Production
System Design
Nicola Accialini
Accialini Training & Consulting 2
About
• As industrial competition increases, it becomes more apparent that
improved levels of output, efficiency and quality can only be
achieved by designing better production systems rather than by
merely exercising greater control over existing ones.
• The design of a production system comprises a linked set of
widely ranging activities and involves problems common to a
variety of situations, regardless of the technology and process
being used.
• Different systems are possible, but there is no one choice the best
fit to everyone: indeed, the production systems must be designed
according to specific requirements, boundaries and assumptions
to predict the market change.
Accialini Training & Consulting
• Design new high-efficient production systems
• Improve efficiency of existing production
systems
• Reduce production costs
• Improve product quality
• Deliver on-time
3
The Objectives
Accialini Training & Consulting 4
The Opportunity
• Develop a bespoke production line that best fits
internal and external requirements and
boundaries;
• Combine state-of-the-art approaches and new
technologies.
Accialini Training & Consulting 5
The Solution
• Implement a well-structured design approach
• Exploit new digital technologies (e.g. Discrete
Event Simulation and Virtual Reality tools) to
support the design team in the decision-
making process
• Perform a workload balance analysis
• Implement a proper layout
• Iterate the process to get the best result
possible
Accialini Training & Consulting 6
Our Proposal
• ATC has developed a full work package to support your
organization.
• Based on the definition of stakeholders’ requirements, physical
boundaries (e.g. space and budget available) and company
expectations, the production sequence can be assessed by adding
more and more details.
• Once the method has been preliminary defined, then a Discrete
Event Simulation (DES) should be performed. This step is highly
recommended in any case, but especially for complex systems.
• A DES can be then used to perform a workload balance analysis as
well. If the production line is relatively simple, to cut some costs the
DES can be substituted using a structured excel file, although some
useful information will be missed.
Accialini Training & Consulting 7
Our Proposal
• Next step will be the lay-out definition, which might involve
some creativity. Indeed, there is no one lay-out that fits best for
everyone, but it must be tailored for each organization. Some
examples of lay-out include:
• Flow line
• Single Routing Cell
• Multi-Routing Cell
• Process Based
• Once the sequence, method and layout has been defined and
modeled, Virtual Reality can be used to support the bought-off
of the final design. It is worth to mentioned that this is an
iterative process, and normally it takes few iteration to reach
the desired result.
Accialini Training & Consulting 8
Why ATC
• ATC is able to provide the right support to your team in
designing new production systems or in improving existing
ones. ATC has collected 10+ years of experience in
developing high-quality critical modules in the aerospace
industry, more specifically accessory and power gearboxes for
aeroengines, which are probably the most critical parts of an
airplane.
• Additionally, in the past 4 years I spent most of the time in
implementing a new assembly facility for a power transmission
which is setting new standards in the aerospace industry. This
project has been developed in collaboration with research
centers in the UK, exploiting digital tools that, contrary to
popular belief, are affordable to SME.
Accialini Training & Consulting 9
The Approach
• Our execution strategy incorporates proven
methodologies, extremely qualified personnel, and a
highly responsive approach to managing deliverables.
• Our execution strategy aims primarily to provide the
organization the proper support in designing new
production systems or in the improvement of existing
ones. The details of the approach will be described in the
following section.
Accialini Training & Consulting 10
Requirements Definition
• The first step implies the definition of the production
system requirements like, but not limited to:
• Space availability
• Product Variation
• Max throughput
• Budget availability
• Overall Equipment Effectiveness
• In this sense, using a proper method and right tools
becomes essential to achieve the expected result.
Typically, this step can be performed remotely.
Accialini Training & Consulting 11
Preliminary Project Plan
• Once the requirements have been defined and project
boundaries understood, a preliminary plan can be defined. This
will be in a form of an excel file and it will include the following
information:
• List of activities;
• Resources and required skills;
• Time schedule;
• Budget.
Accialini Training & Consulting 12
Preliminary analysis of the
manufacturing/assembly sequence
• The second step implies a preliminary analysis of the
manufacturing and/or assembly steps of all the products in
the line/cell. This phase is critical, because it affects all the
downstream steps. This includes:
• Number of steps embedded in the process;
• Type of machines and/or required equipment.
Accialini Training & Consulting 13
Detail definition of the
manufacturing/assembly sequence
• The fourth step is probably the most time consuming and
implies a detail definition of the overall manufacturing and/or
assembly process, including, but not limited to:
• set-up, transportation and process time;
• type and numbers of machines, fixture, tools;
• type and number of workers;
• estimated moving time between different stations;
• corrosion prevention solution (if required);
• cleaning solution;
• lifting solution;
• transportation solution;
• storing solution.
Accialini Training & Consulting 14
Discrete Event Simulation
• The Discrete-Event Simulation (DES) is a very powerful tool
which is used to size and estimate key indicators.
• Key indicators are:
• max throughput;
• identify bottlenecks;
• production cost;
• lead time
• machine and workers utilization
• productivity.
• ATC will not provide a DES, but it is recommended to be
done in outsourcing, due to the both the complexity of the
topic and the software license cost. However, ATC will
support you and act as interface to speed up the process.
Accialini Training & Consulting 15
Workload balance analysis
• When a DES model is available, a workload balance is
pretty straightforward.
• This analysis it is recommended to reduce the time waste
associated with inefficiencies within the line, since it is
recommended that all stations last pretty much the same
amount of time.
Accialini Training & Consulting 16
Layout Definition
• Once the DES activity is completed, it is time to design the
lay-out that best fits to our requirements. This step is
typically performed in a form of a workshop. Typical
solutions include:
• Flow line
• Single Routing Cell
• Multi-Routing Cell
• Process Based
• Moreover, each solution includes different variants,
depending on specific needs.
Accialini Training & Consulting 17
Process Simulation
• Process Simulation is a useful approach to analyze
important factors like:
• Ergonomics
• Space utilization
• Collision
• Fixture size
• Similar to Discrete Event Simulation, ATC will not provide
any Process Simulation, but can recommend advise the
right tool to use and be the interface with the external
provider. Additionally, it is worth to mention that Process
Simulation can be skipped in case the client doesn’t
require such level of detail.
Accialini Training & Consulting 18
Virtual Build Event
• The Virtual Build Event (VBE) consists in a 1 or 2 day
workshop in which the team and stakeholders assess the
final concept by exploiting Virtual Reality capability. This
implies that the entire process has been modeled in 3D.
ATC will not provide 3D modeling, which can be done
internally or externally.
• Once the model is ready, it can be exported to be used with
Virtual Reality Equipment. ATC can recommend the most
suitable and affordable VR Kit on the market, but won’t
provide such equipment by itself.
• Recommendations from the VBE will be then implemented
in the Production System model, and a second VBE should
be taken to buy-off the final solution.
Accialini Training & Consulting 19
Benefits
• Financial
• Reduce the iterations associated with production system
design
• Reduce overall costs associated with production system
design
• Reduce wastes associated to poor production system
design
• Technical
• High Quality Production System delivery
Accialini Training & Consulting
• If you are interested, please submit these few information
and help us to tailor the service to fit best to your needs:
• Work package: How would you prefer to run the project?
• DES: Would you like to perform a DES?
• DES: Do you have any preference in terms of software?
• DES: Do you have any company preference for outsourcing?
20
Request a Quotation
□No preference □Yes, use this:________________________________________
□No preference □Yes, use this:________________________________________
□Yes (recommended) □No, I don’t think I need it
□Only online □Mainly online □Mainly on-site □Only on-site
Accialini Training & Consulting 21
Request a Quotation
• Company name: __________________________________
• Please send a copy of this page to the following email:
nicola@accialiniconsulting.com
• Process Simulation: Are you interested in performing a
process simulation?
• Process Simulation: If yes, what type of simulation would
you like to perform?
• Process Simulation: Do you have any preferred software?
• Process Simulation: Do you have any preferred company?
□Yes (recommended) □No, I don’t think I need it
□Ergonomics □Multiphysics □Kinematics
□No preference □Yes, use this:________________________________________
□No preference □Yes, use this:________________________________________

More Related Content

What's hot

Ruud Teunissen - Personal Test Improvement - Dealing with the Future
Ruud Teunissen - Personal Test Improvement -  Dealing with the FutureRuud Teunissen - Personal Test Improvement -  Dealing with the Future
Ruud Teunissen - Personal Test Improvement - Dealing with the FutureTEST Huddle
 
Week 6: chris piccin lean - 042417 - day 2
Week 6: chris piccin   lean - 042417 - day 2Week 6: chris piccin   lean - 042417 - day 2
Week 6: chris piccin lean - 042417 - day 2Talou Diallo
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturingAmar Borkute
 
Agile India 2015 Conference - Scaling agile in a mainframe product developm...
Agile India 2015 Conference  -  Scaling agile in a mainframe product developm...Agile India 2015 Conference  -  Scaling agile in a mainframe product developm...
Agile India 2015 Conference - Scaling agile in a mainframe product developm...PoojaUppalapati
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comclaric212
 
5a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 20125a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 2012kimsach
 
Ibm innovate adoption of continuous delivery at scale at a large telco - pr...
Ibm innovate   adoption of continuous delivery at scale at a large telco - pr...Ibm innovate   adoption of continuous delivery at scale at a large telco - pr...
Ibm innovate adoption of continuous delivery at scale at a large telco - pr...Mirco Hering
 
Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011ExerciseLeanLLC
 
460 operations - 4.6
460   operations - 4.6460   operations - 4.6
460 operations - 4.6Kyle Bakken
 
Literature review - Data mining and Business Intelligence in Manufacturing
Literature review - Data mining and Business Intelligence in ManufacturingLiterature review - Data mining and Business Intelligence in Manufacturing
Literature review - Data mining and Business Intelligence in ManufacturingAbhishek Nandgaonkar
 
Agile Journey to agile
Agile   Journey to agileAgile   Journey to agile
Agile Journey to agileBrijesh Prabhakar
 
Offshore Software Development company India
Offshore Software Development company IndiaOffshore Software Development company India
Offshore Software Development company Indiarahulkwebvirtue
 

What's hot (15)

Ruud Teunissen - Personal Test Improvement - Dealing with the Future
Ruud Teunissen - Personal Test Improvement -  Dealing with the FutureRuud Teunissen - Personal Test Improvement -  Dealing with the Future
Ruud Teunissen - Personal Test Improvement - Dealing with the Future
 
Week 6: chris piccin lean - 042417 - day 2
Week 6: chris piccin   lean - 042417 - day 2Week 6: chris piccin   lean - 042417 - day 2
Week 6: chris piccin lean - 042417 - day 2
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Agile India 2015 Conference - Scaling agile in a mainframe product developm...
Agile India 2015 Conference  -  Scaling agile in a mainframe product developm...Agile India 2015 Conference  -  Scaling agile in a mainframe product developm...
Agile India 2015 Conference - Scaling agile in a mainframe product developm...
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.com
 
5a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 20125a session 5a_jit systems cfvg 2012
5a session 5a_jit systems cfvg 2012
 
Ibm innovate adoption of continuous delivery at scale at a large telco - pr...
Ibm innovate   adoption of continuous delivery at scale at a large telco - pr...Ibm innovate   adoption of continuous delivery at scale at a large telco - pr...
Ibm innovate adoption of continuous delivery at scale at a large telco - pr...
 
Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011Lean Manufacturing Exam Questions Mar 2011
Lean Manufacturing Exam Questions Mar 2011
 
460 operations - 4.6
460   operations - 4.6460   operations - 4.6
460 operations - 4.6
 
Literature review - Data mining and Business Intelligence in Manufacturing
Literature review - Data mining and Business Intelligence in ManufacturingLiterature review - Data mining and Business Intelligence in Manufacturing
Literature review - Data mining and Business Intelligence in Manufacturing
 
Agile Journey to agile
Agile   Journey to agileAgile   Journey to agile
Agile Journey to agile
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Offshore Software Development company India
Offshore Software Development company IndiaOffshore Software Development company India
Offshore Software Development company India
 
Wcm & am
Wcm & amWcm & am
Wcm & am
 

Similar to Production System Design Support - Accialini Training & Consulting

Gear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & ConsultingGear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & ConsultingNicola Accialini
 
Operation management_process strategies
Operation management_process strategies Operation management_process strategies
Operation management_process strategies Roshaan Rosh
 
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization ProblemsAddressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization Problemsoptimizatiodirectdirect
 
Software Project management
Software Project managementSoftware Project management
Software Project managementsameer farooq
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementationTerry Bunio
 
7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with AutomationWorksoft
 
Point ofview devops
Point ofview devopsPoint ofview devops
Point ofview devopsReshmi Nandy
 
Microservices at Scale: How to Reduce Overhead and Increase Developer Product...
Microservices at Scale: How to Reduce Overhead and Increase Developer Product...Microservices at Scale: How to Reduce Overhead and Increase Developer Product...
Microservices at Scale: How to Reduce Overhead and Increase Developer Product...DevOps.com
 
DevopsBusinessCaseTemplate
DevopsBusinessCaseTemplateDevopsBusinessCaseTemplate
DevopsBusinessCaseTemplatePeter Lamar
 
Cognizant's Zero Deviation Life Cycle - an Overview
Cognizant's Zero Deviation Life Cycle - an OverviewCognizant's Zero Deviation Life Cycle - an Overview
Cognizant's Zero Deviation Life Cycle - an OverviewDr. Bippin Makoond
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionDevOps.com
 
Smart solutions for productivity gain IQA conference 2017
Smart solutions for productivity gain   IQA conference 2017Smart solutions for productivity gain   IQA conference 2017
Smart solutions for productivity gain IQA conference 2017Steve Franklin
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturingTonny Danny
 
MCVisionWP1A_2003
MCVisionWP1A_2003MCVisionWP1A_2003
MCVisionWP1A_2003Jason Reid
 
Trends in software testing by Eka TechServ
Trends in software testing  by Eka TechServTrends in software testing  by Eka TechServ
Trends in software testing by Eka TechServekatechserv
 
OPS 571 GENIUS Education Counseling--ops571genius.com
OPS 571 GENIUS Education Counseling--ops571genius.comOPS 571 GENIUS Education Counseling--ops571genius.com
OPS 571 GENIUS Education Counseling--ops571genius.comvenkat60040
 
OPS 571 GENIUS Inspiring Innovation--ops571genius.com
OPS 571 GENIUS Inspiring Innovation--ops571genius.comOPS 571 GENIUS Inspiring Innovation--ops571genius.com
OPS 571 GENIUS Inspiring Innovation--ops571genius.comkopiko111
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionJayavendhanJ
 

Similar to Production System Design Support - Accialini Training & Consulting (20)

Gear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & ConsultingGear Manufacturing Support - Accialini Training & Consulting
Gear Manufacturing Support - Accialini Training & Consulting
 
Operation management_process strategies
Operation management_process strategies Operation management_process strategies
Operation management_process strategies
 
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization ProblemsAddressing Uncertainty How to Model and Solve Energy Optimization Problems
Addressing Uncertainty How to Model and Solve Energy Optimization Problems
 
Software Project management
Software Project managementSoftware Project management
Software Project management
 
Sdec10 lean package implementation
Sdec10 lean package implementationSdec10 lean package implementation
Sdec10 lean package implementation
 
7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation7 Tips from Siemens Energy for Success with Automation
7 Tips from Siemens Energy for Success with Automation
 
Point ofview devops
Point ofview devopsPoint ofview devops
Point ofview devops
 
Microservices at Scale: How to Reduce Overhead and Increase Developer Product...
Microservices at Scale: How to Reduce Overhead and Increase Developer Product...Microservices at Scale: How to Reduce Overhead and Increase Developer Product...
Microservices at Scale: How to Reduce Overhead and Increase Developer Product...
 
DevopsBusinessCaseTemplate
DevopsBusinessCaseTemplateDevopsBusinessCaseTemplate
DevopsBusinessCaseTemplate
 
Cognizant's Zero Deviation Life Cycle - an Overview
Cognizant's Zero Deviation Life Cycle - an OverviewCognizant's Zero Deviation Life Cycle - an Overview
Cognizant's Zero Deviation Life Cycle - an Overview
 
Critical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management SolutionCritical steps in Determining Your Value Stream Management Solution
Critical steps in Determining Your Value Stream Management Solution
 
Smart solutions for productivity gain IQA conference 2017
Smart solutions for productivity gain   IQA conference 2017Smart solutions for productivity gain   IQA conference 2017
Smart solutions for productivity gain IQA conference 2017
 
CAD _ UNIT 1.pptx
CAD _ UNIT 1.pptxCAD _ UNIT 1.pptx
CAD _ UNIT 1.pptx
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturing
 
MCVisionWP1A_2003
MCVisionWP1A_2003MCVisionWP1A_2003
MCVisionWP1A_2003
 
Trends in software testing by Eka TechServ
Trends in software testing  by Eka TechServTrends in software testing  by Eka TechServ
Trends in software testing by Eka TechServ
 
OPS 571 GENIUS Education Counseling--ops571genius.com
OPS 571 GENIUS Education Counseling--ops571genius.comOPS 571 GENIUS Education Counseling--ops571genius.com
OPS 571 GENIUS Education Counseling--ops571genius.com
 
OPS 571 GENIUS Inspiring Innovation--ops571genius.com
OPS 571 GENIUS Inspiring Innovation--ops571genius.comOPS 571 GENIUS Inspiring Innovation--ops571genius.com
OPS 571 GENIUS Inspiring Innovation--ops571genius.com
 
The Devops Handbook
The Devops HandbookThe Devops Handbook
The Devops Handbook
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I Introduction
 

Recently uploaded

Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7Ayesha Khan
 
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceCall Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceAyesha Khan
 
Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712Delhi Escorts Service
 
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaDelhi Escorts Service
 
NASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALLNASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALLNiteshKumar82226
 
Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...
Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...
Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...riyaescorts54
 
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...Ayesha Khan
 
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...Ayesha Khan
 
BHOPAL CALL GIRL 92628*71154 BHOPAL CALL
BHOPAL CALL GIRL 92628*71154 BHOPAL CALLBHOPAL CALL GIRL 92628*71154 BHOPAL CALL
BHOPAL CALL GIRL 92628*71154 BHOPAL CALLNiteshKumar82226
 
(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)
(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)
(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)riyaescorts54
 
Call Girls in Calangute Beach 8588052666 Goa Escorts ...
Call Girls in Calangute Beach 8588052666 Goa Escorts ...Call Girls in Calangute Beach 8588052666 Goa Escorts ...
Call Girls in Calangute Beach 8588052666 Goa Escorts ...nishakur201
 
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vipCall Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vipAyesha Khan
 
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7Ayesha Khan
 
NAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALLNAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALLNiteshKumar82226
 
Call Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash Payment
Call Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash PaymentCall Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash Payment
Call Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash Paymentaakahthapa70
 
Call Girls In Sector 76 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 76 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 76 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 76 Noida 9711911712 Escorts ServiCe NoidaDelhi Escorts Service
 
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCRsoniya singh
 
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCRthapariya601
 

Recently uploaded (20)

Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
 
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceCall Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
 
Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712
Call Girls In Sector 90, (Gurgaon) Call Us. 9711911712
 
CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990
CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990
CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990
 
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 85 Noida 9711911712 Escorts ServiCe Noida
 
NASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALLNASHIK CALL GIRL 92628*71154 NASHIK CALL
NASHIK CALL GIRL 92628*71154 NASHIK CALL
 
Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...
Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...
Hot Vip Call Girls Service In Sector 149,9818099198 Young Female Escorts Serv...
 
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
 
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
 
BHOPAL CALL GIRL 92628*71154 BHOPAL CALL
BHOPAL CALL GIRL 92628*71154 BHOPAL CALLBHOPAL CALL GIRL 92628*71154 BHOPAL CALL
BHOPAL CALL GIRL 92628*71154 BHOPAL CALL
 
(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)
(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)
(9818099198) Call Girls In Noida Sector 88 (NOIDA ESCORTS)
 
Call Girls in Calangute Beach 8588052666 Goa Escorts ...
Call Girls in Calangute Beach 8588052666 Goa Escorts ...Call Girls in Calangute Beach 8588052666 Goa Escorts ...
Call Girls in Calangute Beach 8588052666 Goa Escorts ...
 
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vipCall Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
 
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
 
NAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALLNAGPUR CALL GIRL 92628*71154 NAGPUR CALL
NAGPUR CALL GIRL 92628*71154 NAGPUR CALL
 
Call Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash Payment
Call Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash PaymentCall Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash Payment
Call Girls In {Aerocity Delhi} 9667938988 Cheap Price Your Budget & Cash Payment
 
Call Girls In Sector 76 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 76 Noida 9711911712 Escorts ServiCe NoidaCall Girls In Sector 76 Noida 9711911712 Escorts ServiCe Noida
Call Girls In Sector 76 Noida 9711911712 Escorts ServiCe Noida
 
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Noida Sector 62 🔝 Delhi NCR
 
9953056974 Low Rate Call Girls Delhi NCR
9953056974 Low Rate Call Girls Delhi NCR9953056974 Low Rate Call Girls Delhi NCR
9953056974 Low Rate Call Girls Delhi NCR
 
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
9643097474 Full Enjoy @24/7 Call Girls in Paschim Vihar Delhi NCR
 

Production System Design Support - Accialini Training & Consulting

  • 1. Accialini Training & Consulting Senior Consultant Production System Design Nicola Accialini
  • 2. Accialini Training & Consulting 2 About • As industrial competition increases, it becomes more apparent that improved levels of output, efficiency and quality can only be achieved by designing better production systems rather than by merely exercising greater control over existing ones. • The design of a production system comprises a linked set of widely ranging activities and involves problems common to a variety of situations, regardless of the technology and process being used. • Different systems are possible, but there is no one choice the best fit to everyone: indeed, the production systems must be designed according to specific requirements, boundaries and assumptions to predict the market change.
  • 3. Accialini Training & Consulting • Design new high-efficient production systems • Improve efficiency of existing production systems • Reduce production costs • Improve product quality • Deliver on-time 3 The Objectives
  • 4. Accialini Training & Consulting 4 The Opportunity • Develop a bespoke production line that best fits internal and external requirements and boundaries; • Combine state-of-the-art approaches and new technologies.
  • 5. Accialini Training & Consulting 5 The Solution • Implement a well-structured design approach • Exploit new digital technologies (e.g. Discrete Event Simulation and Virtual Reality tools) to support the design team in the decision- making process • Perform a workload balance analysis • Implement a proper layout • Iterate the process to get the best result possible
  • 6. Accialini Training & Consulting 6 Our Proposal • ATC has developed a full work package to support your organization. • Based on the definition of stakeholders’ requirements, physical boundaries (e.g. space and budget available) and company expectations, the production sequence can be assessed by adding more and more details. • Once the method has been preliminary defined, then a Discrete Event Simulation (DES) should be performed. This step is highly recommended in any case, but especially for complex systems. • A DES can be then used to perform a workload balance analysis as well. If the production line is relatively simple, to cut some costs the DES can be substituted using a structured excel file, although some useful information will be missed.
  • 7. Accialini Training & Consulting 7 Our Proposal • Next step will be the lay-out definition, which might involve some creativity. Indeed, there is no one lay-out that fits best for everyone, but it must be tailored for each organization. Some examples of lay-out include: • Flow line • Single Routing Cell • Multi-Routing Cell • Process Based • Once the sequence, method and layout has been defined and modeled, Virtual Reality can be used to support the bought-off of the final design. It is worth to mentioned that this is an iterative process, and normally it takes few iteration to reach the desired result.
  • 8. Accialini Training & Consulting 8 Why ATC • ATC is able to provide the right support to your team in designing new production systems or in improving existing ones. ATC has collected 10+ years of experience in developing high-quality critical modules in the aerospace industry, more specifically accessory and power gearboxes for aeroengines, which are probably the most critical parts of an airplane. • Additionally, in the past 4 years I spent most of the time in implementing a new assembly facility for a power transmission which is setting new standards in the aerospace industry. This project has been developed in collaboration with research centers in the UK, exploiting digital tools that, contrary to popular belief, are affordable to SME.
  • 9. Accialini Training & Consulting 9 The Approach • Our execution strategy incorporates proven methodologies, extremely qualified personnel, and a highly responsive approach to managing deliverables. • Our execution strategy aims primarily to provide the organization the proper support in designing new production systems or in the improvement of existing ones. The details of the approach will be described in the following section.
  • 10. Accialini Training & Consulting 10 Requirements Definition • The first step implies the definition of the production system requirements like, but not limited to: • Space availability • Product Variation • Max throughput • Budget availability • Overall Equipment Effectiveness • In this sense, using a proper method and right tools becomes essential to achieve the expected result. Typically, this step can be performed remotely.
  • 11. Accialini Training & Consulting 11 Preliminary Project Plan • Once the requirements have been defined and project boundaries understood, a preliminary plan can be defined. This will be in a form of an excel file and it will include the following information: • List of activities; • Resources and required skills; • Time schedule; • Budget.
  • 12. Accialini Training & Consulting 12 Preliminary analysis of the manufacturing/assembly sequence • The second step implies a preliminary analysis of the manufacturing and/or assembly steps of all the products in the line/cell. This phase is critical, because it affects all the downstream steps. This includes: • Number of steps embedded in the process; • Type of machines and/or required equipment.
  • 13. Accialini Training & Consulting 13 Detail definition of the manufacturing/assembly sequence • The fourth step is probably the most time consuming and implies a detail definition of the overall manufacturing and/or assembly process, including, but not limited to: • set-up, transportation and process time; • type and numbers of machines, fixture, tools; • type and number of workers; • estimated moving time between different stations; • corrosion prevention solution (if required); • cleaning solution; • lifting solution; • transportation solution; • storing solution.
  • 14. Accialini Training & Consulting 14 Discrete Event Simulation • The Discrete-Event Simulation (DES) is a very powerful tool which is used to size and estimate key indicators. • Key indicators are: • max throughput; • identify bottlenecks; • production cost; • lead time • machine and workers utilization • productivity. • ATC will not provide a DES, but it is recommended to be done in outsourcing, due to the both the complexity of the topic and the software license cost. However, ATC will support you and act as interface to speed up the process.
  • 15. Accialini Training & Consulting 15 Workload balance analysis • When a DES model is available, a workload balance is pretty straightforward. • This analysis it is recommended to reduce the time waste associated with inefficiencies within the line, since it is recommended that all stations last pretty much the same amount of time.
  • 16. Accialini Training & Consulting 16 Layout Definition • Once the DES activity is completed, it is time to design the lay-out that best fits to our requirements. This step is typically performed in a form of a workshop. Typical solutions include: • Flow line • Single Routing Cell • Multi-Routing Cell • Process Based • Moreover, each solution includes different variants, depending on specific needs.
  • 17. Accialini Training & Consulting 17 Process Simulation • Process Simulation is a useful approach to analyze important factors like: • Ergonomics • Space utilization • Collision • Fixture size • Similar to Discrete Event Simulation, ATC will not provide any Process Simulation, but can recommend advise the right tool to use and be the interface with the external provider. Additionally, it is worth to mention that Process Simulation can be skipped in case the client doesn’t require such level of detail.
  • 18. Accialini Training & Consulting 18 Virtual Build Event • The Virtual Build Event (VBE) consists in a 1 or 2 day workshop in which the team and stakeholders assess the final concept by exploiting Virtual Reality capability. This implies that the entire process has been modeled in 3D. ATC will not provide 3D modeling, which can be done internally or externally. • Once the model is ready, it can be exported to be used with Virtual Reality Equipment. ATC can recommend the most suitable and affordable VR Kit on the market, but won’t provide such equipment by itself. • Recommendations from the VBE will be then implemented in the Production System model, and a second VBE should be taken to buy-off the final solution.
  • 19. Accialini Training & Consulting 19 Benefits • Financial • Reduce the iterations associated with production system design • Reduce overall costs associated with production system design • Reduce wastes associated to poor production system design • Technical • High Quality Production System delivery
  • 20. Accialini Training & Consulting • If you are interested, please submit these few information and help us to tailor the service to fit best to your needs: • Work package: How would you prefer to run the project? • DES: Would you like to perform a DES? • DES: Do you have any preference in terms of software? • DES: Do you have any company preference for outsourcing? 20 Request a Quotation □No preference □Yes, use this:________________________________________ □No preference □Yes, use this:________________________________________ □Yes (recommended) □No, I don’t think I need it □Only online □Mainly online □Mainly on-site □Only on-site
  • 21. Accialini Training & Consulting 21 Request a Quotation • Company name: __________________________________ • Please send a copy of this page to the following email: nicola@accialiniconsulting.com • Process Simulation: Are you interested in performing a process simulation? • Process Simulation: If yes, what type of simulation would you like to perform? • Process Simulation: Do you have any preferred software? • Process Simulation: Do you have any preferred company? □Yes (recommended) □No, I don’t think I need it □Ergonomics □Multiphysics □Kinematics □No preference □Yes, use this:________________________________________ □No preference □Yes, use this:________________________________________