Managing a clinical drug trial is an endeavor, filled with complex recording, scheduling and reporting requirements. The effort becomes more convoluted when the trial involves multiple drugs from multiple manufacturers. Though tools and methodologies are readily available for single drug trials, approaches to multi-drug trials are generally a cobbling together of tools and methodologies that may not be optimal.
Fortunately, Jira is an ideal tool for managing more complex clinical trials. We'll show how Jira was tailored to track the full path of a multi-year, multi-drug clinical trial. Leveraging Jira workflows and automation, a solution was crafted to track all stages of the trial, handle issue and schedule creation based on required protocols, and provide traceability.
3. Study
Backgrounder
Intro
Collaborate
Oversight
A Collaborative and Unique Effort
• Worldwide collaboration of research institutions and
pharmaceutical companies
• Patients and families contributed input into trial
design
• Adaptive platform trial with more than one therapy
13. Solution
Found
Complex
Model
Goals
Inspiration for Implementation
• Atlassian’s Dan Radigan’s “Jira for Asset
Management” was published in March 2014.
• Jira issues represented assets in a organization
(computers, printers, etc)
• The workflow for that Jira issue represented the
life-cycle of that asset
• Links between Jira issues associate assets with
locations, people, etc
41. Drug Arm G
Workflow
G GROUP
G SCAN READY
G A 7 PREP
G AMENDMENT 4
G AMENDMENT 7 PREP
• Creates more events (like other amendments)
• Workflow transition also removes events to correct
protocol for the rest of the trial
• (Amendment 5 does similar add / delete actions too)
44. Get Your Info
Dashboards
JQL
Summary
All Events for Participant
Project = PE and “Subject Number Event” = [participant id] ( and IssueType
= “Cognitive Testing )
45. Get Your Info
Dashboards
JQL
Summary
Trends in Cognitive Testing
Administration
project = "Participant Events" AND issuetype = "Cognitive Testing" AND "Cognitive
Visit Issue Notes" is not EMPTY ORDER BY "Cognitive Testing Rater" DESC
49. Wrapping up
Add-ons
Stats
Take Aways
Add-ons App
• For Participant Tracker
• Jira Suite Utilities
• Started with: ScriptRunner
Migrated to: JMWE
• Other
• Tempo Timesheets
• Jira Software
• THAT’S IT!
50. Study
Backgrounder
Important Statistics
• Exactly four years of using the tracker
• ~250 participants tracked
• ~20,000 events tracker
• 1000s of issues that are not directly tracking
participants
Add-ons
Stats
Take Aways
51. Study
Backgrounder
Add-ons
Stats
Takeaways
Takeaways
• No substantial regrets on technical implementation
• Proved to be very adaptable and dynamic to
respond to amendments
• Fulfilled goals of:
• Accountability
• Scalable (people/process)
• Dynamic Change
• Proactive monitoring
52. Thank you!
JESSI SMITH | SENIOR CRC | DIAN-TU | @JESSISMITH1024
MICHAEL MARCH | SR ATLASSIAN DUDE | ISOS TECHNOLOGY | @COWMIX