3. Aerzener Maschinenfabrik GmbH 3 Aerzen Asia / March 2011
Delta Hybrid - Bearings
• Patented Design
• Extremely Durable
(Lasts 60,000 hours)
• High Speed & Temperature
4. Aerzener Maschinenfabrik GmbH 4 Aerzen Asia / March 2011
Why Delta Hybrid?
Energy efficiency is an important issue world-wide and in almost all
branches
… not only for environmental reasons
… but mainly for financial reasons!
5. Aerzener Maschinenfabrik GmbH 5 Aerzen Asia / March 2011
Application example Lafarge, Karsdorf:
Production of
1.6 million tons
cement/year
Energy consumption
of
190 million kWh/year
Energy efficiency using Delta Hybrid
6. Aerzener Maschinenfabrik GmbH 6 Aerzen Asia / March 2011
Previous Blower Line Up in Lafarge, Karsdorf:
Use of 35 Aerzen
blowers and 20
compressors:
Loosen
Mix
Transport
(Packing)
7. Aerzener Maschinenfabrik GmbH 7 Aerzen Asia / March 2011
Aerzen Delta Hybrid Solution
Application of Delta Hybrid
since 2007:
Size D62S
0.8 bar
35 m³/min
Continuous operation
8. Aerzener Maschinenfabrik GmbH 8 Aerzen Asia / March 2011
Saving potential:
12,68 kW x 8.000 h = 101.440 kW/year
101.440 kW/year x 35 blowers = 3,55 million kW/year
Aerzen ROI Calculator
9. Aerzener Maschinenfabrik GmbH 9 Aerzen Asia / March 2011
Saving potential:
35 x 10,145.00 = 355,075.00 Euro/year
35 x 91,380.00 = 3,198,300.00 Euro/LCC
Neben der Qualität in Konstruktion und Fertigung unserer Produkte legt die
Aerzener Maschinenfabrik besonderen Wert auf die Vertriebs- und
Serviceorganisation
Im einzelnen bedeutet das für Sie:
anhand eines kurzen Videofilms möchte ich Ihnen nun noch einige
„bewegte“ Eindrücke unseres Unternehmens geben