Integrated Campus Development Plan (ICDP) – March 2012




 Campground Rd,
 Rondebosch
 Cape Town
 T: 021 686 4066
 @: bekkerl@rghs.org.za
 www: rghs.org.za
Integrated Campus Development Plan:

• Integrated plan caters for needs and priorities identified by school
  community

• Enhances character of existing school buildings and grounds as the main
  asset

• New-build confined only to essential needs not met by existing facilities

• Seeks to provide every full-time Educator with a classroom

• Rationalises roads and provides parking to ensure improved pedestrian
  safety and traffic flow

• Sets in place a logical sequence of development

• Provision for long term projects such as multi-purpose hall and/ or hostel
  extension


                                                                               www.rghs.org.za
Integrated Campus Development Plan – Key Intervention Areas




                                               Maths/Science
                                               Block



              Aquatic Centre




                                  Leadership
                                  Centre
                                                               Main Entrance &
                                                               parking




                                                                             www.rghs.org.za
Phase “0” (Completed Oct 2010) : Kemp Hall Courtyard
   March – October 2010
      • Paving and landscaping          • Store rooms
      • Sports office                   • Covered Kemp Hall verandah
      • Upgrading of change rooms       • Soccer field seating
Before




After




                                                                       www.rghs.org.za
Phase 1: Maths & Science Block




                                 www.rghs.org.za
Phase 2: Ground Floor – Science Laboratories
   • 3 x custom built laboratories
   • Preparation room
   • Exhibition/Display areas




                                               www.rghs.org.za
Phase 1: First Floor – Mathematics Classrooms
  • 4 x Mathematics classrooms
  • Bridge to adjoining School building




                                                www.rghs.org.za
Artist’s Impressions




                       www.rghs.org.za
Phase 2: Leadership Centre
  • Life Orientation classrooms
  • Counselling area
  • ROGU office
  • Conference/Functions Room




                                  www.rghs.org.za
First Floor




Ground Floor
                             www.rghs.org.za
www.rghs.org.za
RUSTENBURG HIGH SCHOOL FOR GIRLS
 Proposed Integrated Campus Development Plan (2015 and beyond)
 These phases will be implemented on a needs driven and opportunity basis.

PHASE 3 : Aquatic Centre                          9.  Parking area
                                                  10. Pedestrian link to fields
1.   Service road                                 11. Erinville Hostel crossing
2.   Heated Waterpolo Pool and Facilities         12. Waiting shelter
                                                  13. Forecourt landscaping extension to new
PHASE 4 : Roads, Landscaping & Tennis Courts          road
                                                  14. Soccer field seating extension
1.   Campground Road entrance                     15. Erinville carports
2.   Entrance roadway and landscaping
3.   North road parking                           PHASE 5: Sports Fields
4.   South road parking
5.   Staff parking                                1.    Astroturf Hockey Field
6.   South entrance
7.   Realigned circular road and stop & drop      PHASE 6: Multipurpose Hall
     parking
8.   Barrier Wall and Tennis seating area         1.    Located on meadows south of Erinville
9.   Pedestrian access to Charlie’s Hope




                                                                                                www.rghs.org.za

Integrated Campus Development Plan

  • 1.
    Integrated Campus DevelopmentPlan (ICDP) – March 2012 Campground Rd, Rondebosch Cape Town T: 021 686 4066 @: bekkerl@rghs.org.za www: rghs.org.za
  • 2.
    Integrated Campus DevelopmentPlan: • Integrated plan caters for needs and priorities identified by school community • Enhances character of existing school buildings and grounds as the main asset • New-build confined only to essential needs not met by existing facilities • Seeks to provide every full-time Educator with a classroom • Rationalises roads and provides parking to ensure improved pedestrian safety and traffic flow • Sets in place a logical sequence of development • Provision for long term projects such as multi-purpose hall and/ or hostel extension www.rghs.org.za
  • 3.
    Integrated Campus DevelopmentPlan – Key Intervention Areas Maths/Science Block Aquatic Centre Leadership Centre Main Entrance & parking www.rghs.org.za
  • 4.
    Phase “0” (CompletedOct 2010) : Kemp Hall Courtyard  March – October 2010 • Paving and landscaping • Store rooms • Sports office • Covered Kemp Hall verandah • Upgrading of change rooms • Soccer field seating Before After www.rghs.org.za
  • 5.
    Phase 1: Maths& Science Block www.rghs.org.za
  • 6.
    Phase 2: GroundFloor – Science Laboratories • 3 x custom built laboratories • Preparation room • Exhibition/Display areas www.rghs.org.za
  • 7.
    Phase 1: FirstFloor – Mathematics Classrooms • 4 x Mathematics classrooms • Bridge to adjoining School building www.rghs.org.za
  • 8.
    Artist’s Impressions www.rghs.org.za
  • 9.
    Phase 2: LeadershipCentre • Life Orientation classrooms • Counselling area • ROGU office • Conference/Functions Room www.rghs.org.za
  • 10.
  • 11.
  • 12.
    RUSTENBURG HIGH SCHOOLFOR GIRLS Proposed Integrated Campus Development Plan (2015 and beyond) These phases will be implemented on a needs driven and opportunity basis. PHASE 3 : Aquatic Centre 9. Parking area 10. Pedestrian link to fields 1. Service road 11. Erinville Hostel crossing 2. Heated Waterpolo Pool and Facilities 12. Waiting shelter 13. Forecourt landscaping extension to new PHASE 4 : Roads, Landscaping & Tennis Courts road 14. Soccer field seating extension 1. Campground Road entrance 15. Erinville carports 2. Entrance roadway and landscaping 3. North road parking PHASE 5: Sports Fields 4. South road parking 5. Staff parking 1. Astroturf Hockey Field 6. South entrance 7. Realigned circular road and stop & drop PHASE 6: Multipurpose Hall parking 8. Barrier Wall and Tennis seating area 1. Located on meadows south of Erinville 9. Pedestrian access to Charlie’s Hope www.rghs.org.za