This document provides installation instructions for an ORAC decor moulding in 3 steps: 1) Measure and mark the wall for moulding placement. 2) Attach the front of the moulding to the wall using screws. 3) Attach the back of the moulding to the front piece and allow 24 hours to dry before use.