RESUME HUZEFA CYCLEWALA
E-mail: huzef51@gmail.com
Phone: 91-9819128319
CAREER PROFILE
Objective
I have been looking for an organization that offers me a challenging work environment
wherein I can apply my technical, communication skills & experience to help achieve the
organization’s success. I would like to be a member of an organization that believes and matches
my belief in teamwork, positive aggression, open outlook and embracing technology innovation for
empowering its employees to exceed their potential.
Career Summary
 2.8 years of experience of testing E-commerce sites (Oracle ATG, Demand ware and
Magento)
 Expertise in automating test cases and creating and maintaining test Automation
framework and tools using Selenium web driver
 Proficient in software testing life cycle including test strategy preparation, test plan
development , test cases creation , test execution and bug tracking
 Experienced in Manual/Functional testing, Automation Testing.
 Experienced in different type of testing for example black box testing , Functional testing,
GUI testing , System testing, Integration testing, Exploratory, Risk-Based, Sanity,
Regression, End-to-End Testing.
 Experienced in waterfall and agile development process
 Having excellent documentation skills in defining and creating new user stories and
business flows.
 Test-to-Break attitude, Quick grasping & Pro-Active, Professional with value added
attitudes
 Excellent written, verbal communication including negotiation skills & client/business facing
skills
 Experienced in effective defect tracking and reporting, to improve the communications and
reduce delay.
 Enjoy learning new tools and technologies
Work Experience
 Worked in the Logixal Solution PVT LTD as QA Engineer from Sept 2013 to June 2015
 Presently working as QA engineer in Adapty Solution PVT LTD, Mumbai since July 2015 to
till date.
Professional Qualification
Degree University / Institute % and Year of Graduation
HSC University / Institute % and Year of Graduation
SSC University / Institute % and Year of Graduation
Technical Skills
 Testing Domain Oracle ATG, E-commerce, E-learning
 Testing Technique
Manual testing, Automation testing Black box, Integration,
Verification & Validation, UAT, Functional, Regression, System, GUI
 Automation Tools Selenium IDE, Selenium Web driver, Testng
 Testing Technique
Manual testing, Automation testing Black box, Integration,
Verification &validation , UAT, Functional, Regression, System,
GUI
 Defect Tracking Tools JIRA, Testlink1.8.4, Bugzilla3.4.4
 Operating System Windows XP, Windows 7, Windows 8, MS-Office 2007 , MAC
 Testing Devices Laptop, Tablet, Mobile
 Database MS-SQL, Oracle 9i
 Browser Internet Explorer, Mozilla Firefox, Google Chrome, Safari
FUNCTIONAL SKILLS
 Understanding the technical & functional specifications of FRS
 Preparation, execution and maintenance of Test Scripts by using Selenium web driver.
 Writing and Peer reviewing of RTM and Test Cases.
 Having sound knowledge on Software Testing Life Cycle.
Project 1:
Organization Adapty solution
Project Murcia
Role Test Engineer
Period Dec - 2015 to till date
Methodology Waterfall
Technologies Manual Testing and Reporting tool (Trac)
Domain Magento
Client Murcia
Team size 10
Description:
Murcia is an e-commerce portal developed on Magento. This portal is primarily
used by end users to buy handbags and other products. Application has client and admin
logins, the admin module helps in managing the entire back-end activities like members,
Handbags/items, orders, shopping process for Guest customer etc.
Responsibilities:
 Understanding the Client Requirements and functionality of the system.
 Involved in Manually Testing the application and involved in End to End testing
 Involved in Functional, Regression testing, system testing.
 Involved in various documentation tasks such as daily status report, weekly progress report
and defect logs.
 Preparing Defect tracking and reporting the defects to the developer.
 Retesting the defects and cases where defect has been raised.
 Participated in enhancement meetings, daily status meeting and various other meetings which
were focused on making the application more effective.
Project 2:
Organization Adapty solution
Project BARNEYS (BNY & WHS)
Role Test Engineer
Period Jul 2015 to till date
Methodology Waterfall
Technologies Manual Testing & Automation testing & Reporting tool (Jira)
Domain E- commerce – Oracle ATG
Client BARNEYS
Team size 30
Description:
Barneys New York is an American chain of luxury department stores headquartered
in New York City. The chain owns flagship stores in New York City, Beverly Hills, and Chicago, all of
which have restaurants operated by third parties. Smaller stores can be in other locations found
across the United States. Brands sold include a number of high-end labels such as Saint Laurent
Paris, The Row, Balenciaga, Owens, Burberry, Dries Van Noten, Thom Browne, and Bettanin &
Ventura, as well as Barneys private label merchandise.
Responsibilities:
 Understanding the Client Requirements and functionality of the system.
 Involved in preparing the traceability matrix and mapping functional requirements with test
cases.
 Prepared test cases for Desktop , I Pad & Mobile according to the functional design and use
FRS
 Involved in Manually Testing the application by executing test cases and involved in End to
End testing
 Involved in Functional, Regression testing, system testing.
 Involved in various documentation tasks such as daily status report, weekly progress report
and defect logs.
 Preparing Defect tracking and reporting the defects to the developer.
 Retesting the defects and cases where defect has been raised.
 Participated in enhancement meetings, daily status meeting and various other meetings which
were focused on making the application more effective.
 Writing Test scripts and functions wherever necessary for various units of the business
modules.
Project 3:
Organization Adapty solution
Project BARNEYS (BNY & WHS) Support
Role Test Engineer
Period Mar 2015 to till date
Methodology Waterfall
Technologies Manual Testing & Automation testing & Reporting tool (Jira)
Domain E- commerce - Demand ware
Client BARNEYS
Description:
Barneys New York is an American chain of luxury department stores headquartered
in New York City. The chain owns flagship stores in New York City, Beverly Hills, and Chicago, all of
which have restaurants operated by third parties. Smaller stores can be in other locations found
across the United States. Brands sold include a number of high-end labels such as Saint Laurent
Paris, The Row, Balenciaga, Owens, Burberry, Dries Van Noten, Thom Browne, and Bettanin &
Ventura, as well as Barneys private label merchandise.
Responsibilities:
 Create test cases for the Jira ticket for the particular sprint release
 Test each ticket which is present in the sprint release
 Regression testing once all the defect has been closed on QA environment
 Regression testing on the production once the sprint is released
 Test each Jira ticket on desktop and devices (I Pad & I Phone)
Project 4:
Organization Adapty solution
Project BARNEYS (BNY & WHS) SITE Gap Analysis & Support
Role Test Engineer
Period Nov 2014 to Mar 2015
Methodology Waterfall
Technologies Manual Testing & Automation testing & Reporting tool (Jira)
Domain E- commerce - Demand ware
Client BARNEYS
Description:
Barneys New York is an American chain of luxury department stores headquartered in New York
City. The chain owns flagship stores in New York City, Beverly Hills, and Chicago, all of which
have restaurants operated by third parties. Smaller stores can be in other locations found across
the United States. Brands sold include a number of high-end labels such as Saint Laurent Paris,
The Row, Balenciaga, Owens, Burberry, Dries Van Noten, Thom Browne, and Bettanin & Ventura,
as well as Barneys private label merchandise.
Responsibilities:
 Understanding the Client Requirements and functionality of the system
 Prepared test cases for Desktop, IPAD & Mobile according to the functional design and use
FRS
 Involved in Manually Testing the application by executing test cases and involved in End to
End testing
 Execution of integration, system and functionality test cases & actively involved in Smoke and
Regression Testing.
 Involved in various documentation tasks such as daily status report, weekly progress report
and defect logs.
 Extensively used JIRA for test planning & bug tracking and reporting.
 Participated in enhancement meetings, daily status meeting and various other meetings which
were focused on making the application more effective.
 Writing Test scripts and functions wherever necessary for various units of the business
modules.
Project 5:
Organization Adapty solution
Project Redesign VSI site (Oracle ATG 9.3 to 10.2)
Role Test Engineer
Period Feb 2014 to Nov 2014
Methodology Waterfall
Technologies Oracle ATG (E- Commerce)
Client The Vitamin Shoppe
Team size 20
Description:
The Vitamin Shoppe (formally Vitamin Shoppe Industries, Inc.) is an e-commerce portal
developed on jsp. This portal is primarily used by end users to buy nutritional supplements and
manage their shopping cart. In this project we need to redesign the Full site as well as Mobile site for
VSI.
Responsibilities:
 Understanding the Client Requirements and functionality of the system.
 Involved in preparing the traceability matrix and mapping functional requirements with test
cases.
 Prepared test cases for web & Mobile according to the functional design and use FRS
 Involved in Manually Testing the application by executing test cases and involved in End to
End testing
 Involved in Functional, Regression testing, system testing.
 Involved in various documentation tasks such as daily status report, weekly progress report
and defect logs.
 Preparing Defect tracking and reporting the defects to the developer.
 Retesting the defects and cases where defect has been raised.
 Participated in enhancement meetings, daily status meeting and various other meetings which
were focused on making the application more effective.
 Writing Test scripts and functions wherever necessary for various units of the business
modules.
Project 6:
Organization Logixal Solution
Project Mobile (Endeca and Local inventory)
Duration Nov’ 13 – Feb’ 14
Team Size 5
Client VSI
Domain E-Commerce (Oracle ATG)
Role: Test Engineer
Description:
The Vitamin Shoppe (formally Vitamin Shoppe Industries, Inc.) is an e-commerce
portal developed on jsp. This portal is primarily used by end users to buy nutritional supplements
and manage their shopping cart. In this project we need to test on the mobile site and search
result for the supplements displaying to the customer is coming from Endeca experience manager
and SKU available in inventory.
Responsibilities:
 Understanding the Client Requirements and functionality of the system.
 RTM and Test cases preparation for mobile as per the FRS and design.
 Involved in Manually Testing the application by executing test cases and involved in End to
End testing
 Involved in Functional, Regression testing, system testing
 Extensively used JIRA for test planning & bug tracking and reporting.
 Retesting the defects and cases where defect has been raised.
Project 7:
Organization Logixal Solution
Project Guest checkout functionality
Duration Aug’ 13 – Nov’ 13
Team Size 5
Client VSI
Domain E-Commerce (Oracle ATG)
Role: Test Engineer
Description:
The Vitamin Shoppe (formally Vitamin Shoppe Industries, Inc.) is an e-commerce
portal developed on jsp. This portal is primarily used by end users to buy nutritional supplements
and manage their shopping cart. Application has client and admin logins, the admin module helps
in managing the entire back-end activities like members, supplements/items, orders, shopping
process for Guest customer.
.
Responsibilities:
 Prepared and executed test cases for Web and Mobile according to the functional design and
use FRS & identifying applications functionality, test requirements and coverage.
 Involved in Manually Testing the application by executing test cases and involved in End to
End testing
 Execution of integration, system and functionality test cases & actively involved in Smoke and
Regression Testing.
 Involved in various documentation tasks such as daily status report, weekly progress report
and defect logs.
 Logging and tracking the Defects.
 Assisting the developers to closure of the defects.
Huzefa CycleWala_Resume

Huzefa CycleWala_Resume

  • 1.
    RESUME HUZEFA CYCLEWALA E-mail:huzef51@gmail.com Phone: 91-9819128319 CAREER PROFILE Objective I have been looking for an organization that offers me a challenging work environment wherein I can apply my technical, communication skills & experience to help achieve the organization’s success. I would like to be a member of an organization that believes and matches my belief in teamwork, positive aggression, open outlook and embracing technology innovation for empowering its employees to exceed their potential. Career Summary  2.8 years of experience of testing E-commerce sites (Oracle ATG, Demand ware and Magento)  Expertise in automating test cases and creating and maintaining test Automation framework and tools using Selenium web driver  Proficient in software testing life cycle including test strategy preparation, test plan development , test cases creation , test execution and bug tracking  Experienced in Manual/Functional testing, Automation Testing.  Experienced in different type of testing for example black box testing , Functional testing, GUI testing , System testing, Integration testing, Exploratory, Risk-Based, Sanity, Regression, End-to-End Testing.  Experienced in waterfall and agile development process  Having excellent documentation skills in defining and creating new user stories and business flows.  Test-to-Break attitude, Quick grasping & Pro-Active, Professional with value added attitudes  Excellent written, verbal communication including negotiation skills & client/business facing skills  Experienced in effective defect tracking and reporting, to improve the communications and reduce delay.  Enjoy learning new tools and technologies Work Experience  Worked in the Logixal Solution PVT LTD as QA Engineer from Sept 2013 to June 2015  Presently working as QA engineer in Adapty Solution PVT LTD, Mumbai since July 2015 to till date.
  • 2.
    Professional Qualification Degree University/ Institute % and Year of Graduation HSC University / Institute % and Year of Graduation SSC University / Institute % and Year of Graduation Technical Skills  Testing Domain Oracle ATG, E-commerce, E-learning  Testing Technique Manual testing, Automation testing Black box, Integration, Verification & Validation, UAT, Functional, Regression, System, GUI  Automation Tools Selenium IDE, Selenium Web driver, Testng  Testing Technique Manual testing, Automation testing Black box, Integration, Verification &validation , UAT, Functional, Regression, System, GUI  Defect Tracking Tools JIRA, Testlink1.8.4, Bugzilla3.4.4  Operating System Windows XP, Windows 7, Windows 8, MS-Office 2007 , MAC  Testing Devices Laptop, Tablet, Mobile  Database MS-SQL, Oracle 9i  Browser Internet Explorer, Mozilla Firefox, Google Chrome, Safari
  • 3.
    FUNCTIONAL SKILLS  Understandingthe technical & functional specifications of FRS  Preparation, execution and maintenance of Test Scripts by using Selenium web driver.  Writing and Peer reviewing of RTM and Test Cases.  Having sound knowledge on Software Testing Life Cycle. Project 1: Organization Adapty solution Project Murcia Role Test Engineer Period Dec - 2015 to till date Methodology Waterfall Technologies Manual Testing and Reporting tool (Trac) Domain Magento Client Murcia Team size 10 Description: Murcia is an e-commerce portal developed on Magento. This portal is primarily used by end users to buy handbags and other products. Application has client and admin logins, the admin module helps in managing the entire back-end activities like members, Handbags/items, orders, shopping process for Guest customer etc. Responsibilities:  Understanding the Client Requirements and functionality of the system.  Involved in Manually Testing the application and involved in End to End testing  Involved in Functional, Regression testing, system testing.  Involved in various documentation tasks such as daily status report, weekly progress report and defect logs.  Preparing Defect tracking and reporting the defects to the developer.  Retesting the defects and cases where defect has been raised.  Participated in enhancement meetings, daily status meeting and various other meetings which were focused on making the application more effective.
  • 4.
    Project 2: Organization Adaptysolution Project BARNEYS (BNY & WHS) Role Test Engineer Period Jul 2015 to till date Methodology Waterfall Technologies Manual Testing & Automation testing & Reporting tool (Jira) Domain E- commerce – Oracle ATG Client BARNEYS Team size 30 Description: Barneys New York is an American chain of luxury department stores headquartered in New York City. The chain owns flagship stores in New York City, Beverly Hills, and Chicago, all of which have restaurants operated by third parties. Smaller stores can be in other locations found across the United States. Brands sold include a number of high-end labels such as Saint Laurent Paris, The Row, Balenciaga, Owens, Burberry, Dries Van Noten, Thom Browne, and Bettanin & Ventura, as well as Barneys private label merchandise. Responsibilities:  Understanding the Client Requirements and functionality of the system.  Involved in preparing the traceability matrix and mapping functional requirements with test cases.  Prepared test cases for Desktop , I Pad & Mobile according to the functional design and use FRS  Involved in Manually Testing the application by executing test cases and involved in End to End testing  Involved in Functional, Regression testing, system testing.  Involved in various documentation tasks such as daily status report, weekly progress report and defect logs.  Preparing Defect tracking and reporting the defects to the developer.  Retesting the defects and cases where defect has been raised.  Participated in enhancement meetings, daily status meeting and various other meetings which were focused on making the application more effective.  Writing Test scripts and functions wherever necessary for various units of the business modules.
  • 5.
    Project 3: Organization Adaptysolution Project BARNEYS (BNY & WHS) Support Role Test Engineer Period Mar 2015 to till date Methodology Waterfall Technologies Manual Testing & Automation testing & Reporting tool (Jira) Domain E- commerce - Demand ware Client BARNEYS Description: Barneys New York is an American chain of luxury department stores headquartered in New York City. The chain owns flagship stores in New York City, Beverly Hills, and Chicago, all of which have restaurants operated by third parties. Smaller stores can be in other locations found across the United States. Brands sold include a number of high-end labels such as Saint Laurent Paris, The Row, Balenciaga, Owens, Burberry, Dries Van Noten, Thom Browne, and Bettanin & Ventura, as well as Barneys private label merchandise. Responsibilities:  Create test cases for the Jira ticket for the particular sprint release  Test each ticket which is present in the sprint release  Regression testing once all the defect has been closed on QA environment  Regression testing on the production once the sprint is released  Test each Jira ticket on desktop and devices (I Pad & I Phone) Project 4: Organization Adapty solution Project BARNEYS (BNY & WHS) SITE Gap Analysis & Support Role Test Engineer Period Nov 2014 to Mar 2015 Methodology Waterfall Technologies Manual Testing & Automation testing & Reporting tool (Jira) Domain E- commerce - Demand ware Client BARNEYS Description: Barneys New York is an American chain of luxury department stores headquartered in New York City. The chain owns flagship stores in New York City, Beverly Hills, and Chicago, all of which have restaurants operated by third parties. Smaller stores can be in other locations found across the United States. Brands sold include a number of high-end labels such as Saint Laurent Paris,
  • 6.
    The Row, Balenciaga,Owens, Burberry, Dries Van Noten, Thom Browne, and Bettanin & Ventura, as well as Barneys private label merchandise. Responsibilities:  Understanding the Client Requirements and functionality of the system  Prepared test cases for Desktop, IPAD & Mobile according to the functional design and use FRS  Involved in Manually Testing the application by executing test cases and involved in End to End testing  Execution of integration, system and functionality test cases & actively involved in Smoke and Regression Testing.  Involved in various documentation tasks such as daily status report, weekly progress report and defect logs.  Extensively used JIRA for test planning & bug tracking and reporting.  Participated in enhancement meetings, daily status meeting and various other meetings which were focused on making the application more effective.  Writing Test scripts and functions wherever necessary for various units of the business modules. Project 5: Organization Adapty solution Project Redesign VSI site (Oracle ATG 9.3 to 10.2) Role Test Engineer Period Feb 2014 to Nov 2014 Methodology Waterfall Technologies Oracle ATG (E- Commerce) Client The Vitamin Shoppe Team size 20 Description: The Vitamin Shoppe (formally Vitamin Shoppe Industries, Inc.) is an e-commerce portal developed on jsp. This portal is primarily used by end users to buy nutritional supplements and manage their shopping cart. In this project we need to redesign the Full site as well as Mobile site for VSI. Responsibilities:  Understanding the Client Requirements and functionality of the system.  Involved in preparing the traceability matrix and mapping functional requirements with test cases.  Prepared test cases for web & Mobile according to the functional design and use FRS  Involved in Manually Testing the application by executing test cases and involved in End to End testing  Involved in Functional, Regression testing, system testing.  Involved in various documentation tasks such as daily status report, weekly progress report
  • 7.
    and defect logs. Preparing Defect tracking and reporting the defects to the developer.  Retesting the defects and cases where defect has been raised.  Participated in enhancement meetings, daily status meeting and various other meetings which were focused on making the application more effective.  Writing Test scripts and functions wherever necessary for various units of the business modules. Project 6: Organization Logixal Solution Project Mobile (Endeca and Local inventory) Duration Nov’ 13 – Feb’ 14 Team Size 5 Client VSI Domain E-Commerce (Oracle ATG) Role: Test Engineer Description: The Vitamin Shoppe (formally Vitamin Shoppe Industries, Inc.) is an e-commerce portal developed on jsp. This portal is primarily used by end users to buy nutritional supplements and manage their shopping cart. In this project we need to test on the mobile site and search result for the supplements displaying to the customer is coming from Endeca experience manager and SKU available in inventory. Responsibilities:  Understanding the Client Requirements and functionality of the system.  RTM and Test cases preparation for mobile as per the FRS and design.  Involved in Manually Testing the application by executing test cases and involved in End to End testing  Involved in Functional, Regression testing, system testing  Extensively used JIRA for test planning & bug tracking and reporting.  Retesting the defects and cases where defect has been raised.
  • 8.
    Project 7: Organization LogixalSolution Project Guest checkout functionality Duration Aug’ 13 – Nov’ 13 Team Size 5 Client VSI Domain E-Commerce (Oracle ATG) Role: Test Engineer Description: The Vitamin Shoppe (formally Vitamin Shoppe Industries, Inc.) is an e-commerce portal developed on jsp. This portal is primarily used by end users to buy nutritional supplements and manage their shopping cart. Application has client and admin logins, the admin module helps in managing the entire back-end activities like members, supplements/items, orders, shopping process for Guest customer. . Responsibilities:  Prepared and executed test cases for Web and Mobile according to the functional design and use FRS & identifying applications functionality, test requirements and coverage.  Involved in Manually Testing the application by executing test cases and involved in End to End testing  Execution of integration, system and functionality test cases & actively involved in Smoke and Regression Testing.  Involved in various documentation tasks such as daily status report, weekly progress report and defect logs.  Logging and tracking the Defects.  Assisting the developers to closure of the defects.