Kaizen
Superfactory Excellence Program™
www.superfactory.com
2
© 2004 Superfactory™. All Rights Reserved.
Disclaimer and Approved use
 Disclaimer
 The files in the Superfactory Excellence Program by Superfactory Ventures LLC
(“Superfactory”) are intended for use in training individuals within an organization. The
handouts, tools, and presentations may be customized for each application.
 THE FILES AND PRESENTATIONS ARE DISTRIBUTED ON AN "AS IS" BASIS WITHOUT
WARRANTIES OF ANY KIND, EITHER EXPRESSED OR IMPLIED.
 Copyright
 All files in the Superfactory Excellence Program have been created by Superfactory and there
are no known copyright issues. Please contact Superfactory immediately if copyright issues
become apparent.
 Approved Use
 Each copy of the Superfactory Excellence Program can be used throughout a single Customer
location, such as a manufacturing plant. Multiple copies may reside on computers within
that location, or on the intranet for that location. Contact Superfactory for authorization to
use the Superfactory Excellence Program at multiple locations.
 The presentations and files may be customized to satisfy the customer’s application.
 The presentations and files, or portions or modifications thereof, may not be re-sold or re-
distributed without express written permission from Superfactory.
 Current contact information can be found at: www.superfactory.com
3
© 2004 Superfactory™. All Rights Reserved.
Outline
 What is Kaizen?
 History
 How to Kaizen
 The Kaizen Blitz
 Roadblocks
4
© 2004 Superfactory™. All Rights Reserved.
What is Kaizen?
 Kaizen (Ky’zen)
 “Kai” means “change”
 “zen” means “good (for the better)”
 Gradual, orderly, and continuous improvement
 Ongoing improvement involving everyone
5
© 2004 Superfactory™. All Rights Reserved.
History
 Modern Kaizen is based on the principles of the Toyota
Production System (TPS).
 TPS is a system used in repetitive manufacturing, but the
philosophy can be applied to all operations.
6
© 2004 Superfactory™. All Rights Reserved.
How to Kaizen
 Identify the customer
 Deming Cycle
 Plan – identify what to change and how to do it
 Current state
 Future state
 Implementation plan
 Do – execute the improvement
 Check – ensure the improvement works
 Act – future and ongoing improvements
 Repeat
7
© 2004 Superfactory™. All Rights Reserved.
Deming Cycle
8
© 2004 Superfactory™. All Rights Reserved.
Identify the Customer
 Value added is always determined from the customer’s
perspective.
 Who is the customer?
 Every process should be focused on adding value to the
customer.
 Anything that does not add value is waste.
 Some non-valued added activity is necessary waste (“NVA-
R”)
 Regulatory
 Legal
9
© 2004 Superfactory™. All Rights Reserved.
Types of Waste
 Overproduction
 Excess inventory
 Defects
 Non-value added processing
 Waiting
 Underutilized people
 Excess motion
 Transportation
10
© 2004 Superfactory™. All Rights Reserved.
Identify the Current State
 Crucial first step in process improvement
 Deep understanding of the existing processes and
dependencies
 Identify all the activities currently involved in developing a
new product
 Observe the process first hand
 Identify Value Added (VA), Non-Value Added Required
(NVA-R), and Non-Value Added (NVA)
 Generally creates more questions than answers
11
© 2004 Superfactory™. All Rights Reserved.
Identify the Current State
12
© 2004 Superfactory™. All Rights Reserved.
Identify VA, NVA-R, and NVA
13
© 2004 Superfactory™. All Rights Reserved.
Tools
•Flow Charts
•Cause and Effect Diagrams
•Check Sheets
•Histograms
•Pareto Charts
•Scatter Diagram
•Control Charts
Cause and Effect Diagram (CED)
• Ishikawa or Fishbone diagram
• Relates causes to effects
• Benefits?
• Disadvantages?
• How?
• Start with effect and work back to possible causes
15
© 2004 Superfactory™. All Rights Reserved.
Brainstorm and Analyze
 Kaizen team brainstorming to develop new process
 Post improvement ideas on map or by category
 Workflow
 Technology
 People / Organization
 Procedures
 Develop detailed future state map
 New workflow
 Value Add and Non-Value Add
 Cycle times
 Identify Kaizen “bursts” (immediate radical change)
16
© 2004 Superfactory™. All Rights Reserved.
Develop the Future State
17
© 2004 Superfactory™. All Rights Reserved.
Implementation Plan
 Think global / systems optimization
 Maximum impact to process
 Speed of implementation – create small victories
 Cost-benefit analysis
18
© 2004 Superfactory™. All Rights Reserved.
Implementation Plan
 Will new skill sets be required, and how to achieve them?
 Is the current organization structure sufficient?
 Are there cultural issues?
 Is there potential for “push back”?
 Any implications for suppliers?
 Implications for customers?
 Implications for team members?
 Do current technologies support the new process? Are they
available and cost justifiable?
 Technology is an enabler, not a solution.
 Does the reward system support the new process?
19
© 2004 Superfactory™. All Rights Reserved.
Execute
 Develop a concise, achievable milestone plan
 Communicate the plan to everyone
 Suppliers
 Team members
 Customers
 Track activities in public
 Celebrate small victories and publicly analyze failures
20
© 2004 Superfactory™. All Rights Reserved.
Check and Sustain
 Meet regularly (weekly?) to review status of open
implementation items
 Re-evaluate Future State regularly (quarterly?) for
additional improvement
 Track results on a public Kaizen Board
21
© 2004 Superfactory™. All Rights Reserved.
Typical Results
 40 – 60% reduction of lean time
 10 – 15% productivity improvement
 10 – 20% reduction in rework
 Improved communication between functions and
departments
 Clearly defined customer needs throughout the value
stream
 Improved customer satisfaction
22
© 2004 Superfactory™. All Rights Reserved.
Kaizen Blitz
 Total focus on a defined process to create radical
improvement in a short period of time
 Dramatic improvements in productivity, quality, delivery,
lead-time, set-up time, space utilization, work in process,
workplace organization
 Typically five days (one week) long
23
© 2004 Superfactory™. All Rights Reserved.
Kaizen Blitz - Agenda
 Day 1: Setting the scene
 Meet the team, training
 Day 2: Observe the current process
 Flowchart, identify waste, identify root causes
 Day 3: Develop the future state process
 Brainstorm and flowchart (typically the longest day!)
 Day 4: Implement the new process
 Plan, communicate, implement, modify
 Day 5: Report and analyze
 Performance vs expectations
24
© 2004 Superfactory™. All Rights Reserved.
Kaizen Blitz Rules
 Be open to change
 Stay positive
 Speak out if you disagree
 See waste as an opportunity
 No blame environment
 Treat others as you want to be treated
 Ask the silly questions, challenge the givens
 Creativity before capital
 Understand the data and principles
 Just do it!
25
© 2004 Superfactory™. All Rights Reserved.
Roadblocks
 Too busy to study it
 A good idea but the timing is premature
 Not in the budget
 Theory is different from practice
 Isn’t there something else for you to do?
 Doesn’t match corporate policy
 Not our business – let someone else analyze it
 It’s not improvement – it’s common sense
 I know the result even if we don’t do it
 Fear of accountability
 Isn’t there an even better way?

More Related Content

Similar to Kaizen.ppt

Six_Sigma.ppt
Six_Sigma.pptSix_Sigma.ppt
Six_Sigma.ppt
VikasRai405977
 
Six_Sigma.ppt
Six_Sigma.pptSix_Sigma.ppt
Six_Sigma.ppt
yuva9PPC
 
Amit.ppt
Amit.pptAmit.ppt
Amit.ppt
sanjeetgiri6
 
What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...
What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...
What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...
0122446
 
Six_Sigma.ppt
Six_Sigma.pptSix_Sigma.ppt
Six_Sigma.ppt
SenthilJS2
 
Lean vs. Traditional Manufacturing.ppt
Lean vs. Traditional Manufacturing.pptLean vs. Traditional Manufacturing.ppt
Lean vs. Traditional Manufacturing.ppt
MohammedRizwanSharif1
 
Manufacturing.ppt
Manufacturing.pptManufacturing.ppt
Manufacturing.ppt
MohammedRizwanSharif1
 
Value_Streams.ppt
Value_Streams.pptValue_Streams.ppt
Value_Streams.ppt
BetshaTizazu
 
The new fundamentals of agile at scale
The new fundamentals of agile at scale The new fundamentals of agile at scale
The new fundamentals of agile at scale
Perforce
 
Outsourcing
OutsourcingOutsourcing
Outsourcing
Dave Cole
 
Introduction to DevOps slides.pdf
Introduction to DevOps slides.pdfIntroduction to DevOps slides.pdf
Introduction to DevOps slides.pdf
BoreVishnusai
 
Gems of agile a glimpse of agile for senior management
Gems of agile   a glimpse of agile for senior managementGems of agile   a glimpse of agile for senior management
Gems of agile a glimpse of agile for senior management
Neeraj Bachani
 
Welcome to Generator
Welcome to GeneratorWelcome to Generator
Welcome to Generator
Becta FE and Skills
 
Practical DevOps
Practical DevOpsPractical DevOps
Practical DevOps
Kelvin Yeung
 
Why DevOps Matters To The CIO
Why DevOps Matters To The CIOWhy DevOps Matters To The CIO
Why DevOps Matters To The CIO
benjaminwootton
 
Securely Scaling Agile Software Delivery: Traceability, Visibility and Colla...
Securely Scaling Agile Software Delivery:  Traceability, Visibility and Colla...Securely Scaling Agile Software Delivery:  Traceability, Visibility and Colla...
Securely Scaling Agile Software Delivery: Traceability, Visibility and Colla...
Kevin Hancock
 
Process Innovation Capabilities Diagnostic Tool - Working Draft
Process Innovation Capabilities Diagnostic Tool - Working DraftProcess Innovation Capabilities Diagnostic Tool - Working Draft
Process Innovation Capabilities Diagnostic Tool - Working Draft
Brad Power
 
Agile adoption patterns and antipatterns
Agile adoption patterns and antipatternsAgile adoption patterns and antipatterns
Agile adoption patterns and antipatterns
Greg Hutchings
 
8d
8d8d
Gartner ADDI 2018: Pivotal & Service NSW
Gartner ADDI 2018: Pivotal & Service NSWGartner ADDI 2018: Pivotal & Service NSW
Gartner ADDI 2018: Pivotal & Service NSW
VMware Tanzu
 

Similar to Kaizen.ppt (20)

Six_Sigma.ppt
Six_Sigma.pptSix_Sigma.ppt
Six_Sigma.ppt
 
Six_Sigma.ppt
Six_Sigma.pptSix_Sigma.ppt
Six_Sigma.ppt
 
Amit.ppt
Amit.pptAmit.ppt
Amit.ppt
 
What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...
What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...
What is Six Sigma? Phases of Six Sigma. Define; Measure; Evaluate / Analyze; ...
 
Six_Sigma.ppt
Six_Sigma.pptSix_Sigma.ppt
Six_Sigma.ppt
 
Lean vs. Traditional Manufacturing.ppt
Lean vs. Traditional Manufacturing.pptLean vs. Traditional Manufacturing.ppt
Lean vs. Traditional Manufacturing.ppt
 
Manufacturing.ppt
Manufacturing.pptManufacturing.ppt
Manufacturing.ppt
 
Value_Streams.ppt
Value_Streams.pptValue_Streams.ppt
Value_Streams.ppt
 
The new fundamentals of agile at scale
The new fundamentals of agile at scale The new fundamentals of agile at scale
The new fundamentals of agile at scale
 
Outsourcing
OutsourcingOutsourcing
Outsourcing
 
Introduction to DevOps slides.pdf
Introduction to DevOps slides.pdfIntroduction to DevOps slides.pdf
Introduction to DevOps slides.pdf
 
Gems of agile a glimpse of agile for senior management
Gems of agile   a glimpse of agile for senior managementGems of agile   a glimpse of agile for senior management
Gems of agile a glimpse of agile for senior management
 
Welcome to Generator
Welcome to GeneratorWelcome to Generator
Welcome to Generator
 
Practical DevOps
Practical DevOpsPractical DevOps
Practical DevOps
 
Why DevOps Matters To The CIO
Why DevOps Matters To The CIOWhy DevOps Matters To The CIO
Why DevOps Matters To The CIO
 
Securely Scaling Agile Software Delivery: Traceability, Visibility and Colla...
Securely Scaling Agile Software Delivery:  Traceability, Visibility and Colla...Securely Scaling Agile Software Delivery:  Traceability, Visibility and Colla...
Securely Scaling Agile Software Delivery: Traceability, Visibility and Colla...
 
Process Innovation Capabilities Diagnostic Tool - Working Draft
Process Innovation Capabilities Diagnostic Tool - Working DraftProcess Innovation Capabilities Diagnostic Tool - Working Draft
Process Innovation Capabilities Diagnostic Tool - Working Draft
 
Agile adoption patterns and antipatterns
Agile adoption patterns and antipatternsAgile adoption patterns and antipatterns
Agile adoption patterns and antipatterns
 
8d
8d8d
8d
 
Gartner ADDI 2018: Pivotal & Service NSW
Gartner ADDI 2018: Pivotal & Service NSWGartner ADDI 2018: Pivotal & Service NSW
Gartner ADDI 2018: Pivotal & Service NSW
 

Recently uploaded

定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
utuvvas
 
Automotive power train system- A final report
Automotive power train system- A final reportAutomotive power train system- A final report
Automotive power train system- A final report
KartikThakkar24
 
gHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdfgHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdf
maicuongdt21
 
欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】
欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】
欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】
romom51096
 
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
arcosarturo900
 
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
ramaysha335
 
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
pycfbo
 
Cyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery EffortsCyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery Efforts
TycoonSuccess
 
Automotive Engine Valve Manufacturing Plant Project Report.pptx
Automotive Engine Valve Manufacturing Plant Project Report.pptxAutomotive Engine Valve Manufacturing Plant Project Report.pptx
Automotive Engine Valve Manufacturing Plant Project Report.pptx
Smith Anderson
 
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdfToyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
ssuser5e3aa3
 
physics-project-final.pdf khdkkdhhdgdjgdhdh
physics-project-final.pdf khdkkdhhdgdjgdhdhphysics-project-final.pdf khdkkdhhdgdjgdhdh
physics-project-final.pdf khdkkdhhdgdjgdhdh
isaprakash1929
 
Unlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENT
Unlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENTUnlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENT
Unlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENT
siqbal9337
 
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
utuvvas
 
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
pycfbo
 
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
jafiradnan336
 
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENTUnlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
siqbal9337
 
Call Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in PuneCall Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in Pune
rajni kaurn06
 
Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...
Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...
Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...
deepakrana121234
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
ggany
 
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling PerformanceTop-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Motor Haus
 

Recently uploaded (20)

定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
定制(london学位证书)英国伦敦大学毕业证本科学历原版一模一样
 
Automotive power train system- A final report
Automotive power train system- A final reportAutomotive power train system- A final report
Automotive power train system- A final report
 
gHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdfgHSM Product Introduction 2022newdocumane.pdf
gHSM Product Introduction 2022newdocumane.pdf
 
欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】
欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】
欧洲杯投注-欧洲杯投注冠军赔率-欧洲杯投注夺冠赔率|【​网址​🎉ac55.net🎉​】
 
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
欧洲杯竞猜-欧洲杯竞猜下注平台-欧洲杯竞猜投注平台|【​网址​🎉ac44.net🎉​】
 
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
欧洲杯竞猜-欧洲杯竞猜外围竞猜-欧洲杯竞猜竞猜平台|【​网址​🎉ac123.net🎉​】
 
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
一比一原版南昆士兰大学毕业证(USQ毕业证书)学历如何办理
 
Cyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery EffortsCyclone Remal: Assessing Impact and Recovery Efforts
Cyclone Remal: Assessing Impact and Recovery Efforts
 
Automotive Engine Valve Manufacturing Plant Project Report.pptx
Automotive Engine Valve Manufacturing Plant Project Report.pptxAutomotive Engine Valve Manufacturing Plant Project Report.pptx
Automotive Engine Valve Manufacturing Plant Project Report.pptx
 
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdfToyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
Toyota Land Cruiser Owners Manual 1968-1971 FJ40 FJ43 FJ45.pdf
 
physics-project-final.pdf khdkkdhhdgdjgdhdh
physics-project-final.pdf khdkkdhhdgdjgdhdhphysics-project-final.pdf khdkkdhhdgdjgdhdh
physics-project-final.pdf khdkkdhhdgdjgdhdh
 
Unlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENT
Unlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENTUnlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENT
Unlimited Short Call Girls Andheri ✅ 9920874524 FULL CASH PAYMENT
 
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
 
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
一比一原版皇家墨尔本理工大学毕业证(RMIT毕业证书)学历如何办理
 
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
美洲杯买球-美洲杯买球在哪里押注-美洲杯买球在哪里投注|【​网址​🎉ac44.net🎉​】
 
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENTUnlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
Unlimited Short Call Girls Navi Mumbai ✅ 9930245274 FULL CASH PAYMENT
 
Call Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in PuneCall Girls Pune 7023059433 Vip Escorts Service in Pune
Call Girls Pune 7023059433 Vip Escorts Service in Pune
 
Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...
Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...
Call Girls in Chennai (Tamil Nadu ) call me [🔝7737669865🔝] Escort In Chennai ...
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
 
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling PerformanceTop-Quality AC Service for Mini Cooper Optimal Cooling Performance
Top-Quality AC Service for Mini Cooper Optimal Cooling Performance
 

Kaizen.ppt

  • 1. 1 © 2004 Superfactory™. All Rights Reserved. Kaizen Superfactory Excellence Program™ www.superfactory.com
  • 2. 2 © 2004 Superfactory™. All Rights Reserved. Disclaimer and Approved use  Disclaimer  The files in the Superfactory Excellence Program by Superfactory Ventures LLC (“Superfactory”) are intended for use in training individuals within an organization. The handouts, tools, and presentations may be customized for each application.  THE FILES AND PRESENTATIONS ARE DISTRIBUTED ON AN "AS IS" BASIS WITHOUT WARRANTIES OF ANY KIND, EITHER EXPRESSED OR IMPLIED.  Copyright  All files in the Superfactory Excellence Program have been created by Superfactory and there are no known copyright issues. Please contact Superfactory immediately if copyright issues become apparent.  Approved Use  Each copy of the Superfactory Excellence Program can be used throughout a single Customer location, such as a manufacturing plant. Multiple copies may reside on computers within that location, or on the intranet for that location. Contact Superfactory for authorization to use the Superfactory Excellence Program at multiple locations.  The presentations and files may be customized to satisfy the customer’s application.  The presentations and files, or portions or modifications thereof, may not be re-sold or re- distributed without express written permission from Superfactory.  Current contact information can be found at: www.superfactory.com
  • 3. 3 © 2004 Superfactory™. All Rights Reserved. Outline  What is Kaizen?  History  How to Kaizen  The Kaizen Blitz  Roadblocks
  • 4. 4 © 2004 Superfactory™. All Rights Reserved. What is Kaizen?  Kaizen (Ky’zen)  “Kai” means “change”  “zen” means “good (for the better)”  Gradual, orderly, and continuous improvement  Ongoing improvement involving everyone
  • 5. 5 © 2004 Superfactory™. All Rights Reserved. History  Modern Kaizen is based on the principles of the Toyota Production System (TPS).  TPS is a system used in repetitive manufacturing, but the philosophy can be applied to all operations.
  • 6. 6 © 2004 Superfactory™. All Rights Reserved. How to Kaizen  Identify the customer  Deming Cycle  Plan – identify what to change and how to do it  Current state  Future state  Implementation plan  Do – execute the improvement  Check – ensure the improvement works  Act – future and ongoing improvements  Repeat
  • 7. 7 © 2004 Superfactory™. All Rights Reserved. Deming Cycle
  • 8. 8 © 2004 Superfactory™. All Rights Reserved. Identify the Customer  Value added is always determined from the customer’s perspective.  Who is the customer?  Every process should be focused on adding value to the customer.  Anything that does not add value is waste.  Some non-valued added activity is necessary waste (“NVA- R”)  Regulatory  Legal
  • 9. 9 © 2004 Superfactory™. All Rights Reserved. Types of Waste  Overproduction  Excess inventory  Defects  Non-value added processing  Waiting  Underutilized people  Excess motion  Transportation
  • 10. 10 © 2004 Superfactory™. All Rights Reserved. Identify the Current State  Crucial first step in process improvement  Deep understanding of the existing processes and dependencies  Identify all the activities currently involved in developing a new product  Observe the process first hand  Identify Value Added (VA), Non-Value Added Required (NVA-R), and Non-Value Added (NVA)  Generally creates more questions than answers
  • 11. 11 © 2004 Superfactory™. All Rights Reserved. Identify the Current State
  • 12. 12 © 2004 Superfactory™. All Rights Reserved. Identify VA, NVA-R, and NVA
  • 13. 13 © 2004 Superfactory™. All Rights Reserved. Tools •Flow Charts •Cause and Effect Diagrams •Check Sheets •Histograms •Pareto Charts •Scatter Diagram •Control Charts
  • 14. Cause and Effect Diagram (CED) • Ishikawa or Fishbone diagram • Relates causes to effects • Benefits? • Disadvantages? • How? • Start with effect and work back to possible causes
  • 15. 15 © 2004 Superfactory™. All Rights Reserved. Brainstorm and Analyze  Kaizen team brainstorming to develop new process  Post improvement ideas on map or by category  Workflow  Technology  People / Organization  Procedures  Develop detailed future state map  New workflow  Value Add and Non-Value Add  Cycle times  Identify Kaizen “bursts” (immediate radical change)
  • 16. 16 © 2004 Superfactory™. All Rights Reserved. Develop the Future State
  • 17. 17 © 2004 Superfactory™. All Rights Reserved. Implementation Plan  Think global / systems optimization  Maximum impact to process  Speed of implementation – create small victories  Cost-benefit analysis
  • 18. 18 © 2004 Superfactory™. All Rights Reserved. Implementation Plan  Will new skill sets be required, and how to achieve them?  Is the current organization structure sufficient?  Are there cultural issues?  Is there potential for “push back”?  Any implications for suppliers?  Implications for customers?  Implications for team members?  Do current technologies support the new process? Are they available and cost justifiable?  Technology is an enabler, not a solution.  Does the reward system support the new process?
  • 19. 19 © 2004 Superfactory™. All Rights Reserved. Execute  Develop a concise, achievable milestone plan  Communicate the plan to everyone  Suppliers  Team members  Customers  Track activities in public  Celebrate small victories and publicly analyze failures
  • 20. 20 © 2004 Superfactory™. All Rights Reserved. Check and Sustain  Meet regularly (weekly?) to review status of open implementation items  Re-evaluate Future State regularly (quarterly?) for additional improvement  Track results on a public Kaizen Board
  • 21. 21 © 2004 Superfactory™. All Rights Reserved. Typical Results  40 – 60% reduction of lean time  10 – 15% productivity improvement  10 – 20% reduction in rework  Improved communication between functions and departments  Clearly defined customer needs throughout the value stream  Improved customer satisfaction
  • 22. 22 © 2004 Superfactory™. All Rights Reserved. Kaizen Blitz  Total focus on a defined process to create radical improvement in a short period of time  Dramatic improvements in productivity, quality, delivery, lead-time, set-up time, space utilization, work in process, workplace organization  Typically five days (one week) long
  • 23. 23 © 2004 Superfactory™. All Rights Reserved. Kaizen Blitz - Agenda  Day 1: Setting the scene  Meet the team, training  Day 2: Observe the current process  Flowchart, identify waste, identify root causes  Day 3: Develop the future state process  Brainstorm and flowchart (typically the longest day!)  Day 4: Implement the new process  Plan, communicate, implement, modify  Day 5: Report and analyze  Performance vs expectations
  • 24. 24 © 2004 Superfactory™. All Rights Reserved. Kaizen Blitz Rules  Be open to change  Stay positive  Speak out if you disagree  See waste as an opportunity  No blame environment  Treat others as you want to be treated  Ask the silly questions, challenge the givens  Creativity before capital  Understand the data and principles  Just do it!
  • 25. 25 © 2004 Superfactory™. All Rights Reserved. Roadblocks  Too busy to study it  A good idea but the timing is premature  Not in the budget  Theory is different from practice  Isn’t there something else for you to do?  Doesn’t match corporate policy  Not our business – let someone else analyze it  It’s not improvement – it’s common sense  I know the result even if we don’t do it  Fear of accountability  Isn’t there an even better way?