Improving ECM Consultancy
Final presentation
Nicole van den Wildenberg
Eindhoven, TU/e, August 20th
, 2007
2 Custom presentation- or document control name
Agenda
» About the research:
» Problem definition, assignment and context
» Root causes
» Design
» Implementation
» Evaluation
» Conclusions & Recommendations
3 Custom presentation- or document control name
But first…
B I N G O
• • 921
128 •
18 • •
• •
• 789 •
4 Custom presentation- or document control name
The Research
5 Custom presentation- or document control name
Problem definition and assignment
Final problem definition:Final problem definition:
ECM business consultancy is not aligned with standards and best practices concerned with
ECM and consultancy, thus causing a gap between the ECM demand and supply interactions
on the one hand and ECM institutional design on the other. This causes sub optimization and
a lack of quality.
Final problem definition:Final problem definition:
ECM business consultancy is not aligned with standards and best practices concerned with
ECM and consultancy, thus causing a gap between the ECM demand and supply interactions
on the one hand and ECM institutional design on the other. This causes sub optimization and
a lack of quality.
Final assignment (twofold):Final assignment (twofold):
Describe how ECM business consultancy is executed in the current situation. Describe how
standards and best practices concerned with ECM and consultancy influence ECM business
consultancy. Determine the existing gap.
Align ECM business consultancy with standards and best practices concerned with ECM and
consultancy by designing a Computation Independent ECM business consultancy model and
implement the ECM business consultancy model. This closes the gap.
Final assignment (twofold):Final assignment (twofold):
Describe how ECM business consultancy is executed in the current situation. Describe how
standards and best practices concerned with ECM and consultancy influence ECM business
consultancy. Determine the existing gap.
Align ECM business consultancy with standards and best practices concerned with ECM and
consultancy by designing a Computation Independent ECM business consultancy model and
implement the ECM business consultancy model. This closes the gap.
6 Custom presentation- or document control name
Main research models and methods
» The regulative cycle with reference models
» Morioka’s triangle
» Multilevel stakeholder analysis
7 Custom presentation- or document control name
Regulative cycle + reference models
Orientation
Set of problems /
problem mess /
Problem
definition
Diagnosis
(analysis &
mapping)
Intervention
(implementation)
Plan (design)
Evaluation
benchmarking,
market &
competitor
analysis
reference model
Translation
site specific
reference model
real site
work system
8 Custom presentation- or document control name
Morioka’s triangle: the research context
Institutions
Demand side
Supply side
pull
push
Technology
Interactions
Harmonization
Legislation
Standards
9 Custom presentation- or document control name
Multilevel stakeholder analysis: problems
» Macro & meso scale: Institutions:
» ECM standards and best practices authorities: application of standards and best
practices is not a task of authorities, high variability of standards, extensive
amount of standards.
» Micro scale: Demand side:
» ECM users: impact of ECM system implementations underestimated, lack of
knowledge of standards.
» Micro scale: Supply side:
» ECM vendors: ECM systems are complex, complex requirements to ECM
systems.
» ECM system integrators: lack of a standardized way of working, lack of a
standardized method to incorporate ECM standards and best practices in the
delivery of ECM business consultancy.
» Pico scale: Supply side:
» ECM consultants: lack of standards and best practices to do the job.
10 Custom presentation- or document control name
Root causes & Opportunities
11 Custom presentation- or document control name
Root causes & Opportunities
» Root causes:
» Lack of a practicable model for applying ECM standards and best practices.
» ECM systems are complex.
» The impact of an ECM system implementation is underestimated.
» Opportunities:
» Risk reduction in the ECM strategy.
» Development of ECM business consultancy delivery by Atos Origin.
» Engaging in knowledge collaboration.
12 Custom presentation- or document control name
The Design
13 Custom presentation- or document control name
ECM consultancy activities
» Creating ECM Awareness
» Executing an ECM Scan
» Designing an Enterprise Architecture
» ECM Requirements Engineering
» ECM Software Selection
» Consultancy during an ECM implementation
» Consultancy during System Operation & Maintenance
14 Custom presentation- or document control name
Design to bridge the gap
» Design requirements:
» Implementation independent
» Practicable
» Positioned between standards/best practices
and ECM systems
» Flexible
» Add value for stakeholders
» ECM business consultancy model
» Repository
» Process
» Framework
» Organization
15 Custom presentation- or document control name
ECM business consultancy repository
16 Custom presentation- or document control name
ECM business consultancy process
» Define Stakeholders
» Define Solution goals
» Define Solution requirements
» Mapping & Selection:
» Map Requirements onto Components
» Rank Components
» Select Components
» Maintain Knowledge Base
» Feedback loops
17 Custom presentation- or document control name
ECM business consultancy framework
» Goals
» Requirements
» Technical
» Non-technical
» Components descriptions
» Maturity level
» MoSCoW
» Scoring & Mapping
Metric Description
1
1
1
3ValueOrder [Ordinal] ‘Ad-Hoc’ Workflow, advanced
workflow or BPM capabilities.
3ValueOrder =
(Satisfactory,
Acceptable, Poor)
See Figure C. 3 WfMC basic
process definition meta-model
2
2
3
4
5
3ValueOrder [Ordinal]
3ValueOrder =
(Satisfactory,
Acceptable, Poor)
2
3
4
5
6 Portability
Non-technical factor
Reliability
Usability
Efficiency
Maintainability
Security
Functionality compliance
1 Use of BPEL, BPML, SWAP, WSCI See respective definitions
Use Workflow
Suitability of Data
Accuracy
Interoperability
1
Characteristic
Functionality
Suitability
Suitability of Services
18 Custom presentation- or document control name
ECM business consultancy organization
» Model Owner: responsible for facilitating the use and maintenance of the model.
» Domain Experts: monitor change to the ECM domain and feed these back to the
knowledge base in the form of goals and requirements.
» Requirements Engineer; defines stakeholders, goals and solution requirements,
stores them in the SUD repository.
» Component Engineer: maintains the component descriptions in the knowledge
base.
19 Custom presentation- or document control name
Implementation
20 Custom presentation- or document control name
Implementation
1. Implementation of the ECM business consultancy model.
» Conversion: refine the model.
» Training: train ECM consultants in the use of the model.
» Testing and acceptance: execute a pilot and evaluate/assess the model.
2. Development of ECM business consultancy service products for Atos Origin.
» Service Products must have added value for Atos Origin and its clients.
ID Task Name Resource Names
1 Approval Sponsor
2 Kick off Sponsor
3 Enforcement
4 Arrange enforcement Sponsor
5 Write code of conduct Owner
6 Conversion
7 Coordinate conversion Owner
8 Participate in conversion ECMConsultants
9 Repository
10 Arrange repository Owner
11 Implement repository Owner
12 Arrange model maintenance Owner
13 Training
14 Arrange training Owner
15 Give initial training Owner
16 Follow training ECMConsultants
17 Service Product
18 Arrange service product development Business Development Manager
19 Coordinate/communicate with marketingBusiness Development Manager
20 Develop marketing collateral Business Development Manager
21 Pilot
22 Plan first pilot Owner
23 Execute first pilot ECMConsultants
24 Apply model ECMConsultants
25 Maintain model/feedback ECMConsultants
26 Arrange first focus group review Owner
3-9
Sponsor
3-9
Owner
Owner
ECM Consultants
Owner
Owner
Owner
Owner
Owner
ECM Consultants
Business Development Manager
Business Development Manager
Business Development Manager
Owner
ECM Consultants
ECM Consultants
ECM Consultants
Owner
29 6 14 22 30 8 16 24 1 9 17 25 3 11 19 27 4 12 20 28 5
20 Aug '07 10 Sep '07 1 Oct '07 22 Oct '07 12 Nov'07 3 Dec '07 24 Dec '07 14 Jan '08 4 Feb '08
21 Custom presentation- or document control name
The Evaluation
22 Custom presentation- or document control name
Evaluation
» Credibility: affirmation by people in the context.
» Transferability: a generic market domain model could be extended with an ECM
domain model.
» Dependability: the ECM business consultancy model is Computation Independent
and is sensitive to changes in the ECM domain.
» Confirmability: the ECM business consultancy model is based on information,
conclusions and interpretations that can be traced back to their sources.
23 Custom presentation- or document control name
Conclusions & Recommendations
24 Custom presentation- or document control name
Conclusions
Macro and meso scale: market and industries
» The alignment between the demand and supply side in the ECM market is not optimal. The
focus on technology is often too high and an alignment with an ECM user’s strategy is often
missing.
Micro scale: organizations
» The ECM business consultancy model decreases the risks of implementing suboptimal ECM
solutions.
» The starting point for any ECM implementation should be an analysis of stakeholders, goals
and requirements.
» The ECM business consultancy model can (and will) be used by Atos Origin to deliver ECM
solutions with a focus on the strategic level.
Pico scale: individual human beings
» The ECM consultants have affirmed that the ECM business consultancy model fills the
perceived lack of a practicable model for delivering consultancy.
25 Custom presentation- or document control name
Recommendations
» Implementations of the ECM business consultancy model.
» Develop one or more service products based on the ECM business consultancy
model; additionally develop a service product or solution concerned with pro-active,
flexible compliance through ECM and Business Process Management (BPM).
» Involve the Atos Origin’s Requirements Definition Center (RDC) in a review of the
ECM domain models as presented in this research.
» Review the ECM Scan based on the knowledge gained from this research.
» Extend the ECM business consultancy model with software architecting according
to the CARE/SA methodology on which the design has been based.
» Perform additional research to include traceability of requirements throughout an
entire ECM implementation.
Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish itself are registered trademarks of Atos Origin SA. August 2006
© 2006 Atos Origin. Confidential information owned by Atos Origin, to be used by the recipient only. This document or any part of it, may not be reproduced, copied,
circulated and/or distributed nor quoted without prior written approval from Atos Origin.
For more information please contact:
Nicole van den Wildenberg
m +31 (0)6 51 40 46 30
nicole.vandenwildenberg@atosorigin.com
Atos Origin Nederland B.V.
Papendorpseweg 93
3528 BJ, Utrecht
www.atosorigin.com

More Related Content

What's hot

2011 05-11 IIBA Vendor Webinar- Business Process Modeling
2011 05-11 IIBA Vendor Webinar- Business Process Modeling2011 05-11 IIBA Vendor Webinar- Business Process Modeling
2011 05-11 IIBA Vendor Webinar- Business Process ModelingTracy Cook
 
Decision model and notation (DMN standard explained. A worked example by Nick...
Decision model and notation (DMN standard explained. A worked example by Nick...Decision model and notation (DMN standard explained. A worked example by Nick...
Decision model and notation (DMN standard explained. A worked example by Nick...112Motion
 
Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1iasaglobal
 
B potential pitfalls_of_process_modeling_part_b-2
B potential pitfalls_of_process_modeling_part_b-2B potential pitfalls_of_process_modeling_part_b-2
B potential pitfalls_of_process_modeling_part_b-2Jean-François Périé
 
Introduction to DMN
Introduction to DMNIntroduction to DMN
Introduction to DMNMax Tay
 
Software Architecture: Why and What?
Software Architecture: Why and What?Software Architecture: Why and What?
Software Architecture: Why and What?Chris F Carroll
 
MCVisionWP1A_2003
MCVisionWP1A_2003MCVisionWP1A_2003
MCVisionWP1A_2003Jason Reid
 
Adam boczek 2015 agile architecture in 10 steps v1.0
Adam boczek 2015 agile architecture in 10 steps v1.0Adam boczek 2015 agile architecture in 10 steps v1.0
Adam boczek 2015 agile architecture in 10 steps v1.0iasaglobal
 
Solution design & procurement approach v1
Solution design & procurement approach v1Solution design & procurement approach v1
Solution design & procurement approach v1Doug Walters
 
The Decision Model and Notation (DMN) standard - a worked example
The Decision Model and Notation (DMN) standard - a worked exampleThe Decision Model and Notation (DMN) standard - a worked example
The Decision Model and Notation (DMN) standard - a worked exampleAviva
 
A revised TOGAF ADM for whole-of-enterprise architecture development
A revised TOGAF ADM for whole-of-enterprise architecture developmentA revised TOGAF ADM for whole-of-enterprise architecture development
A revised TOGAF ADM for whole-of-enterprise architecture developmentTetradian Consulting
 
BABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis ModelsBABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis Modelsamorshed
 
Enterprise reference architecture v1.1.ppt
Enterprise reference architecture   v1.1.pptEnterprise reference architecture   v1.1.ppt
Enterprise reference architecture v1.1.pptAhmed Fattah
 

What's hot (18)

Agile modeling
Agile modelingAgile modeling
Agile modeling
 
Enterprise architecture as practice
Enterprise architecture as practiceEnterprise architecture as practice
Enterprise architecture as practice
 
2011 05-11 IIBA Vendor Webinar- Business Process Modeling
2011 05-11 IIBA Vendor Webinar- Business Process Modeling2011 05-11 IIBA Vendor Webinar- Business Process Modeling
2011 05-11 IIBA Vendor Webinar- Business Process Modeling
 
Decision model and notation (DMN standard explained. A worked example by Nick...
Decision model and notation (DMN standard explained. A worked example by Nick...Decision model and notation (DMN standard explained. A worked example by Nick...
Decision model and notation (DMN standard explained. A worked example by Nick...
 
Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1Introduction to Enterprise Architecture and TOGAF 9.1
Introduction to Enterprise Architecture and TOGAF 9.1
 
B potential pitfalls_of_process_modeling_part_b-2
B potential pitfalls_of_process_modeling_part_b-2B potential pitfalls_of_process_modeling_part_b-2
B potential pitfalls_of_process_modeling_part_b-2
 
Introduction to DMN
Introduction to DMNIntroduction to DMN
Introduction to DMN
 
TOGAF 9 Enterprise Continuum
TOGAF 9 Enterprise ContinuumTOGAF 9 Enterprise Continuum
TOGAF 9 Enterprise Continuum
 
Software Architecture: Why and What?
Software Architecture: Why and What?Software Architecture: Why and What?
Software Architecture: Why and What?
 
MCVisionWP1A_2003
MCVisionWP1A_2003MCVisionWP1A_2003
MCVisionWP1A_2003
 
Adam boczek 2015 agile architecture in 10 steps v1.0
Adam boczek 2015 agile architecture in 10 steps v1.0Adam boczek 2015 agile architecture in 10 steps v1.0
Adam boczek 2015 agile architecture in 10 steps v1.0
 
Solution design & procurement approach v1
Solution design & procurement approach v1Solution design & procurement approach v1
Solution design & procurement approach v1
 
The Decision Model and Notation (DMN) standard - a worked example
The Decision Model and Notation (DMN) standard - a worked exampleThe Decision Model and Notation (DMN) standard - a worked example
The Decision Model and Notation (DMN) standard - a worked example
 
Business Modeling and the Business Analyst
Business Modeling and the Business AnalystBusiness Modeling and the Business Analyst
Business Modeling and the Business Analyst
 
A revised TOGAF ADM for whole-of-enterprise architecture development
A revised TOGAF ADM for whole-of-enterprise architecture developmentA revised TOGAF ADM for whole-of-enterprise architecture development
A revised TOGAF ADM for whole-of-enterprise architecture development
 
BABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis ModelsBABOK V3.0 Business Analysis Models
BABOK V3.0 Business Analysis Models
 
Introduction Virtual Reality: VDC-Whitepaper
Introduction Virtual Reality: VDC-WhitepaperIntroduction Virtual Reality: VDC-Whitepaper
Introduction Virtual Reality: VDC-Whitepaper
 
Enterprise reference architecture v1.1.ppt
Enterprise reference architecture   v1.1.pptEnterprise reference architecture   v1.1.ppt
Enterprise reference architecture v1.1.ppt
 

Viewers also liked

Estate Tax Webinar
Estate Tax WebinarEstate Tax Webinar
Estate Tax Webinarbenskjold
 
Vija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmai
Vija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmaiVija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmai
Vija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmaiSOS Children'sVillages Latvia
 
Cloud Computing
Cloud ComputingCloud Computing
Cloud Computingbenskjold
 
El casal de tebes
El casal de tebesEl casal de tebes
El casal de tebesDeborah5
 
Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...
Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...
Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...SOS Children'sVillages Latvia
 
Laila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomā
Laila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomāLaila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomā
Laila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomāSOS Children'sVillages Latvia
 
Just one word "Els MP3X"
Just  one  word "Els MP3X"Just  one  word "Els MP3X"
Just one word "Els MP3X"Asun Santos
 
Just one word "Els increïbles"
Just  one  word "Els increïbles"Just  one  word "Els increïbles"
Just one word "Els increïbles"Asun Santos
 
Improving ECM Consultancy intermediate presentation-v1.0
Improving ECM Consultancy intermediate presentation-v1.0Improving ECM Consultancy intermediate presentation-v1.0
Improving ECM Consultancy intermediate presentation-v1.0Nicole van den Wildenberg
 
Just one word "Els rockers"
Just  one  word "Els rockers"Just  one  word "Els rockers"
Just one word "Els rockers"Asun Santos
 
Just one word Els aviadors de 3r
Just  one  word Els aviadors de 3rJust  one  word Els aviadors de 3r
Just one word Els aviadors de 3rAsun Santos
 
Hypertext transfer protocol (http)
Hypertext transfer protocol (http)Hypertext transfer protocol (http)
Hypertext transfer protocol (http)johnny19910916
 

Viewers also liked (16)

Estate Tax Webinar
Estate Tax WebinarEstate Tax Webinar
Estate Tax Webinar
 
Jaunais SOS Ziņotāja numurs 2014/1 ir klāt!
Jaunais SOS Ziņotāja numurs 2014/1 ir klāt! Jaunais SOS Ziņotāja numurs 2014/1 ir klāt!
Jaunais SOS Ziņotāja numurs 2014/1 ir klāt!
 
Vija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmai
Vija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmaiVija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmai
Vija Tirzmale Labdarības organizācijas, kā “ielāps” veselības aprūpes sistēmai
 
Cloud Computing
Cloud ComputingCloud Computing
Cloud Computing
 
El casal de tebes
El casal de tebesEl casal de tebes
El casal de tebes
 
Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...
Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...
Sadarbības tīkls bērniem labākai līdzdalībai politikas veidošanas procesos - ...
 
El cuerpo humano
El cuerpo humanoEl cuerpo humano
El cuerpo humano
 
Laila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomā
Laila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomāLaila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomā
Laila Rieksta – Riekstiņa, Aktuālas problēmas bērnu tiesību jomā
 
Just one word "Els MP3X"
Just  one  word "Els MP3X"Just  one  word "Els MP3X"
Just one word "Els MP3X"
 
Just one word "Els increïbles"
Just  one  word "Els increïbles"Just  one  word "Els increïbles"
Just one word "Els increïbles"
 
Turing machine
Turing machineTuring machine
Turing machine
 
Improving ECM Consultancy intermediate presentation-v1.0
Improving ECM Consultancy intermediate presentation-v1.0Improving ECM Consultancy intermediate presentation-v1.0
Improving ECM Consultancy intermediate presentation-v1.0
 
Just one word "Els rockers"
Just  one  word "Els rockers"Just  one  word "Els rockers"
Just one word "Els rockers"
 
Just one word Els aviadors de 3r
Just  one  word Els aviadors de 3rJust  one  word Els aviadors de 3r
Just one word Els aviadors de 3r
 
Powerpoint
PowerpointPowerpoint
Powerpoint
 
Hypertext transfer protocol (http)
Hypertext transfer protocol (http)Hypertext transfer protocol (http)
Hypertext transfer protocol (http)
 

Similar to Improving ECM Consultancy final presentation-v1.0

2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_PresentationFoliage
 
Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)Mikkel Brahm
 
System Architect and Rhapsody
System Architect and RhapsodySystem Architect and Rhapsody
System Architect and RhapsodyMartin Owen
 
Quality Management and Quality Standard
Quality Management and Quality StandardQuality Management and Quality Standard
Quality Management and Quality StandardMurageppa-QA
 
Service Management Solution Framework (SMSF)
Service Management Solution Framework (SMSF)Service Management Solution Framework (SMSF)
Service Management Solution Framework (SMSF)Malcolm Ryder
 
Simulanis Corporate Presentation
Simulanis Corporate PresentationSimulanis Corporate Presentation
Simulanis Corporate PresentationRavi Yadav
 
Business Analyst Online Training in Hyderabad, India
Business Analyst Online Training in Hyderabad, IndiaBusiness Analyst Online Training in Hyderabad, India
Business Analyst Online Training in Hyderabad, Indiaunited global soft
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' Alan Martin Redmond, PhD
 
Production System Design Support - Accialini Training & Consulting
Production System Design Support - Accialini Training & ConsultingProduction System Design Support - Accialini Training & Consulting
Production System Design Support - Accialini Training & ConsultingNicola Accialini
 
Business Analyst Online training in hyderabad, India, USA, UK, Australia, sa...
Business Analyst Online training in hyderabad,  India, USA, UK, Australia, sa...Business Analyst Online training in hyderabad,  India, USA, UK, Australia, sa...
Business Analyst Online training in hyderabad, India, USA, UK, Australia, sa...United Global Soft
 
Ecom Nets Technologies
Ecom Nets TechnologiesEcom Nets Technologies
Ecom Nets Technologiesnveeravalli
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Are You an Accidental or Intentional Architect?
Are You an Accidental or Intentional Architect?Are You an Accidental or Intentional Architect?
Are You an Accidental or Intentional Architect?iasaglobal
 
Construction Supply Chain Management
Construction Supply Chain ManagementConstruction Supply Chain Management
Construction Supply Chain ManagementFayssal AL-KILANI
 
Software Professional Services Project Management
Software Professional Services Project ManagementSoftware Professional Services Project Management
Software Professional Services Project ManagementChuck Crafton
 
itSMF 2020 - Business Analyzis
itSMF 2020 - Business AnalyzisitSMF 2020 - Business Analyzis
itSMF 2020 - Business AnalyzisitSMF Belgium
 

Similar to Improving ECM Consultancy final presentation-v1.0 (20)

2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
2016_GarrettThurstonModelBasedEnterpriseCOE_Presentation
 
Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)Architecting the Enterprise (in a SAFe Context)
Architecting the Enterprise (in a SAFe Context)
 
REQB® - Advanced Level Requirements Manager
REQB® - Advanced Level Requirements ManagerREQB® - Advanced Level Requirements Manager
REQB® - Advanced Level Requirements Manager
 
COBIT®5 - Assessor
COBIT®5 - AssessorCOBIT®5 - Assessor
COBIT®5 - Assessor
 
Oracle Fusion HCM Fixed Scope Offering
Oracle Fusion HCM Fixed Scope OfferingOracle Fusion HCM Fixed Scope Offering
Oracle Fusion HCM Fixed Scope Offering
 
System Architect and Rhapsody
System Architect and RhapsodySystem Architect and Rhapsody
System Architect and Rhapsody
 
Quality Management and Quality Standard
Quality Management and Quality StandardQuality Management and Quality Standard
Quality Management and Quality Standard
 
Service Management Solution Framework (SMSF)
Service Management Solution Framework (SMSF)Service Management Solution Framework (SMSF)
Service Management Solution Framework (SMSF)
 
Simulanis Corporate Presentation
Simulanis Corporate PresentationSimulanis Corporate Presentation
Simulanis Corporate Presentation
 
Business Analyst Online Training in Hyderabad, India
Business Analyst Online Training in Hyderabad, IndiaBusiness Analyst Online Training in Hyderabad, India
Business Analyst Online Training in Hyderabad, India
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
 
Production System Design Support - Accialini Training & Consulting
Production System Design Support - Accialini Training & ConsultingProduction System Design Support - Accialini Training & Consulting
Production System Design Support - Accialini Training & Consulting
 
Business Analyst Online training in hyderabad, India, USA, UK, Australia, sa...
Business Analyst Online training in hyderabad,  India, USA, UK, Australia, sa...Business Analyst Online training in hyderabad,  India, USA, UK, Australia, sa...
Business Analyst Online training in hyderabad, India, USA, UK, Australia, sa...
 
Ecom Nets Technologies
Ecom Nets TechnologiesEcom Nets Technologies
Ecom Nets Technologies
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
Project Planning & Feasibility Study
Project Planning & Feasibility StudyProject Planning & Feasibility Study
Project Planning & Feasibility Study
 
Are You an Accidental or Intentional Architect?
Are You an Accidental or Intentional Architect?Are You an Accidental or Intentional Architect?
Are You an Accidental or Intentional Architect?
 
Construction Supply Chain Management
Construction Supply Chain ManagementConstruction Supply Chain Management
Construction Supply Chain Management
 
Software Professional Services Project Management
Software Professional Services Project ManagementSoftware Professional Services Project Management
Software Professional Services Project Management
 
itSMF 2020 - Business Analyzis
itSMF 2020 - Business AnalyzisitSMF 2020 - Business Analyzis
itSMF 2020 - Business Analyzis
 

Recently uploaded

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Recently uploaded (20)

The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Improving ECM Consultancy final presentation-v1.0

  • 1. Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish itself are registered trademarks of Atos Origin SA. August 2006 © 2006 Atos Origin. Confidential information owned by Atos Origin, to be used by the recipient only. This document or any part of it, may not be reproduced, copied, circulated and/or distributed nor quoted without prior written approval from Atos Origin. Improving ECM Consultancy Final presentation Nicole van den Wildenberg Eindhoven, TU/e, August 20th , 2007
  • 2. 2 Custom presentation- or document control name Agenda » About the research: » Problem definition, assignment and context » Root causes » Design » Implementation » Evaluation » Conclusions & Recommendations
  • 3. 3 Custom presentation- or document control name But first… B I N G O • • 921 128 • 18 • • • • • 789 •
  • 4. 4 Custom presentation- or document control name The Research
  • 5. 5 Custom presentation- or document control name Problem definition and assignment Final problem definition:Final problem definition: ECM business consultancy is not aligned with standards and best practices concerned with ECM and consultancy, thus causing a gap between the ECM demand and supply interactions on the one hand and ECM institutional design on the other. This causes sub optimization and a lack of quality. Final problem definition:Final problem definition: ECM business consultancy is not aligned with standards and best practices concerned with ECM and consultancy, thus causing a gap between the ECM demand and supply interactions on the one hand and ECM institutional design on the other. This causes sub optimization and a lack of quality. Final assignment (twofold):Final assignment (twofold): Describe how ECM business consultancy is executed in the current situation. Describe how standards and best practices concerned with ECM and consultancy influence ECM business consultancy. Determine the existing gap. Align ECM business consultancy with standards and best practices concerned with ECM and consultancy by designing a Computation Independent ECM business consultancy model and implement the ECM business consultancy model. This closes the gap. Final assignment (twofold):Final assignment (twofold): Describe how ECM business consultancy is executed in the current situation. Describe how standards and best practices concerned with ECM and consultancy influence ECM business consultancy. Determine the existing gap. Align ECM business consultancy with standards and best practices concerned with ECM and consultancy by designing a Computation Independent ECM business consultancy model and implement the ECM business consultancy model. This closes the gap.
  • 6. 6 Custom presentation- or document control name Main research models and methods » The regulative cycle with reference models » Morioka’s triangle » Multilevel stakeholder analysis
  • 7. 7 Custom presentation- or document control name Regulative cycle + reference models Orientation Set of problems / problem mess / Problem definition Diagnosis (analysis & mapping) Intervention (implementation) Plan (design) Evaluation benchmarking, market & competitor analysis reference model Translation site specific reference model real site work system
  • 8. 8 Custom presentation- or document control name Morioka’s triangle: the research context Institutions Demand side Supply side pull push Technology Interactions Harmonization Legislation Standards
  • 9. 9 Custom presentation- or document control name Multilevel stakeholder analysis: problems » Macro & meso scale: Institutions: » ECM standards and best practices authorities: application of standards and best practices is not a task of authorities, high variability of standards, extensive amount of standards. » Micro scale: Demand side: » ECM users: impact of ECM system implementations underestimated, lack of knowledge of standards. » Micro scale: Supply side: » ECM vendors: ECM systems are complex, complex requirements to ECM systems. » ECM system integrators: lack of a standardized way of working, lack of a standardized method to incorporate ECM standards and best practices in the delivery of ECM business consultancy. » Pico scale: Supply side: » ECM consultants: lack of standards and best practices to do the job.
  • 10. 10 Custom presentation- or document control name Root causes & Opportunities
  • 11. 11 Custom presentation- or document control name Root causes & Opportunities » Root causes: » Lack of a practicable model for applying ECM standards and best practices. » ECM systems are complex. » The impact of an ECM system implementation is underestimated. » Opportunities: » Risk reduction in the ECM strategy. » Development of ECM business consultancy delivery by Atos Origin. » Engaging in knowledge collaboration.
  • 12. 12 Custom presentation- or document control name The Design
  • 13. 13 Custom presentation- or document control name ECM consultancy activities » Creating ECM Awareness » Executing an ECM Scan » Designing an Enterprise Architecture » ECM Requirements Engineering » ECM Software Selection » Consultancy during an ECM implementation » Consultancy during System Operation & Maintenance
  • 14. 14 Custom presentation- or document control name Design to bridge the gap » Design requirements: » Implementation independent » Practicable » Positioned between standards/best practices and ECM systems » Flexible » Add value for stakeholders » ECM business consultancy model » Repository » Process » Framework » Organization
  • 15. 15 Custom presentation- or document control name ECM business consultancy repository
  • 16. 16 Custom presentation- or document control name ECM business consultancy process » Define Stakeholders » Define Solution goals » Define Solution requirements » Mapping & Selection: » Map Requirements onto Components » Rank Components » Select Components » Maintain Knowledge Base » Feedback loops
  • 17. 17 Custom presentation- or document control name ECM business consultancy framework » Goals » Requirements » Technical » Non-technical » Components descriptions » Maturity level » MoSCoW » Scoring & Mapping Metric Description 1 1 1 3ValueOrder [Ordinal] ‘Ad-Hoc’ Workflow, advanced workflow or BPM capabilities. 3ValueOrder = (Satisfactory, Acceptable, Poor) See Figure C. 3 WfMC basic process definition meta-model 2 2 3 4 5 3ValueOrder [Ordinal] 3ValueOrder = (Satisfactory, Acceptable, Poor) 2 3 4 5 6 Portability Non-technical factor Reliability Usability Efficiency Maintainability Security Functionality compliance 1 Use of BPEL, BPML, SWAP, WSCI See respective definitions Use Workflow Suitability of Data Accuracy Interoperability 1 Characteristic Functionality Suitability Suitability of Services
  • 18. 18 Custom presentation- or document control name ECM business consultancy organization » Model Owner: responsible for facilitating the use and maintenance of the model. » Domain Experts: monitor change to the ECM domain and feed these back to the knowledge base in the form of goals and requirements. » Requirements Engineer; defines stakeholders, goals and solution requirements, stores them in the SUD repository. » Component Engineer: maintains the component descriptions in the knowledge base.
  • 19. 19 Custom presentation- or document control name Implementation
  • 20. 20 Custom presentation- or document control name Implementation 1. Implementation of the ECM business consultancy model. » Conversion: refine the model. » Training: train ECM consultants in the use of the model. » Testing and acceptance: execute a pilot and evaluate/assess the model. 2. Development of ECM business consultancy service products for Atos Origin. » Service Products must have added value for Atos Origin and its clients. ID Task Name Resource Names 1 Approval Sponsor 2 Kick off Sponsor 3 Enforcement 4 Arrange enforcement Sponsor 5 Write code of conduct Owner 6 Conversion 7 Coordinate conversion Owner 8 Participate in conversion ECMConsultants 9 Repository 10 Arrange repository Owner 11 Implement repository Owner 12 Arrange model maintenance Owner 13 Training 14 Arrange training Owner 15 Give initial training Owner 16 Follow training ECMConsultants 17 Service Product 18 Arrange service product development Business Development Manager 19 Coordinate/communicate with marketingBusiness Development Manager 20 Develop marketing collateral Business Development Manager 21 Pilot 22 Plan first pilot Owner 23 Execute first pilot ECMConsultants 24 Apply model ECMConsultants 25 Maintain model/feedback ECMConsultants 26 Arrange first focus group review Owner 3-9 Sponsor 3-9 Owner Owner ECM Consultants Owner Owner Owner Owner Owner ECM Consultants Business Development Manager Business Development Manager Business Development Manager Owner ECM Consultants ECM Consultants ECM Consultants Owner 29 6 14 22 30 8 16 24 1 9 17 25 3 11 19 27 4 12 20 28 5 20 Aug '07 10 Sep '07 1 Oct '07 22 Oct '07 12 Nov'07 3 Dec '07 24 Dec '07 14 Jan '08 4 Feb '08
  • 21. 21 Custom presentation- or document control name The Evaluation
  • 22. 22 Custom presentation- or document control name Evaluation » Credibility: affirmation by people in the context. » Transferability: a generic market domain model could be extended with an ECM domain model. » Dependability: the ECM business consultancy model is Computation Independent and is sensitive to changes in the ECM domain. » Confirmability: the ECM business consultancy model is based on information, conclusions and interpretations that can be traced back to their sources.
  • 23. 23 Custom presentation- or document control name Conclusions & Recommendations
  • 24. 24 Custom presentation- or document control name Conclusions Macro and meso scale: market and industries » The alignment between the demand and supply side in the ECM market is not optimal. The focus on technology is often too high and an alignment with an ECM user’s strategy is often missing. Micro scale: organizations » The ECM business consultancy model decreases the risks of implementing suboptimal ECM solutions. » The starting point for any ECM implementation should be an analysis of stakeholders, goals and requirements. » The ECM business consultancy model can (and will) be used by Atos Origin to deliver ECM solutions with a focus on the strategic level. Pico scale: individual human beings » The ECM consultants have affirmed that the ECM business consultancy model fills the perceived lack of a practicable model for delivering consultancy.
  • 25. 25 Custom presentation- or document control name Recommendations » Implementations of the ECM business consultancy model. » Develop one or more service products based on the ECM business consultancy model; additionally develop a service product or solution concerned with pro-active, flexible compliance through ECM and Business Process Management (BPM). » Involve the Atos Origin’s Requirements Definition Center (RDC) in a review of the ECM domain models as presented in this research. » Review the ECM Scan based on the knowledge gained from this research. » Extend the ECM business consultancy model with software architecting according to the CARE/SA methodology on which the design has been based. » Perform additional research to include traceability of requirements throughout an entire ECM implementation.
  • 26. Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish itself are registered trademarks of Atos Origin SA. August 2006 © 2006 Atos Origin. Confidential information owned by Atos Origin, to be used by the recipient only. This document or any part of it, may not be reproduced, copied, circulated and/or distributed nor quoted without prior written approval from Atos Origin. For more information please contact: Nicole van den Wildenberg m +31 (0)6 51 40 46 30 nicole.vandenwildenberg@atosorigin.com Atos Origin Nederland B.V. Papendorpseweg 93 3528 BJ, Utrecht www.atosorigin.com

Editor's Notes

  1. 921 = het aantal keren dat ECM voorkomt in mijn afstudeerscriptie 128 = het aantal afkorting in de afkortingenlijst 18 = aantal ECM software leveranciers in het Gartner kwadrant van 2006) met de overnam van Stellent door Oracle: 17) 789 = aantal CMS pakketten dat momenteel op CMS Matrix.org met elkaar vergeleken kan worden.