The Republic of Buryatia now is a region of dynamic development of industrial potential and favorable investment climate that makes it one of the most attractive regions of Russia.
Invest in Ukraine: Transport InfrastructureOfficeNIC
This is a comprehensive analysis of the transport infrastructure sector in Ukraine. It is an integrated guide for perspective investors who are exploring opportunities in Ukraine. The report includes key figures characterizing the market, as well as information about the ongoing projects. This report also contains the list of forthcoming reforms and policy development needed to boost Ukrainian transport infrastructure. The report was prepared by the Office of the National Investment Council of Ukraine and presented at the Council meeting in Kyiv, on May 25, 2018
The project involves complex development of the territory with total area of 316.1 hectares and includes the construction of multi-apartment residential blocks as well as shopping, leisure and other commercial objects with public infrastructures.
Aktobe region is the second region in the country by land area, where concentrated all domestic chromium reserves, 55% nickel reserves, 40% titanium reserves and 34% phosphate reserves. Favorable transport and geographical position of the region predetermines its specialization in the field of transport and logistics services, which strengthens competitiveness of manufacturing industry in terms of promotion of exports to foreign markets.
Путеводитель инвестора. Челябинская областьPwC Russia
Данный путеводитель поможет потенциальным инвесторам оценить разнообразные возможности, которые предлагает данный регион. Стабильная социальная и экономическая обстановка в регионе способствует быстрому росту экономики.
Bakytzhan Mukhanbetovich, President Rector of JSC Kazakh Academy of Transport and Communication discusses the Kazakh perspective on One Belt, One Road at CILT International Convention 2017
Invest in Ukraine: Transport InfrastructureOfficeNIC
This is a comprehensive analysis of the transport infrastructure sector in Ukraine. It is an integrated guide for perspective investors who are exploring opportunities in Ukraine. The report includes key figures characterizing the market, as well as information about the ongoing projects. This report also contains the list of forthcoming reforms and policy development needed to boost Ukrainian transport infrastructure. The report was prepared by the Office of the National Investment Council of Ukraine and presented at the Council meeting in Kyiv, on May 25, 2018
The project involves complex development of the territory with total area of 316.1 hectares and includes the construction of multi-apartment residential blocks as well as shopping, leisure and other commercial objects with public infrastructures.
Aktobe region is the second region in the country by land area, where concentrated all domestic chromium reserves, 55% nickel reserves, 40% titanium reserves and 34% phosphate reserves. Favorable transport and geographical position of the region predetermines its specialization in the field of transport and logistics services, which strengthens competitiveness of manufacturing industry in terms of promotion of exports to foreign markets.
Путеводитель инвестора. Челябинская областьPwC Russia
Данный путеводитель поможет потенциальным инвесторам оценить разнообразные возможности, которые предлагает данный регион. Стабильная социальная и экономическая обстановка в регионе способствует быстрому росту экономики.
Bakytzhan Mukhanbetovich, President Rector of JSC Kazakh Academy of Transport and Communication discusses the Kazakh perspective on One Belt, One Road at CILT International Convention 2017
PGM Urban Hardlandscapes produce y comercializa construcciones de materias compuestas para su uso en las obras de construcción y reparación de carreteras y vías ferroviarias, para la construcción civil e industrial
The Komi Republic is located in the northeast of European Russia and is a part of the Northwestern Federal District. Its area is 416,800 square km (2.4% of Russia). Industry takes the central place in the economy. The main economic activities are part of the fuel, energy, and forestry sectors. The Komi Republic is currently among the regions with high level of investment attractiveness.
In terms of per capita investment in fixed assets, Komi occupies one of the leading positions among the regions of Russian regions. According to Fitch, the national long-term rating of Komi is defined at AA- (rus) level. According to Moody's the credit rating over the national scale is defined at Аa3.ru level.
Región de Kémerovo está situada en el suroeste de Siberia con una superficie de 95.7 mil de km². La región tiene red de transporte muy desarrolada de los Urales. Su territorio cruzan las redes importantes de ferrocarril y carreteras de Rusia - el Transiberiano.
Kémerovo es una de las regiones industriales más importantes de Rusia, con uno de los mayores depósitos de carbón del mundo. Región de Kémerovo está dominado por la industria metalúrgica y la minera, la petroquímica y la ingeniería mecánica.
“Gidrokompozit” LLC is equipped with modern injection molding machines JONWAI with clamping forces from 120 to 650 tons and shot sizes up to 3500 cm3.
High-tech equipment makes it possible to produce parts from 5 grams to 3 kilograms from various materials, such as polyamide, polyethylene, polypropylene, acrylonitrile butadiene styrene copolymer (ABS), liquid crystal polymer (LCP), and their blend compounds.
The modern laboratory of physical and mechanical and physical-chemical analysis, certified by ILAC, is developing compounds for replacement existing metal solutions and performing the quality control of raw materials and final products.
Concurso internacional de los proyectos de innovación en química IQ-CHem.
IQ-CHem is an international contest of innovative projects in the field of chemistry and new materials
2. Head of the Republic of Buryatia– Prime Minister of the Republic of Buryatia
Vyacheslav V. Nagovitcin
The Republic of Buryatia now is a region of dynamic development of industrial potential and favorable investment climate that makes
it one of the most attractive regions of Russia.
In order to achieve the strategic goal of development of our Republic - that is improvement of living standards and quality of life
of the population - we aim at creation of competitive economy, development and modernization of production, transport and social
infrastructure, forming of large industrial infrastructure complexes. We create the Baikal Haven Tourism & Recreation Zone as well as
regional zones of economicfavor.
Buryatia has all conditions for development of investment cooperation. These are its advantageous transport and geographic position
in relation to domestic and foreign markets, rich and highly explored mineral resources base, vast tourism and recreation resources,
strategic reserve of pure drinking water, and high scientific, labor and cultural potential.
The Republic of Buryatia is open for implementation of new significant economic and social projects. We are constantly working
at arrangement of the most favorable, beneficial and comfortable conditions for business development and attraction of potential
investors. I would like to invite you to take a closer look at our Republic. I wish you rewarding work, effective mutually beneficial
cooperation with the Republic of Buryatia and success to your business!
The Deputy Chair of the Government of the Republic of Buryatia for economic development,
the Investments Officer of the Republic of Buryatia
Alexander E. Chepik
Nowadays the Republic of Buryatia is one of the most fast-growing regions of Russia. All the measures of government support to
market players have become a kind of accelerator for omnidirectional development of the Republic.
The Board of Investment Activity is affiliated with the Head of the Republic Buryatia, the institution of the Investment Officer of the
Republic of Buryatia was introduced, and the Fund for regional development of the Republic of Buryatia was established. The Republic
of Buryatia supports investors intending to put up money for its capital investment projects. The Government of the Republic of Buryatia
constantly works at arrangement of the most favorable, beneficial and comfortable conditions for business development.
All that facilitates reduction of the way of an investor to solving of specific problems depending on thestate authorities.
Minister of Economy of the Republic of Buryatia
Zandra G. Sangadiev
For the Government of Buryatia support of investors is one of the priority areas of development of social and economicpotential
of the region. Legal, infrastructural and informational framework for attraction of investors, as well as the administrative and financial
tools of investment support were created in the Republic.
In particular, the laws focused on investment support were passed. Thus, the Law of the Republic of Buryatia «On the government
support for investment activity in the Republic of Buryatia» provides seven forms of the government support including financial and
property government support for organizations entered into the investment agreement implementing investment projects.
Welcome to the Republic of Buryatia! 3
3. Republic of Buryatia
RUSSIA
Republic of Buryatia
Mongolia
China
Ulan-Ude
Kazakhstan
LakeBaikal
Germany
TurkeySpain
CONTENTS:
BURYATIA - TERRITORY INVESTMENT 6
TRANSPORT AND LOGISTICS SECTOR
MINERAL RESOURCES SECTOR
8
24
AGRO-INDUSTRIAL SECTOR 48
INDUSTRY AND RESIDENTIAL CONSTRUCTION 70
TOURISM AND RECREATION SECTOR 92
FUND FOR REGIONAL DEVELOPMENT 126
4. GENERAL INFORMATION ABOUT THE REPUBLIC OF BURYATIA:
• Area - 351 300 km2
• Population - 978.6 thousand people
• Administrative center - the city of Ulan-Ude
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
7
Р258
Р258
А340
А164
Р436
Р437
Р438
148 МW
CHPP-1 (Central Heating
and Power Plant)
М55
А165
А164
Р436
Р437
Р438
The distance from Ulan-Ude:
• Moscow - 5631 km
• Beijing - 2013 km
• Ulan - Bator - 584 km
• Seoul - 2200 km
• Tokyo - 3115 km
BURYATIA -
TERRITORY INVESTMENT
• Guaranteedsupport of the Government of
the Republic of Buryatia
• Up-to-datelegislative framework
• Investment projects support based on “one
stop” principle
• Effective development institutions
• Full set of financial instruments
Favorable investment policy:
The Baikal-Amur Railway
20%of the world’s fresh
water reserve
LakeBaikal
Logistics:
• Р-258 Moscow-Vladivostok
• А-340 Ulan-Ude - Kyakhta - Ulaanbaatar
• The Trans-Siberian Railway
• The Baikal-Amur Railway
• International Airport «Baikal» in Ulan-
Ude
railroad
federal
highways
Ulan-Ude
TYVA
IRKUTSK
REGION
Trans-Baikal
Territory
MONGOLIA
5. Euro-Asian transport corridors 10
The automobile tourism cluster “Kyakhta” 12
The production and logistic center in Gusinoozersk
town
14
Setting-up of an international trans-asian logistic
company in Gusonoozyorsk
16
logistics center, station «sulfate» 18
The automobile tourist cluster “Baykalskiy” 20
Logistic center in Ulan-Ude 22
INVESTMENTS PROPOSALS
OF THE REPUBLIC OF BURYATIA
Transport and logistics sector
Ulan-Ude
Ulaanbaatar
Peking
Moscow
6. 100
9289,2
83,5
59,3
39,5
55,9
40,3
28,7
Moscow
Ulan-Ude
Ulaanbaatar
Peking Tokyo
Novosibirsk
Rotterdam
Dalian
Title Distance
Peking - Ulaanbaatar -
Ulan-Ude - Moscow
9 500 km 12 days
The Trans-Siberian
Railway
11 000 km 14 days
Northern Sea Route 13 500 km 35 days
South Sea Route 20 700 km 49 days
EURO-ASIAN TRANSPORT CORRIDORS
Usage of the international
transport corridor for cargo
carriage through Buryatia along
the route «Moscow - Ulan-Ude
- Kyakhta - Ulan Bator - Beijing»
allows to reduce time of delivery
up to 12 days. Goods turnover between Russia and
China(bln. U.S. dollars)
2015201420132012201120102009200820072006
The relevance of establishment of logistics
centers in the Republic of Buryatia is based on
the feasibility of use of the transit and transport
potential of the Republic in the context of
stable growth of the goods turnover and cargo
carriage between Russia and China, the countries
of the Asia-Pacific Region.
Factors of development of cargo carriage through the transport corridor
Construction and reconstruction of the Zamyn-Uud - Ulan-Bator - Altan-Bulak
motorway that was opened for traffic in 2014.
Expansion of the road border crossing Zamyn-Uud from the side of Mongolia on the
border with China.
The reconstruction of the multiway road border crossing «Kyakhta» that allows to
increase its capacity up to 1200 vehicles per day.Completion date is 2015.
Reconstruction and expansion of the Ulan-Ude – Kyakhtamotorway. Work performance
period is 2012-2020.
88,2
Construction and reconstruction of the
Beijing - Zamyn-Uud(China) motorway
Construction of the Zamyn-Uud - Atan-
Bulak - Kyakhta (Mongolia) motorway
Construction of the Kyakhta - Ulan-Ude
(Russia) motorway
10 11
7. Р258
Р441
Р258
Р258Р258
А164
А340
Р440
Altan-Bulak
The multiway road border crossing
«Kyakhta»
Offered vacant lots Highway Electrical sub-station
TIC – to $ 30 mln.
А340
А340
THE AUTOMOBILE TOURISM CLUSTER
“KYAKHTA”
Irkutsk
Mongolia
lake
Baikal KyakhtaNaushki
It is proposed to implement the investment
projects of development and operation of transport
and logistics complexes located on two land plots 12
and 19 ha in area in the territory of the automobile
tourist cluster “Kyakhta” and bordering with the
multiway road border crossing «Kyakhta».
Service station for trucks
Open air parking for trucks
Cargo terminal including temporary
storage warehouses
Transportandlogisticssector
Ulan-Ude
Station «Naushki»
35 km
Ulan-Ude
224 km
Kyahta
12 hectares19 hectares
12 13MONGOLIA
RUSSIA
8. Р258
Р441
Р258
Р258Р258
А164
А340
Р440
Offered vacant lots Electrical sub-station
Railroad
Highway
Projected railway branch
TIC – to $ 10 mln.
TIC – to $ 10 mln.
logistics center
The production and
logistics center
Goosenoe lake
Ulan-Ude
125km
Gusinoozyorsk
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
10 hectares
30 hectares
station
Zagustay
THE PRODUCTION AND LOGISTIC CENTER
IN GUSINOOZERSK
Irkutsk
Mongolia
lake
Baikal
It is proposed to implement the project of production
and logistic centers with reloading and container yard
within the territory of Gusinoozyorsk nearby Zagustay
railway station.
Two plots with total area of 40 ha , nearby the
Ulan-Ude – Naushkirailway were prepared for the
construction purposes.
There is a thermal power plant with a capacity of
1100MW within the territory of Gusinoozyorsk and free
capacity for setting-up of power-consuming industries
is available.
Loading yards
The production and logistics centers
Gusinoozyorsk
Transportandlogisticssector
Ulan-Ude
14 15
9. Offered vacant lots Electrical sub-station
Railroad
Highway
Projected railway branch
TIC – to $ 10 mln.
TIC – to $ 10 mln.
logistics center
The production and
logistics center
Goosenoe lake
Ulan-Ude
125km
Gusinoozyorsk
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
10 hectares
30 hectares
station
Zagustay
Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
SETTING-UP OF AN INTERNATIONAL TRANS-ASIAN
LOGISTIC COMPANY IN GUSINOOZYORSK
Irkutsk
Mongolia
lake
Baikal
Setting-up of an international trans-asian logistics
company within the territory of the industrial special
economic zone in Gusinoozyorsk nearby the railway
station Zagustay is proposed for joint implementation
with the project initiator (OJSC «ANMET»).
Investment area - 146 hectares.
Implementation period: 2012 - 2016 years.
Indicators: TIC – $ 56 mln.
Trucking - 820 thousand tons per year
The number of vehicles - 400 cars with trailers, 100 units
of machinery
Gusinoozyorsk
Transportandlogisticssector
Ulan-Ude Projected railway branch
Offered vacant lots
Railroad
Highway
Ulan-Ude
125 km
Gusinoozyorsk
1,100 MW
Gusinoozyorskaya TPP
(Termal Power Plant)
146 hectare
station
Zagustay
Zone of economic favor
TIC – to $ 56 mln.
16 17
10. А340
Р258
Р441
Р258
Р258
А164
А340
Р440
Naushki
139 km
Gusinoozyorskaya TPP, 9 km
TIC – to $ 10 mln
«Tahoy»,
1 km
LOGISTICS CENTER, STATION
«SULFATE»
Irkutsk
Ulan-Ude
Mongolia
lake
Baikal
Sulfate station
Itisproposedtoimplementtheprojectofmultimode
container and reloading yard in the territory of the
village ofof Tokhoy nearby Sulfat railway station.
Free plot area is 20 ha. The plot is situated along the
Ulan-Ude – Naushkirailway.
The Gusinoozyorskaya TPP (Termal Power Plant)
with a capacity of 1100 MW is located 9 km from the
proposedplot .
logistics centerMultimode container and reloading yards
Sulfate station
Transportandlogisticssector
logistics center
village
Tohoy
Offered vacant lots
Highway
Electrical sub-station
Ulan-Ude
116 km
20 hectares
Lake Solenoe
Projected railway branch
Sulfate station
TIC – to $ 14 mln
Railroad
18 19
11. А165
Р258
Р441
Р258
Р258
А164
А340
Р440
THE AUTOMOBILE TOURIST CLUSTER
“BAYKALSKIY”
Irkutsk
Mongolia
lake
Baikal
It is proposed to construct a service station for trucks
and cars.
The service station for passenger cars 700 m2 in area
as well as the service station for heavy vehicles, tourist
coaches, camping cars 3700 m2 in area.
Warehouse complex including trading facilities and
temporary storage warehouses with different storage
conditions.
Warehouse complex
Parking
Lower
Ivolga
Transportandlogisticssector
Service station
Ulan-Ude
35/10 КW
10/04 КW
2Х630,4 U.
А340
А340
Р258
Р258
village Nishaya
Nur-Selenie
village
Offered vacant lots Highway Electrical sub-station
20 hectares
Ulan-Ude2km
Railroad, 9 km
Airport «Baikal», 3 km
TIC – to $ 10 mln.
20 21
12. А340
Р258
Р441
Р258
Р258
А164
А340
Р440
LOGISTIC CENTER IN ULAN-UDE
Irkutsk
Ulan-Ude
Mongolia
lake
Baikal
It is proposed to implement the project of setting-
up of industrial and logistic center and cargo terminal
withintheterritoryofUlan-UdenearbyBaikalairport.
The total area of 24 hectares of vacant land.
Multimode container and reloading yards
Transportandlogisticssector
Industrial and logistic centers
+
Highway Electrical sub-station
TIC – to $ 10 mln Ulan-Ude
Airport «Baikal»
22 23
13. INVESTMENTS PROPOSALS
OF THE REPUBLIC OF BURYATIA
Mineral resources sector
Share of mineral resources of
the Republic of Buryatia in the
national mineral resources
26
Investments proposals,
unlicensed stock
27
Mukhalskoye deposit Al2
O3
,
Na2
CO3
, K2
O
28
Vitimkonskoye ore field TiO2
, FeO,
V2
O5
29
Mokhovoye deposit Sn 30
Synnyrskoye potassium-alumina
deposit (Kalyumny site)
31
Chayskoye deposit Ni, Cu 32
Malo-Oynogorskoye deposit W,
Mo
33
Dovatkinskoye polimetallic ore
field
34
Chulbonskoye high-purity raw
quartz deposit
35
Ozyorninskiy ore cluster 36
Soukhusan deposit Fe 38
Egitinskoye deposit CaF2
39
Kharanurskoye deposit P2
O5
40
Aiktinskoye and Bolaiktinskoye
raw cement deposits
41
Mukhor-talinskoye deposit,
perlite and zeolite
42
Facing stones 43
Common minerals 44
Basalt 45
Mineral springs 46
14. Mineralresourcessector
SHARE OF MINERAL RESOURSES OF THE REPUBLIC OF
BURYATIA IN THE NATIONAL MINERAL RESOURSES
RUSSIA
Buryatia
90%
nephritis fluorite asbestos apatite
16% 15% 13%
nonmetals
Zn Mo Pb W U
48%
32%
24%
20%
10%
metals
Cu, Ni
Ti, Fe, V
Sn
quartz
Al2
O3
, Na2
CO3
, K2
O
Fe, Cu, Mn
Fe
Zn, Pb
fluorite
W, Mo
P
P
INVESTMENT PROPOSALS
UNLICENSED STOCK
lakeBaikal
Ulan-Ude
Al2
O3
, K2
O
26 27
15. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Mukhalskoye deposit
Ust-Dzhilinda
Mineralresourcessector
28
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
29
№ Data Alumina Cement Na2
CO3
Potash
1 Period of coverage, years 31
2 Stock С1+С2, mln. t. ore 427,4
3 resources Р1, mln. t. ore 273,1
4 Production output, th. t. per year 650 3 300 454 280
5 selling price, $/t. 214 109 174 686
6 cost of production, $ mln. 138 359 79 192
7 Capex, $ mln. 970
8 Specific production costs per ton of ore, $/t 38
9 Net present value (NPV), $ mln. 632
10 Internal rate of return, % 20
11 Capital investments payback period, years 6,6
Electrical transmission line
(110 Kw), 75 km
MUKHALSKOYE DEPOSIT
Al2
O3
, Na2
CO3
, K2
O
Ulan-Ude
380 km
CONTENTS:
Al2
O3
-25,1 %
K2
O - 4,2 %
Na2
O - 10,4 %
№ Data TiO2
FeO V2
O5
1 Resources P2
-ore, mln. t. 1 097
2 Resources P2 , mln. t. 78 219 1,37
3 Content in the ore, % 7,1 20 0,125
4 Annual output: for the ore, mln. t. 20
5 Annual output, th. t. 1422 4 000 25
6 DPP, years 6,3
7 Return on investments, % 23
8 Approximate volume of investments, $ mln. 179
Vitimkonskoye
ore field
Electrical transmission line
(110 Кw) 30 km
VITIMKONSKOYE ORE FIELD
TiO2
, FeO, V2
O5
Irokinda
IRKUTSK
REGION
ZABAIKALSKIY
REGION
REPUBLIC
OF BURYATIA
The project provides for geological exploration works, development of Magnitny prospective area,
construction of mining-and-processing works
Ulan-Ude
700 km
Taksimo
16. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
№
Reserves
category
Ore
reserves,
th. t.
The average content, % Stocks of metal, th. t.
Sn Cu FeO Fe2
O3
Sn Cu FeO Fe2
O3
1 С2
1 105,53 1,146 0,412 7,254 11,548 12,66 4,55 80,31 127,67
2 Р1
1 105,53 12,66 4,55 80,31 127,67
3 Р2
308,48 5,53 0,78 30,45 66,17
4 In all: 2 519,54 30,85 9,88 191,07 321,51
Новый Уоян
№ Data Ore Cement K2O Al2
O3
1 Approximate volume of investments, $ mln. 1353
2 Output, th. t. /year - 3 300 1 820 650
3 Stock С2
, mln. t. 679 - 123 152
4 Resources Р1
, mln. t. 1 850 - 331 414
5 Content, % - - 17-18 22-23
6 DPP, years 5,8
7 Return on investments, % 41
Mineralresourcessector
30
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
31
MOKHOVOYE DEPOSIT Sn
MOKHOVOYE
DEPOSIT Sn
Electrical transmission line
(110 ), 15 km
Irokinda
IRKUTSKY
REGION
ZABAYKALSKY
REGION
REPUBLIC OF
BURYATIA
Ulan-Ude
700 km
Taksimo
Novy Uoyan
Severobaikalsk
Nizhneangarsk
Synnyrskoye deposit
Electrical transmission line
(220 kW), 80 km
SYNNYRSKOYE POTASSIUM-ALUMINA DEPOSIT
(KALYUMNY SITE)
17. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Novy Uoyan
Severobaikalsk
Chayskoye deposit
Electrical transmission line
(220 kW), 45 km
№ Data Ni Cu Co
1 Annual output ore , th. t. 2 000
2 Stock С2
of ore, th. t. 51 100
3 Stock С2
, th. t. 260 86 10,7
4 Resources, th. t. 800 270 33
5 Content, % 5,58 1,7 0,19
CHAYSKOYE DEPOSIT Ni, Cu MALO-OYNOGORSKOYE DEPOSIT W, Mo
Annual production, t/year:
Ore - 12 mln.
Molybdenum concentrate – 8 490;
Tungstic anhydride – 2 543;
Pyrite concentrate – 178 000;
Acid ammonium molibdate – 159.
Mineralresourcessector
32
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
33
Nizhneangarsk
№ Data Ore Mo WO3
S Re
1 Approximate volume of investments, $ mln. 50
2 Stock А+B+C1
+C2
, th. t. 305 014 154 922 122 602 4 790 2,5
3 Non-commercial reserves, th. t. 46 309 8 993 11 558 76
4 Resources Р1
, th. t. 67,3 51,4
5 Content, % 0,066
6 Discounted payback period, years 4
7 Return on investments, % 36
18. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Maila village
Khorinsk
Dovatkinskoye
deposit
DOVATKINSKOYE POLIMETALLIC ORE FIELD
Ulan-Ude
165 km
№ Data Ore Pb Zn Cd Ag
Lead
concentrate
Zinc
concentrate
1
Approximate volume of
investments, $ mln.
29
2 Stock C1+C2,th. t. 1 720,7 83,9 123 549,2 230,5
3 Resources Р1
+Р2
,th. t. 23 225,3 850,5 1 397,1 5 382,82 2 913,5
4 Annual output,th. t. 300 10,2 16,4 28,7 16,9 32,7
5 Discounted payback period, years 4,2
6 Return on investments 39 %
Electrical transmission line
(110 kW), 42 km
CHULBONSKOYE HIGH-PURITY RAW QUARTZ DEPOSIT
Sakhuli
Kurumkan
CHULBONSKOYE
HIGH-PURITY
Electrical transmission line
(220 kW), 110 km
Ulan-Ude
165 km
It is envisaged the development of a deposit, production of quartz concentrate, high-quality refined
silicon, multisilicon,and photoelectric systems.
THE LARGEST DEPOSIT
Quartz content from 99.96 to 99.98%
Light transmission coefficient 30-60%
Annual output:
• quartz grit – 5 000 t.;
• metallulgical refined silicon – 18 000 t.;
• quartz crucibles – 18 pcs.
• multisilicon – 10 000 t.
• Photoelectric systems – 200 MW.
Mineralresourcessector
34
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
35
19. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Ulzytuyskoye
Solong
Oktyabrskoye
Mayskoye
Ozyorny
town
Yuzhno-Arishinskoye
Ozyornoye
Severno-Gurvunurskoye
Gurvunurskoye
Arishinskoye
Gunduyskoye
Turkulskoye
Zvyozdnoye
Ozyorninskiy ore cluster
OZYORNINSKIY ORE CLUSTER
Distance to the city of Ulan-Ude - 300
km.
Distance to the nearest railway station
– 160 km.
Routed to the Ozyorny deposit 110 kW
transmission line and road paved.
110 kW transmission line also runs
along the road Ulan-Ude - Bagdarin.
№ Deposit Minerals
Stock and inferred resources
(th. t.) Content
stock resources
1 Arishinskoye Cu, Fe
Ore C2
– 134 841,3
Fe – 43 037; Cu – 280,2
Ore -134 841,0
Fe – 34,64%
Cu – 0,18%
2 Gunduyskoye
Сu, BaSO4
copper barytic
Ore С2
– 14 192,0
BaSO4
– 4 531,0 Cu- 78,7
Ore Р1
-7 723,0
Ва- 2 411,0 Сu – 39,0
Ba- 32,46%
Cu-0,59%
3 Gurvunurskoye Iron-ore Ore С1
- 23 333,1 Р1
– 96 500,0 Fe – 35,89%
4 Dabkharskoye Fluorite Ore С2
-826,0; СаF2
– 315,0 Ore P1
- 1 700,0 До 82,63%
5 Oktyabrskoye Iron-manganese
С2
-5 961,0
Mg – 589,0 Fe – 1 950,0
Р1
– 527,0
Mg – 49,0 Fe – 202,0
Mg-9,9%
Fe- 32,7%
6 Osenneye Fluorite
С2
- 1 714,0
CaF2
– 442,0
Р1
- 355,0
CaF2
– 106,5
30%
7 Solong Magnetite
Ore С2
-117 846,8; Fe – 46 313,0
Boric ore– 6 600,0; B2
O3
- 379,5
Zn – 260,2; Mb – 10,8
P1
– 150 000,0
Fe – 39.32%
B2
O3
– 6,28%
Zn – 0,3 %
Mb -0,01%
8 Souhusan Iron-ore C2
-67 000,0; Fe – 22 000,0 Fe - 49,33%
9 Turkulskoye
Copper barytic
, Fe
Ore (Cu Ba)C2
- 10 268; Cu – 57
BaSO4
– 1 557,0; Ore Fe C2
- 96 500,0
Fe – 27 000,0
Cu- 0,56%
BaSO4
– 15,66%
Fe – 27,2%
10 Ulzutuyskoe Lead-zinc
С2
– 16 872,7
Zn – 509,4; Pb - 52,2
Zn – 4,23%
Pb - 0,61%
10 Ulzytuyskoye
Свинцово-цин-
ковое
С2
– 16 872,7
Zn – 509,4; Pb - 52,2
Zn – 4,23%
Pb - 0,61%
Mineralresourcessector
36 37
20. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
SOUKHUSAN DEPOSIT Fe
Sosnovo-Ozyorsk
Electrical transmission line
(110 kW), 35 km
Ulan-Ude
320 km
SOUKHUSAN
deposit
№ Data
1 Stock: С1
+C2
, th. t. 67 000
2 Prognosticresources P1, thousand t. 300 000
3 Content Fe 49,3%
4 CAPEX , $ mln. 57
5 Annual cast iron production, th. t. 884,1
№ Data
1 Stock С1
, th. t. 3 922
2 Stock С2
, th. t. 445,8
3 Prognostic resources of ore cluster, th. t. of ore 5 800
4 Content, % 53,3
Сосново-ОзерскEgitinskoye
deposit
Ulan-Ude
250 km
Mineralresourcessector
38
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
39
Sosnovo-Ozyorsk
EGITINSKOYE DEPOSIT CaF2
21. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Sorok
Kharanurskoye
deposit
Electrical transmission line
(35 kW), 17 km
Ulan-Ude
470 km
№ Data Ore P2
O5
1 Annual phosphorite meal production, th. t. 300
2 Common stock С1
, th. t. 300 000
3 Easy-to-extract secondary rock phosphate reserve C1
, thousand t. 3 292,5 588
4 Easy-to-extract secondary rock phosphate reserve C2
, thousand t 652,6 107,3
5 Average content, % 17,9
6 Forecast resourses, th. t. 84 000 15 300
7 Discounted payback period, years 3,4
8 Assessment of investments profitability, % 32,4
9 Approximate volume of investments, $ mln. 34
Taksimo
Aiktinskoye
deposit
Electrical transmission line
(220 kW), 24 km
Ulan-Ude
700 km
The deposits are developed for raw materials base for projected cement plant with a capacity of 2 mln.t. of cement
peryear.TheAiktinskoyeand Bolaiktinskoyedeposits’balancereservesoflimestoneandsiltstoneforportland cement
production by dry mix process for open mining were approved by the State Committee for mineral reservesof the
USSR as of 01.06.1989.
Bolaiktinskoye
deposit
Mineralresourcessector
40
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
41
KHARANURSKOYE DEPOSIT P2
O5
№ Data
Aiktinskoye deposit Bolaiktinskoye deposit
Limestones Limestones Siltstones
1 Stock А, th. t. 46 668 - -
2 Stock В, th. t. 37 950 - 12 531
3 Stock С1
, th. t. 65 881 27 185 44 987
4 Reserves C2 outside the project quarries, th.t. 667 335 - -
AIKTINSKOYE AND BOLAIKTINSKOYE RAW CEMENT DEPOSITS
22. Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
Mineralresourcessector
42
Chita
Irkutsk
Zakamensk Kjahta
Taksimo
Severobaykal’sk
Kurumkan Bagdarin
Romanivka
Orlik
Ulan-Ude
43
MUKHOR-TALINSKOYE DEPOSIT, PERLITE AND ZEOLITE
Reserves and resources of zeolitized rock 169,5 mln t., including:
Reserves C2 – 63,7 mln.t., P1 – 105,8 mln.t.
Required basic investments amount – $ 14 mln.
• PRODUCTION USE:
• Zeolites of market grades (0-1 mm, 1-3 mm, 3-5 mm, > 5 mm) for industries, agriculture, environment protection (1st
stage – up to 20 th. t./year)
• Perlites of market grades for construction enterprises (1st stage - up to 25 th. m3/year)
• Expanded perlite (sand and macadam)produced by using of the mobile facilities of Ukrainian Research and Development
Institute on construction materials and products (Ukr NIISMI);
• Cementless lime-perlitic and lime-zeolitic binders;
• Wall blocks with expanded perlite;
• Sand-lime bricks with zeolitic and perlitic components;
• Light porous materials, such as sponge glass, vitrophire, agroperlite;
• Organomineral fertilizer based on poultry-breeding biowaste
• and natural zeolites;
• Organomineral fertilizer based on urban waste water sludge and natural zeolites;
• Zeolite-mineral fertilizer based on natural zeolites and nitrogen-containing substances -
ammonium nitrate, carbamide;
• Household and industrial filters with natural zeolites for natural and waste water
purification (after-purification);
• Mineral dietary supplements, premixes, preparations, food supplements, deodorants,
fillings, substrates for animal breeding, veterinary,
agriculture, vegetable growing, household activities;
FACING STONES
Located in the Pribaikalsliy district 47 km north-west of Ulan-Ude on the right bank of the Selenga river. The nearest railway stations are Tataurovo (7
km) on the left bank of the river Selenga and the Mostovoy passing place (12 km) – on the right bank. The deposit is connected by the ferry line across
the Selenga river. On the right bank of the Selenga river the Ulan-Ude – Shergino crushed-rock road passes in the vicinity to the deposit. The deposit is
connected with the administrative center of the Pribaikalskiy district – the village of Tataurovo (24 km) as well as with the village of Koma (6,5 km) and
Ostrozhskoye (6 km) by dirt road suitable for all-year-round traffic.
1. Ostrozhskoye deposit
Located in the territory of Bichurskiy district, on the left bank of the river Ara-Kiret, 16 km south-west of the village of Bichury, 10 km
south of the village of Ara-kiret. The deposit is connected with the nearest localities Ara-Kiret, Elan and with the Ulan-Ude – Bichura –
Kudara motorway by trafficable dirt roads. Was explored by the production geological association “Buryatgeologia” (Reutova, 1980).
2. Ara-Kiretskoye deposit
Located in the territory of Dzhidinskiy district, 10 km north-east of the Dzhida railway station,
2.5 km north-west of the Butikhinskiy way station.
Based on the data available, the trachyandesites are recommended for the application in
construction.
3. Butikhinskoye deposit
2
1
3
Decorativeness level 10-11
COMMERCIAL RESERVES:
facing slabs B + C1 – 142 th.m2
Macadam for roads and concrete B + C1 – 515 th.m2
4. Doschatoye deposit
24. 1
2
3
4
5
12
89
11
7
10
Mineralresourcessector
46
MINERAL SPRINGS
District Spring name
1. North-Baikal district
(thermal waters)
Spring Goudzhekit, 6 l/s Spring Dzelinda, 22 l/s
Spring Irkaninskiy, 5 l/s
2. Kurumkan area
(thermal waters)
Spring Kuchiger, 10 l/s Spring Alla, 10 l/s
Spring Umkhey, 30 l/s Spring Garga, 5 l/s
3. Muyskiy district (thermal waters) Spring Tolmachevskiy, 15 l/s Spring Muyskiy, 15 l/s
4. Bauntovskiy district (thermal waters) Spring Bauntovskiy, 10-12 l/s
5. Barguzinskiy district (thermal waters) Spring Tolstikhinskiy, 6 l/s
6. Okinskiy district
(Cold water) Spring Zhoygan, 1 l/s
(Thermal water) Spring Khoyto-Gol, 13 l/s
7. Tunkinskiy district (thermal water) Spring Tunkinskiy, 6.7 l/s
8. Ivolginskiy district(Cold water)
Spring Arshan UtaBulag, 1-3 l/s
Spring Khalyutinskiy, 10 l/s
9. Kabanskiy district (thermal water) Spring Zagza, 2 l/s
10. Bichurskiy district (Cold water) Spring Shibertuyskiy, 100 l/s
11. Zakamenskiy district (thermal water) Spring Engorboyskiy arshan 2 l/s
12. Pribaykalskiy district Spring Pitatelevskiy, 3.13 l/s
The Republic of Buryatia is rich in unique
mineral springs (more than 360 springs).
The main indications for therapy are:
• diseases of the circulatory system;
• diseases of the nervous system
• diseases of digestive organs;
• diseases of genitourinary system;
• endocrine diseases;
• metabolic disorders;
• skin disease;
• diseases of musculoskeletal system;
• gynecological diseases;
• pediatrics.
1
2
3
4
5
12
89
11
7
10
Kurumkansky
district
Severo-baikalskiy
district
Bauntovskiy district
Barguzinskiy district
Okinskiy district
Tunkinskiy
district
Muyskiy
district
Bichurskiy
district
Zakamenskiy
district
Kabanskiy district
Pribaykalskiy district
6
lakeBaikal
Ulan-Ude
Ivolginskiy
district
47
25. Agricultural park “Ilkinskiy”: 50
Poultry farm 52
Commercial dairy farm 53
Greenhouse facility 54
Vegetable store and vegetable processing shop 55
Goat farm 56
Biogas station with disposal facilities, boiler station, electrical sub-station,
water intake facilities
57
Construction of greenhouse complex in Gusinoozyorsk 58
Commercial dairy farm of 1000 animal units in the village of Zagustay 60
Construction of the fattening complex for 2000 cattele unitsin the village of
the ust-altasha and the village of Tsolga
62
Fattening complex for 3000 cattle units in the village of of Nizhniy Torey 64
Construction of the fattening complex for 1000 cattle units in the village of of
Dyrestuy of the Dzhidinskiy district
66
Construction of the fattening complex for 1000 cattle units in the village of of
Novaya Bryan of the Zaigraevskiy district
68
INVESTMENTS PROPOSALS
OF THE REPUBLIC OF BURYATIA
Agro-industrial sector
26. Objects of the agricultural park “Ilkinskiy”
№ name Land area
1 Poultry farm 36,7 hectares
2 Commercial dairy farm 13,6 hectares
3 Vegetable store 9,8 hectares
4 Greenhouse facility 18,4 hectares
5 Goat farm 7 hectares
6 Vegetable processing shop 2,9 hectares
7 Biogas station with disposal facilities, boiler station, electricalsub-station 12 hectares
8 Water intake facilities 6,3 hectares
9
Farm machinery production and service integrated plant with trading facility and
trading pavilion
10,08 hectares
50
Agro-industrialsector
AGRICULTURAL PARK “ILKINSKIY”
lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
Investment site the Agricultural park “Ilkinskiy”
in the territory of the rural village Ilkinskoye of the
Zaigraevskiy district. Total project cost $ 96 mln.
Ilka
Offered vacant lots Electrical sub-stationRailroad
Highway
Ulan-Ude
84 km
Ilka station
150 hectare
1
2
3
9
8
4
5
Site plan of the Agricultural park
“Ilkinskiy”
6
7
51
27. Agro-industrialsector
AGRICULTURAL PARK “ILKINSKIY”:POULTRY FARM
Project cost – $ 30 mln.
Area – 36,7 hectare
Egg production capacity – 1.25 mln. p/year
Meat production capacity – 5000 t. per year
PbP – 7,5 years
IRR – 26,5%
AARR – 18%
Payback – 5,6 years
1 – poultry house for 1000 purebred hens;
2 –hatcheries for 50 thousand chicks;
3 – poultry houses for laying hens of breeding stock;
4, 27 – bedding storage; 5 –parking boxes; 6 – car wash; 7 – petrol station;
8 – service buildings suite with sanitary inspection room for eggs and poultry
containers; 9 - autoweight; 10 - administrative and amenity building with control
room; 11 – slaughterhouse, packing department, 12 –hatcheriesfor chicks feed for
36 thousands bird places; 13 - egg-handling plant for 140 – 160 thousand eggs per
shift;14 – feed room; 15 – feedstuff store for 1000 t.; 16 – silage store; 17 – root
vegetables store; 18 – brigade house for 10 persons; 19 – tuber corps store; 20 –
veterinary; 21 – poultries for chicks of breeding stock for 12 thousand animal units;
23 –electrical substations; 24 – acclimatizators for 12-15 thousand youngsters; 25
– solarium; 26 - brigade house for 25 persons; 27 – hatchery.
24
26
25
27
1
21
2
23
26
323
18
18
22
4
5
8
9
10
6
713
14
15
16
1719
12 11
20
AGRICULTURAL PARK “ILKINSKIY”:COMMERCIAL DAIRY FARM
123
4
6
7 8
5
5
5
5
5
5
5
5
Project cost – $ 7 mln.
Area – 13,6 hectares
Production capacity – 3 500 t. per year
PbP – 3,8 years
IRR – 61%
1 – muck storage;
2 – hay and chaff storage;
3 – silostorage;
4 – auxiliary department, machinery storage and
maintenance, feed room with hoppers;
5 – cow sheds;
6 – administration, sanitation unit;
7 – truck scales;
8 – sanitary inspection station and farmerhouse..
52 53
28. Agro-industrialsector
AGRICULTURAL PARK “ILKINSKIY”:GREENHOUSE FACILITY
Construction of multispan greenhouses is proposed.
Project cost – $ 32 mln.;
Area – 18,4 ha;
Production capacity – 10 000 t. per year.
1 – multispan greenhouse;
2 – production department;
3 – gate house, administration unit.
2 311
11
111
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AGRICULTURAL PARK “ILKINSKIY”:VEGETABLE STORE AND
VEGETABLE PROCESSING DEPARTMENT
Construction of 8 vegetable stores 12x105 m in size is
proposed.
Peeling and packing of fresh vegetables as well as
advanced processing – fermentation, conservation – are
to be performed at the vegetable processing shop.
Project cost – $ 5,5 and 3,5 mln.;
Area – 9,8 ha и 2,9 ha;
Production capacity – 64 000 t. per year;
PbP – 1,6 years;
IRR – 28,7%.
1 – auxiliary building;
2 – vegetable store;
3 – gate house, administration unit..
1
2 3
2
2
2
2
2
2
2
54 55
29. AGRICULTURAL PARK “ILKINSKIY”:BIOGAS STATION WITH DISPOSAL FACILITIES, BOILER
STATION, ELECTRICAL SUB-STATION, WATER INTAKE FACILITIES
Agro-industrialsector
Project cost — $ 5 mln;
Area - 7 ha;
Production capacity 4000 t per year;
IRR – 82,76 %;
AARR – 44,09 %;
Payback – 2,6 years.
Proposed layout:
-production shop;
-5 stabling farms for 2500 goats;
-administration building.
AGRICULTURAL PARK “ILKINSKIY”:GOAT FARM.
1-buildings for goats handling
2-feedstuff stores;
3-production department;
4-gate house, administration
unit.
7 7
1
1
Project cost $ 13,5 mln;
Area 12 ha;
IRR – 17,01 %;
AARR – 15,34 %;
Payback – 6,6 years.
Advantages of biogas station:
- Independence from increasing rates as well as from
possible gas and electric power supply disruption;
- Simultaneous availability of multiple energy:
electric power, heating, gas, motor fuel;
-Complete resolving of the problem of organic
recycling with its division into pure water, biohumus
and mineral fertilizers rich in nitric and phosphoric
components. 1
1 1
2
8 5
4
3
6
1 – biogas unit;
2 – electricalsubstation;
3 – gate house, administration unit;
4 - fertilizers production shop;
5 – storage yard;
6 – disposal facilities;
7 – absorption fields;;
8 – boiler station.
56 57
30. Greenhouse complex
58
Offered vacant lots Electrical sub-station
Railroad
Highway
lake Gusinoe
Ulan-Ude
125km
Gusinoozyorsk
Gusinoozyorskaya TPP
(Thermal Power Plant)
Capacity 1100 MW
20 hectares
Required systems for commercial
greenhouses:
• Drop irrigation system;
• Environmental system;
• Carbon dioxide fertilization system;
• Curtain system;
• Drain return and check system;
• Greenhouse heating system;
• Air ventilation system;
• Power supply system.
58
Agro-industrialsector
CONSTRUCTION OF GREENHOUSE
COMPLEX IN GUSINOOZYORSK
Greenhouse complex for growing of hydroponic
vegetables.
Area (available) – 10 ha
The total land area – 20 ha
Production capacity – 10 000 t. per year
Project cost – $ 25 mln.
PbP – 5 years
Р258
Р441
Р258
Р258Р258
А164
А340
Р440
Irkutsk
Mongolia
lake
Baikal
Gusinoozyorsk
Ulan-Ude
ADMINISTRATIVE
BUILDING
WAREHOUSES
GREENHOUSE
FACILITIES
59
31. 60
Agro-industrialsector
COMMERCIAL DAIRY FARM FOR 1000 ANIMAL
UNITS IN THE VILLAGE OF ZAGUSTAY
Commercial high-tech production dairy farm for 1000
animal units in the village of Zagustay of the Kizhinginskiy
district.
The total land area – 2 500 ha (expandable 10 000 ha).
Production capacity – 5 600 t. per year
Project cost – $ 9 mln
NPV – $ 1,4 mln
PbP – 8,8 years
lake Baikal
Zagustay
MILKING ROOM
COW SHEDS
CALF SHEDS
Р258
Р258
Р258
А340
Ulan-Ude
ARTIFICIAL INSEMINATION
CENTER
MATERNITY BARN
VETERINARY STATION
GARAGE AND VEHICLE REPAIR
SHOP
SILAGE PIT
ADMINISTRATION
BUILDING
Offered vacant lots Electrical sub-stationHighway
the lake
Sagan-Thorom
Ulan-Ude
187 km
2 500 haCOMMERCIAL DAIRY FARM:
• 2 cow sheds for 500 animal units
each;
• 2 calf sheds for 1 154 animal units;
• Maternity barn for 68 animal units;
• Milking room 2 x 20 (Europarallel);
• Veterinary station;
• Artificial insemination center;
The village of
Zagustay
Auxiliary production facilities:
• Barn floor, feed processing shop
and feedstuff store;
• Silage pit;
• Garage and vehicle repair shop;
• Administration building;
• Muck storage tanks;
• Biogas unit.
61
33. Feedlots (top view)
Agro-industrialsector
FATTENING COMPLEX FOR 3000 CATTLE UNITS
IN THE VILLAGE OF NIZHNIY TOREY
Livestockbreedingcomplexforcattlefeedandraising
for 3000 cattle units, rural village “Nizhnetoreyskoye”
in the village of Nizhniy Torey of the Dzhidinskiy
district.
Project cost — $ 10 mln.
РВР - 8 years
Land areas - 11000 ha
Production capacity - 6000 t per year
MUCK STORAGE
LOAFING FEED YARD
CATTLE FATTERING BUILDING
FOR 230 ANIMAL UNITS
Feedlot layout
Р258
Р441
Р258
Р258Р258
А164
А340
Р440
Irkutsk
Mongolia
lake
Baikal
Village Nizhniy Torey
Ulan-Ude
HEIFER FARM FOR 360
ANIMAL UNITS
HAY PIT
HAY AND CHAFF LAND
STORAGE YARD
AGRICULTURAL VEHICLES
SHED
HAY AND CHAFF STORAGE
YARD
64
• open feed yards
• own
• fodder in stock
• products processing management
• government support
Setting-up of beef and
breeding stock-rearing
farm:
Village Nizhniy Torey
Ulan-Ude
Auxiliary production facilities:
• Barn floor, feed processing shop
and feedstuff store
• Silage pit
• Garage and vehicle repair shop
• Administration building
• Muck storage tanks and biogas unit
272 km.
Land boundaries
65
34. CONSTRUCTION FATTENING COMPLEX ON 1,000 HEAD OF
CATTLE IN THE VILLAGE DYRESTUY DZHIDA DISTRICT
Necessary investments, $ mln. 7
Area, ha 1500,5
Category of land
Agricultural
land
Possibility of extension Available
The distance to a highway, km 2
The distance to a railway station, km 5
The distance to an airport, km 230
The distance to the nearest residential
area, km
2
Labor resources, persons 1246
Agreed discounting rate, - D,% 2,85
Net present value – NPV, $ mln. 1,4
Internal rate of return – IRR, % 8,08
Pay-back period – PBP, years 7,75
Land areasAgro-industrialsector
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
Р440
lake
Baikal
Irkutsk
Mongolia
Ulan-Ude
Dzhida
А340
Dyrestuy
Railroad
Highway
nomad camp
Dyrestuy
the village
of of Zarubino
331,3 hectares
362,6 hectares
806,6 hectares
• open feed yards
• own fodder in stock
• government support
• products processing
management
Setting-up of beef and
breeding stock-rearing
farm:
Ulan-Ude
230 km
66 67
35. CONSTRUCTION FATTENING COMPLEX BY 1000 HEAD OF
CATTLE IN NEW BRJAN ZAIGRAEVSKY DISTRICT
Necessary investments , $ mln. 7
Area, ha 3220
Category of land Agricultural land
Possibility of extension Available
The distance to a highway, km 0,5 km
The distance to a railway station, km 5 km
The distance to an airport, km 70 km
The distance to the nearest residential
area, km
2 km
Labor resources, persons 4431
Agreed discounting rate, - D,% 2,85
Net present value – NPV, $ mln. 1,4
Internal rate of return – IRR, % 8,08
Pay-back period – PBP, years 7,7
agro-industrialsector
lake Baikal
Р258
Р258
Р258
А340
Ulan-Ude
the village of Novaya
Bryan
Offered vacant lots
the village
of Novaya Bryan
Railroad
Highway
68 69
36. Comprehensive residential development in Ulan-Ude 72
Research park “Biotekhnopolis” 74
The zone of economic favor in Ulan-Ude 78
The industrial zone of economic favor in Gusinoozyorsk 80
Farm machinery production in the agricultural park “Ilkinskiy” 82
Construction of industrial and logistic center, Sulfat railway station 84
Industrial park in Ulan-Ude 86
Construction of cement plant 88
Ceramic bricks production plant 90
INVESTMENT PROPOSALS OF THE
REPUBLIC OF BURYATIA
Industry and residential construction
37. South-Eastern district of Ulan-Ude
South-West district of Ulan-Ude
COMPREHENSIVE RESIDENTIAL DEVELOPMENT IN
ULAN-UDE
Industryandresidentialconstruction
А165
М55
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
lake
Baikal
Irkutsk
Mongolia
Ulan-Ude
Quarter 115 116
Area of land,hectares 20,4 26,8
Residential area, m2
116,744 146 398
Office and commercial area, m2
3 509 4 610
Kindergarten, locations 140 200
School, locations 700
The volume of investments,
$ thousand
80 000 101 000
Quarter 140 6 146 а 146 б 148 a 148 б
Area of land,hectares 21,3 19 20,3 17,7 17,5
Residential area, m2
110 813 98 848 105 611 110 501 109 253
Office and commercial area, m2
3 664 3 268 3 492 3 044 3 010
Kindergarten, locations 140 130 140 140 140
School, locations 1400
The volume of investments, $ thousand 75 500 68 000 72 000 73 500 73 000
Airport «Baikal»
Railway station
South-Eastern district of Ulan-Ude
(140b; 146a,b; 148a,b quarters)
Offered vacant lots
47,2 hectares
Highway
Ulan-ude
Railroad
South-West district of Ulan-Ude
(115, 116 quarters)
95,8 hectares
72 73
38. Biotekhnopolis
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
lake
Baikal
Industryandresidentialconstruction
RESEARCH PARK “BIOTEKHNOPOLIS”
Irkutsk
Mongolia
Ulan-Ude
74
We invite you to become a resident of the
“Biotekhnopolis” high tech research park being
created in Ulan-Ude.
The priority sectors of the research park are:
• information technology and software;
• Energy efficiency and energy saving;
• Biopharmaceutical and medical technologies.
•
The research park project is initiated by the
Government of the Republic of Buryatia and the
Buryat scientific center ofthe Russian Academy of
Sciences, Siberian branch.
The site for the research park development is
located in the south-east part of Ulan-Ude, in the
zone of economic favor.The land plot area is 21 ha.
1
23
45
1. Residential complex
2. Data-center
3. Production building
4. Multifunctional center
5. Medical high technology center
Starting up of production in this territory the companies for 5 years will enjoy the
following tax reliefs: property tax and land tax exemption, reduced corporate tax rate.
75
39. Multifunctional center Production building
Industryandresidentialconstruction
Construction of the first start-up facility of the research park is funded from the federal and
regional budgets.Businesses will be located at a site of 31600 m2
in area:
• medical hightechnology center (6600 m2
);
• production premises (9000 m2
);
• data-center (8000 m2
);
• multifunctional service center for the research park residents;
• business-incubator.
We invite pharmaceutical enterprises, medical
device and equipment manufacturers, as well as
energy-saving goods manufacturers to start up their
production in the research park.We also welcome
companies working in the field of alternative energy
and information technology. The enterprises will
be provided with production shops, laboratories,
warehouse, office and amenity premises.
Biotechnopolis
Medical hightechnology centerData-center
76 77
40. Electric power supply
Available capacity
of the transformer substation
“Stroitelnaya” 35/10 12.6 MVA
Including free capacity 11.2 MVA
Wastewater disposal.
Wastewater disposal is performed through a free-flow tank to the
municipal sewerage, the networks length – 8000 meters.
Heating supply
Available capacity Boiler house with 4 boilers, with nominal capacity of 4x13,3MMkcal/hr,
including free capacity 3 reserve boilers,with a capacity of about 50 MMkcal/hr
Transport availability
Railwayembankment (9.8 km). Dirt road (900 meters).
It is possible that access roads (900 meters of automobile road) will be built and railways will be restored (7,8 km).
Watersupply
Available capacity
5 artesial water wells with total
well yield 47,5 m3/hour
Including free capacity
4 reserved water wells with total
capacity of 40 m3s per hour
Legend:
Biotechnopolis
Railway (embankment)
Boiler station
Water intake facilities (5 water supply wells)
Water conduit
Water conduit (project)
Sanitation
Sanitation (project)
Power line (project)
Heating line
Heating line (project)
Electric power supply
Existing
Transformer substation 3510KW
Transformer substation 22010 (project)
А B
CD
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
EXISTING INFRASTRUCTURE
lake
Baikal
Industryandresidentialconstruction
THE ZONE OF ECONOMIC FAVOR IN ULAN-UDE
Irkutsk
Mongolia
Ulan-Ude
Offered vacant lots Distributed sitesZone of economic favor
Privileges provided to residents of the zone of
economic favor for 5 years:
• Reduced land rental (from 3 cent / 1 m2 per
year)
• Property tax exemption
• Land tax exemption
• Reduction of corporate tax rate
ABCD outline
25 hectares
8 hectares
20 hectares
20 hectare
78 79
41. Р258
Р441
Р258
Р258
Р258
А164
А340
Р440
THE INDUSTRIAL ZONE OF ECONOMIC FAVOR IN GUSINOOZYORSK
Irkutsk
Mongolia
lake
Baikal
The projects of the building materials production,
processing industry and assembling in the territory of the
industrial zone of economic favor in Gusinoozyorsk nearby
Zagustay railway station are proposed.
The investment site №1 (free and clear of any claims
from third parties) 52 ha in area for industrial production
development.
The investment site №2 (free and clear of any claims from
third parties) 100 ha in area for realization of a project for the
formation of industrial production of construction materials
with total investment up to $ 10 mln.
Gusinoozyorsk
Industryandresidentialconstruction
Ulan-Ude
THE CONSTRUCTION OF A HYDROCARBONS DEEP
CONVERSION PLANT
THE CONSTRUCTION OF A BUILDING MATERIALS
PRODUCTION PLANT
Offered vacant lots
Site №2
100 hectares
Railroad
Highway
Ulan-Ude
125 km
Gusinoozyorsk
Gusinoozyorskaya TPP
(Thermal Power Plant)
Capacity 1100 MW
Site №1
52 hectares
Zagustay
station
Distributed sitesZone of economic favor
TIC – $ 10 mln
80 81
42. Industryandresidentialconstruction FARM MACHINERY PRODUCTION IN THE
AGRICULTURAL PARK “ILKINSKIY”
lake Baikal
Ilka
Р258
Р258
Р258
А340
Ulan-Ude
The project for organization of small farm
mechanization assembling, repair, maintenance of the
machinery and equipment for agriculture and forestry.
The market: the Republic of Buryatia, Irkutsk Region,
Transbaikalia territory, Krasnoyarsk Territory, and other
regions of Siberia and the Far East, in the long term –
the opportunities to export to Mongolia.
• The buyers of the farm machinery are entitled to a compensation for a share of the cost of high tech
machinery and equipment.
GOVERNMENT SUPPORT MEASURES
82
Offered vacant lots
Electrical sub-station
Railroad
Highway
Ulan-Ude
84 km
Ilka station
150 ha
10,08 ha
83
1
1
3
4
2
Site Plan
1 – administrative and amenity building;
3 – production shop; 4 – trading pavilion;
2 – the site for fairs and public events.
4
4444
43. А340
Р258
Р441
Р258
Р258
А164
А340
Р440
CONSTRUCTION OF INDUSTRIAL AND LOGISTIC
CENTER, SULFAT RAILWAY STATION
Irkutsk
Ulan-Ude
Mongolia
lake
Baikal
Itisproposedtoimplementtheprojectofindustrial
and logistics center construction in the territory of
the village of Tokhoy nearby Sulfat railway station.
Free plot area is 28 ha. The plot is situated along the
Ulan-Ude – Naushki railway.
Gusinoozyorskaya TPP (Termal Power Plant) is 9
km from the proposed plot.
Multimode container and reloading yards
Sulfat railway
station
Industryandresidentialconstruction
The production and logistics
center
Naushki
139 km
Gusinoozyorskaya TPP
(Thermal Power Plant)
9 km
Railroad
TIC – to $ 10 mln
“Tokhoy”
transformer
substation
1 km
The village of
Tokhoy
Offered vacant lots
Highway
Electrical sub-station
Ulan-Ude
116 km
28 hectares
lake Solenoe
Projected railway branch
Sulfat railway
station
TIC – to $ 10 mln
84 85
44. Airport «Baikal»
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
It is planned the creation of the building materials
production cluster with the development center of
high construction technologies.
The site of the industrial park has a number of
advantages:
• near the park is a railroad «Moscow — Ulan-Bator
— Beijing» (1 km);
• federal highway «Р258 Moscow — Vladivostok»
(10 km);
• the proximity to the key market (Ulan-Ude)
lake
Baikal
Industryandresidentialconstruction
INDUSTRIAL PARK IN ULAN-UDE
Irkutsk
Mongolia
Ulan-Ude
The services for the industrial park residents
• provision of production areas;
• provision of office premises;
• provision of design services;
• equipment maintenance engineering Services;
• additional services (security, legal, IT services).
The residents are offered the entire complex of logistic service
:
• truck parking;
• warehouses;
• the rolling stock of freight rail cars with 4 rail tracks;
• storage yard;
• the services of the logistics center for registration, shipment and
receipt of cargo.
Offered vacant lots Highway
Ulan-Ude
Railroad
The site has all the necessary infrastructure:
The total area of the park – 15 hectare
Area Offices and
business premises – 5 000 m2.
Area of industrial building – 25 000 m2
Water supply – 350 m3
per day
Electricity power - 1,8 Megawatt
Distance to the highway «P258» – 10 km
Distance to railway station – 1 km
Railway station
15 hectares
Production shops
Material handling cranes
Administration building
Finished goods warehouse
Parking
86 87
45. Barun-Toreyskoye limestones
deposit, C1 reserves ≈ 25,717
thousandt.
Toreyskoye limestone deposit,
C1 and C2 reserves ≈ 40,000
thousand t.
Barun-Sarastuyskoye limestones
deposit, C1 reserves ≈ 63,932
thousand t.
Barun-Alsagskoye limestones
deposit, C1 reserves ≈ 22,214
thousand t.
The chemical composition in
respect to the content of CaO >
50% and MgO > 2% in the deposits
Industryandresidentialconstruction
CONSTRUCTION OF CEMENT PLANT
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
Р440
lake
Baikal
Irkutsk
Mongolia
Ulan-Ude
Jida
The project involves the construction of a cement
plant.
There are large limestone deposits in the Republic
of Buryatia providing the raw material for cement
production. Total reserve equals to 150 000 – 200 000
th. t.
А340
88
Jida
Offered vacant lots Highway
Ulan-Ude
240 km
Р440
deposit of
limestone
Mongolia
88 89
46. Industryandresidentialconstruction
CERAMIC BRICKS PRODUCTION PLANT
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
Р440
lake
Baikal
Irkutsk
Mongolia
Ulan-Ude
Orongoy
The projectinvolves the construction of a ceramic bricks
production plant with a capacity up to 60 mln.units per
year.
Land plot for the construction of the plant is 60 km from
Ulan-Ude, close to the Moscow – Ulan-Ude – Ulan-Bator –
Beijing railway and the Ulan-Ude – Ulan-Bator motorway.
The clay deposit (the stocks of 1427 thousand m3) is
located 10 km from the plot.
There is a technical capability for power supply
connection, capability for well drilling.
The indicators of economic efficiency of the project
The volume of investments $ 14,5 mln.
NPV $ 1,1 mln.
IRR 13 %
PBP 4,68 years
DPBP 4,62 years
Profitability of the investment
project
6,54 %
90
А340
20 hectares
Orongoy
Offered vacant lots HighwayRailroad
Ulan-Ude
60 km
91
47. INVESTMENTS PROPOSALS
OF THE REPUBLIC OF BURYATIA
Tourism and Recreation Sector
The Baikal Haven special economic zone 94
The site “Gora Bychya” 96
The tourist and recreational cluster “Podlemorye”, the site “Zarechye” 98
Key development indicators of the tourist and recreational cluster “Podlemorye” 100
The automobile tourist cluster “Baykalskiy” 102
Infrastructure and key indicatorsof the automobile tourist cluster “Baykalskiy” 104
The automobile tourist cluster “Tunkinskaya dolina” 106
Infrastructure and key indicatorsof the automobile tourist cluster “Tunkinskaya
dolina”
108
The automobile tourism cluster “Kyakhta” 110
Infrastructure and key indicatorsof the automobile tourist cluster “Kyakhta” 112
“Adrenalin” (the alpine ski resort on Orlinaya mountain) 114
Infrastructure and key featuresof the park “Adrenalin” 116
Development of the medical recreational complex “Ilyinka SPA” 118
Sports and health complex at Lake Baikal in the Enkheluk village 120
Key indicators of the project in the Enkheluk village 122
48. А340
Р258
The Baikal Haven special economic tourism and recreation zone
The sites of the first stage of
development:
• Turka
• Peski
The sites of the second stage of
development:
• Goryachinsk village (460,9 ha)
• the Bychya mountain (2341 ha)
• Bay Bezymyannya (422 ha)
Ulan-Ude
110 km
the site «Turka»
ADVANTAGES:
Provision of the investment site with utility infrastructure
Provision of tax benefits and state guarantees of the Republic of
Buryatia;
The capability of buyout of the land plots by the owners of the
facilities.
№ Specialty
A year-round world class
resort
1 Term of existence 49 years
2 Area 5 areas - 3658 ha
3 Arrivals per year 1 000 000 peoples
4 Locations 22 000lake Baikal
THE BAIKAL HAVEN SPECIAL
ECONOMIC ZONE
Ulan-Ude
Turka
Peski
the Bychya
mountain
(1771 м.)
Bay Bezymyannaya
TourismandRecreationSector
Goryachinsk
94
Bay Bezymyannaya
Goryachinsk
Peski
Turka
Gremyachinsk
Bychya mountain (1771 m.)
lake Baikal
lake
Kotokel
95
49. lake Baikal
Ulan-Ude
А340
Р258
the Bychya
mountain
(1771 м.)
96
Legend:
The zone for the ski runs widening
The optimal zone for ski runs
slopes
lighting point
Freeride
Profile cross-country
SKI SLOPES
lake Baikal
the Bychya
mountain
the lake
Bychye
THE BAIKAL HAVEN SPECIAL ECONOMIC ZONE
THE SITE “GORA BYCHYA”
• 7 lifts;
• 16 runs the length of 28,77 km;
• Snowmaking system;
• 10 000 holidaymakers;
• The resort town with shopping,
entertainment, and sports centers.
TourismandRecreationSector
Economic indicators:
IC – $ 213,5 mln;
SR – $ 66,5 mln;
ROS – 65%;
ROI – 22%;
Types of recreation and entertainment:
• Alpine and cross-country skiing,
freestyle, mogul skiing, ski-cross;
• Tubing, halfpipe, skiing slopestyle,
freeride skiing;
• Toboggan, mountain bike,
skateboard,
97the Bychya mountain
50. А340
Р258
lake
Baikal
• Health-improving and family vacation with children;
• Romantic yacht tours, cruise for married couples without
children seeking a different vacation experience;
• Event tourism;
• Beach vacations;
• Year-round weekend tourism;
• Outdoor activity and extreme tourism for trained persons
and sportsmen;
• Ecotourism – for those who desire to spend time in the
countryside with small physical activity;
• Business tourism; (MICE).
TOURIST OFFER:
OFFERS FREE SITES:
1. The forested plot 2,9628 ha in area is located 1,250 m north-west from the Zarechye village, to the north of the complex of
buildings on the right side of the projected haven, bordering with the Lake Baikal coast line.
2. The forested plot 1,6277 ha in area is located 1,300 m north-west from the Zarechye village, to the north of the complex of
buildings on the right side of the projected haven, bordering with the Lake Baikal coast line.
3. The treeless plot 2,3408 ha in area is located 1,500 m north-west from the Zarechye village
4. The treeless plot of the coast line of Lake Baikal nearby Cape Sukhinskiy, 2,3128 ha
1
2
3
4
10
The layout chart of the tourist and recreational
cluster “Podlemorye” in the planned structure
of the rural village municipality of Sukhinskoye
Ulan-Ude
180 km
Railroad, 84 km
station Selenga
1. The guest center “Tengri”
2. Family boarding house
3. Tourist complex
4. Beach area “Baikalskie peski”
5. Reserve area
6. Golf club “Golfstrim”
7. Hotel and entertainment complex
“Zarechye”
8. Waste recycling station
9. Disposal facilities
10.Water intake facilities
TourismandRecreationSector THE TOURIST AND RECREATIONAL CLUSTER
“PODLEMORYE”, THE SITE “ZARECHYE”
Zarechye
Ulan-Ude
The site “Zarechye”
The site “Sukhaya”
The site“Enkheluk”
The total area of the cluster – 139,52 ha
lake Baikal
1
The village of of
Zarechye
The village of
of Sukhaya
Offered vacant lots Electrical sub-station
Highway
lake Baikal
Harbor
Water intake facilities
Water intake
facilities
2
4
3 10
5
610
10
8
7
8 9
98 99
51. Total volume of investments — $ 137 mln, including:
- $ 46,5 mln. — government investments in engineering and transport infrastructure
- $ 90,5 mln. — private investments in tourism facilities
№ Title Capacity
1 Area of claster 139,5 ha
2 Area of tourist and service infrastructure 64,5 th. m2
3 Capacity hotels 1400 locations
4 Increase in employment to 2500 jobs
5 Increased flow of tourists to 450 th. people per year
6 Project implementation period 2013-2017 years
7 Construction of overhead power lines
ВЛ-35 kW with substation 35/10 kW;
hvl-10 kW ; vl-0,4 kW
8
Construction of the transfer station with elements of separate waste
collection
10 t. per year
9
Construction of treatment facilities, including installation works,
construction and laying of sewer with sewage pumping stations,
installation and commissioning of sewerage systems, drainage;
construction and installation of sewage treatment plants.
500 m3
/day
10 Construction of intake structures 2 buildings m3
/day
11 Construction of internal paved roads 30 km long, 4 category 30 km
12 Work on bank protection 5000 m2
SCHEME OF ENGINEERING SUPPORT TRC “PODLEMORYE”TourismandRecreationSector
KEY DEVELOPMENT INDICATORS OF THE TOURIST AND
RECREATIONAL CLUSTER “PODLEMORYE”
The site“Enkheluk”
The site “Sukhaya”
The site “Zarechye”
lake Baikal
EXPLICATION
The site “Sukhaya”
1. ТFamily boarding house – 1,68 ha
2. Tourist complex – 9,1525 ha
3. The guest center “Tengri” – 0,2247
ha
4. Haven – 11,4 ha
5. Reserve area – 10,2 ha
The site “Zarechye”
1. Tourist complex – 23,7 ha
2. Hotel and entertainment complex
– 4,2 ha
3. Golf club “Golfstrim” – 2,2 ha
The site“Enkheluk”
1. Tourist camp “Enkheluk” – 4,7 ha
2. Guest house – 0,27 ha
3. Guest house “Sakura” – 0,25 ha
4. Guest house – 0,26 ha
5. Guest house “Baikalskiy dvorik” –
0,25 ha
6. Capm “Teremki” – 0,3 ha
7. Tourist complex – 7,5 ha
Legend:
Inhabited areas
Specially protected natural
areas
Forest reserve lands
Agricultural areas
Facilities ofthe tourist and recreational
cluster “Podlemorye”
Projected havens
Disposal facilities
Waste transfer station
Voltage transformer substation;
Electrical transmission line VL – 35 kW
101100
52. А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
The Lower Ivolga
village
Nur-Selenie village
Ulan-Ude2km
Railroad, 9 km
Airport «Baikal», 3 km
Ivolginsky datsan, 15 km
А340
Р258
Р258
Offered vacant lots HighwayDistributed sites
1.Hotel complex
2. Fast food café
3.Camping “Yurtochny gorodok”
4. Laundry of 5 washing-machines
5. Motel
6. Café
7. Hypermarket
8. Information center
9. Water park
10. Motel
11. The theatre of folk art
12. Recreational and entertainment center
13. Summer café
14. The outdoor area for playings and parties
15.Shopping and entertainment center
16. Fitness complex
SPA-center17. Farm products mimimarket
18. stable yard
19. Service station
20. Production and warehouse premises
21. Automobile showroom
22, 23. Truck parking;
24, 25. Wholesale-retail trade warehousing
complex
26. Petrol station
27. Camping sites, motel
28. Water intake facilities
29. Gas boiler house
31. Electrical substation 35/10 kW
32. Public toilet
33. Stadium
35. Police centre
36. Administrative office
37. Tea house
38. Railway station
39. Heated car parking
41. The buildings on the sports area
42. Sewerage pump station
43. Waste transfer station
44. Gas storage holder
TourismandRecreationSector
THE AUTOMOBILE TOURIST CLUSTER
“BAYKALSKIY”
Ulan-Ude
Irkutsk
Mongolia
lake
Baikal
The Lower
Ivolga village
TOURIST OFFER:
PEAK SEASON:
• sports tourism;
• adventure tourism
• automobile tourism
• ecotourism.
OFF-SEASON OFFER:
• business tourism;
• cultural and educational tourism;
• event tourism;
• religious tourism;
• active tourism.
The Buddhist monastic complex, the center of the Buddhist Traditional
Sangha of Russia, historic and architectural monuments. The place of
stay of the incorruptible relics of Pandito Khambo lama Itigelov.
1
26
25
24
39
20
19 22
21
23
3539
29
44
28
43
18
31
23
4
5
6
42
32
3617
37
7
8
9 11
12 14
13
10
15
16
102 103
53. № Title Capacity
1
Construction of the water conduit “Tapkhar – the automobile tourist
cluster “Baykalskiy”
9,8 km
2 Construction of the electric power supply facilities.
The total length is 7,35 km. Capacity of the
electric substation is 6,3 MW
3 Construction of the heating supplysystem 6 km
4 Construction of the gas boiler house 16 MW
5 Construction of the wasrewater disposal line, 9,5 km
6
Construction of the on-site information, communication and computer
network
6 km
7 Construction of internal automobile roads with parkings, the total length is 30 km
8 Construction of sites for waste receptacles, 0,1 km
9 Construction of street lighting, 6 km
10 Increase of the tourists flow to the region to 400 thousand people per year
11 Increase of the total area of the tourism infrastructure facilities by 170,41 thousand m2
12 Increase of the total area of the hotel infrastructure facilities by 26,0 thousand sq. m .
13
Increase of the number of beds in group accommodation
establishments
to 1165 units
14 Increase of the number of workplaces to 1200
Total investment — $ 62,5 mln., including:
government investments in engineering and transport infrastructure – $ 21,5 mln.;
private investments in tourism facilities – $ 41 mln. Free land plots area is 206 ha. Free land plots area is
206 hectares
The sites 1 – 3: transport and logistics zone (bus station, camping sites
and motels, fast food restaurants)
The sites 4 – 9: mixed development zone (shopping, public catering,
leisure and entertainment, and culture and educational facilities)
The sites 10-14: social and business zone (the center of exhibition and
congress activities; multiplex cinema, food court, café and restaurant, bowling,
fitness-club, billiard and shopping malls)
The sites 15-25: recreation and sports zone (sport complex, water park,
carting, entertainment park and equestrian center)
1 2
34
5
6
7
8
9 10
11
12
1314
15
16
17
21
18
19
20
22
23
24
25
INFRASTRUCTURE AND KEY INDICATORSOF THE
AUTOMOBILE TOURIST CLUSTER “BAYKALSKIY”
TourismandRecreationSector
104 105
54. PETROL STATION
HALTING POINT
BATH-HEALTH COMPLEX
SERVICE STATION, PETROL
STATION FOR TRUCKS
CAR WASH TRUCK PARKING
MOTEL CAFÉ
TRADING FACILITY WITH
MARKET PLACE
HEATED CAR
PARKING
site А
- bath-health complex
site B
- the tourist and recreational complex
site С
- service station and convenience
retailing
Disposal facilities
1
2
3
4 57
10
11
12
13
TourismandRecreationSector THE AUTOMOBILE TOURIST
CLUSTER “TUNKINSKAYA DOLINA”
lake Baikal
Р258
А164
Р258
Kyren
Total investment – $ 39,5 mln., including:
governmentinvestmentsinengineeringandtransport
infrastructure – $ 13,5 mln.;
private investments in tourism facilities – $ 26 mln.
Ulan-Ude
430 kmMongolia
100 km
Railroad, 100 km
HighwayDistributed sites
Automobile tourist
cluster “Tunkinskaya
dolina”
Irkutsk
Mongolia
Republic of
Buryatia
Irkutsk region
TOURIST OFFER:
• Medical and health tourism based on thermal
water and mineral springs, spa-tourism;
• Mountain hiking;
• Religious tourism.
Offered vacant lots Electrical sub-station
11,2 hectares
Water intake
facilities
1,2,3. Hotel complex
4. Sport tourist complex
5. Tourist complex
6. Yurt complex
7. Sports and health complex
8. Culture and entertainment complex
9. Tourist complex
10. Hopping center
11. Rental center
12, 13, 14. Auto parts store, petrol station, car-
wash, service station
15. Motel
1
7
6
8
9
106 107
55. 4
7 8
8
8
1 2
3
2
2
1
5
6
3
№ Title Capacity
1 Free land plots area is 11,2 ha
2 Tourist flow 300,000 arrivals
3 NPV $ 14,5 mln.
4 PbP 8 years
5 Pi 1,37
6
The construction of the access road from the federal motorway to the
automobile tourist cluster “Tunkinskaya dolina”
4 km
7 The construction of water intake facility and water supply system 1250 m3/day
8 The construction of disposal facilities 2000 m3/day
9
The construction of electric power network system 10 kW, 0,4 kW and
electrical sub-station 400 kW
18 km
10 The construction of waste sorting station 10000 t. per year
11 The construction of intraresort automobile road 2,5 km
1. PETROL STATION
2. SERVICESTATION. CAR WASH.
3. HEATEDCARPARKING
4. BUS STOP PAVILION
5. MOTEL
6. CAFÉ FOR 50 PERSONS
7. TRUCK PARKING
8. TRADING FACILITY WITH MARKET
PLACE
Type Codes
Boundaries of the facilities of the automobile
tourist cluster
Water protection area
Residential area
Service objects area
Outdoor activity area
Recreational area
Utility area
Engineering infrastructure area
Rural tourism area
Car service area
Projected building development
Projected sidewalks, roads
Driveways and parkings;
Public planting of greenery
The territory for utility purpose
EXPLICATION
INFRASTRUCTURE AND KEY INDICATORSOF THE
AUTOMOBILE TOURIST CLUSTER “TUNKINSKAYA DOLINA”
TourismandRecreationSector SPECIFIC LAND USE LAYOUT AND FREE LAND PLOTS OF THE
AUTOMOBILE TOURIST CLUSTER “TUNKINSKAYA DOLINA”
108 109
А
А
56. А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
The cluster is perceived as the first reception point for
tourists arriving in Russia, as well as the largest border
crossing and customs point for freights imported in Russia
from the countries of the Asia-Pacific Region.
The freight traffic coming through Mongolia is predicted
to increase significantly due to the construction of the Ulan-
Bator - Beijing motorway that has already been completed on
the side of China.
lake
Baikal
TourismandRecreationSector
THE AUTOMOBILE TOURISM CLUSTER
“KYAKHTA”
TOURIST OFFER:
• Religious tourism (Buddhism in Russia);
• Medical and health tourism (pelotherapy);
• Cultural and educational tourism (Tea Road).
Irkutsk
Mongolia
Ulan-Ude
KyakhtaNaushki
Ulan-Ude
Irkutsk
Ulaanbaatar
Peking
Krasnoyarsk
Russia
Mongolia
China
Offered vacant lots
Highway Electrical sub-station
MRBC «Kyakhta»
Altan-Bulak
RUSSIA
MONGOLIA
Station «Naushki»
35 km
Ulan-Ude
224 km
City Kyakhta
the site С
12 ha
the site В
19 ha
А340
А340
the site А
1,34 га
110 111
57. № Title Capacity
1 Сonstruction of water intake and water supply system ATK «Kyakhta» 80,0 m3
/h
2 Construction of boiler and heating system 7,5 Gcal/h
3
Construction of substation 110/10 kW, Vl-6 kW (10 km.), VL-0,4 kW (3 km.) and
2-transforming substation 2 x 1000 kW.
4000 kW
4 Construction of sewer networks 3 km
5 Construction of a telephone exchange and cable ducts 1500 phone numbers
6 Construction of internal roads with parking and sidewalks 5 km
7 The increase in tourist flow to 350 000 peoples per year
8 The increase in the total area of facility tourist infrastructure by 92,5 th. m2
9 The increase in the total area of the hotel infrastructure by 25,5 th. m2
10 The increase of seats in collective accommodation facilities to 1020
11 The increase in jobs to 1000
INFRASTRUCTURE AND KEY INDICATORSOF THE
AUTOMOBILE TOURIST CLUSTER “KYAKHTA”
TourismandRecreationSector
OFFERED VACANT LOTS (FIG. P.113)
• A. The flat grass covered plot (1,34 ha) with no bushes and trees,
located within the city of Kyakhta,bordering to the north with the
Ulan-Ude – Ulan-Bator federal road. Investors are proposed to
develop shopping and social center in this plot (refer to fig.), which
includes–along with shopping an catering facilities–multiplex
cinema, bowling and billiard center, fitness center, children’s
playing area, family entertainment complex with a shooting gallery,
lasertag (Lasermaxx), gaming machines, etc.The proposed project
is targeted at tourists and citizens of Kyakhta.
• B. The flat plot (19 ha), partially bushy, located within the city of
Kyakhta at the 1st kilometer of the Kyakhta – Bichura motorway.
Investors are proposed to develop customs and logistics terminal
of the 1st category with “A”-class warehouse complex. The capacity
of the terminal allows to store simultaneously more than 300
vehicles.
• C. The sloping grass covered plot (12 ha) with no bushes and trees
located at the 2nd kilometer of the Kyakhta – Bichura motorway.
Investors are proposed to develop a complex of ancillary services
facilities (service station wih car parking, catering, hotel, insurance
companies, etc).
2
3
4
5
6
1
1 – petrolstation; 2 –Shopping and
entertainment complex; 5 – hotel and
office complex; center; 3 – shopping mall;
4 – hotel
Complex; 6 – open air parking.112 113
58. Airport «Baikal»
railway station
Adrenalin Park
А165
М55
Р441
М55
М55
А164
А165
Р440
А340
Р258
Р441
Р258
Р258
А164
А340
Р440
The site is 10 km from the center of Ulan-Ude.
Themaximumnaturalelevationoftherunsreaches
to 924 meters, with the natural skiable elevation
difference of 230-220 meters and the runs length
up to 820 meters.
The maximum capacity of the complex – 6200
people per day.
lake
Baikal
TourismandRecreationSector
“ADRENALIN” (THE ALPINE SKI RESORT
ON ORLINAYA MOUNTAIN)
Irkutsk
Mongolia
Ulan-Ude
SKI RESORT FACILITIES:
• the complex of ski runs, toboggan runs and ski lifts;
• service infrastructure (hotels, cafes, restaurants, shops);
• baths spa-complex;
• equestrian center;
• service center;
• day and night parkings.
Offered vacant lots
91 ha
Highway
114 115
59. № Title Capacity
1 The total area of the ski slopes 27,47 ha
2 Ski runs length 6925 m
3 Total chairlifts length 784 m
4 Ski tows length 1358 m
5 Unsupported ski lifts length 717 m
6 Infrastructure development area 20,6 ha
7 Proposed ski area capacity in terms of Persons at One Time (PAOT) 1500 peoples
8 Simple pay-back period 7,62 years
9 Net present value (NPV) $ 5,5 mln
10 Internal rate of return (IRR) 16,4 %
11 Profitability index (PI) 1,14
12 Modified internal rate of terurn (MIRR) 15 %
13 Income reinvestment rate 14 %
14 Investment cost discounting rate 14 %
INFRASTRUCTURE AND KEY FEATURES OF
THE PARK “ADRENALIN”
TourismandRecreationSector
Total investments – $ 43,5 mln., including:
• $ 2,5 mln. – investments in engineering infrastructure;
• $ 41 mln. – investments in tourism and recreation facilities.
116 117
60. TourismandRecreationSector
Ulan-Ude
60 km
lake Baikal
Ilyinka
Р258
Р258
Р258
А340
Ulan-Ude
TOURIST OFFER:
• Medical and health tourism (treatment
of polyarthritis, diseases of the nervous
system and others)
• Hippotherapy
• Family recreation
• Sports tourism
• Mineral water spring
Highway
Offered vacant lots
The total land area
7,02 hectares
The site is situated nearby the
bank of the Selenga river and
shares a land border to the west
with the working health resort
“Ilyinka” of the Republican
Exercise Therapy Centre.
The water well of the
Pitatelevskoye thermal mineral
water deposit (chloride-sulphate-
sodium and sodium-calcium
mineral water)
RailroadMineral water
spring
DEVELOPMENT OF THE MEDICAL RECREATIONAL
COMPLEX “ILYINKA SPA”
The volume of investments – $ 10 mln.
Facility:
• Hotel for 100 guests;
• Bath building;
• Sports complex;
• Restaurants complex and
entertainment center.
118 119
61. Enkheluk
1 land plot 4,5 ha in area is
offered to investors
TOURIST OFFER:
• sports tourism;
• business tourism;
• beach and water tourism;
• family recreational tourism.
Offered vacant lots
Highway Electrical sub-station
Ulan-Ude
170 km
TourismandRecreationSector
А340
Р258
SPORTS AND HEALTH COMPLEX AT LAKE
BAIKAL IN THE ENKHELUK VILLAGE
Ulan-Ude
lake
Baikal
Enkheluk
“Enkheluk” means “calm, blessed” in Buryat. There
are natural sand beaches at the sites proposed to
investors.
The mountain slopes of the Morskoy ridge covered
in mixed softwood forest appear in the vicinity of the
proposed sites (the highest point of the ridge – the
Davydov bald peak 1 707 meters high).
Asphalt road distance to Ulan-Ude – 170 km.
The Davydov
bald peak lake Baikal
120 121
62. KEY INDICATORS OF THE PROJECT IN THE ENKHELUK VILLAGE
№ Title Capacity
1 Development area 4000 m2
2 Total floor area 6200 m2
3 Construction volume 22 000 m3
4 Maximum tourist flow (on condition of full house) 90000 peoples/day in year
5 Winter season occupancy 40% (22050 peoples/day)
6 Summer season occupancy 85% (19550 peoples/day)
7 Estimated cost of the project $ 5 mln.
8 Construction period 9 months
9 Payback period 84 months
10 The period of achievement of full project capacity 12 months
11 NPV $ 330 th..
12 Number of created workplaces 60 units
TourismandRecreationSector
• hotel with 80 rooms, three VIP cottages for 6
guests,three cottages for 8 guests, a motel for
32 guests and a camping for 54 guests – total
accommodation for up to 250 guests;
• parking for 100 cars;
• restaurant, bistro and open-air café for 300
persons;
• conference hall for 100 persons;
• concert venue;
• cimena-bar;
• billiard room;
• water sports center (gym, swimming-pool
(mini water park), fitness center, sauna, mini
football and volleyball courts, tennis court,
equipment rental);
• bath, barbeque area and bonfire site;
• children’s playground; skatepark and
rollerdrom.
PROPOSED FACILITIES OF THE COMPLEX
122 123
63. FIVE DEVELOPMENT PRIORITY AREAS
Mineral resources sector
Agro-industrial sector
Tourism and Recreation
Sector Transport and logistics
sector
Establishment of the legal entity at the territiory of the Republic of Buryatia
Formation and providing of the land lot
Obtaining of engineering specifications for connection
to utility networks
Obtaining of a building license and commissioning
Assistance in carrying out state expertise of design and estimates
Assistance in preparation of the necessary documents for obtaining state support
Industry and residential
construction
Ulan-Ude
Ulaanbaatar
Peking
Moscow
Primary objectives:
• development and promotion of the investment projects of the Republic of Buryatia;
• attraction of investors for projects implementation in the territory of the Republic;
• creation of favorable environment for investors supporting investment projects
based on one stop approach.
FUND FOR REGIONAL DEVELOPMENT REPUBLIC BURYATIYA
Objective: attraction of investments to the economy of the
Republic of Buryatia.
Founder: the Government of the Republic of Buryatia represented by the Ministry of
Economy of the Republic of Buryatia.
The Fund for Regional Development of the Republic of Buryatia is an organization authorized
by the Government of the Republic of Buryatia in the field of application of government investment
policy seeking to attract investments to the economy of the Republic, create favorable environment
for investors and business, and reduce the administrative barriers
Fund for Regional Development of the Republic of Buryatia provides support
for investment projects and assists in the following tasks:
124 125
64. FUND FOR REGIONAL DEVELOPMENT REPUBLIC BURYATIYA
Ulan-Ude, st. Babushkina, 14 а, off. 35-38
tell. (3012) 45-50-46, 45-54-85;
www.invest-buryatia.ru
Е-mail: fondreg@gmail.com
fondreg@mail.ru