THE RESUME!
OBJECTIVE:
 To join an institute where I can enhance my knowledge & skill to meet new
challenges and give my best to prove my abilities, and achieve the goals of the
institution efficiently and effectively. Being honest, moderate and motivating
individual with practical experience and skills. I enjoy working in
multicultural environment and quite comfortable in working with different
peoples and organization.
PERSONAL SKILLS:
 Ability and also willingness to work in all-weather condition.
 Able to explain technical design ideas clearly.
 Constantly focusing on a client’s objectives of Quality, Cost and Time.
 Self-motivated with a positive and friendly attitude.
 Excellent Skills in AutoCAD Microsoft office (Word, Excel, Power Point & MS
project).
 Good communicator with lower & upperauthorities.
PROFILE SUMMERY:
 An enthusiastic, self-motivated and Capable of Making Decisions, an
Electrical engineer having eleven(11) Years of experience in the field of
Power plants, Pakistan and MEP Desingning in UAE. During this time, I
worked with contractors, consultant, Client and managements like, Sharjah
Municipality, SEWA Deportment.
EDUCATION:
 B-Tech Electrical Engineering, Preston university, Lahore, Pakistan.
 DAE (Diploma of Associate Engineering in Electrical Technology).
CAREER DETAIL:
Employer: Al – Handasiah (Consult. Arch. Civilion)
Country: Sharjah,UnitedArabEmirates (UAE)
Position: MEP Designer & Elecrical Engineer.
Duration: 2013 – Till to date
Responsibilities:
 Preparing detailed working drawing.
 Designing, implementation, maintain and improve electrical instrument, equipment,
facilities, components and systems for commercial, industrial and domestic purposes.
 Tender preparation for engineering companies, including preliminary engineering design,
cost estimation, cad and visualization.
 Operate computer assisted engineering and design software and equipments to perform
different engineering tasks.
 Preparing the schedule of loads.
 Review drawings for concerned projects.
 Submitting drawings for approval in SEWA.
 Discussion with SEWA Engineers, regarding all electrical projects including Villas,
building and commercial shed projects.
 Provides technical advice on what’s needed in their buildings.
 Give excellent service and assistance to every client’s inquiries up to end’s of project
Jibran Akhtar
(Electrical Engineer)
DOB:
March 15th, 1984
Contact # UAE
(Mob): 050-5306914
Email Address:
jabrannokot@gmail.com
Marital Status:
Married
Driving License:
Valid UAE driving license.
License No. 570760
Professional skills:
1-AutoCad (MEP Desiging)
4-Ms. Office
5-Adobe Photo Shop
(intermediate level)
Language:
English, Urdu, Arabic
(Basic)
 Perform other related tasks that may be assigned from time to time.
 Visit sites for all electrical work inspection.
 Preparing weekly and monthly progress reports.
 Employer: Al shahmah Al fethiah Elect.cont. sharjah (U.A.E)
Country: Sharjah,UnitedArabEmirates (UAE)
Position: Elecrical Engineer.
Duration: 2012 – 2013
Responsibilities:
 Preparing the site for cable pulling activities and arranging the drum location, winch machine location as per
the approved cable pulling tension calculation.
 Estimation of material and manpower requirement for the project.
 Ensure approved HSE (Health, safety and Environment) plan is strictly maintain at site
 Employer: Alam Cotton Mill Pvt. Ltd.
Country: Lahore, Pakistan
Position: Shift Supervisor (Electrical Controll Room).
Duration: 2005 - 2012
Responsibilities:
 I was working as shift supervisor in Alam Cotton Mills at 3 Plant Capacity 1584x3=4.7MW, Power Plant &
Air Compressor L55x3 from 07-03-2006 to till now.
 I worked there as an operator in Allied Engineering & Rental Services at model 3516B caterpillar diesel
engine from 18-08-2005 to 10-05-2012.
 Routine Maintenance experience of G3516C Gas Engine Top End + 3516B.
 Routine maintenance work of G3516C caterpillar.
 Trouble shooting of 3516C Caterpillar.
 Major maintenance due to 25000 hours W/C and helped.
 Erection of cooling towers 03 numb and type liengchi under supervision.
 Maintenance and service of heat exchanger under supervision.
 Taped and clearance after 1000 hours by hand experience.
 Installation and maintenance of L55*3 air screw compress and W/O under supervision.
 Related experience walker machine boiler and soft water plant maintenance and services.
 Routine Maintenance G3516B Diesel Engine.
 Routine Maintenance 2 Diesel Engine Mitsubishi.

Jabran Akhtar cv updated

  • 1.
    THE RESUME! OBJECTIVE:  Tojoin an institute where I can enhance my knowledge & skill to meet new challenges and give my best to prove my abilities, and achieve the goals of the institution efficiently and effectively. Being honest, moderate and motivating individual with practical experience and skills. I enjoy working in multicultural environment and quite comfortable in working with different peoples and organization. PERSONAL SKILLS:  Ability and also willingness to work in all-weather condition.  Able to explain technical design ideas clearly.  Constantly focusing on a client’s objectives of Quality, Cost and Time.  Self-motivated with a positive and friendly attitude.  Excellent Skills in AutoCAD Microsoft office (Word, Excel, Power Point & MS project).  Good communicator with lower & upperauthorities. PROFILE SUMMERY:  An enthusiastic, self-motivated and Capable of Making Decisions, an Electrical engineer having eleven(11) Years of experience in the field of Power plants, Pakistan and MEP Desingning in UAE. During this time, I worked with contractors, consultant, Client and managements like, Sharjah Municipality, SEWA Deportment. EDUCATION:  B-Tech Electrical Engineering, Preston university, Lahore, Pakistan.  DAE (Diploma of Associate Engineering in Electrical Technology). CAREER DETAIL: Employer: Al – Handasiah (Consult. Arch. Civilion) Country: Sharjah,UnitedArabEmirates (UAE) Position: MEP Designer & Elecrical Engineer. Duration: 2013 – Till to date Responsibilities:  Preparing detailed working drawing.  Designing, implementation, maintain and improve electrical instrument, equipment, facilities, components and systems for commercial, industrial and domestic purposes.  Tender preparation for engineering companies, including preliminary engineering design, cost estimation, cad and visualization.  Operate computer assisted engineering and design software and equipments to perform different engineering tasks.  Preparing the schedule of loads.  Review drawings for concerned projects.  Submitting drawings for approval in SEWA.  Discussion with SEWA Engineers, regarding all electrical projects including Villas, building and commercial shed projects.  Provides technical advice on what’s needed in their buildings.  Give excellent service and assistance to every client’s inquiries up to end’s of project Jibran Akhtar (Electrical Engineer) DOB: March 15th, 1984 Contact # UAE (Mob): 050-5306914 Email Address: jabrannokot@gmail.com Marital Status: Married Driving License: Valid UAE driving license. License No. 570760 Professional skills: 1-AutoCad (MEP Desiging) 4-Ms. Office 5-Adobe Photo Shop (intermediate level) Language: English, Urdu, Arabic (Basic)
  • 2.
     Perform otherrelated tasks that may be assigned from time to time.  Visit sites for all electrical work inspection.  Preparing weekly and monthly progress reports.  Employer: Al shahmah Al fethiah Elect.cont. sharjah (U.A.E) Country: Sharjah,UnitedArabEmirates (UAE) Position: Elecrical Engineer. Duration: 2012 – 2013 Responsibilities:  Preparing the site for cable pulling activities and arranging the drum location, winch machine location as per the approved cable pulling tension calculation.  Estimation of material and manpower requirement for the project.  Ensure approved HSE (Health, safety and Environment) plan is strictly maintain at site  Employer: Alam Cotton Mill Pvt. Ltd. Country: Lahore, Pakistan Position: Shift Supervisor (Electrical Controll Room). Duration: 2005 - 2012 Responsibilities:  I was working as shift supervisor in Alam Cotton Mills at 3 Plant Capacity 1584x3=4.7MW, Power Plant & Air Compressor L55x3 from 07-03-2006 to till now.  I worked there as an operator in Allied Engineering & Rental Services at model 3516B caterpillar diesel engine from 18-08-2005 to 10-05-2012.  Routine Maintenance experience of G3516C Gas Engine Top End + 3516B.  Routine maintenance work of G3516C caterpillar.  Trouble shooting of 3516C Caterpillar.  Major maintenance due to 25000 hours W/C and helped.  Erection of cooling towers 03 numb and type liengchi under supervision.  Maintenance and service of heat exchanger under supervision.  Taped and clearance after 1000 hours by hand experience.  Installation and maintenance of L55*3 air screw compress and W/O under supervision.  Related experience walker machine boiler and soft water plant maintenance and services.  Routine Maintenance G3516B Diesel Engine.  Routine Maintenance 2 Diesel Engine Mitsubishi.