system.  Implemented enhancement to handle work order (IW32) approval limits for the approvers.  Uploaded Equipment task list data via IA01 transaction using BDC methods.  Developed Equipment classification report which takes object type as input and will display all equipment number and its classification data in ALV format.  Developed report and its form to show details of payable invoices stocks.  Preparing unit test plans on the developed objects.  Handled all the enhancements and new developments.  Documented all the custom developments. Project #10 Client: Adwan marketing Groups (www.adwanmarketing.com) Module: SD/MM/FI Type of Project: Implementation Location: Saudi Arabia. Description: Adwan Marketing Co. has been a prime source of Electrical Materials & Test Instruments to the Saudi Market since 1978 , and during the past few years the Company expanded its operations by opening new branches in Qatar and UAE. Having experience of serving the Electrical Construction Industries, Electrical power utilities, Instrumentation & Petrochemical Industries and Oil & Gas Industrial Projects as a supplier of quality products. Responsibilities & Recently developed objects:  Working as a Technical lead at onsite and coordinating with the functional team and end users to finalize the get the Functional requirements.  Developed forms of Quotation, Sales Order, Invoice, Delivery, Purchase order.  Developed HR reports like End of service report, payslip.  Developed BDC programs to upload all HR infotypes.  Developed Custom reports of SD, FI modules.  Coordinated with offshore technical consultants and delivered the objects on time. Project #9 Client: Tarwada Cargo Transport (www.tarwada.ae) Module: SD/MM/FI Type of Project: Implementation Location: Dubai. Description: TCT carry all types of cargo locally and across the border. From cold stuffs and breakables, to cars and construction material. TCT have the full range of cargo vehicles at your disposal, including container trucks, car carriers, refrigeration trucks, flat beds, low beds and tippers. Responsibilities & Recently developed objects:  Working as a Technical lead at onsiteand coordinating with the functional team and end users to finalize the get the Functional requirements.  Developed cheque printing form.
  • 3.
     Implemented GPSprocess in the transaction VT02n.  Developed Quotation and invoice forms from scratch which contains dynamic approval signatures.  Currently working on HR object developments. Project #8 Client: Orion Carbons (www.orioncarbons.com) Module: SD/MM/FI Type of Project: Development and Support. Location : Offshore. Description: Orion Engineered Carbons is one of the world’s leading suppliers of Carbon Black deriving from Evonik (Degussa). With more than 100 years of industry experience, we offer standard and high-performance products for Rubber, Coatings, Printing Inks, Polymers and other applications Responsibilities & Recently developed objects:  Working as a Team lead at offshore and coordinating with the onsite team to get the Functional requirements.  Working on all support tickets  Working on New developments and enhancements.  Designed the enhancement to combine the invoices for different forwarding agents.  Modifying the 19 smart forms to print the contact details with different languages.  Mentoring the new consultants on ABAP. Project #7 Client: Al Faisaliah Group (www.alfaisaliah.com) Module: SD/MM/FI Type of Project: BW Implementation Location : Riyadh , Saudi Arabia. Description: Al Faisaliah Group (AFG) is a major diversified enterprise based in Saudi Arabia and operating across the Middle East. Established in 1970, the Group has grown to become one of the top Saudi companies, and is also one of the fastest-growing organisations in the country. Responsibilities & Recently developed objects:  Coordinating with the client and onsite/offshore team about the requirements.  Analyzed the existing ECC reports.  Created the 45 Function modules to support BI extractions for the existing ECC reports.  Enhanced the BI data sources to add the additional functionality to the BI extractions.  Trained the users to user the BI reports though BEX explorer.  Involved in testing the BI reports with the user though BEX explorer. Project #6 Client: Almarai Baby foods (www.almarai.com) Module: MM/WM/PM/QM/PP Type of Project: Implementation Location : Riyadh , Saudi Arabia. Description: Almarai is based in Riyadh, the capital of the Kingdom of Saudi Arabia. Its network spans the Arabian Peninsula, leading and influencing the agricultural, dairy processing and food distribution industries. Responsibilities & Recently developed objects:  Analyzing Functional specifications and Preparing & modifying technical specifications.  Developed a customer exit for VL31N to restrict the inbound delivery creation for unpacked materials.  Developed templates for the internet service of LM00 transaction. Worked to modify the templates to suit the screens for Intermac RF device, Generated the Labels for the storage bin from Intemec printer.  Developed a ALV report to display the status of the IDOC.  Developed Enhancement points to customize the user requirements.  Developed outbound interfaces which interact with Proleit system.  Developed inbound interfaces which get data from Proleit and update the same in SAP.  Developed a BDC Program to upload the BOM details though CS01 Transaction.
  • 4.
    Project #5 Client: BSI(London) Module: Technical Upgrade (At onsite) Type of Project: Production Support & Development Location : London, United Kingdom. Description: Since its foundation in 1901 as the Engineering Standards Committee, BSI Group has grown into a leading global business services organization providing standards-based solutions in more than 150 countries. Responsibilities & Recently developed objects:  Handled all dumps occurred in the new ECC6 system.  Worked on all note corrections Via SPAU Transaction code.  Corrected the Z programs from Unicode errors.  Developed a BDC program to add the user properties to SU01 Project #4 Client: Siemens Industrial Turbo machinery (SIT) (www.siemens.com/energy) Module: WM/PS/SD/MM Type of Project: Production Support & Development Location : Offshore. Description: Siemens Industrial Turbo machinery (SIT) Ltd in Lincoln, designs, manufactures, installs and provides life-time support for world-class gas turbines for Industrial Power Generation and the Oil and Gas Industry. Responsibilities & Recently developed objects:  Analyzing Functional specifications.  Preparing & modifying technical specifications.  Preparing technical effort estimation for the new developments.  Preparing Unit Test Plans for the developed objects.  Queue management in Touch paper ticketing system.  Developed overhaul error report using ALV interactive.  Developed ALV report for all sales document flow details.  Developed ALV interactive report for MRP requirement report.  Created Secondary index to the field CATSPS-PERNR to improve the performance of CAT5 Job as per the SAP Note.  Implemented USER-EXIT MC45AFZZ to copy Header level (VBAK-PS_PSP_PNR) WBS Element value to its Items (VBAP- PS_PSP_PNR) for the TCODE VA01.  Developed a print program and smartforms to print Labels Via Intermec printer using Intermac code.  Automated 12 PS transactions to download the output data overnight on business working days.  Attending weekly and monthly reviews on all support calls. Project #3 Client: NBCU (GE) (http://www.nbcuni.com/) Module: FI/CO Type of Project: Production Support & Development Location : Offshore. Description: NBC Universal is media client based out across the world. Responsibilities:  Daily used to update the interface status report twice in a day to client.  Monitoring the jobs, IDOCS and Application server files.  Handling the enhancements and new developments.  Queue management in Kintana ticketing system.  Worked on Winscp and Putty (Unix Tool) tools to clean and move the application server files from one location to another location.  Enhanced the material master outbound IDOC with two custom fields.  Recently developed a search help enhancement for CJ03 Transaction.
  • 5.
    Project #2 Client: Armstrong(http://www.armstrong.com/) Module: SD, MM, FI/CO Type of Project: Production Support & Development Description:Armstrong Floor Products: AFP is a worldwide leader in manufacturing and marketing of residential and commercial floor products. Armstrong and its family of brands -- Armstrong, Bruce® and Robbins® -- offer the most extensive portfolio of flooring products available. Responsibilities: As a team member my responsibilities includes  Analyzing functional specifications.  Preparing and modifying the Technical Design Specification for the assigned objects.  Preparing Unit Test Plans for the developed objects.  Handled all kind of production support tickets.  Developed a new transaction for AFP shipment reservation tool using module pool programming.  Developed RFC function modules using classes and methods which are used in AFP Shipment reservation tool.  Developed reports using OOPS.  Worked on break fix and enhancement tickets.  Implemented various SAP Notes.  Attended in weekly discussion for status on open tickets. Project #1 Client: ZEP ( http://www.zepinc.com/ ) Module: FI/CO Type of Project: Implementation Description:Zep Inc. (NYSE: ZEP) is a leading provider of specialty chemical products to a wide variety of industrial, institutional and retail customers. Responsibilities & Recently Developed objects:  Developed conversion program for customer master data using call transaction method with two table controls (Bank details and credit card details)  Developed customer master inbound interface which process the file coming from third party and post the data using BDC.  Implemented BADI for storing the customer master data on application server before saving data in R/3 data base.  Developed smart forms for dunning in both US and Canadian languages.  Preparing Unit Test Plans for the developed objects.  Used performance-tuning tools like Runtime Analysis to increase the performance of the object. (KHASIMSA SHAIK)