LRT3
INSTALLATION WORK AT MAIN LINE
TRACKSIDE (GUIDEWAYS)
LRT3 | SCOPE OF WORK FOR INSTALLATION MAIN LINE
TRACKSIDE (GUIDEWAYS)
1. Railway System LAN / FOC Cable (CTS)
2. Wayside Wi-Fi (WDCS)
3. Main Cable Containment for COMM System
4. Secondary Cable Containment for WDCS System
5. Private Automatic Branch Exchange at Trackside
(PABX)
6. Railways System LAN From Station to Ancillary
Building
COMMS
Scope of Works
At Mainline
Trackside (Guideways)
SCOPE OF WORK
UNDER
TRACKSIDE
(GUIDEWAYS)
CONTRACT
SCOPE OF WORK
UNDER STATION
& ANCILLARY
BUILDING
CONTRACT
3
6 December 2016
LRT3 | SCOPE OF WORK FOR INSTALLATION MAIN LINE
TRACKSIDE (GUIDEWAYS)
Trackside
Power Cable
Antenna
System Solution
Wayside Wi-Fi
(WDCS)
FOC / CTS, Railway
System LAN
Pole
Design
By Sub-System
Design Team
Sub Contractor
Material
Common Items
Fiber Optic Cable Leaky Cable
Power Cable Network Cable
Feeder Cable
Racks & Enclosures
Network Security
Data Analytic
Computer
Peripherals
Sub DB
Power System
SAT
Installation Services
Cable Laying Equipment
Installation
Material
Indoor/Internal
Fiber Optic Cable
Mounting bracket
for leaky cable
Grounding Cable
Ethernet Network
Cable
Labelling
Gapping
Fiber Optic Cable
Feeder Cable
Grounding Cable
Network Cable
Fiber Optic Cable
Termination
Grounding Cable
Termination
Network Cable
Termination
Labelling
Fiber Optic Cable
Termination
Grounding Cable
Termination
Ethernet Cable
Network
Termination
Trackside
Enclosure
Indoor/Internal
Antenna
NAP
Ethernet Network
Cable
Labelling
Gapping
Fiber Optic Cable
Feeder Cable
Grounding Cable
Network Cable
Fiber Optic Cable
Termination
Grounding Cable
Termination
Network Cable
Termination
Labelling
Fiber Optic Cable
Termination
Grounding Cable
Termination
Grounding Cable
PICO
Secondary Cable
Containment &
Accessories
Consumables item
Labelling
Gapping kit
LRT3 Construction Team
Procurement / Logistic
Patch Panel
Main Cable
Containment at
Track side
Secondary Cable
Containment for
Wayside Wi-Fi
(WDCS)
Coaxial Cable
Installation &
Termination
Accessories
(including all type
of brackets and RF
peripheral devices
Wayside Pole
ODF
Power Cable
Power Cable
Termination
Fiber Optic Power
Cable Termination
LRT3 | SCOPE OF WORK AT MAIN LINE TRACKSIDE
(GUIDEWAYS)
STATIO
N XX
WDCS-POWER x
2
CTS / FOC -FIBER 48C
x 2
CTS-FIBER 48C x 2
STATION
YY
WDCS-FIBER
24C x 1
TPSS XX
CTS-FIBER 12C x 2
UPS x 1
PABX x 2
WDCS-FIBER
48C x 2
LVSS YY
PABX
(BLS)
Section A Section B
Work scope under trackside (guideways) including
Main Cable Containment and Secondary Cable
Containment
Work scope under Station and Ancillary building
Contract including Secondary Cable Containment
5
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) FOR WESTERN
AREA SITE LOCATION
ST1
0
ST1
1
ST1
2
ST1
3
ST1
5
ST1
6 ST1
7
ST1
8
ST1
9
ST2
0
ST2
1
ST2
2
ST2
3
(PKGE
9)
ST2
5
ST2
6
ST1
4
WESTERN
PHASE
UG
JOHAN
SETIA
DEPOT
GS 9
GS 10
GS 8
GS 9
GS 8
GS 10
GS 7
GS
7
GS 6
GS 6
GS 5
GS 5
ST2
4
(PKGE 10)
(PKGE
8)
(PKGE
7)
(PKGE 5) (PKGE 6)
WESTERN PHASE
GUIEDWAYS
TRACK AREA
(3.382 km)
(2.305 km)
(4.016 km)
(4.157km)
(2.692km)
(4.976
km)
(2.635km)
21.858KM
Total of
Length
Track Area
Involved
Total No of
Track Area
Involved
PACKAGE
S
GUIEDWA
YS &
STATION
PHASE LOCATION
PACKAGE 5 GS 5
WESTER
N
i. GUIEDWAYS STATION DATO MENTERI (ST12) TO STATION UITM
SHAH ALAM (ST14)
ii. GUIEDWAYS STATION UITM SHAH ALAM (ST14) TO STATION
SEKSYEN 7 SHAH ALAM (ST15)
PACKAGE 6 GS 6
WESTER
N
i. GUIEDWAYS STATION SEKSYEN 7 SHAH ALAM (ST15) TO STATION
BANDAR BARU KLANG (S17)
PACKAGE 7 GS 7
WESTER
N
i. GUIEDWAYS FROM STATION BANDAR BARU KLANG (ST17) TO
STATION PASAR BESAR KLANG (ST18)
ii. GUIEDWAYS FROM STATION PASAR BESAR KLANG (ST18) TO
STATION JALAN MERU (ST19)
iii. GUIEDWAYS FROM STATION JALAN MERU(ST19) TO STATION
KLANG (ST20)
PACKAGE 8 GS 8
WESTER
N
I. GUIEDWAYS FROM STATION KLANG (ST20) TO STATION TAMAN
SELATAN (ST21)
II. GUIEDWAYS FROM STATION TAMAN SELATAN (ST21) TO STATION
SRI ANDALAS (ST22)
III. GUIEDWAYS FROM STATION SRI ANDALAS (ST22) TO STATION
KLANG JAYA (ST23)
PACKAGE 9 GS 9
WESTER
N
i. GUIEDWAYS FROM STATION KLANG JAYA (ST23) TO STATION
BANDAR BUKIT TINGGI (ST24)
ii. GUIEDWAYS FROM STATION BANDAR BUKIT TINGGI (ST 24) TO
STATION JOHAN SETIA (ST26)
PACKAGE
10
GS 10
WESTER
N
i. GUIEDWAYS FROM STATION JOHAN SETIA (ST26) JOHAN SETIA
DEPOT
Available Stations
Provisional Stations
Cancelled Stations
Elevated Track
Underground Tunnel
6
6 December 2016
LRT3 | SCOPE OF WORK MAIN LINE TRACKSIDE (GUIDEWAYS)
Main Cable
Containment
Secondary Cable Containment
Main Cable
Containment
7
6 December 2016
LRT3 | SCOPE OF WORK MAIN LINE TRACKSIDE (GUIDEWAYS)
Main Cable Containment
8
6 December 2016
Main Cable Containment
Secondary Cable
Containment
LRT3 | SCOPE OF WORK MAIN LINE TRACKSIDE (GUIDEWAYS)
9
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 17
(GS7)
10
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 18
(GS7)
11
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 19
(GS7)
12
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 20
(GS8)
13
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) BETWEEN STATION 20
TO STATION 21 (GS8)
14
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 21
(GS8)
15
6 December 2016
LRT3 | MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 22
(GS8)
ICTLY PRIVATE AND CONFIDENTIAL
Thank You

Installation at Main Line Trackside (Guideways)_WDCS.pptx

  • 1.
    ICTLY PRIVATE ANDCONFIDENTIAL LRT3 INSTALLATION WORK AT MAIN LINE TRACKSIDE (GUIDEWAYS)
  • 2.
    LRT3 | SCOPEOF WORK FOR INSTALLATION MAIN LINE TRACKSIDE (GUIDEWAYS) 1. Railway System LAN / FOC Cable (CTS) 2. Wayside Wi-Fi (WDCS) 3. Main Cable Containment for COMM System 4. Secondary Cable Containment for WDCS System 5. Private Automatic Branch Exchange at Trackside (PABX) 6. Railways System LAN From Station to Ancillary Building COMMS Scope of Works At Mainline Trackside (Guideways) SCOPE OF WORK UNDER TRACKSIDE (GUIDEWAYS) CONTRACT SCOPE OF WORK UNDER STATION & ANCILLARY BUILDING CONTRACT
  • 3.
    3 6 December 2016 LRT3| SCOPE OF WORK FOR INSTALLATION MAIN LINE TRACKSIDE (GUIDEWAYS) Trackside Power Cable Antenna System Solution Wayside Wi-Fi (WDCS) FOC / CTS, Railway System LAN Pole Design By Sub-System Design Team Sub Contractor Material Common Items Fiber Optic Cable Leaky Cable Power Cable Network Cable Feeder Cable Racks & Enclosures Network Security Data Analytic Computer Peripherals Sub DB Power System SAT Installation Services Cable Laying Equipment Installation Material Indoor/Internal Fiber Optic Cable Mounting bracket for leaky cable Grounding Cable Ethernet Network Cable Labelling Gapping Fiber Optic Cable Feeder Cable Grounding Cable Network Cable Fiber Optic Cable Termination Grounding Cable Termination Network Cable Termination Labelling Fiber Optic Cable Termination Grounding Cable Termination Ethernet Cable Network Termination Trackside Enclosure Indoor/Internal Antenna NAP Ethernet Network Cable Labelling Gapping Fiber Optic Cable Feeder Cable Grounding Cable Network Cable Fiber Optic Cable Termination Grounding Cable Termination Network Cable Termination Labelling Fiber Optic Cable Termination Grounding Cable Termination Grounding Cable PICO Secondary Cable Containment & Accessories Consumables item Labelling Gapping kit LRT3 Construction Team Procurement / Logistic Patch Panel Main Cable Containment at Track side Secondary Cable Containment for Wayside Wi-Fi (WDCS) Coaxial Cable Installation & Termination Accessories (including all type of brackets and RF peripheral devices Wayside Pole ODF Power Cable Power Cable Termination Fiber Optic Power Cable Termination
  • 4.
    LRT3 | SCOPEOF WORK AT MAIN LINE TRACKSIDE (GUIDEWAYS) STATIO N XX WDCS-POWER x 2 CTS / FOC -FIBER 48C x 2 CTS-FIBER 48C x 2 STATION YY WDCS-FIBER 24C x 1 TPSS XX CTS-FIBER 12C x 2 UPS x 1 PABX x 2 WDCS-FIBER 48C x 2 LVSS YY PABX (BLS) Section A Section B Work scope under trackside (guideways) including Main Cable Containment and Secondary Cable Containment Work scope under Station and Ancillary building Contract including Secondary Cable Containment
  • 5.
    5 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) FOR WESTERN AREA SITE LOCATION ST1 0 ST1 1 ST1 2 ST1 3 ST1 5 ST1 6 ST1 7 ST1 8 ST1 9 ST2 0 ST2 1 ST2 2 ST2 3 (PKGE 9) ST2 5 ST2 6 ST1 4 WESTERN PHASE UG JOHAN SETIA DEPOT GS 9 GS 10 GS 8 GS 9 GS 8 GS 10 GS 7 GS 7 GS 6 GS 6 GS 5 GS 5 ST2 4 (PKGE 10) (PKGE 8) (PKGE 7) (PKGE 5) (PKGE 6) WESTERN PHASE GUIEDWAYS TRACK AREA (3.382 km) (2.305 km) (4.016 km) (4.157km) (2.692km) (4.976 km) (2.635km) 21.858KM Total of Length Track Area Involved Total No of Track Area Involved PACKAGE S GUIEDWA YS & STATION PHASE LOCATION PACKAGE 5 GS 5 WESTER N i. GUIEDWAYS STATION DATO MENTERI (ST12) TO STATION UITM SHAH ALAM (ST14) ii. GUIEDWAYS STATION UITM SHAH ALAM (ST14) TO STATION SEKSYEN 7 SHAH ALAM (ST15) PACKAGE 6 GS 6 WESTER N i. GUIEDWAYS STATION SEKSYEN 7 SHAH ALAM (ST15) TO STATION BANDAR BARU KLANG (S17) PACKAGE 7 GS 7 WESTER N i. GUIEDWAYS FROM STATION BANDAR BARU KLANG (ST17) TO STATION PASAR BESAR KLANG (ST18) ii. GUIEDWAYS FROM STATION PASAR BESAR KLANG (ST18) TO STATION JALAN MERU (ST19) iii. GUIEDWAYS FROM STATION JALAN MERU(ST19) TO STATION KLANG (ST20) PACKAGE 8 GS 8 WESTER N I. GUIEDWAYS FROM STATION KLANG (ST20) TO STATION TAMAN SELATAN (ST21) II. GUIEDWAYS FROM STATION TAMAN SELATAN (ST21) TO STATION SRI ANDALAS (ST22) III. GUIEDWAYS FROM STATION SRI ANDALAS (ST22) TO STATION KLANG JAYA (ST23) PACKAGE 9 GS 9 WESTER N i. GUIEDWAYS FROM STATION KLANG JAYA (ST23) TO STATION BANDAR BUKIT TINGGI (ST24) ii. GUIEDWAYS FROM STATION BANDAR BUKIT TINGGI (ST 24) TO STATION JOHAN SETIA (ST26) PACKAGE 10 GS 10 WESTER N i. GUIEDWAYS FROM STATION JOHAN SETIA (ST26) JOHAN SETIA DEPOT Available Stations Provisional Stations Cancelled Stations Elevated Track Underground Tunnel
  • 6.
    6 6 December 2016 LRT3| SCOPE OF WORK MAIN LINE TRACKSIDE (GUIDEWAYS) Main Cable Containment Secondary Cable Containment Main Cable Containment
  • 7.
    7 6 December 2016 LRT3| SCOPE OF WORK MAIN LINE TRACKSIDE (GUIDEWAYS) Main Cable Containment
  • 8.
    8 6 December 2016 MainCable Containment Secondary Cable Containment LRT3 | SCOPE OF WORK MAIN LINE TRACKSIDE (GUIDEWAYS)
  • 9.
    9 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 17 (GS7)
  • 10.
    10 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 18 (GS7)
  • 11.
    11 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 19 (GS7)
  • 12.
    12 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 20 (GS8)
  • 13.
    13 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) BETWEEN STATION 20 TO STATION 21 (GS8)
  • 14.
    14 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 21 (GS8)
  • 15.
    15 6 December 2016 LRT3| MAIN LINE TRACKSIDE (GUIDEWAYS) AREA STATION 22 (GS8)
  • 16.