Instruction Guide for Gas Phase Chromatograph
Preparation:
    Put a sheet of paper in the printer (always make sure the paper is not jamming in the
      printer).
    Position both 3-way-valve between the bottle table and GC chromographer- make sure
      the nozzle is perpendicular. (For reference see diagram.)

Vorbereitung
    Blatt am Drucker einlegen.
    Stellung der beiden 3-Weg-Ventile zwischen Flashenbank und GC überprüfen (Soll-
      zustand siehe Abbildung)




                                      Step 1. Calibration
                                       Schritt 1. Eichen

Main menu [Hauptmenu (1)] select Data set (Messreihe angeben) (Put the numbers in one at
a time with Enter).

 (5) Loading / laden (5)
      1. Calibration 1 (low gas concentration/ niedrige Gaskonzentrationen, dry location /
         trockene Standort; E0, E1, E2). Important: set the control panel of the
         Chromotograph to:

                 “DET”  “1”  “Enter”  “Range”  ”0”  “Enter”

       2. Calibration 2 (high gas concentration/ hohe Gaskonzentrationen, wet location/
          feuchte Standorte; E1, E2, E3). Important: set the control panel of the
          Chromotograph to:

                  “DET”  “1”  “Enter”  “Range” ”1”  “Enter”
 Type 0 to return to main menu
 (3) Performing analysis / Analyse durchführen  Enter  „j“  (Data name)  Enter
 (6) Gas Processor / Gasprozessor
 (6) Graphics / Graphiken
       1. (1) FID (Flame ionisation detector, sensitive for CH4) and ECD (electron capture
detector, sensitive for N20, CO2). Important: while E0 is being measured, correct the base
curve of the measurement.
               -Position the base curve of the FID (gray) over the upper small wheel on the
       Chromotographer, above the top of the red mark on the monitor.
               - Level the white base curve of the ECD above the lower small wheel on
       Chromatographer with the blue marking on display screen.
During or after the calibration, plug the glass bottles into the corresponding plots according to
the numbers listed in the protocol but DON’T open.
Instruction guide for gas phase chromatograph

More Related Content

Viewers also liked

Fiche d'inscription - Danse - La Nacelle
Fiche d'inscription - Danse - La NacelleFiche d'inscription - Danse - La Nacelle
Fiche d'inscription - Danse - La Nacellelaetizia
 
Golf score ecosystem
Golf score ecosystemGolf score ecosystem
Golf score ecosystem宏之 藤原
 
Cbg Calendar
Cbg CalendarCbg Calendar
Cbg Calendarkstoepel
 
SalesStaff LLC Case Study - Mobile Computing Solutions Marketing
SalesStaff LLC Case Study - Mobile Computing Solutions MarketingSalesStaff LLC Case Study - Mobile Computing Solutions Marketing
SalesStaff LLC Case Study - Mobile Computing Solutions MarketingInsource Leads
 
Ofício 112
Ofício 112Ofício 112
Ofício 112heliane
 
Interrogazione Antonio De Poli a ministro lavoro su comparto terme euganee
Interrogazione Antonio De Poli a ministro lavoro su comparto terme euganeeInterrogazione Antonio De Poli a ministro lavoro su comparto terme euganee
Interrogazione Antonio De Poli a ministro lavoro su comparto terme euganeeAntonio De Poli
 

Viewers also liked (10)

Fiche d'inscription - Danse - La Nacelle
Fiche d'inscription - Danse - La NacelleFiche d'inscription - Danse - La Nacelle
Fiche d'inscription - Danse - La Nacelle
 
Golf score ecosystem
Golf score ecosystemGolf score ecosystem
Golf score ecosystem
 
Career and Leadership Pipeline Evolution
Career and Leadership Pipeline EvolutionCareer and Leadership Pipeline Evolution
Career and Leadership Pipeline Evolution
 
Cbg Calendar
Cbg CalendarCbg Calendar
Cbg Calendar
 
SalesStaff LLC Case Study - Mobile Computing Solutions Marketing
SalesStaff LLC Case Study - Mobile Computing Solutions MarketingSalesStaff LLC Case Study - Mobile Computing Solutions Marketing
SalesStaff LLC Case Study - Mobile Computing Solutions Marketing
 
ResumeRev04302016
ResumeRev04302016ResumeRev04302016
ResumeRev04302016
 
Combinar correspondencia
Combinar correspondenciaCombinar correspondencia
Combinar correspondencia
 
Ofício 112
Ofício 112Ofício 112
Ofício 112
 
Pres
PresPres
Pres
 
Interrogazione Antonio De Poli a ministro lavoro su comparto terme euganee
Interrogazione Antonio De Poli a ministro lavoro su comparto terme euganeeInterrogazione Antonio De Poli a ministro lavoro su comparto terme euganee
Interrogazione Antonio De Poli a ministro lavoro su comparto terme euganee
 

Similar to Instruction guide for gas phase chromatograph

Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographRodrigo Rudge
 
Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographRodrigo Rudge
 
Training Outline HMLS Auto Calcimeter
Training Outline HMLS Auto CalcimeterTraining Outline HMLS Auto Calcimeter
Training Outline HMLS Auto CalcimeterMichael Crum
 
As practical-exam-notes
As practical-exam-notesAs practical-exam-notes
As practical-exam-noteszohaib201
 
As practical-exam-notes
As practical-exam-notesAs practical-exam-notes
As practical-exam-noteszohaib201
 
Wiring a pH and Conductivity Probe to a Zeno3200
Wiring a pH and Conductivity Probe to a Zeno3200Wiring a pH and Conductivity Probe to a Zeno3200
Wiring a pH and Conductivity Probe to a Zeno3200TAMUK
 
Medidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdfMedidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdfJuanRios958368
 
Cn mx3000 p_20120808e
Cn mx3000 p_20120808eCn mx3000 p_20120808e
Cn mx3000 p_20120808eElsa von Licy
 
Lecture_(4)_R.E.M and Area Calculation
Lecture_(4)_R.E.M and Area CalculationLecture_(4)_R.E.M and Area Calculation
Lecture_(4)_R.E.M and Area CalculationBahzad5
 
Desing and Development of a Steady State System Simulator
Desing and Development of a Steady State System SimulatorDesing and Development of a Steady State System Simulator
Desing and Development of a Steady State System SimulatorAlvaro H. Pescador
 
helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)Bakhtiar Mahmood
 

Similar to Instruction guide for gas phase chromatograph (20)

Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatograph
 
Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatograph
 
Gc step 2 (1)
Gc step 2 (1)Gc step 2 (1)
Gc step 2 (1)
 
Gc step 2 (1)
Gc step 2 (1)Gc step 2 (1)
Gc step 2 (1)
 
Gc step 2 (1)
Gc step 2 (1)Gc step 2 (1)
Gc step 2 (1)
 
Gc step 2
Gc step 2Gc step 2
Gc step 2
 
Gc step 2
Gc step 2Gc step 2
Gc step 2
 
Aiwa tv-f2400
Aiwa tv-f2400Aiwa tv-f2400
Aiwa tv-f2400
 
Data logging (1)
Data logging (1)Data logging (1)
Data logging (1)
 
Sokkia set20 k
Sokkia set20 kSokkia set20 k
Sokkia set20 k
 
Training Outline HMLS Auto Calcimeter
Training Outline HMLS Auto CalcimeterTraining Outline HMLS Auto Calcimeter
Training Outline HMLS Auto Calcimeter
 
As practical-exam-notes
As practical-exam-notesAs practical-exam-notes
As practical-exam-notes
 
As practical-exam-notes
As practical-exam-notesAs practical-exam-notes
As practical-exam-notes
 
Wiring a pH and Conductivity Probe to a Zeno3200
Wiring a pH and Conductivity Probe to a Zeno3200Wiring a pH and Conductivity Probe to a Zeno3200
Wiring a pH and Conductivity Probe to a Zeno3200
 
Medidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdfMedidor digital de presion 680 UserManual.pdf
Medidor digital de presion 680 UserManual.pdf
 
Cn mx3000 p_20120808e
Cn mx3000 p_20120808eCn mx3000 p_20120808e
Cn mx3000 p_20120808e
 
Lecture_(4)_R.E.M and Area Calculation
Lecture_(4)_R.E.M and Area CalculationLecture_(4)_R.E.M and Area Calculation
Lecture_(4)_R.E.M and Area Calculation
 
Desing and Development of a Steady State System Simulator
Desing and Development of a Steady State System SimulatorDesing and Development of a Steady State System Simulator
Desing and Development of a Steady State System Simulator
 
CAREER EPISODES E-1
CAREER EPISODES E-1CAREER EPISODES E-1
CAREER EPISODES E-1
 
helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)helium porosimeter (Reservoir lab)
helium porosimeter (Reservoir lab)
 

More from Rodrigo Rudge

2. site characteristics
2. site characteristics2. site characteristics
2. site characteristicsRodrigo Rudge
 
Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographRodrigo Rudge
 
Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographRodrigo Rudge
 

More from Rodrigo Rudge (7)

2. site characteristics
2. site characteristics2. site characteristics
2. site characteristics
 
Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatograph
 
Gc read out
Gc read outGc read out
Gc read out
 
Gc read out
Gc read outGc read out
Gc read out
 
Instruction guide for gas phase chromatograph
Instruction guide for gas phase chromatographInstruction guide for gas phase chromatograph
Instruction guide for gas phase chromatograph
 
Gc read out
Gc read outGc read out
Gc read out
 
3. co2 measurement
3. co2 measurement3. co2 measurement
3. co2 measurement
 

Instruction guide for gas phase chromatograph

  • 1. Instruction Guide for Gas Phase Chromatograph Preparation:  Put a sheet of paper in the printer (always make sure the paper is not jamming in the printer).  Position both 3-way-valve between the bottle table and GC chromographer- make sure the nozzle is perpendicular. (For reference see diagram.) Vorbereitung  Blatt am Drucker einlegen.  Stellung der beiden 3-Weg-Ventile zwischen Flashenbank und GC überprüfen (Soll- zustand siehe Abbildung) Step 1. Calibration Schritt 1. Eichen Main menu [Hauptmenu (1)] select Data set (Messreihe angeben) (Put the numbers in one at a time with Enter).  (5) Loading / laden (5) 1. Calibration 1 (low gas concentration/ niedrige Gaskonzentrationen, dry location / trockene Standort; E0, E1, E2). Important: set the control panel of the Chromotograph to: “DET”  “1”  “Enter”  “Range”  ”0”  “Enter” 2. Calibration 2 (high gas concentration/ hohe Gaskonzentrationen, wet location/ feuchte Standorte; E1, E2, E3). Important: set the control panel of the Chromotograph to: “DET”  “1”  “Enter”  “Range” ”1”  “Enter”  Type 0 to return to main menu  (3) Performing analysis / Analyse durchführen  Enter  „j“  (Data name)  Enter  (6) Gas Processor / Gasprozessor  (6) Graphics / Graphiken 1. (1) FID (Flame ionisation detector, sensitive for CH4) and ECD (electron capture detector, sensitive for N20, CO2). Important: while E0 is being measured, correct the base curve of the measurement. -Position the base curve of the FID (gray) over the upper small wheel on the Chromotographer, above the top of the red mark on the monitor. - Level the white base curve of the ECD above the lower small wheel on Chromatographer with the blue marking on display screen. During or after the calibration, plug the glass bottles into the corresponding plots according to the numbers listed in the protocol but DON’T open.