The document provides an agenda and summary for a Q3 2011 evaluation meeting of the 24/7 Outdoor Society general assembly. It includes a review of activities in Q3 2011, the budget and expenses for the quarter and year, and upcoming planned activities for Q1 2012 including hikes and a surfing trip. The headcount for the group remains the same minus a few withdrawals.
Dmitriy Chernyavskyy worked as a procurement assistant for Moray Offshore Renewables Ltd. from June to September 2016. His role involved analyzing scenarios such as project delays, risks from invitation to bids and requests for proposals. He conducted a finish-to-finish analysis showing an 18.5% project delay and calculated associated liquidated damages. Additionally, he analyzed the environmental and economic impacts of the offshore wind farm, including reductions in levelized costs of energy over time.
Kraft Foods has its European headquarters located in Zurich, Switzerland. The document contains 4 copyrighted photos taken by Lubica Fahr. The photos are related to Kraft Foods' European headquarters.
Welcome To The Wilderness With Balan MadhavanDreeme Kochi
The document appears to be an itinerary for a 3 day tour from February 24-26, 2012 that includes visits to various locations like Jatinga Lighthouse and Siju Caves in Meghalaya, India. It provides details of the daily activities, rates for members and non-members, and contact information for registration or inquiries. Accommodation is included at Jatinga Lodge Resort in Balpakram National Park.
Accessibilità nel turismo: ITFITS - ANNA GRAZIA LAURAIT FITS
Turismo e sostenibilità: presente e futuro del mercato Accessibilità nel turismo: stato dell’arte e progetti futuri
Annagrazia Laura, Presidente European Network for Accessible Tourism
This document provides information on Seattle's 2009-2010 Revised Real Estate Excise Tax (REET) Allocation Proposal from April 13, 2009. It summarizes the city's Capital Improvement Program (CIP) and budgets. It shows how CIP funding is allocated across city departments and projects. It also outlines revisions to the REET budget due to lower than expected REET revenues, including cuts and delays to several fire station projects.
Water Management System at Chaibasa Cement Works presented by A.K.SrivastavaIndia Water Portal
This is a presentation from Chaibasa Cement Works,ACC Limited one of the finalists at the 5th CII-GBC National Award for Excellence in Water Management in 2008.
The awards are in 2 categories, Within the Fence for work done on minimizing the organisations water footprint, and Beyond the Fence for work done in the community around the industry.
This presentation was in the "Within the Fence" category.
We thank CII and the respective companies for giving us permission to upload these presentations on the India Water Portal website for dissemination to a wider audience.
NJFuture Redevelopment Forum 13 Building Capacity AldermanNew Jersey Future
The document summarizes key details of the redevelopment of the Bayonne Crossing site in New Jersey, including:
- The $82 million project remediated 30.5 acres of contaminated land and constructed 11 buildings totaling 356,500 square feet of space, creating over 900 jobs.
- Over 1,000 construction jobs were involved and large amounts of contaminated soil, steel, and concrete were removed and recycled from the site.
- The project involved extensive public-private partnerships between the City of Bayonne and various state agencies to obtain necessary approvals, permits, and $82 million in financing over more than a decade of planning and construction.
The Public Utilities Commission of Sri Lanka issued a consultation paper on setting electricity tariffs for the period of 2011-2015. The paper presented key issues for public comment, including sales forecasts and allowed losses for transmission and distribution licensees. Distribution licensees filed sales forecasts and loss allowances between 2011-2015 ranging from 11-14.8% losses. The transmission licensee filed purchases from generation and loss allowances of 11% for 2011. The paper proposed allowed revenues for licensees and the provision for energy sold for street lighting. It analyzed government subsidies to the electricity sector and presented a roadmap for tariff restructuring and rebalancing to achieve cost-reflective tariffs by 2015. Finally, the paper outlined proposed electricity tar
Dmitriy Chernyavskyy worked as a procurement assistant for Moray Offshore Renewables Ltd. from June to September 2016. His role involved analyzing scenarios such as project delays, risks from invitation to bids and requests for proposals. He conducted a finish-to-finish analysis showing an 18.5% project delay and calculated associated liquidated damages. Additionally, he analyzed the environmental and economic impacts of the offshore wind farm, including reductions in levelized costs of energy over time.
Kraft Foods has its European headquarters located in Zurich, Switzerland. The document contains 4 copyrighted photos taken by Lubica Fahr. The photos are related to Kraft Foods' European headquarters.
Welcome To The Wilderness With Balan MadhavanDreeme Kochi
The document appears to be an itinerary for a 3 day tour from February 24-26, 2012 that includes visits to various locations like Jatinga Lighthouse and Siju Caves in Meghalaya, India. It provides details of the daily activities, rates for members and non-members, and contact information for registration or inquiries. Accommodation is included at Jatinga Lodge Resort in Balpakram National Park.
Accessibilità nel turismo: ITFITS - ANNA GRAZIA LAURAIT FITS
Turismo e sostenibilità: presente e futuro del mercato Accessibilità nel turismo: stato dell’arte e progetti futuri
Annagrazia Laura, Presidente European Network for Accessible Tourism
This document provides information on Seattle's 2009-2010 Revised Real Estate Excise Tax (REET) Allocation Proposal from April 13, 2009. It summarizes the city's Capital Improvement Program (CIP) and budgets. It shows how CIP funding is allocated across city departments and projects. It also outlines revisions to the REET budget due to lower than expected REET revenues, including cuts and delays to several fire station projects.
Water Management System at Chaibasa Cement Works presented by A.K.SrivastavaIndia Water Portal
This is a presentation from Chaibasa Cement Works,ACC Limited one of the finalists at the 5th CII-GBC National Award for Excellence in Water Management in 2008.
The awards are in 2 categories, Within the Fence for work done on minimizing the organisations water footprint, and Beyond the Fence for work done in the community around the industry.
This presentation was in the "Within the Fence" category.
We thank CII and the respective companies for giving us permission to upload these presentations on the India Water Portal website for dissemination to a wider audience.
NJFuture Redevelopment Forum 13 Building Capacity AldermanNew Jersey Future
The document summarizes key details of the redevelopment of the Bayonne Crossing site in New Jersey, including:
- The $82 million project remediated 30.5 acres of contaminated land and constructed 11 buildings totaling 356,500 square feet of space, creating over 900 jobs.
- Over 1,000 construction jobs were involved and large amounts of contaminated soil, steel, and concrete were removed and recycled from the site.
- The project involved extensive public-private partnerships between the City of Bayonne and various state agencies to obtain necessary approvals, permits, and $82 million in financing over more than a decade of planning and construction.
The Public Utilities Commission of Sri Lanka issued a consultation paper on setting electricity tariffs for the period of 2011-2015. The paper presented key issues for public comment, including sales forecasts and allowed losses for transmission and distribution licensees. Distribution licensees filed sales forecasts and loss allowances between 2011-2015 ranging from 11-14.8% losses. The transmission licensee filed purchases from generation and loss allowances of 11% for 2011. The paper proposed allowed revenues for licensees and the provision for energy sold for street lighting. It analyzed government subsidies to the electricity sector and presented a roadmap for tariff restructuring and rebalancing to achieve cost-reflective tariffs by 2015. Finally, the paper outlined proposed electricity tar
The itinerary document outlines the schedule and logistics for a 2-day charity climb of Mt. Ugu. Day 1 involves traveling to Aritao, Nueva Vizcaya by bus and jeep, registering in Kayapa, beginning the trek at 7am, stopping for meals, and reaching the summit around 4pm. Day 2 consists of waking at 6am, breaking camp by 8am, trekking to villages for lunch and rest stops, and departing for Baguio by 4pm to take the bus back to Manila overnight. The document provides expense estimates, gear checklists, participant lists, and logistical reminders for the climb.
The itinerary outlines a two-day hiking trip through Mount Samiento in Nueva Vizcaya, Philippines. On day one, the group will take a bus to Aritao and then a jeepney to Kayapa to start their hike, with stops planned along the route including a village, pine forest, and the mountain summit. Day two involves hiking back down the mountain with stops in villages along the way before returning to Baguio and Manila. The budget estimates the total cost per person to be around 1,415-1,615 PHP, excluding food.
The Outdoor Society held a general assembly on March 16, 2012. The agenda included discussing an upcoming BC awards night, two upcoming OS projects (Cagbalete Revel and Educate, and Community Hype), headcount and enlistment numbers, a point system for participation, and attendees of the general assembly meeting. The OS was also approved to receive up to ₱10,000 in budget for their two proposed projects.
This document outlines the agenda for a general assembly of the 24/7 Outdoor Society on February 17, 2012. The agenda includes discussions on community projects and activities, organizational goals, and involvement. It also provides details on upcoming hiking trips and a pre-climb meeting for a double-day hike of Cinco Picos. The document concludes with information on an upcoming awards event to recognize performers in the BC Program.
The document provides instructions for tracking supply requests using a monthly supplies request tracker. It explains how to track supplies based on the requester's name and includes a sample request for classroom supplies from "Mazzie" for a "CRM 19" class starting on January 30th. The document demonstrates how the tracker automatically calculates the total number of items released.
The document describes two community projects proposed by Cagbalete Revel & Educate. Project 1 involves a photo exhibit and member recruitment campaign at two locations from March 12-23. Project 2 is a waste management seminar and clean-up at Cagbalete on April 14-15 to educate the local community about proper waste disposal and environmental preservation. It provides timelines, communication plans, activity details, budgets, and objectives for each project.
This document provides information for an upcoming climb of Mount Manalmon, including a pre-climb meeting, basic mountaineering course, preparation details, itinerary, gear requirements, meal plan, tasks and responsibilities. The climb will include either a day trip or overnight option
This document summarizes the agenda for a general assembly meeting of the 24/7 Outdoor Society. The agenda items include reviewing activities scheduled for the third quarter, presenting a project proposal template, nominating new co-leads, planning fourth quarter activities, discussing upcoming promotions of the group, and providing a membership update. Budgets and timelines are included for some of the proposed fourth quarter activities.
This is the deck presented on the Dec 15 GA.
Attendees were:
Cherry Cular
Karl Manongsong
Sheila Paz
Jed Olaso
Thirdy BitBit
Basio Arceo
Powee Lapus
Aika Abanto
Ralph
*If I missed anyone, please post a comment or PM me,
Thanks!
The itinerary document outlines the schedule and logistics for a 2-day charity climb of Mt. Ugu. Day 1 involves traveling to Aritao, Nueva Vizcaya by bus and jeep, registering in Kayapa, beginning the trek at 7am, stopping for meals, and reaching the summit around 4pm. Day 2 consists of waking at 6am, breaking camp by 8am, trekking to villages for lunch and rest stops, and departing for Baguio by 4pm to take the bus back to Manila overnight. The document provides expense estimates, gear checklists, participant lists, and logistical reminders for the climb.
The itinerary outlines a two-day hiking trip through Mount Samiento in Nueva Vizcaya, Philippines. On day one, the group will take a bus to Aritao and then a jeepney to Kayapa to start their hike, with stops planned along the route including a village, pine forest, and the mountain summit. Day two involves hiking back down the mountain with stops in villages along the way before returning to Baguio and Manila. The budget estimates the total cost per person to be around 1,415-1,615 PHP, excluding food.
The Outdoor Society held a general assembly on March 16, 2012. The agenda included discussing an upcoming BC awards night, two upcoming OS projects (Cagbalete Revel and Educate, and Community Hype), headcount and enlistment numbers, a point system for participation, and attendees of the general assembly meeting. The OS was also approved to receive up to ₱10,000 in budget for their two proposed projects.
This document outlines the agenda for a general assembly of the 24/7 Outdoor Society on February 17, 2012. The agenda includes discussions on community projects and activities, organizational goals, and involvement. It also provides details on upcoming hiking trips and a pre-climb meeting for a double-day hike of Cinco Picos. The document concludes with information on an upcoming awards event to recognize performers in the BC Program.
The document provides instructions for tracking supply requests using a monthly supplies request tracker. It explains how to track supplies based on the requester's name and includes a sample request for classroom supplies from "Mazzie" for a "CRM 19" class starting on January 30th. The document demonstrates how the tracker automatically calculates the total number of items released.
The document describes two community projects proposed by Cagbalete Revel & Educate. Project 1 involves a photo exhibit and member recruitment campaign at two locations from March 12-23. Project 2 is a waste management seminar and clean-up at Cagbalete on April 14-15 to educate the local community about proper waste disposal and environmental preservation. It provides timelines, communication plans, activity details, budgets, and objectives for each project.
This document provides information for an upcoming climb of Mount Manalmon, including a pre-climb meeting, basic mountaineering course, preparation details, itinerary, gear requirements, meal plan, tasks and responsibilities. The climb will include either a day trip or overnight option
This document summarizes the agenda for a general assembly meeting of the 24/7 Outdoor Society. The agenda items include reviewing activities scheduled for the third quarter, presenting a project proposal template, nominating new co-leads, planning fourth quarter activities, discussing upcoming promotions of the group, and providing a membership update. Budgets and timelines are included for some of the proposed fourth quarter activities.
This is the deck presented on the Dec 15 GA.
Attendees were:
Cherry Cular
Karl Manongsong
Sheila Paz
Jed Olaso
Thirdy BitBit
Basio Arceo
Powee Lapus
Aika Abanto
Ralph
*If I missed anyone, please post a comment or PM me,
Thanks!
2. AGENDA
Q3 2011 Evaluation
Q4 2012 activities
Headcount (Note: same as before minus a few withdrawals)
Budget
24/7 OS ID
Things to look forward to...
2
3. Q3 EVALUATION
Q3 Evaluation October to December
Hit Rate %
Updates / Remarks on Post-event
Community Q3 Activity (Attendees Remarks on Hit Rate
the Activity Hype (Y/N)
over Total HC)
Nov 25 CSR
Activity
24/7 OS Y
Maaga nag
Paso
3
4. ALLOCATION SUMMARY
Budget Purpose Date Given Comments
P28,000 BMC and Red Cross Aug 11, 2011 The Red Cross Activity had to be rescheduled. So, the budget was allocated for the following:
BMC
Creation and purchase of the Community Jersey shirts
Mt. Batulao Climb
Purchase of the community’s own burner
P5,000 Q3 Hype Sep 16, 2011
BREAKDOWN SUMMARY
28000
BMC 11540.60
JERSEY SHIRTS 6400
BMC POST-CLIMB MEETING 1200
BURNER 3000
MT. BATULAO CLIMB 8490
BUDGET
TOTAL 30630.6
DIFFERENCE -2630.6
CONTRIBUTIONS
BMC 1200
MT. BATULAO CLIMB 3900
TOTAL 5100 Correction: 24/7 OS bought a cook set
REMAINING 2469.4
and not a burner for 3000php.
Additional Expenses:
BREAKDOWN SUMMARY 1,015 php - taxi fare used for the
5000
delivery of the Sendong Donations.
HYPE MATERIALS 5000
TOTAL 5000
DIFFERENCE 0
REMAINING 0
OVERALL REMAINING COMMUNITY BALANCE 2469.40
4
10. THINGS TO LOOK FORWARD TO...
Cinco Picos Traverse (and overnight at the Silaguin Cove)
Feb 25 - 26, 2012 (Sat - Sun)
Trek - Mt. Damas Traverse
March 10 - 11, 2012 (Sat - Sun)
Open Climb ( guests should have an experience in
mountaineering)
Surfing - Baler, Aurora
June 15 - 17, 2012 (Fri - Sun)
Exclusive to OS members
10
11. ATTENDEES:
Cherry Cular (facilitator)
Karl Manongsong
Aika Abanto (birthday was on Jan 12)
Tisha Gumacas
Sheila Paz (birthday is on Jan 20)
Tolits Arceo
Lester Jed Olaso
Aron Cornejo
BJ Salonga
11