Internship
Presentation
By: Nadeem Qandeel
E&C Intern
EE Major-SCSU
Graduating in 12/2015
Responsible
By Nature
Outline
 Overview of internship
 Project
 Background
 Problem statement
 Product specs
 Tasks
 Challenges
 Project management
 Conclusion
The Internship
 Xcel Energy
 SHERCO plant
 Engineering &
Construction
Fire Pump Controller Project
 Sprinkler system
 Controller is the
brain
 Starts the engine
 Engine pumps
water
Background
 Controller
replacement
 Manufacturer is out of
business
 Old Controller
 Not up to date with
latest NFPA standards
 Positive ground
connection
Fire Pump Controller Project
Problem Statement
Product Specs
Fire Pump Controller Project
 Monitors systems and auto start
 Regulates 2 batteries for engine
 2 battery chargers
 Test timer for weekly test
 Heater/Humidistat
 NEMA 12 enclosure
 Visual and audible alarms for:
 Engine failed to start
 Engine over speed
 Engine cooling water high temp
 Engine low lube oil pressure
 AC or battery charger failure
 Read manuals
 Search for vendors
 Team discussion
 Review proposals
 Scope of work document
 Select controller options
 Maximo
 Review drawings
Tasks
Fire Pump Controller Project
 Negative ground connection
 Coordination
 Establishing terms and conditions
 Safety
Fire Pump Controller Project
Challenges
Fire Pump Controller Project
21-May 10-Jun 30-Jun 20-Jul 9-Aug 29-Aug 18-Sep 8-Oct
Requirements gathering
Analysis
Alignment with other departments
Design comparisons
Vendor selection & Customization
Establishing terms and conditions
Documentation
Drawings revision (Demo)
Installation
Testing
Start Date 25-May 15-Jun 25-May 22-Jun 26-Jun
1-Jul 25-May 20-Jun 4-Sep 8-Sep
Tasks Duration 21 7 115 4 4 27 115 25 4 2
Project management
Budget: $ 100,000
 Project is in progress
 Future work
 Engine conversion
 Installation of controller
Conclusion
Intern Experience
 Accountability
 Operational Excellence
 Relationship Focused
Questions?

More Related Content

What's hot

A User's Perspective on IES Modeling
A User's Perspective on IES ModelingA User's Perspective on IES Modeling
A User's Perspective on IES Modelingenergytrustor
 
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume SystemsEnergy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systemsmelanie_bissonnette
 
Energy Modeling 2009 Presentation
Energy Modeling 2009 PresentationEnergy Modeling 2009 Presentation
Energy Modeling 2009 PresentationMatt Macko
 
TowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for CondosTowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for CondosToronto 2030 District
 
Enhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilityEnhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilitySimply Marcomms
 
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...YRG sustainability
 
Case Study: Energy Audit For Cooling Tower
Case Study: Energy Audit For Cooling Tower Case Study: Energy Audit For Cooling Tower
Case Study: Energy Audit For Cooling Tower Hina Gupta
 
Structural Weld Overlay CPNPP
Structural Weld Overlay CPNPPStructural Weld Overlay CPNPP
Structural Weld Overlay CPNPPleansavant
 
Retrocommissioning Gets Results
Retrocommissioning Gets ResultsRetrocommissioning Gets Results
Retrocommissioning Gets ResultsMcKenney's Inc
 
project_portfolio
project_portfolioproject_portfolio
project_portfolioYan Chen
 

What's hot (14)

A User's Perspective on IES Modeling
A User's Perspective on IES ModelingA User's Perspective on IES Modeling
A User's Perspective on IES Modeling
 
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume SystemsEnergy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
Energy Savings for Occupancy-Based Control of Variable-Air-Volume Systems
 
Building Performance Modeling
Building Performance ModelingBuilding Performance Modeling
Building Performance Modeling
 
Energy Modeling 2009 Presentation
Energy Modeling 2009 PresentationEnergy Modeling 2009 Presentation
Energy Modeling 2009 Presentation
 
TowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for CondosTowerLabs: Accelerating Adoption of Green Building Technologies for Condos
TowerLabs: Accelerating Adoption of Green Building Technologies for Condos
 
Enhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainabilityEnhancing competitiveness and achieving sustainability
Enhancing competitiveness and achieving sustainability
 
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
Building Performance Modeling: How to Use Modeling Analysis to Optimize Desig...
 
Resume
ResumeResume
Resume
 
Case Study: Energy Audit For Cooling Tower
Case Study: Energy Audit For Cooling Tower Case Study: Energy Audit For Cooling Tower
Case Study: Energy Audit For Cooling Tower
 
Nitesh 1 pager CV Green
Nitesh 1 pager CV GreenNitesh 1 pager CV Green
Nitesh 1 pager CV Green
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
Structural Weld Overlay CPNPP
Structural Weld Overlay CPNPPStructural Weld Overlay CPNPP
Structural Weld Overlay CPNPP
 
Retrocommissioning Gets Results
Retrocommissioning Gets ResultsRetrocommissioning Gets Results
Retrocommissioning Gets Results
 
project_portfolio
project_portfolioproject_portfolio
project_portfolio
 

Viewers also liked

Virus electronico
Virus electronicoVirus electronico
Virus electronicokarelyssss
 
autonomus Bike Progress
autonomus Bike Progressautonomus Bike Progress
autonomus Bike ProgressNadeem Qandeel
 
Responsabilidad solcial empresarial
Responsabilidad solcial empresarialResponsabilidad solcial empresarial
Responsabilidad solcial empresarialjorge alvarez
 
Actualités du droit des noms de domaine - Juillet 2012
Actualités du droit des noms de domaine - Juillet 2012Actualités du droit des noms de domaine - Juillet 2012
Actualités du droit des noms de domaine - Juillet 2012Cedric Manara
 
Présentation AFNIC aux rencontres parlementaires du numérique
Présentation AFNIC aux rencontres parlementaires du numériquePrésentation AFNIC aux rencontres parlementaires du numérique
Présentation AFNIC aux rencontres parlementaires du numériquemathieuweill
 
3 colombia tpa may2012 esp 2
3 colombia tpa may2012 esp 23 colombia tpa may2012 esp 2
3 colombia tpa may2012 esp 2ProColombia
 
Wireless Charging Proposal
Wireless Charging Proposal Wireless Charging Proposal
Wireless Charging Proposal Nadeem Qandeel
 

Viewers also liked (11)

Virus electronico
Virus electronicoVirus electronico
Virus electronico
 
autonomus Bike Progress
autonomus Bike Progressautonomus Bike Progress
autonomus Bike Progress
 
Slider 1
Slider 1Slider 1
Slider 1
 
Responsabilidad solcial empresarial
Responsabilidad solcial empresarialResponsabilidad solcial empresarial
Responsabilidad solcial empresarial
 
Maria mapa
Maria mapaMaria mapa
Maria mapa
 
Responsabilidad
ResponsabilidadResponsabilidad
Responsabilidad
 
Actualités du droit des noms de domaine - Juillet 2012
Actualités du droit des noms de domaine - Juillet 2012Actualités du droit des noms de domaine - Juillet 2012
Actualités du droit des noms de domaine - Juillet 2012
 
Présentation AFNIC aux rencontres parlementaires du numérique
Présentation AFNIC aux rencontres parlementaires du numériquePrésentation AFNIC aux rencontres parlementaires du numérique
Présentation AFNIC aux rencontres parlementaires du numérique
 
Responsabilidad y disciplinaria
Responsabilidad y disciplinariaResponsabilidad y disciplinaria
Responsabilidad y disciplinaria
 
3 colombia tpa may2012 esp 2
3 colombia tpa may2012 esp 23 colombia tpa may2012 esp 2
3 colombia tpa may2012 esp 2
 
Wireless Charging Proposal
Wireless Charging Proposal Wireless Charging Proposal
Wireless Charging Proposal
 

Similar to Internship Presentation Fire Pump Controller Project

Manir_TECK_Presentation_1
Manir_TECK_Presentation_1Manir_TECK_Presentation_1
Manir_TECK_Presentation_1Manir Al Faisal
 
Restoration of Energy Efficiency In Cooling Systems
Restoration of Energy Efficiency In Cooling SystemsRestoration of Energy Efficiency In Cooling Systems
Restoration of Energy Efficiency In Cooling SystemsDeVonGeorge
 
Compressed Air Powered Engine
Compressed Air Powered EngineCompressed Air Powered Engine
Compressed Air Powered EngineAbhishek Hingmire
 
S&S Technical overview January 2014
S&S Technical overview January 2014S&S Technical overview January 2014
S&S Technical overview January 2014Pete Singleton
 
Automotive transient thermal modeling seminar draft 5
Automotive transient thermal modeling seminar draft 5Automotive transient thermal modeling seminar draft 5
Automotive transient thermal modeling seminar draft 5Jonathan Earley
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsEmerson Exchange
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014Umar Saeed
 
Case Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown ReliabilityCase Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown ReliabilityFlex Process
 
Parmenter, Brady, Poster
Parmenter, Brady, PosterParmenter, Brady, Poster
Parmenter, Brady, PosterBrady Parmenter
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017Czero
 
Combinated energy presure
Combinated energy presureCombinated energy presure
Combinated energy presurekamila64
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseDNVGLEnergy
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Lucia Shen
 
Case Study: Refinery Relief and Flare Study
Case Study: Refinery Relief and Flare StudyCase Study: Refinery Relief and Flare Study
Case Study: Refinery Relief and Flare StudyFlex Process
 

Similar to Internship Presentation Fire Pump Controller Project (20)

Energy Modeling
Energy ModelingEnergy Modeling
Energy Modeling
 
Fall Final Presentation
Fall Final PresentationFall Final Presentation
Fall Final Presentation
 
Manir_TECK_Presentation_1
Manir_TECK_Presentation_1Manir_TECK_Presentation_1
Manir_TECK_Presentation_1
 
Lab seminar
Lab seminarLab seminar
Lab seminar
 
Restoration of Energy Efficiency In Cooling Systems
Restoration of Energy Efficiency In Cooling SystemsRestoration of Energy Efficiency In Cooling Systems
Restoration of Energy Efficiency In Cooling Systems
 
Compressed Air Powered Engine
Compressed Air Powered EngineCompressed Air Powered Engine
Compressed Air Powered Engine
 
S&S Technical overview January 2014
S&S Technical overview January 2014S&S Technical overview January 2014
S&S Technical overview January 2014
 
Automotive transient thermal modeling seminar draft 5
Automotive transient thermal modeling seminar draft 5Automotive transient thermal modeling seminar draft 5
Automotive transient thermal modeling seminar draft 5
 
Transition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operationsTransition to online AMS reduces maintenance costs and improves operations
Transition to online AMS reduces maintenance costs and improves operations
 
A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014A-Umar Saeed-Nestle Summer Associate Program-2014
A-Umar Saeed-Nestle Summer Associate Program-2014
 
Case Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown ReliabilityCase Study: Natural Gas Letdown Reliability
Case Study: Natural Gas Letdown Reliability
 
Vel Linked In CV
Vel Linked In CVVel Linked In CV
Vel Linked In CV
 
Parmenter, Brady, Poster
Parmenter, Brady, PosterParmenter, Brady, Poster
Parmenter, Brady, Poster
 
Czero Engineering - Feb 2017
Czero Engineering  - Feb 2017Czero Engineering  - Feb 2017
Czero Engineering - Feb 2017
 
Combinated energy presure
Combinated energy presureCombinated energy presure
Combinated energy presure
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
 
harpreet cv purchase
harpreet  cv purchaseharpreet  cv purchase
harpreet cv purchase
 
Sunderland Resume
Sunderland ResumeSunderland Resume
Sunderland Resume
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015
 
Case Study: Refinery Relief and Flare Study
Case Study: Refinery Relief and Flare StudyCase Study: Refinery Relief and Flare Study
Case Study: Refinery Relief and Flare Study
 

Internship Presentation Fire Pump Controller Project

  • 1. Internship Presentation By: Nadeem Qandeel E&C Intern EE Major-SCSU Graduating in 12/2015 Responsible By Nature
  • 2. Outline  Overview of internship  Project  Background  Problem statement  Product specs  Tasks  Challenges  Project management  Conclusion
  • 3. The Internship  Xcel Energy  SHERCO plant  Engineering & Construction
  • 4. Fire Pump Controller Project  Sprinkler system  Controller is the brain  Starts the engine  Engine pumps water Background
  • 5.  Controller replacement  Manufacturer is out of business  Old Controller  Not up to date with latest NFPA standards  Positive ground connection Fire Pump Controller Project Problem Statement
  • 6. Product Specs Fire Pump Controller Project  Monitors systems and auto start  Regulates 2 batteries for engine  2 battery chargers  Test timer for weekly test  Heater/Humidistat  NEMA 12 enclosure  Visual and audible alarms for:  Engine failed to start  Engine over speed  Engine cooling water high temp  Engine low lube oil pressure  AC or battery charger failure
  • 7.  Read manuals  Search for vendors  Team discussion  Review proposals  Scope of work document  Select controller options  Maximo  Review drawings Tasks Fire Pump Controller Project
  • 8.  Negative ground connection  Coordination  Establishing terms and conditions  Safety Fire Pump Controller Project Challenges
  • 9. Fire Pump Controller Project 21-May 10-Jun 30-Jun 20-Jul 9-Aug 29-Aug 18-Sep 8-Oct Requirements gathering Analysis Alignment with other departments Design comparisons Vendor selection & Customization Establishing terms and conditions Documentation Drawings revision (Demo) Installation Testing Start Date 25-May 15-Jun 25-May 22-Jun 26-Jun 1-Jul 25-May 20-Jun 4-Sep 8-Sep Tasks Duration 21 7 115 4 4 27 115 25 4 2 Project management Budget: $ 100,000
  • 10.  Project is in progress  Future work  Engine conversion  Installation of controller Conclusion Intern Experience  Accountability  Operational Excellence  Relationship Focused