San Francisco, CA 94107
                                415.336.0106
                                josieadele@gmail.com

I N T E R I O R   D E S I G N
O F F I C E S C A P E S S C O T T R I C E
                               P r o j e c t D e s i g n e r            Denver, CO
                               ff&e - custom millwork - flooring design



                               Denver’s two Steelcase dealerships merged to become the
                               largest furniture dealership in the region. Our Interiors team
                               determined appropriate spacial needs suited to the 25,000 sf
                               expansion space and a new flooring division.
                               I was responsible for furniture, finish, fabric selection, custom
                               millwork details and flooring design.
                               Design details promoted traffic flow throughout the space.
                               Color and material selection reflected natural elements of the
                               Colorado Rocky Mountains region.




Custom millwork was
designed in the cafe to
house technology hub,
while the bar height counter
suggested traffic flow into
the main showroom.




                                                                                           1/6
O F F I C E S C A P E S S C O T T R I C E
Project Designer                         Denver, CO
ff&e - custom millwork - flooring design




An Architectural library was centrally located and created an
oasis to foster interaction in an informal setting of the new
flooring division.
I designed the custom bar-height counter to showcase and
house Milliken carpet samples.
All samples shown in library display were created during my
collaboration with Milliken Design services in LaGrange, GA.




                         The New Business Development
                         team area was planned to meet
                         A L T E R N A T I V E
                         O F F I C I N G strategies. Space
                         planning was based on a non-
                         traditional panel system to promote
                         communication in a highly collaborative
                         department.
                         Warm colors were specified to ignite
                         drive and ambition in this competitive
                         work environment.




                                                       2/6
W O R K P L A C E                   2 0 1 0
                                                                                                                Project Designer                 Denver, CO
                                                                                                                furniture - finish - fabric specification



                                                                                           This functional, living laboratory explored and analyzed the
                                                                                           future of work space design.
                                                                                           I was responsible for space planning, furniture and finish
                                                                                           specification. R&D was based on productivity of the
                                                                                           knowledge worker.




P L A Y G R O U N D
informal space promotes high-energy dialogue, brainstorming and creativity




C A M P S I T E                                                                  I N F O B A R
self-contained, flexible space for a duration of time specified by users needs   wired cafe’ atmosphere promotes community and information exchange area

                                                                                                                                                     3/6
A C C E N T U R E
               Project Designer           Denver, CO
               programming - space plan - ff&e



Development of the new Accenture work place was a
response to a high-end hoteling environment that spoke to
the Generation X worker. Aligning with the clients’ global
initiatives, I was responsible for space planning,
custom furniture design, finish and fabric selection.


O P E N      P L A N      S Y S T E M S




                                                  4/6
A C C E N T U R E
               Project Designer           Denver, CO
               programming - space plan - ff&e



Based on workplace programming, open plan vs
enclosed space storage and surface needs were
designed. I increased workstation occupancy 10%
by designing task specific work areas with the
Steelcase Wood team.



E N C L O S E D
C O L L A B O R A T I V E




                                                  5/6
A C C E N T U R E
                          Project Designer           Denver, CO
                          programming - space plan - ff&e

S P A C E   P L A N




                      7
                                                         6/6

Josie Adele Portfolio

  • 1.
    San Francisco, CA94107 415.336.0106 josieadele@gmail.com I N T E R I O R D E S I G N
  • 2.
    O F FI C E S C A P E S S C O T T R I C E P r o j e c t D e s i g n e r Denver, CO ff&e - custom millwork - flooring design Denver’s two Steelcase dealerships merged to become the largest furniture dealership in the region. Our Interiors team determined appropriate spacial needs suited to the 25,000 sf expansion space and a new flooring division. I was responsible for furniture, finish, fabric selection, custom millwork details and flooring design. Design details promoted traffic flow throughout the space. Color and material selection reflected natural elements of the Colorado Rocky Mountains region. Custom millwork was designed in the cafe to house technology hub, while the bar height counter suggested traffic flow into the main showroom. 1/6
  • 3.
    O F FI C E S C A P E S S C O T T R I C E Project Designer Denver, CO ff&e - custom millwork - flooring design An Architectural library was centrally located and created an oasis to foster interaction in an informal setting of the new flooring division. I designed the custom bar-height counter to showcase and house Milliken carpet samples. All samples shown in library display were created during my collaboration with Milliken Design services in LaGrange, GA. The New Business Development team area was planned to meet A L T E R N A T I V E O F F I C I N G strategies. Space planning was based on a non- traditional panel system to promote communication in a highly collaborative department. Warm colors were specified to ignite drive and ambition in this competitive work environment. 2/6
  • 4.
    W O RK P L A C E 2 0 1 0 Project Designer Denver, CO furniture - finish - fabric specification This functional, living laboratory explored and analyzed the future of work space design. I was responsible for space planning, furniture and finish specification. R&D was based on productivity of the knowledge worker. P L A Y G R O U N D informal space promotes high-energy dialogue, brainstorming and creativity C A M P S I T E I N F O B A R self-contained, flexible space for a duration of time specified by users needs wired cafe’ atmosphere promotes community and information exchange area 3/6
  • 5.
    A C CE N T U R E Project Designer Denver, CO programming - space plan - ff&e Development of the new Accenture work place was a response to a high-end hoteling environment that spoke to the Generation X worker. Aligning with the clients’ global initiatives, I was responsible for space planning, custom furniture design, finish and fabric selection. O P E N P L A N S Y S T E M S 4/6
  • 6.
    A C CE N T U R E Project Designer Denver, CO programming - space plan - ff&e Based on workplace programming, open plan vs enclosed space storage and surface needs were designed. I increased workstation occupancy 10% by designing task specific work areas with the Steelcase Wood team. E N C L O S E D C O L L A B O R A T I V E 5/6
  • 7.
    A C CE N T U R E Project Designer Denver, CO programming - space plan - ff&e S P A C E P L A N 7 6/6