SlideShare a Scribd company logo
1 of 25
Download to read offline
www.ironroadlimited.com.au
Central Eyre Iron Project
Underpinning Regional Renewal
May 2014
www.ironroadlimited.com.au
Forward Looking Statements
This announcement contains certain statements with respect to future matters and which may constitute "forward-looking statements". Such statements are only predictions and
are subject to inherent risks and uncertainties which could cause actual values, results, performance or outcomes to differ materially from those expressed, implied or projected.
Investors are cautioned that such statements are not guarantees of future performance and accordingly not to put undue reliance on forward-looking statements due to the
inherent uncertainty therein.
Competent Persons’ Statements
The information in this report that relates to the Exploration Target within the EL4849 is based on and fairly represents information and supporting documentation compiled by Mr
Milo Res, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Res is a full time employee of the Company. Mr Res has sufficient
experience that is relevant to the style of mineralisation and the type of deposits under consideration and to the activity being undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Res consents to the inclusion in the report
of the matters based on his information in the form and context in which it appears.
The information in this report that relates to Resources estimated for the Boo-Loo prospect is based on and fairly represents information and supporting documentation compiled
by Mr Ian MacFarlane, who is a Fellow of the Australasian Institute of Mining and Metallurgy and an employee of Coffey Mining. Mr MacFarlane has sufficient experience
relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr MacFarlane consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
The information in this report that relates to Resources estimated for the Murphy South-Rob Roy (MSRR) prospect is based on and fairly represents information and supporting
documentation compiled by Ms Heather Pearce, who is a member of the Australasian Institute of Mining and Metallurgy, and a full time employee of Iron Road Limited. This
estimation was peer review by Dr Isobel Clark, who is a member of the Australasian Institute of Mining and Metallurgy and employed by Xstract Mining Consultants. Dr Clark has
sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which she is undertaking to qualify as a Competent
Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Clark consents to the inclusion in
the report of the matters based on the information in the form and context in which it appears.
The information in this report that relates to Reserves estimated for Murphy South / Rob Roy (MSRR) is based on and fairly represents information and supporting documentation
compiled by Mr Harry Warries, a Fellow of the Australasian Institute of Mining and Metallurgy, and an employee of Coffey Mining. Mr Warries has sufficient experience relevant to
the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Warries consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
Exploration Potential
It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information in this presentation relating to exploration targets
should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resource(s) or Reserve(s) have not been used in this
context. Any potential quantity and grade is conceptual in nature, since there has been insufficient work completed to define them beyond exploration targets and that it is
uncertain if further exploration will result in the determination of a Mineral Resource.
Cautionary Statements
2
www.ironroadlimited.com.au
Modelling based upon 25 year mine life, consisting of:
• Initial 17 years using Proven and Probable Mining Reserve of 2,071Mt @ 15.5% iron (200x100m, 100x50m diamond drill spacing);
• Further eight years using 28% Measured, 24% Indicated and 48% Inferred Resources of 1,303Mt @ 15.0% iron (200x100m diamond drill spacing). Cautionary statement
– There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the
determination of Indicated Mineral Resources or that the production target itself will be realised; and
• Planning underway for a further drilling campaign to extend mine life beyond 30 years.
Base Case Development Model: Encompasses a 25 year mine life, based on existing Ore Reserves and Mineral Resources, producing 21.5 million tonnes of concentrate per
annum following a staged ramp up over 2½ years. Modelling does not include revenues from potential third party users of the infrastructure.
The Reserves, Resources and Exploration Target underpinning the production target have been prepared by a competent person in accordance with the JORC Codes 2012 and
2004 (there being no material changes since the Resources were last reported under the JORC Code 2004):
• There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the
determination of Indicated Mineral Resources or that the production target itself will be realised.
• On 26 February 2014, the company announced the results of its definitive feasibility study for CEIP. All material assumptions underpinning the production target and
forecast financial information referred to in the announcement continue to apply and have not materially changed. A copy of that announcement can be obtained from
ironroadlimited.com
Cautionary Statements
3
Location Classification Base Case Development Model
Proportion (%)
MSRR Proven Ore Reserves 62%
MSRR Probable Ore Reserves 6%
MSRR Measured Resources 9%
MSRR Indicated Resources 8%
MSRR / BLD Inferred Resources 1 15%
www.ironroadlimited.com.au
Development phase ready
Iron Road is ready to build South
Australia’s next major development.
The CEIP will provide economic,
employment and infrastructure
benefits to open up opportunities for
the Eyre Peninsula and wider State.
Underpinning Regional Renewal
4
www.ironroadlimited.com.au
Long Life Magnetite Project
5
1950+
Construction
700+
Long term
operations
www.ironroadlimited.com.au
Central Eyre Iron Project (CEIP)
6
100% owned Iron Road
$100 million definitive feasibility study completed
21.5 million tonnes per annum production
2018 production commences
+25 years minimum mine life
High quality product reduces steel mill pollution
Integrated mine, rail and port development
www.ironroadlimited.com.au
Definitive Feasibility Study Key Outcomes
7
Capital Cost
US$3.98B
(mine, corridor & port)
Operating Cost
US$44.33
(FOB)/t
Annual Revenue
US$2.8B
(concentrate sales)
Capital Intensity
US$185
(per annual tonne)
Mine Life
25+ years
(minimum)
NPV (12.5%)
$US2.69B
(ungeared, post-tax)
Project IRR
21%
(ungeared, post-tax)
www.ironroadlimited.com.au
Innovative Paths Realised Through DFS
8
Reduced mine footprint
• Mine footprint reduced
by 2610 hectares
• No tailings dam
Efficient operations
• Modularisation
reduces project risk on
multiple fronts
• In-pit crushing and
conveying
• Power and water
efficiencies improved
to benefit operating
costs
Deep water port
• Selected site doesn’t
require dredging
• Allows for 24 hour
turnaround time of
Capesize vessels
• Readily expandable
Export opportunities
• Almost 50 million
tonnes per annum
available for third party
bulk commodity
exports
• MoU signed in
February with grain
handler
www.ironroadlimited.com.au
CEIP
Highly Competitive Operating Costs
• FOB operating costs (ex-
State royalty) of US$44.33
per dry metric tonne
• Normalising cost curve for
prices received, the CEIP is
placed in the second quartile
of the 2018 price adjusted
CFR China cost curve
• Competitive with recent large-
scale Pilbara developments
such as FMG Solomon
• This method compares “like
for like” – everything
benchmarked back to the
reference 62% iron and
accounts for new supply
9
www.ironroadlimited.com.au
Iron Ore Market
• China increasingly working to improve energy
efficiencies and air quality
• Strategic concern for Chinese steel industry to
secure high quality magnetite feedstock in
order to meet pollution reduction and energy
efficiency goals
• CEIP high quality feedstock allows:
 Less power use for steel mills, and
therefore less pollution
 Better efficiency, higher utilisation
 Widening price differential for above
benchmark grades
• New global supply predominately below
benchmark grade
10
www.ironroadlimited.com.au
Supportive State and Federal Governments
• August 2013 – Major Development status declared
by Deputy Premier Mr John Rau
• April 2014 – Major Project Facilitation Status
declared by Federal Minister for Infrastructure and
Regional Development Mr Warren Truss
• Iron Road is the only current South Australian
project to receive Federal recognition
• Allows for project approvals to be considered at
highest level of government
• Clear and transparent framework to achieve timely
assessment and approvals
11
www.ironroadlimited.com.au
CEIP To Be A Catalyst For New Opportunities
• Dedicated community team
• Local events and community sponsorships
• Keeping communities informed through:
– Community information sessions
– Regular updates in the local press
– Presentations to community groups, councils
and government agencies
• Work with Community Consultative Committees
– Independent Chairperson
– Voice of the community
– Improve decision making
– Inform IRD of community expectations
12
+Import & export
www.ironroadlimited.com.au
Employment and Infrastructure Benefits
• Peaking at 1950 jobs during construction
• Approximately 750 long-term operations roles
• Additional capacity for other exporters – both
minerals and agriculture
• Opens up deep water port access to the state
• An investment enabler for other previously
‘stranded’ resources and renewable energy projects
• Additional indirect jobs created from project
• Grain export MOU signed in February 2014
13
1950+
Construction
700+
Long term
operations
INFRASTRUCTURE
www.ironroadlimited.com.au
About CEIP Operations: Mining
14
Initial 25 year mine life confirmed
21.5 million tonnes per annum
High quality 67% iron concentrate
Premium iron blending feedstock for sinter,
which feeds the majority of blast furnaces
In pit crushing and conveying
Gravity separation circuit reduces power
demand
Effective modularisation design mitigates
cost and schedule risk
www.ironroadlimited.com.au
About CEIP Operations: Corridor & rail network
15
Heavy-haul railway, 148 kilometres long
25 tonne axle-load capacity
Transporting 10,000 tonnes of iron
concentrate from mine to port
Ore cars will be covered and comprise a
secure bottom chute for unloading
Potential to connect to national rail network
www.ironroadlimited.com.au
About CEIP Operations: Cape Hardy Port
16
Deep water port requires no dredging
Initial 70 million tonnes per annum capacity
Third party opportunities for export
capacity
Supports Panamax and Capesize vessels
Two berths and single shiploader support
efficient turnaround times
1,100 hectares of land readily supports
expansion
www.ironroadlimited.com.au
Next Steps, Ready To Build
• Finalising government
submissions and applications
• Building and strengthening
stakeholder relationships
• Discussions continue with the
north Asian steel industry
• Project participation and
offtake discussions
progressing with the recent
announcement of the DFS
findings
• Financing strategy and
discussions also continuing
• Well positioned to initiate the
operational readiness plan
17
www.ironroadlimited.com.au
New Opportunities for South Australia
• DFS completed and Iron Road ready for new
building phase
• High quality product relevant to customers’
strategic needs
• Underpin further opportunities through export
opportunities and new projects
• Low operating costs ensures long term viability
• Fully integrated pit to customer premium iron ore
supply business
• Delivering value to shareholders, customers and
communities
• Legacy assets – rail, port, power
18
www.ironroadlimited.com.au
Disclaimer
Subscribe to alerts online
www.ironroadlimited.com.au
Delivering Australia’s Next Fully Integrated
Iron Supply Business
19
www.ironroadlimited.com.au
Appendices
20
www.ironroadlimited.com.au
Key Financial Parameters
21
Key Financial Assumptions (real 2013 terms)
Capital cost estimate (incl. contingencies) US$3.98 billion
Pre-stripping and preparatory mining works US$0.48 billion
Capital intensity US$185 per annual tonne
FOB operating cost (ex state royalty) US$44.33/dmt (dry metric tonne)
62% Fe CFR China Index price US$112.00/dmt
+ standard grade differential / premium US$3.00/dmt per 1% Fe above 62%
+ additional CEIP high quality premium US$3.00/dmt
Received 67% CEIP CFR China price US$130.00/dmt
Capesize freight rate – Cape Hardy to North Asia US$17.73/dmt
Long term AUD/USD 0.85
Nominal discount rate 12.5%
CPI 2.5% p.a.
Corporate tax rate 30%
www.ironroadlimited.com.au
Key Operating Parameters
22
Mine life • 25 years Steady state production • 21.5Mtpa of concentrate
Mining
• Ore mined
3.57 billion tonnes
over life of mine
• Mine strip ratio
1.22 : 1 (waste : ore)
Processing
• Product size of greater
than -130 micron (p80)
(~120 mesh)
• Power demand of 260
megawatts
• Water requirement of 14
gigalitres per annum
Indicative
concentrate
specifications
• ~67% iron
• <4.0% silica
• <2.0% alumina
• 0.005% phosphorous
• 0.002% sulphur
www.ironroadlimited.com.au
CEIP Global Mineral Resource
Location Classification
Tonnes
(Mt)
Fe
(%)
SiO2
(%)
Al2O3
(%)
P
(%)
Murphy South/Rob Roy
Measured 2,222 15.69 53.70 12.84 0.08
Indicated 474 15.6 53.7 12.8 0.08
Inferred 667 16 53 12 0.08
Boo-Loo Inferred 328 17 52 12 0.09
Total 3,691 16 53 13 0.08
CEIP Indicative Concentrate Specification – 106 micron (p80)
Iron (Fe) Silica (SiO2) Alumina (Al2O3) Phosphorous (P) LOI
67% 3.3% 1.9% 0.005% -2.6
The Murphy South/Rob Roy mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Iron Road Limited and peer
reviewed by Xstract Mining Consultants (Rob Roy). The Boo-Loo mineral resource estimate was carried out following the guidelines of the JORC Code
(2004) by Coffey Mining Ltd.
23
CEIP Resource Statement
www.ironroadlimited.com.au
CEIP Global Mineral Resource
Location Classification
Tonnes
(Mt)
Fe
(%)
Murphy South/Rob Roy
Proved 1,871 15.6
Probable 200 15.1
Total 2,071 15.5
The information in this report that relates to Reserves estimated for Murphy South / Rob Roy (MSRR) is based on and fairly represents
information and supporting documentation compiled by Mr Harry Warries, a Fellow of the Australasian Institute of Mining and
Metallurgy, and an employee of Coffey Mining. Mr Warries has sufficient experience relevant to the style of mineralisation and the type
of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Warries consents to
the inclusion in the report of the matters based on his information in the form and context in which it appears.
24
CEIP Reserve Statement
www.ironroadlimited.com.au
Large Scale, Long Life Project
Largest Measured + Indicated
magnetite Mineral Resource in
Australia. Underpins long life
operation:
• Mineral Resource
3.7Bt @ 16% Fe*
• Exploration Target of 10-21Bt @
14-20% iron*
• Potential to deliver one billion
tonnes of high quality concentrate
25
0
500
1,000
1,500
2,000
2,500
3,000
M+IResources-tonnes(millions)
Measured (tonnes)
Indicated (tonnes)
Resource Category
* Full resource outlined at Appendix, Exploration Target notes at page 2

More Related Content

What's hot

Iron Road - Building South Australia’s Infrastructure Gateway
Iron Road - Building South Australia’s Infrastructure GatewayIron Road - Building South Australia’s Infrastructure Gateway
Iron Road - Building South Australia’s Infrastructure GatewayIron_Road_Limited
 
Iron Road Secures Capital to Progress Central Eyre Iron Project
Iron Road Secures Capital to Progress Central Eyre Iron ProjectIron Road Secures Capital to Progress Central Eyre Iron Project
Iron Road Secures Capital to Progress Central Eyre Iron ProjectIron_Road_Limited
 
Iron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 ConferenceIron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 ConferenceIron_Road_Limited
 
SA Resources & Energy Investment Conference 2017
SA Resources & Energy Investment Conference 2017SA Resources & Energy Investment Conference 2017
SA Resources & Energy Investment Conference 2017Iron_Road_Limited
 
CEIP Definitive Feasibility Study Community Information Sessions April 2014
CEIP Definitive Feasibility Study Community Information Sessions April 2014CEIP Definitive Feasibility Study Community Information Sessions April 2014
CEIP Definitive Feasibility Study Community Information Sessions April 2014Iron_Road_Limited
 
Iron Road - SA Resources & Energy Investment Conference Presentation
Iron Road - SA Resources & Energy Investment Conference PresentationIron Road - SA Resources & Energy Investment Conference Presentation
Iron Road - SA Resources & Energy Investment Conference PresentationIron_Road_Limited
 
2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...
2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...
2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...Symposium
 
Trer presentation - 4 19 12
Trer presentation - 4 19 12Trer presentation - 4 19 12
Trer presentation - 4 19 12TRER-Englewood
 
Murchison Minerals Corporate Presentation - 2022
Murchison Minerals Corporate Presentation - 2022Murchison Minerals Corporate Presentation - 2022
Murchison Minerals Corporate Presentation - 2022CHF Investor Relations
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold
 
Crocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold
 
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor PresentationCarpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor PresentationSymposium
 
Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014Symposium
 
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor PresentationBroken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor PresentationSymposium
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Gold Corp
 

What's hot (20)

Iron Road - Building South Australia’s Infrastructure Gateway
Iron Road - Building South Australia’s Infrastructure GatewayIron Road - Building South Australia’s Infrastructure Gateway
Iron Road - Building South Australia’s Infrastructure Gateway
 
Iron Road Secures Capital to Progress Central Eyre Iron Project
Iron Road Secures Capital to Progress Central Eyre Iron ProjectIron Road Secures Capital to Progress Central Eyre Iron Project
Iron Road Secures Capital to Progress Central Eyre Iron Project
 
Iron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 ConferenceIron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 Conference
 
SA Resources & Energy Investment Conference 2017
SA Resources & Energy Investment Conference 2017SA Resources & Energy Investment Conference 2017
SA Resources & Energy Investment Conference 2017
 
CEIP Definitive Feasibility Study Community Information Sessions April 2014
CEIP Definitive Feasibility Study Community Information Sessions April 2014CEIP Definitive Feasibility Study Community Information Sessions April 2014
CEIP Definitive Feasibility Study Community Information Sessions April 2014
 
Iron Road - SA Resources & Energy Investment Conference Presentation
Iron Road - SA Resources & Energy Investment Conference PresentationIron Road - SA Resources & Energy Investment Conference Presentation
Iron Road - SA Resources & Energy Investment Conference Presentation
 
2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...
2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...
2015 Broken Hill Resources Investment symposium - Carpentaria Exploration (AS...
 
Trer presentation - 4 19 12
Trer presentation - 4 19 12Trer presentation - 4 19 12
Trer presentation - 4 19 12
 
Temas powerpoint final-20210527
Temas powerpoint final-20210527Temas powerpoint final-20210527
Temas powerpoint final-20210527
 
Murchison Minerals Corporate Presentation - 2022
Murchison Minerals Corporate Presentation - 2022Murchison Minerals Corporate Presentation - 2022
Murchison Minerals Corporate Presentation - 2022
 
Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011 Crocodile Gold Corporate Presentation September 2011
Crocodile Gold Corporate Presentation September 2011
 
Great Quest PEA Presentation
Great Quest PEA PresentationGreat Quest PEA Presentation
Great Quest PEA Presentation
 
Crocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate Presentation
 
01740252
0174025201740252
01740252
 
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor PresentationCarpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
Carpentaria Exploration | ASX:CAP | RIS2014 Broken Hill Investor Presentation
 
Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014
 
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor PresentationBroken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
Broken Hill Prospecting | ASX:BPL | RIS2014 Broken Hill Investor Presentation
 
MIL AGM Presentation
MIL AGM PresentationMIL AGM Presentation
MIL AGM Presentation
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010
 
Zinc One Presentation March 2019
Zinc One Presentation March 2019Zinc One Presentation March 2019
Zinc One Presentation March 2019
 

Viewers also liked

Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...
Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...
Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...Bethany Alden Rivers
 
Underpinning the psychological aspects of expatriation - Business Psychology ...
Underpinning the psychological aspects of expatriation - Business Psychology ...Underpinning the psychological aspects of expatriation - Business Psychology ...
Underpinning the psychological aspects of expatriation - Business Psychology ...Be a chameleon
 
Strategy underpinning Macmillan's brand
Strategy underpinning Macmillan's brandStrategy underpinning Macmillan's brand
Strategy underpinning Macmillan's brandCharityComms
 
Underpinning Principles of Presentation
Underpinning Principles of PresentationUnderpinning Principles of Presentation
Underpinning Principles of Presentationrichardejjones
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinningOkwera David
 

Viewers also liked (8)

Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...
Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...
Towards a 'Changemaker' pedagogy: understanding teachers' beliefs about socia...
 
Underpinning the psychological aspects of expatriation - Business Psychology ...
Underpinning the psychological aspects of expatriation - Business Psychology ...Underpinning the psychological aspects of expatriation - Business Psychology ...
Underpinning the psychological aspects of expatriation - Business Psychology ...
 
Strategy underpinning Macmillan's brand
Strategy underpinning Macmillan's brandStrategy underpinning Macmillan's brand
Strategy underpinning Macmillan's brand
 
Underpinning Excellence in H.E. Toolkit
Underpinning Excellence in H.E. ToolkitUnderpinning Excellence in H.E. Toolkit
Underpinning Excellence in H.E. Toolkit
 
Underpinning Principles of Presentation
Underpinning Principles of PresentationUnderpinning Principles of Presentation
Underpinning Principles of Presentation
 
basement excavation, underpinning
basement excavation, underpinningbasement excavation, underpinning
basement excavation, underpinning
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Shoring and underpinning
Shoring and underpinningShoring and underpinning
Shoring and underpinning
 

Similar to Iron Road - Central Eyre Iron Project Underpinning Regional Renewal

Iron Road - South Australian Trade Mission to India Presentation
Iron Road - South Australian Trade Mission to India PresentationIron Road - South Australian Trade Mission to India Presentation
Iron Road - South Australian Trade Mission to India PresentationIron_Road_Limited
 
130218 February Investor Presentation (Final)
130218 February Investor Presentation (Final)130218 February Investor Presentation (Final)
130218 February Investor Presentation (Final)Dean Richardson
 
Gold 2013 Sydney - Chesser Resources ASX:CHZ
Gold 2013 Sydney - Chesser Resources ASX:CHZGold 2013 Sydney - Chesser Resources ASX:CHZ
Gold 2013 Sydney - Chesser Resources ASX:CHZSymposium
 
CRK AGM presentation May 18 2011
CRK AGM presentation May 18  2011CRK AGM presentation May 18  2011
CRK AGM presentation May 18 2011Crocodile Gold
 
Forsys Metals IR Presentation
Forsys Metals IR Presentation Forsys Metals IR Presentation
Forsys Metals IR Presentation TMX Equicom
 
Iron Road - South Australian Chamber of Mines and Energy Presentation
Iron Road - South Australian Chamber of Mines and Energy PresentationIron Road - South Australian Chamber of Mines and Energy Presentation
Iron Road - South Australian Chamber of Mines and Energy PresentationIron_Road_Limited
 
Gold 2013 Sydney - Middle Island Resources ASX:MDI
Gold 2013 Sydney - Middle Island Resources ASX:MDIGold 2013 Sydney - Middle Island Resources ASX:MDI
Gold 2013 Sydney - Middle Island Resources ASX:MDISymposium
 
Chesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor Presentation
Chesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor PresentationChesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor Presentation
Chesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor PresentationSymposium
 
IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014Tapas Das
 
Metro Mining (ASX:MMI) Investor Presentation February 2015
Metro Mining (ASX:MMI) Investor Presentation February 2015Metro Mining (ASX:MMI) Investor Presentation February 2015
Metro Mining (ASX:MMI) Investor Presentation February 2015Symposium
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Company Spotlight
 
Gold 2013 Sydney - Northern Star Resources ASX:NST
Gold 2013 Sydney - Northern Star Resources ASX:NSTGold 2013 Sydney - Northern Star Resources ASX:NST
Gold 2013 Sydney - Northern Star Resources ASX:NSTSymposium
 
Iron Road Presentation to Tumby Bay & Districts Community Consultative Group
Iron Road Presentation to Tumby Bay & Districts Community Consultative GroupIron Road Presentation to Tumby Bay & Districts Community Consultative Group
Iron Road Presentation to Tumby Bay & Districts Community Consultative GroupIron_Road_Limited
 
Pancontinental Uranium Corp. June 2013 Corporate Presentation
Pancontinental Uranium Corp. June 2013 Corporate PresentationPancontinental Uranium Corp. June 2013 Corporate Presentation
Pancontinental Uranium Corp. June 2013 Corporate Presentationruptajac
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01ImageRes
 
Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation
Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation
Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation Symposium
 
2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...
2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...
2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...Symposium
 
Corporate Presentation November 2012
Corporate Presentation November 2012Corporate Presentation November 2012
Corporate Presentation November 2012Crocodile Gold
 

Similar to Iron Road - Central Eyre Iron Project Underpinning Regional Renewal (20)

Iron Road - South Australian Trade Mission to India Presentation
Iron Road - South Australian Trade Mission to India PresentationIron Road - South Australian Trade Mission to India Presentation
Iron Road - South Australian Trade Mission to India Presentation
 
130218 February Investor Presentation (Final)
130218 February Investor Presentation (Final)130218 February Investor Presentation (Final)
130218 February Investor Presentation (Final)
 
Gold 2013 Sydney - Chesser Resources ASX:CHZ
Gold 2013 Sydney - Chesser Resources ASX:CHZGold 2013 Sydney - Chesser Resources ASX:CHZ
Gold 2013 Sydney - Chesser Resources ASX:CHZ
 
CRK AGM presentation May 18 2011
CRK AGM presentation May 18  2011CRK AGM presentation May 18  2011
CRK AGM presentation May 18 2011
 
Forsys Metals IR Presentation
Forsys Metals IR Presentation Forsys Metals IR Presentation
Forsys Metals IR Presentation
 
Iron Road - South Australian Chamber of Mines and Energy Presentation
Iron Road - South Australian Chamber of Mines and Energy PresentationIron Road - South Australian Chamber of Mines and Energy Presentation
Iron Road - South Australian Chamber of Mines and Energy Presentation
 
Gold 2013 Sydney - Middle Island Resources ASX:MDI
Gold 2013 Sydney - Middle Island Resources ASX:MDIGold 2013 Sydney - Middle Island Resources ASX:MDI
Gold 2013 Sydney - Middle Island Resources ASX:MDI
 
News Release: Pre-feasibility Study Engaged with Roche Group
News Release: Pre-feasibility Study Engaged with Roche GroupNews Release: Pre-feasibility Study Engaged with Roche Group
News Release: Pre-feasibility Study Engaged with Roche Group
 
Chesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor Presentation
Chesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor PresentationChesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor Presentation
Chesser Resources | ASX:CHZ | RIS2014 Broken Hill Investor Presentation
 
IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014IRL PPT 2011 & AR 2014
IRL PPT 2011 & AR 2014
 
Metro Mining (ASX:MMI) Investor Presentation February 2015
Metro Mining (ASX:MMI) Investor Presentation February 2015Metro Mining (ASX:MMI) Investor Presentation February 2015
Metro Mining (ASX:MMI) Investor Presentation February 2015
 
Mao marketing-presentation-june2013
Mao marketing-presentation-june2013Mao marketing-presentation-june2013
Mao marketing-presentation-june2013
 
Gold 2013 Sydney - Northern Star Resources ASX:NST
Gold 2013 Sydney - Northern Star Resources ASX:NSTGold 2013 Sydney - Northern Star Resources ASX:NST
Gold 2013 Sydney - Northern Star Resources ASX:NST
 
Iron Road Presentation to Tumby Bay & Districts Community Consultative Group
Iron Road Presentation to Tumby Bay & Districts Community Consultative GroupIron Road Presentation to Tumby Bay & Districts Community Consultative Group
Iron Road Presentation to Tumby Bay & Districts Community Consultative Group
 
Pancontinental Uranium Corp. June 2013 Corporate Presentation
Pancontinental Uranium Corp. June 2013 Corporate PresentationPancontinental Uranium Corp. June 2013 Corporate Presentation
Pancontinental Uranium Corp. June 2013 Corporate Presentation
 
Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01Peterdavies 140303205825-phpapp01
Peterdavies 140303205825-phpapp01
 
Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation
Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation
Peel Mining | ASX:PEX | RIS2014 Broken Hill Investor Presentation
 
2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...
2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...
2015 Broken Hill Resources Investment Symposium - Sirius Resources NL (ASX:SI...
 
Presentation
PresentationPresentation
Presentation
 
Corporate Presentation November 2012
Corporate Presentation November 2012Corporate Presentation November 2012
Corporate Presentation November 2012
 

Recently uploaded

VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书Fis s
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxHenryBriggs2
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberAgent, Inc.
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirtsrahman018755
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书Fir La
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 

Recently uploaded (20)

VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Amaira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Amaira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书如何办理伦敦大学毕业证(文凭)London学位证书
如何办理伦敦大学毕业证(文凭)London学位证书
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Short-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptxShort-, Mid-, and Long-term gxxoals.pptx
Short-, Mid-, and Long-term gxxoals.pptx
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
Cyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdfCyberagent_For New Investors_EN_240424.pdf
Cyberagent_For New Investors_EN_240424.pdf
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
OKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T ShirtsOKC Thunder Reveal Game 2 Playoff T Shirts
OKC Thunder Reveal Game 2 Playoff T Shirts
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
如何办理东俄勒冈大学毕业证(文凭)EOU学位证书
 
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls KolkataRussian Call Girls Kolkata Indira 🤌  8250192130 🚀 Vip Call Girls Kolkata
Russian Call Girls Kolkata Indira 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 

Iron Road - Central Eyre Iron Project Underpinning Regional Renewal

  • 1. www.ironroadlimited.com.au Central Eyre Iron Project Underpinning Regional Renewal May 2014
  • 2. www.ironroadlimited.com.au Forward Looking Statements This announcement contains certain statements with respect to future matters and which may constitute "forward-looking statements". Such statements are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or outcomes to differ materially from those expressed, implied or projected. Investors are cautioned that such statements are not guarantees of future performance and accordingly not to put undue reliance on forward-looking statements due to the inherent uncertainty therein. Competent Persons’ Statements The information in this report that relates to the Exploration Target within the EL4849 is based on and fairly represents information and supporting documentation compiled by Mr Milo Res, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Res is a full time employee of the Company. Mr Res has sufficient experience that is relevant to the style of mineralisation and the type of deposits under consideration and to the activity being undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Res consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this report that relates to Resources estimated for the Boo-Loo prospect is based on and fairly represents information and supporting documentation compiled by Mr Ian MacFarlane, who is a Fellow of the Australasian Institute of Mining and Metallurgy and an employee of Coffey Mining. Mr MacFarlane has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr MacFarlane consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The information in this report that relates to Resources estimated for the Murphy South-Rob Roy (MSRR) prospect is based on and fairly represents information and supporting documentation compiled by Ms Heather Pearce, who is a member of the Australasian Institute of Mining and Metallurgy, and a full time employee of Iron Road Limited. This estimation was peer review by Dr Isobel Clark, who is a member of the Australasian Institute of Mining and Metallurgy and employed by Xstract Mining Consultants. Dr Clark has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Dr Clark consents to the inclusion in the report of the matters based on the information in the form and context in which it appears. The information in this report that relates to Reserves estimated for Murphy South / Rob Roy (MSRR) is based on and fairly represents information and supporting documentation compiled by Mr Harry Warries, a Fellow of the Australasian Institute of Mining and Metallurgy, and an employee of Coffey Mining. Mr Warries has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Warries consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. Exploration Potential It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information in this presentation relating to exploration targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resource(s) or Reserve(s) have not been used in this context. Any potential quantity and grade is conceptual in nature, since there has been insufficient work completed to define them beyond exploration targets and that it is uncertain if further exploration will result in the determination of a Mineral Resource. Cautionary Statements 2
  • 3. www.ironroadlimited.com.au Modelling based upon 25 year mine life, consisting of: • Initial 17 years using Proven and Probable Mining Reserve of 2,071Mt @ 15.5% iron (200x100m, 100x50m diamond drill spacing); • Further eight years using 28% Measured, 24% Indicated and 48% Inferred Resources of 1,303Mt @ 15.0% iron (200x100m diamond drill spacing). Cautionary statement – There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised; and • Planning underway for a further drilling campaign to extend mine life beyond 30 years. Base Case Development Model: Encompasses a 25 year mine life, based on existing Ore Reserves and Mineral Resources, producing 21.5 million tonnes of concentrate per annum following a staged ramp up over 2½ years. Modelling does not include revenues from potential third party users of the infrastructure. The Reserves, Resources and Exploration Target underpinning the production target have been prepared by a competent person in accordance with the JORC Codes 2012 and 2004 (there being no material changes since the Resources were last reported under the JORC Code 2004): • There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the production target itself will be realised. • On 26 February 2014, the company announced the results of its definitive feasibility study for CEIP. All material assumptions underpinning the production target and forecast financial information referred to in the announcement continue to apply and have not materially changed. A copy of that announcement can be obtained from ironroadlimited.com Cautionary Statements 3 Location Classification Base Case Development Model Proportion (%) MSRR Proven Ore Reserves 62% MSRR Probable Ore Reserves 6% MSRR Measured Resources 9% MSRR Indicated Resources 8% MSRR / BLD Inferred Resources 1 15%
  • 4. www.ironroadlimited.com.au Development phase ready Iron Road is ready to build South Australia’s next major development. The CEIP will provide economic, employment and infrastructure benefits to open up opportunities for the Eyre Peninsula and wider State. Underpinning Regional Renewal 4
  • 5. www.ironroadlimited.com.au Long Life Magnetite Project 5 1950+ Construction 700+ Long term operations
  • 6. www.ironroadlimited.com.au Central Eyre Iron Project (CEIP) 6 100% owned Iron Road $100 million definitive feasibility study completed 21.5 million tonnes per annum production 2018 production commences +25 years minimum mine life High quality product reduces steel mill pollution Integrated mine, rail and port development
  • 7. www.ironroadlimited.com.au Definitive Feasibility Study Key Outcomes 7 Capital Cost US$3.98B (mine, corridor & port) Operating Cost US$44.33 (FOB)/t Annual Revenue US$2.8B (concentrate sales) Capital Intensity US$185 (per annual tonne) Mine Life 25+ years (minimum) NPV (12.5%) $US2.69B (ungeared, post-tax) Project IRR 21% (ungeared, post-tax)
  • 8. www.ironroadlimited.com.au Innovative Paths Realised Through DFS 8 Reduced mine footprint • Mine footprint reduced by 2610 hectares • No tailings dam Efficient operations • Modularisation reduces project risk on multiple fronts • In-pit crushing and conveying • Power and water efficiencies improved to benefit operating costs Deep water port • Selected site doesn’t require dredging • Allows for 24 hour turnaround time of Capesize vessels • Readily expandable Export opportunities • Almost 50 million tonnes per annum available for third party bulk commodity exports • MoU signed in February with grain handler
  • 9. www.ironroadlimited.com.au CEIP Highly Competitive Operating Costs • FOB operating costs (ex- State royalty) of US$44.33 per dry metric tonne • Normalising cost curve for prices received, the CEIP is placed in the second quartile of the 2018 price adjusted CFR China cost curve • Competitive with recent large- scale Pilbara developments such as FMG Solomon • This method compares “like for like” – everything benchmarked back to the reference 62% iron and accounts for new supply 9
  • 10. www.ironroadlimited.com.au Iron Ore Market • China increasingly working to improve energy efficiencies and air quality • Strategic concern for Chinese steel industry to secure high quality magnetite feedstock in order to meet pollution reduction and energy efficiency goals • CEIP high quality feedstock allows:  Less power use for steel mills, and therefore less pollution  Better efficiency, higher utilisation  Widening price differential for above benchmark grades • New global supply predominately below benchmark grade 10
  • 11. www.ironroadlimited.com.au Supportive State and Federal Governments • August 2013 – Major Development status declared by Deputy Premier Mr John Rau • April 2014 – Major Project Facilitation Status declared by Federal Minister for Infrastructure and Regional Development Mr Warren Truss • Iron Road is the only current South Australian project to receive Federal recognition • Allows for project approvals to be considered at highest level of government • Clear and transparent framework to achieve timely assessment and approvals 11
  • 12. www.ironroadlimited.com.au CEIP To Be A Catalyst For New Opportunities • Dedicated community team • Local events and community sponsorships • Keeping communities informed through: – Community information sessions – Regular updates in the local press – Presentations to community groups, councils and government agencies • Work with Community Consultative Committees – Independent Chairperson – Voice of the community – Improve decision making – Inform IRD of community expectations 12 +Import & export
  • 13. www.ironroadlimited.com.au Employment and Infrastructure Benefits • Peaking at 1950 jobs during construction • Approximately 750 long-term operations roles • Additional capacity for other exporters – both minerals and agriculture • Opens up deep water port access to the state • An investment enabler for other previously ‘stranded’ resources and renewable energy projects • Additional indirect jobs created from project • Grain export MOU signed in February 2014 13 1950+ Construction 700+ Long term operations INFRASTRUCTURE
  • 14. www.ironroadlimited.com.au About CEIP Operations: Mining 14 Initial 25 year mine life confirmed 21.5 million tonnes per annum High quality 67% iron concentrate Premium iron blending feedstock for sinter, which feeds the majority of blast furnaces In pit crushing and conveying Gravity separation circuit reduces power demand Effective modularisation design mitigates cost and schedule risk
  • 15. www.ironroadlimited.com.au About CEIP Operations: Corridor & rail network 15 Heavy-haul railway, 148 kilometres long 25 tonne axle-load capacity Transporting 10,000 tonnes of iron concentrate from mine to port Ore cars will be covered and comprise a secure bottom chute for unloading Potential to connect to national rail network
  • 16. www.ironroadlimited.com.au About CEIP Operations: Cape Hardy Port 16 Deep water port requires no dredging Initial 70 million tonnes per annum capacity Third party opportunities for export capacity Supports Panamax and Capesize vessels Two berths and single shiploader support efficient turnaround times 1,100 hectares of land readily supports expansion
  • 17. www.ironroadlimited.com.au Next Steps, Ready To Build • Finalising government submissions and applications • Building and strengthening stakeholder relationships • Discussions continue with the north Asian steel industry • Project participation and offtake discussions progressing with the recent announcement of the DFS findings • Financing strategy and discussions also continuing • Well positioned to initiate the operational readiness plan 17
  • 18. www.ironroadlimited.com.au New Opportunities for South Australia • DFS completed and Iron Road ready for new building phase • High quality product relevant to customers’ strategic needs • Underpin further opportunities through export opportunities and new projects • Low operating costs ensures long term viability • Fully integrated pit to customer premium iron ore supply business • Delivering value to shareholders, customers and communities • Legacy assets – rail, port, power 18
  • 19. www.ironroadlimited.com.au Disclaimer Subscribe to alerts online www.ironroadlimited.com.au Delivering Australia’s Next Fully Integrated Iron Supply Business 19
  • 21. www.ironroadlimited.com.au Key Financial Parameters 21 Key Financial Assumptions (real 2013 terms) Capital cost estimate (incl. contingencies) US$3.98 billion Pre-stripping and preparatory mining works US$0.48 billion Capital intensity US$185 per annual tonne FOB operating cost (ex state royalty) US$44.33/dmt (dry metric tonne) 62% Fe CFR China Index price US$112.00/dmt + standard grade differential / premium US$3.00/dmt per 1% Fe above 62% + additional CEIP high quality premium US$3.00/dmt Received 67% CEIP CFR China price US$130.00/dmt Capesize freight rate – Cape Hardy to North Asia US$17.73/dmt Long term AUD/USD 0.85 Nominal discount rate 12.5% CPI 2.5% p.a. Corporate tax rate 30%
  • 22. www.ironroadlimited.com.au Key Operating Parameters 22 Mine life • 25 years Steady state production • 21.5Mtpa of concentrate Mining • Ore mined 3.57 billion tonnes over life of mine • Mine strip ratio 1.22 : 1 (waste : ore) Processing • Product size of greater than -130 micron (p80) (~120 mesh) • Power demand of 260 megawatts • Water requirement of 14 gigalitres per annum Indicative concentrate specifications • ~67% iron • <4.0% silica • <2.0% alumina • 0.005% phosphorous • 0.002% sulphur
  • 23. www.ironroadlimited.com.au CEIP Global Mineral Resource Location Classification Tonnes (Mt) Fe (%) SiO2 (%) Al2O3 (%) P (%) Murphy South/Rob Roy Measured 2,222 15.69 53.70 12.84 0.08 Indicated 474 15.6 53.7 12.8 0.08 Inferred 667 16 53 12 0.08 Boo-Loo Inferred 328 17 52 12 0.09 Total 3,691 16 53 13 0.08 CEIP Indicative Concentrate Specification – 106 micron (p80) Iron (Fe) Silica (SiO2) Alumina (Al2O3) Phosphorous (P) LOI 67% 3.3% 1.9% 0.005% -2.6 The Murphy South/Rob Roy mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Iron Road Limited and peer reviewed by Xstract Mining Consultants (Rob Roy). The Boo-Loo mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Coffey Mining Ltd. 23 CEIP Resource Statement
  • 24. www.ironroadlimited.com.au CEIP Global Mineral Resource Location Classification Tonnes (Mt) Fe (%) Murphy South/Rob Roy Proved 1,871 15.6 Probable 200 15.1 Total 2,071 15.5 The information in this report that relates to Reserves estimated for Murphy South / Rob Roy (MSRR) is based on and fairly represents information and supporting documentation compiled by Mr Harry Warries, a Fellow of the Australasian Institute of Mining and Metallurgy, and an employee of Coffey Mining. Mr Warries has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Warries consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 24 CEIP Reserve Statement
  • 25. www.ironroadlimited.com.au Large Scale, Long Life Project Largest Measured + Indicated magnetite Mineral Resource in Australia. Underpins long life operation: • Mineral Resource 3.7Bt @ 16% Fe* • Exploration Target of 10-21Bt @ 14-20% iron* • Potential to deliver one billion tonnes of high quality concentrate 25 0 500 1,000 1,500 2,000 2,500 3,000 M+IResources-tonnes(millions) Measured (tonnes) Indicated (tonnes) Resource Category * Full resource outlined at Appendix, Exploration Target notes at page 2