AMG ADVANCED METALLURGICAL GROUP N.V.
HOULIHAN LOKEY PRESENTATION, May 17, 2018
1
C AU TIO N ARY N O TE
THIS DOCUMENT IS STRICTLY CONFIDENTIAL AND IS BEING PROVIDED TO YOU SOLELY FOR YOUR INFORMATION BY AMG ADVANCED METALLURGICAL GROUP
N.V. (THE “COMPANY”) AND MAY NOT BE REPRODUCED IN ANY FORM OR FURTHER DISTRIBUTED TO ANY OTHER PERSON OR PUBLISHED, IN WHOLE OR IN PART,
FOR ANY PURPOSE. FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF APPLICABLE SECURITIES LAWS.
This presentation does not constitute or form part of, and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the Company
or any of its subsidiaries nor should it or any part of it, nor the fact of its distribution, form the basis of, or be relied on in connection with, any contract or commitment whatsoever.
This presentation has been prepared by, and is the sole responsibility of, the Company. This document, any presentation made in conjunction herewith and any accompanying
materials are for information only and are not a prospectus, offering circular or admission document. This presentation does not form a part of, and should not be construed as, an
offer, invitation or solicitation to subscribe for or purchase, or dispose of any of the securities of the companies mentioned in this presentation. These materials do not constitute an
offer of securities for sale in the United States or an invitation or an offer to the public or form of application to subscribe for securities. Neither this presentation nor anything
contained herein shall form the basis of, or be relied on in connection with, any offer or commitment whatsoever. The information contained in this presentation has not been
independently verified. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy or completeness of the
information or the opinions contained herein. The Company and its advisors are under no obligation to update or keep current the information contained in this presentation. To the
extent allowed by law, none of the Company or its affiliates, advisors or representatives accept any liability whatsoever (in negligence or otherwise) for any loss howsoever arising
from any use of this presentation or its contents or otherwise arising in connection with the presentation.
Certain statements in this presentation constitute forward-looking statements, including statements regarding the Company's financial position, business strategy, plans and
objectives of management for future operations. These statements, which contain the words "believe,” “expect,” “anticipate,” “intends,” “estimate,” “forecast,” “project,” “will,” “may,”
“should” and similar expressions, reflect the beliefs and expectations of the management board of directors of the Company and are subject to risks and uncertainties that may cause
actual results to differ materially. These risks and uncertainties include, among other factors, the achievement of the anticipated levels of profitability, growth, cost and synergy of the
Company’s recent acquisitions, the timely development and acceptance of new products, the impact of competitive pricing, the ability to obtain necessary regulatory approvals, and
the impact of general business and global economic conditions. These and other factors could adversely affect the outcome and financial effects of the plans and events described
herein.
Neither the Company, nor any of its respective agents, employees or advisors intend or have any duty or obligation to supplement, amend, update or revise any of the forward-
looking statements contained in this presentation.
The information and opinions contained in this document are provided as at the date of this presentation and are subject to change without notice.
This document has not been approved by any competent regulatory or supervisory authority.
2
G L O B A L T R E N D S
C O 2 e m i s s i o n r e d u c t i o n ,
p o p u l a t i o n g r o w t h ,
i n c r e a s i n g a f f l u e n c e ,
a n d e n e r g y e f f i c i e n c y
D E M A N D
I n n o v a t i v e n e w p r o d u c t s
t h a t a r e l i g h t e r ,
s t r o n g e r , a n d r e s i s t a n t t o
h i g h e r t e m p e r a t u r e s
S U P P L Y
A M G s o u r c e s , p r o c e s s e s ,
a n d s u p p l i e s t h e c r i t i c a l
m a t e r i a l s t h a t t h e m a r k e t
d e m a n d s
AMG IS A
CRITICAL
MATERIALS
COMPANY
L EAD ER IN AD VAN C ED TEC H N O L O G IES
TO AD D R ESS C O 2 R ED U C TIO N
AMG: MITIGATING TECHNOLOGIES
Products and processes saving raw
materials, energy and CO2 emissions
during manufacturing
(e.g., recycling of Ferrovanadium)
AMG: ENABLING TECHNOLOGIES
Products and processes saving
CO2 emissions during use
(e.g., light-weighting and fuel efficiency in
the aerospace and automotive industries)
A GLOBAL IMPERATIVE FOR THE 21ST CENTURY
CO2 REDUCTION
AMG AT A G L AN C E
AMG IS A GLOBAL
SUPPLIER OF
CRITICAL
MATERIALS TO:
Q1 2018 REVENUE
TRANSPORTATIONENERGY INFRASTRUCTURE SPECIALTY METALS
AND CHEMICALS
BY END MARKET: BY REGION:BY SEGMENT:
46% Europe
33% North America
16% Asia
5% ROW
19% Engineering
81% Critical
Materials
29% Infrastructure
22% Specialty Metals
& Chemicals
39% Transportation
10% Energy
Market leading producer of highly
engineered specialty metals and
vacuum furnace systems
~3,300
Employees
~$1 billion
Annual Revenues
At the forefront of
CO2 Reduction
5
H EALTH AN D SAFETY: SU STAIN ED IMPR O VEMEN T
LOST TIME INCIDENT RATE
0.82
1.04
1.12
1.19
1.95
TOTAL INCIDENT RATE
2017
2016
2015
2014
2013
1.31
1.68
2.02
2.23
3.30
6
STR ATEG IC H ISTO RY
COST
REDUCTION
SUPPLY CHAIN
EXCELLENCE
SCALING
PROFITABLE
GROWTH
PRODUCT MIX
OPTIMIZATION
TARGETED W/C
& DEBT LEVELS
Cost-reduction and
capex discipline in
response to global
economic slowdown
Competitive advantage
through manufacturing
and supply chain
excellence, accelerating
cost-reduction efforts
Properly positioned,
financially and
operationally, to pursue
growth targets across
portfolio
Streamlined operations
and improved operating
performance by
eliminating low-margin
product lines
Further reduction
in both working capital
and net debt,
strengthening the
balance sheet
2012 2013 2014 2015 2016 - 2017
7
MISSION STATEMENT
To increase long term value through industry leadership, operational expertise
and efficient deployment of capital
STRATEGIC OBJECTIVE
Identifying long term trends and leveraging those trends through technological excellence and
innovations in the indispensable areas of critical materials and vacuum technologies
PATHS TO GROWTH
Routine organic growth
of existing business lines
Non-routine expansion
of existing business lines
Transformational
projectsA B C
C U R R EN T STR ATEG Y
8
L ITH IU M & TAN TAL U M BU IL D O U T – MAY 2 0 1 8 STATU S
Structured, sequenced
approach to maximizing
the value of our Mibra
Mine asset
2017 2018
Tantalum
Spodumene
SP I
SP II
Lithium Carbonate I
PRODUCTION
CAPEX SPEND
EXPANDED PRODUCTION
CAPEX SPEND
CAPEX SPEND
PRODUCTION
202120202019
PRODUCTION
CAPEX SPEND PRODUCTION
9
L ITH IU M PR O J EC T PH ASES
Construction of a lithium
concentrate plant to produce
90,000 mt of spodumene per
year
Approved capex: $50M
Start-up has commenced
Construction of second
lithium concentrate plant,
resulting in capacity
expansion from 90,000 mt
to 180,000 mt per year
Approved capex: $110M*
Construction of lithium
chemical plants for the
downstream conversion
of lithium concentrate into
lithium carbonate
PHASE I & PHASE II PHASE III
LITHIUM CONCENTRATE PRODUCTION
LITHIUM CHEMICAL
PRODUCTION
LITHIUM CONCENTRATE
PLANT I
LITHIUM CONCENTRATE
PLANT II
LITHIUM CHEMICAL
PLANTS
*Phase II capex includes investments related to the expansion of existing tantalum operations in
addition to the development and expansion of the existing mining infrastructure
O PER ATIN G C O STS FO R SPO D U MEN E PR O D U C TIO N
0
50
100
150
200
250
300
Talison - Greenbushes
(Australia)
Pilbara - Pilgangoora
(Australia)
Altura - Pilgangoora
(Australia)
Galaxy Resources
Mt. Cattlin (Australia)
Process Minerals
Mt. Marion (Australia)
AMG
($134/mt)
Operating costs for spodumene production, 2017
($/mt)
Sources: Roskill, AMG management estimates
Notes: AMG is by-product from tantalum/feldspar production; Pilbara and Galaxy includes credits from tantalite production
Market price:
~$1,000/mt
At current market prices, AMG’s lithium concentrate projects (Spodumene I & II) would
generate annual incremental EBITDA of ~$130M at $1,000/mt
11
AMG - VAN AD IU M: O H IO EXPAN SIO N
Timeline
Cement market-
leading position
in North America
Sourcing
simplification
and inventory
reduction
Strategic Rationale
2018
• Basic engineering
• Environmental approval
• Detailed engineering and construction
2019
• Construction
• Commissioning (Q4)
2020
• Ramp-up and operation
Summary
• $35M investment to expand total spent catalyst roasting capacity by 9,000 ST in
Cambridge, Ohio facility
• 30% increase in roasting capacity to gold-standard recycling process – 99% of solids
produced throughout process are saleable material
• Well aligned with attractive vanadium market dynamics
Customers are looking for
additional recycling capacity;
expansion enables AMG-V to
take on additional spent
catalyst
Allows AMG-V to run 100% on
roasted catalyst, simplifying
sourcing process and
significantly reducing inventory
12
AMG VAN AD IU M: G O IN G G L O BAL
Partnership between two market
leaders to develop a sustainable
'cradle-to-grave' solution for catalyst
supply and reclamation
+
13
VAN AD IU M: IN VEN TO RY VS FE- V PR IC E
Slight under-supply position is forecasted to continue for the next several years,
driving down global inventories to near-record lows
14
$0
$5
$10
$15
$20
$25
$30
$35
$40
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Ryan’s Notes Fe-V Price
Vanadium Inventory
VanadiumInventory
(MonthsofConsumption)
Fe-VPrice(US$/poundFe-V)
Source for Fe-V price: CRU Ryan’s Notes – average monthly US FeV 80% V Mid
VAN AD IU M D EMAN D : C H IN ESE R EBAR
Source: China Iron & Steel Research Institute Group (CISRI) – March 2018
New standard
enacted
50,000
40,000
35,000
30,000
25,000
20,000
15,000
10,000
5,000
0
45,000
350
250
200
150
100
50
0
300
2005 2006 2007 2008 2009 2010 2011 2012 2013 2020E2019E2018E2017E201620152014
VanadiumConsumptioninChinaRebar(mt-V)
HSRebarsProduction(millionsoftons)
HS Rebars Production V-Gr.3, 60% V-Gr.3, 70% V-Gr.3, 80%
15
FER R O VAN AD IU M: 5 - YEAR PR IC E TR EN D
$0
$5
$10
$15
$20
$25
$30
$35
Ferrovanadium($perlb)
Ferrovanadium
16Source: CRU Ryan’s Notes – average monthly US FeV 80% V Mid
FIN AN C IAL H IG H L IG H TS
17
$33.0 $31.9
$27.6
$33.0
$44.5
Q1 17 Q2 17 Q3 17 Q4 17 Q1 18
$258.0 $262.0 $258.9
$280.7
$308.4
Q1 17 Q2 17 Q3 17 Q4 17 Q1 18
$52.5 $54.3 $51.3
$56.5
$70.1
Q1 17 Q2 17 Q3 17 Q4 17 Q1 18
REVENUE (IN MILLIONS OF US DOLLARS)
$81.8
$76.9
$40.5
$91.0
$104.8
Q1 17 Q2 17 Q3 17 Q4 17 Q1 18
GROSS PROFIT (IN MILLIONS OF US DOLLARS)
ORDER INTAKE (IN MILLIONS OF US DOLLARS)EBITDA (IN MILLIONS OF US DOLLARS)
20%
YoY
35%
YoY
28%
YoY
34%
YoY
FIN AN C IAL D ATA: R O C E & EBITD A
• Q1 ‘18 EBITDA up 35%
versus Q1 ‘17 due to
improved profitability
within AMG Critical
Materials
• Q1 2018 annualized ROCE
improved to 28.4% from
25.5% in Q1 2017
• ROCE improvements
are the result of efficient use
of capital and
improved profitability
Annualized ROCE
EBITDA (IN MILLIONS OF US DOLLARS)
$33.0 $31.9
$27.6
$33.0
$44.5
Q1 '17 Q2 '17 Q3 '17 Q4 '17 Q1 '18
Q1 ‘18 ROCE
IMPROVED TO
28.4% FROM
25.5% IN Q1 ‘17
Q1 ‘18 EBITDA
UP 35%
VERSUS Q1 ‘17
7.4%
11.9% 12.0%
18.8%
25.5%
28.4%
2013 2014 2015 2016 Q1
2017
Q1
2018
18
FIN AN C IAL D ATA: N ET D EBT & N ET C ASH
FR O M O PER ATIO N S
• Net debt: $9.4 million
o $184.8 million reduction of net
debt since December 31, 2012
• AMG’s primary debt
facility is a $650 million
multicurrency term loan and
revolving credit facility
o $350 million 7-year senior
secured term loan B facility,
a $200 million 5-year senior
secured revolving credit facility,
and a $100 million 5-year letter
of credit facility to support AMG
Engineering
o In compliance with all
debt covenants
• AMG generated cash from
operating activities of $24.8
million during Q1 2018, $7.0
million higher than in Q1 2017
$194.2
$160.5
$87.8
($1.0)
$7.3
($0.5)
$9.4
2012 2013 2014 2015 2016 Q1
2017
Q1
2018
-$10
$5
$20
$35
$50
Q1 Q2 Q3 Q4
2012 2013 2014
2015 2016 2018
NET DEBT (CASH) (IN MILLIONS OF US DOLLARS)
OPERATING CASH FLOW (IN MILLIONS OF US DOLLARS)
$185M
REDUCTION
IN NET DEBT
SINCE 2012
Q1 2018 OPERATING
CASH FLOW
OF $24.8M
19
AMG C R ITIC AL MATER IAL S
• Q1 2018 revenue of
$248.4 million was 28%
higher than Q1 2017
• EBITDA increased by $11.4
million over Q1 2017 to $37.1
million in Q1 2018, driven
primarily by higher vanadium
and silicon metal prices,
improved product mix and
strong sales volumes
• Capital expenditures
increased to $22.0 million
in Q1 2018 vs. $9.5 million in
Q1 2017
• The largest expansion capital
project was AMG’s lithium
project in Brazil
$194.5 $202.6 $203.4 $214.0
$248.4
$25.7 $23.9 $23.5
$26.9
$37.1
Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018
Revenue EBITDA
$9.5
$16.9
$21.6
$26.9
$22.0
Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018
REVENUE & EBITDA (IN MILLIONS OF US DOLLARS)
CAPITAL EXPENDITURES (IN MILLIONS OF US DOLLARS)
Q1 2018 EBITDA
INCREASED BY
$11.4M OVER Q1 2017
INCREASE OF $12.5M
IN Q1 ‘18 VS. Q1 ’17
DUE TO LITHIUM
PROJECT
20
AMG C R ITIC AL MATER IAL S – Q U ARTER LY R EVEN U E
D R IVER S
• AMG Critical Materials
revenue in the first quarter
increased by $53.8 million, or
28%, to $248.4 million
• This was driven by improved
vanadium, silicon, aluminum,
antimony, graphite and
titanium prices, and higher
sales volumes of vanadium,
aluminum, chrome, graphite,
tantalum and titanium
products
• Lower tantalum sales prices
were partially offset by higher
sales volumes
KEY PRODUCT
Q1 ‘18 REV
($M)
Q1 ‘17 REV
($M)
VOLUME PRICE
FeV & FeNiMo $55.2 $27.0
Al Master Alloys
& Powders
$51.1 $43.4
Chromium Metal $26.0 $21.3
Tantalum & Niobium $13.0 $19.6
Titanium Alloys
& Coatings
$30.1 $22.5
Antimony $28.2 $25.4
Graphite $20.1 $14.9
Silicon Metal $24.7 $20.5
21
C R ITIC AL MATER IAL S PR IC ES: H ISTO R IC AL PR IC IN G
22
• Metal prices are measured
on a scale of 0 to 10, with 0
and 10 representing the
minimum and maximum
average quarterly prices
occurring since the end of
2005
• The positions demonstrate
the current price level of
each metal with respect to
their various historical price
points since the end of 2005
AMG’s relevant
prices have started
to move out of the
bottom quartiles
6.0
2.8
1.2
7.7
3.6
4.0
8.7
7.9
6.6
8.6
5.1
3.7
3.1
1.4
0.5
1.9
3.2 3.2
0.0
5.4
3.0
6.8
0.7
3.7
0
2.5
5
7.5
10
Scale
Metals
Mar 2018 Position Mar 2017 Position
Highest
Price
Lowest
Price
Note: Metal Positions are measured on a scale of 0 to 10, with 0 being the minimum price and 10 being the maximum price. They are calculated
using the formula [(Dec ‘05 ending value – min. monthly avg) / (max. monthly avg – min. monthly avg) *10] where maximum and minimum
monthly averages are measured over the period 31 Dec ‘05 through 31 Mar ’18; graphite prices are per Benchmark Minerals, showing five year
historical data.
Cr Mo Ni FeV Ti Al C Si Ta SbNbLi
[unchanged]
AMG EN G IN EER IN G
• EBITDA increased by
$0.1 million in Q1 2018
versus Q1 2017
• Revenue in the quarter was
adversely impacted by
timing effects, namely early
stage engineering work
underway on a number of
large orders received in
recent months
• Order backlog of $255.8
million as of March 31,
2018, a 24% increase
compared to December 31,
2017
• Signed $104.8 million in
new orders during Q1 2018,
a 1.74x book to bill ratio
$63.5
$59.4 $55.6
$66.7
$60.1
$7.3
$8.0
$4.1
$6.1
$7.4
Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018
Revenue EBITDA
$81.8
$76.9
$40.5
$91.0
$104.8
Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018
REVENUE & EBITDA (IN MILLIONS OF US DOLLARS)
ORDER INTAKE (IN MILLIONS OF US DOLLARS)
REVENUE DECLINED
BY 5% VS. Q1 2017
DUE TO TIMING
EFFECTS
BOOK TO BILL RATIO
OF 1.74X IN Q1 2018
23
A E R O S PA C E : D R I V I N G G R O W T H I N T H E C O R E B U S I N E S S
Underlying fundamentals point to
continued growth in this critical end
market
Sources: Boeing; Airbus; Statista; Deloitte
Development of Order Backlog Forecasted Production Levels of Commercial Aircraft
Numberofaircraftproduced
OBAirbusinthousandAircrafts
OBBoeinginbillionsofUSD
BOEING AIRBUS
24
W O R KIN G C APITAL R ED U C TIO N
WORKING CAPITAL DAYS REDUCED BY 80% SINCE Q3’10
79
69 70 70 70
65 65 65 65
62 61
53
47
43
47
42
31
23
28
30 30
19
26
17 17
15
18
22 22
16
25
54 DAYS, OR 68%
REDUCTION
25
Q1
‘11
Q2
‘11
Q3
‘11
Q4
‘11
Q1
‘12
Q2
‘12
Q3
‘12
Q4
‘12
Q1
‘13
Q2
‘13
Q3
‘13
Q4
‘13
Q1
‘14
Q2
‘14
Q3
‘14
Q3
‘10
Q4
‘10
Q4
‘14
Q1
‘15
Q2
‘15
Q3
‘15
Q4
‘15
Q1
‘16
Q2
‘16
Q3
‘16
Q4
‘16
Q1
‘17
Q2
‘17
Q3
‘17
Q4
‘17
Q1
‘18
Management’s priority in 2018 is to execute on our highly accretive lithium project
2 0 1 8 O U TL O O K & L ITH IU M PR O J EC T U PD ATE
L I T H I U M P R O J E C T U P D AT EO U T L O O K
We believe we can achieve our goals earlier
than previously expected and can commit to
turning the present EBITDA level into $200
million, or more, in the fiscal year ending
December 31, 2020, or earlier.
As demonstrated in the first quarter of 2018,
AMG expects full year 2018 EBITDA to improve
considerably compared to the prior year.
AMG's management team is focused on
delivering our highly accretive lithium project and
executing our long term lithium strategy. In
addition, we will continue to pursue other
acquisition opportunities and organic growth
projects in order to generate long term value for
our shareholders.
Project is progressing in-line with expectations – commissioning
has commenced as of May 15, 2018.
Phase I - Lithium Concentrate Plant 1: our first lithium concentrate
plant has now commenced start-up and will reach full name-plate
operating capacity of 90,000 tons per annum of lithium concentrate in
the fourth quarter of 2018.
Phase II - Lithium Concentrate Plant 2: work on our second lithium
concentrate plant is also well underway and we expect to complete
detailed engineering and commence construction in the third quarter of
2018. Furthermore, we expect to begin production by the end of 2019.
Phase III - Lithium Carbonate: we are preparing a definitive concept
to move downstream into the production of lithium chemicals, to
capture the incremental value associated with this part of the value
chain. We look forward to providing further updates in due course.
26

More Related Content

What's hot

Capital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation finalCapital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation finalgstubel
 
Amg investor presentation august 2013
Amg   investor presentation august 2013Amg   investor presentation august 2013
Amg investor presentation august 2013jdiluzio
 
Amg investor presentation aug 2014
Amg   investor presentation aug  2014Amg   investor presentation aug  2014
Amg investor presentation aug 2014jdiluzio
 
AMG Lithium
AMG LithiumAMG Lithium
AMG Lithiumgstubel
 
AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016gstubel
 
Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017gstubel
 
AMG for Investors - September 2016
AMG for Investors - September 2016AMG for Investors - September 2016
AMG for Investors - September 2016gstubel
 
dynaCERT Investors Presentation February 2016
dynaCERT Investors Presentation February 2016dynaCERT Investors Presentation February 2016
dynaCERT Investors Presentation February 2016Jim Payne
 
Pepsi hydrogen injected trucks
Pepsi hydrogen injected trucksPepsi hydrogen injected trucks
Pepsi hydrogen injected trucksHabibur Rahman
 
AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013jdiluzio
 
Pepsi trucks using hydrogen on demand fuel systems
Pepsi trucks using hydrogen on demand fuel systemsPepsi trucks using hydrogen on demand fuel systems
Pepsi trucks using hydrogen on demand fuel systemsHabibur Rahman
 
SAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGY
SAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGYSAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGY
SAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGYHabibur Rahman
 
Amg investor presentation february 2011
Amg   investor presentation february 2011Amg   investor presentation february 2011
Amg investor presentation february 2011AMG
 
Amg -investor_presentation_november_2010
Amg  -investor_presentation_november_2010Amg  -investor_presentation_november_2010
Amg -investor_presentation_november_2010AMG
 

What's hot (16)

Capital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation finalCapital markets day AMG Engineering presentation final
Capital markets day AMG Engineering presentation final
 
Amg investor presentation august 2013
Amg   investor presentation august 2013Amg   investor presentation august 2013
Amg investor presentation august 2013
 
Amg investor presentation aug 2014
Amg   investor presentation aug  2014Amg   investor presentation aug  2014
Amg investor presentation aug 2014
 
AMG Lithium
AMG LithiumAMG Lithium
AMG Lithium
 
AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016AMG Investor Presentation - August 2016
AMG Investor Presentation - August 2016
 
Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017Berenberg Investor Forum Presentation - April 2017
Berenberg Investor Forum Presentation - April 2017
 
AMG for Investors - September 2016
AMG for Investors - September 2016AMG for Investors - September 2016
AMG for Investors - September 2016
 
dynaCERT Investors Presentation February 2016
dynaCERT Investors Presentation February 2016dynaCERT Investors Presentation February 2016
dynaCERT Investors Presentation February 2016
 
Pepsi hydrogen injected trucks
Pepsi hydrogen injected trucksPepsi hydrogen injected trucks
Pepsi hydrogen injected trucks
 
AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013AMG Corporate Strategy Presentation December 2013
AMG Corporate Strategy Presentation December 2013
 
Pepsi trucks using hydrogen on demand fuel systems
Pepsi trucks using hydrogen on demand fuel systemsPepsi trucks using hydrogen on demand fuel systems
Pepsi trucks using hydrogen on demand fuel systems
 
SAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGY
SAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGYSAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGY
SAVE FUEL ON A TRUCK USING HYDROGEN TECHNOLOGY
 
Bowen Coking Coal
Bowen Coking CoalBowen Coking Coal
Bowen Coking Coal
 
Solazyme 2Q 2013 earnings
Solazyme 2Q 2013 earningsSolazyme 2Q 2013 earnings
Solazyme 2Q 2013 earnings
 
Amg investor presentation february 2011
Amg   investor presentation february 2011Amg   investor presentation february 2011
Amg investor presentation february 2011
 
Amg -investor_presentation_november_2010
Amg  -investor_presentation_november_2010Amg  -investor_presentation_november_2010
Amg -investor_presentation_november_2010
 

Similar to Houlihan Lokey Presentation May 17 2018

June 2018 Investor Update
June 2018 Investor UpdateJune 2018 Investor Update
June 2018 Investor Updategstubel
 
June 2018 Investor Ipdate
June 2018 Investor IpdateJune 2018 Investor Ipdate
June 2018 Investor Ipdategstubel
 
AMG Investor Presentation February 2019
AMG Investor Presentation February 2019AMG Investor Presentation February 2019
AMG Investor Presentation February 2019gstubel
 
Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017gstubel
 
Investor Presentation Q3 - November 2018
Investor Presentation Q3 - November 2018Investor Presentation Q3 - November 2018
Investor Presentation Q3 - November 2018gstubel
 
AMG Investor Presentation May 2018
AMG Investor Presentation May 2018AMG Investor Presentation May 2018
AMG Investor Presentation May 2018gstubel
 
AMG Investor Presentation August 2018
AMG Investor Presentation August 2018AMG Investor Presentation August 2018
AMG Investor Presentation August 2018gstubel
 
September 2017 Presentation
September 2017 PresentationSeptember 2017 Presentation
September 2017 Presentationgstubel
 
Amg agm presentation - 2013
Amg   agm presentation - 2013Amg   agm presentation - 2013
Amg agm presentation - 2013jdiluzio
 
Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017gstubel
 
January 2018 Investor Update
January 2018 Investor UpdateJanuary 2018 Investor Update
January 2018 Investor Updategstubel
 
Amg investor presentation november 2014 final
Amg   investor presentation november 2014 finalAmg   investor presentation november 2014 final
Amg investor presentation november 2014 finaljdiluzio
 
Investor Deck March 2023.pdf
Investor Deck March 2023.pdfInvestor Deck March 2023.pdf
Investor Deck March 2023.pdfgstubel
 
AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017gstubel
 
AMG Investor Presentation
AMG Investor PresentationAMG Investor Presentation
AMG Investor Presentationgstubel
 
November 2017 Investor Update
November 2017 Investor UpdateNovember 2017 Investor Update
November 2017 Investor Updategstubel
 
AMG-V Bond Roadshow
AMG-V Bond RoadshowAMG-V Bond Roadshow
AMG-V Bond Roadshowgstubel
 
AMG Investor Presentation November 2017
AMG Investor Presentation November 2017AMG Investor Presentation November 2017
AMG Investor Presentation November 2017gstubel
 
AMG Investor Presentation August 2017
AMG Investor Presentation August 2017AMG Investor Presentation August 2017
AMG Investor Presentation August 2017gstubel
 
September 2020 ECO2RP presentation
September 2020 ECO2RP presentationSeptember 2020 ECO2RP presentation
September 2020 ECO2RP presentationgstubel
 

Similar to Houlihan Lokey Presentation May 17 2018 (20)

June 2018 Investor Update
June 2018 Investor UpdateJune 2018 Investor Update
June 2018 Investor Update
 
June 2018 Investor Ipdate
June 2018 Investor IpdateJune 2018 Investor Ipdate
June 2018 Investor Ipdate
 
AMG Investor Presentation February 2019
AMG Investor Presentation February 2019AMG Investor Presentation February 2019
AMG Investor Presentation February 2019
 
Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017Berenberg Pan-European Discovery Conference - June 2017
Berenberg Pan-European Discovery Conference - June 2017
 
Investor Presentation Q3 - November 2018
Investor Presentation Q3 - November 2018Investor Presentation Q3 - November 2018
Investor Presentation Q3 - November 2018
 
AMG Investor Presentation May 2018
AMG Investor Presentation May 2018AMG Investor Presentation May 2018
AMG Investor Presentation May 2018
 
AMG Investor Presentation August 2018
AMG Investor Presentation August 2018AMG Investor Presentation August 2018
AMG Investor Presentation August 2018
 
September 2017 Presentation
September 2017 PresentationSeptember 2017 Presentation
September 2017 Presentation
 
Amg agm presentation - 2013
Amg   agm presentation - 2013Amg   agm presentation - 2013
Amg agm presentation - 2013
 
Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017Capital Markets Day CFO Presentation - June 2017
Capital Markets Day CFO Presentation - June 2017
 
January 2018 Investor Update
January 2018 Investor UpdateJanuary 2018 Investor Update
January 2018 Investor Update
 
Amg investor presentation november 2014 final
Amg   investor presentation november 2014 finalAmg   investor presentation november 2014 final
Amg investor presentation november 2014 final
 
Investor Deck March 2023.pdf
Investor Deck March 2023.pdfInvestor Deck March 2023.pdf
Investor Deck March 2023.pdf
 
AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017AMG Investor Presentation - March 2017
AMG Investor Presentation - March 2017
 
AMG Investor Presentation
AMG Investor PresentationAMG Investor Presentation
AMG Investor Presentation
 
November 2017 Investor Update
November 2017 Investor UpdateNovember 2017 Investor Update
November 2017 Investor Update
 
AMG-V Bond Roadshow
AMG-V Bond RoadshowAMG-V Bond Roadshow
AMG-V Bond Roadshow
 
AMG Investor Presentation November 2017
AMG Investor Presentation November 2017AMG Investor Presentation November 2017
AMG Investor Presentation November 2017
 
AMG Investor Presentation August 2017
AMG Investor Presentation August 2017AMG Investor Presentation August 2017
AMG Investor Presentation August 2017
 
September 2020 ECO2RP presentation
September 2020 ECO2RP presentationSeptember 2020 ECO2RP presentation
September 2020 ECO2RP presentation
 

More from gstubel

AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024gstubel
 
AMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfAMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfgstubel
 
AMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfAMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfgstubel
 
AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023gstubel
 
CMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdfCMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdfgstubel
 
Quarterly Slides February 22 2023
Quarterly Slides February 22 2023Quarterly Slides February 22 2023
Quarterly Slides February 22 2023gstubel
 
Qtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfQtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfgstubel
 
AMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfAMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfgstubel
 
Quarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdfQuarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdfgstubel
 
AMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdfAMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdfgstubel
 
Equity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdfEquity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdfgstubel
 
Quarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdfQuarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdfgstubel
 
Quarterly slides February 2022
Quarterly slides February 2022Quarterly slides February 2022
Quarterly slides February 2022gstubel
 
Capital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium PresentationCapital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium Presentationgstubel
 
Quarterly Slides October 2021
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021gstubel
 
Quarterly Slides July 2021
Quarterly Slides July 2021Quarterly Slides July 2021
Quarterly Slides July 2021gstubel
 
Quarterly Slides May 2021
Quarterly Slides May 2021Quarterly Slides May 2021
Quarterly Slides May 2021gstubel
 
Berenberg SDG Presentation
Berenberg SDG PresentationBerenberg SDG Presentation
Berenberg SDG Presentationgstubel
 
Quarterly slides February 2021
Quarterly slides February 2021Quarterly slides February 2021
Quarterly slides February 2021gstubel
 
Quarterly Slides October 2020
Quarterly Slides October 2020Quarterly Slides October 2020
Quarterly Slides October 2020gstubel
 

More from gstubel (20)

AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024AMG Quarterly Slide deck - February 2024
AMG Quarterly Slide deck - February 2024
 
AMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdfAMG Quarterly Slides_November 2023.pdf
AMG Quarterly Slides_November 2023.pdf
 
AMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdfAMG Quarterly Slides_July 2023.pdf
AMG Quarterly Slides_July 2023.pdf
 
AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023AMG Quarterly Slides May 2023
AMG Quarterly Slides May 2023
 
CMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdfCMD AMG Lithium Presentations.pdf
CMD AMG Lithium Presentations.pdf
 
Quarterly Slides February 22 2023
Quarterly Slides February 22 2023Quarterly Slides February 22 2023
Quarterly Slides February 22 2023
 
Qtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdfQtr Slides_November 2 2022.pdf
Qtr Slides_November 2 2022.pdf
 
AMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdfAMG Investor Deck October 2022.pdf
AMG Investor Deck October 2022.pdf
 
Quarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdfQuarterly Slides_July 2022.pdf
Quarterly Slides_July 2022.pdf
 
AMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdfAMG Saudi Arabia Project Update July 2022.pdf
AMG Saudi Arabia Project Update July 2022.pdf
 
Equity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdfEquity Capital Market Presentation May 2022.pdf
Equity Capital Market Presentation May 2022.pdf
 
Quarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdfQuarterly Slides_May 2022.pdf
Quarterly Slides_May 2022.pdf
 
Quarterly slides February 2022
Quarterly slides February 2022Quarterly slides February 2022
Quarterly slides February 2022
 
Capital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium PresentationCapital Markets Day AMG Lithium Presentation
Capital Markets Day AMG Lithium Presentation
 
Quarterly Slides October 2021
Quarterly Slides October 2021Quarterly Slides October 2021
Quarterly Slides October 2021
 
Quarterly Slides July 2021
Quarterly Slides July 2021Quarterly Slides July 2021
Quarterly Slides July 2021
 
Quarterly Slides May 2021
Quarterly Slides May 2021Quarterly Slides May 2021
Quarterly Slides May 2021
 
Berenberg SDG Presentation
Berenberg SDG PresentationBerenberg SDG Presentation
Berenberg SDG Presentation
 
Quarterly slides February 2021
Quarterly slides February 2021Quarterly slides February 2021
Quarterly slides February 2021
 
Quarterly Slides October 2020
Quarterly Slides October 2020Quarterly Slides October 2020
Quarterly Slides October 2020
 

Recently uploaded

VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Roomrran7532
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Corporation
 
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkataanamikaraghav4
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Roomdivyansh0kumar0
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书Fis s
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一Fir La
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书Fir La
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 

Recently uploaded (20)

VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With RoomVIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
VIP Kolkata Call Girls Bidhannagar 8250192130 Available With Room
 
Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)Methanex Investor Presentation (April 2024)
Methanex Investor Presentation (April 2024)
 
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls KolkataHigh Profile Call Girls Kolkata Trisha 🤌  8250192130 🚀 Vip Call Girls Kolkata
High Profile Call Girls Kolkata Trisha 🤌 8250192130 🚀 Vip Call Girls Kolkata
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Udyog Vihar Delhi reach out to us at 🔝9953056974🔝
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Falcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best PlatformFalcon Invoice Discounting - Best Platform
Falcon Invoice Discounting - Best Platform
 
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rishra 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rishra 👉 8250192130 Available With Room
 
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
如何办理(UTS毕业证书)悉尼科技大学毕业证学位证书
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
定制(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
如何办理北卡罗来纳大学教堂山分校毕业证(文凭)UNC学位证书
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCREscort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
Escort Service Call Girls In Shalimar Bagh, 99530°56974 Delhi NCR
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICECall Girls In South Delhi 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
Call Girls In South Delhi 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SERVICE
 
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls ServicesPreet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
Preet Vihar (Delhi) 9953330565 Escorts, Call Girls Services
 

Houlihan Lokey Presentation May 17 2018

  • 1. AMG ADVANCED METALLURGICAL GROUP N.V. HOULIHAN LOKEY PRESENTATION, May 17, 2018 1
  • 2. C AU TIO N ARY N O TE THIS DOCUMENT IS STRICTLY CONFIDENTIAL AND IS BEING PROVIDED TO YOU SOLELY FOR YOUR INFORMATION BY AMG ADVANCED METALLURGICAL GROUP N.V. (THE “COMPANY”) AND MAY NOT BE REPRODUCED IN ANY FORM OR FURTHER DISTRIBUTED TO ANY OTHER PERSON OR PUBLISHED, IN WHOLE OR IN PART, FOR ANY PURPOSE. FAILURE TO COMPLY WITH THIS RESTRICTION MAY CONSTITUTE A VIOLATION OF APPLICABLE SECURITIES LAWS. This presentation does not constitute or form part of, and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire securities of the Company or any of its subsidiaries nor should it or any part of it, nor the fact of its distribution, form the basis of, or be relied on in connection with, any contract or commitment whatsoever. This presentation has been prepared by, and is the sole responsibility of, the Company. This document, any presentation made in conjunction herewith and any accompanying materials are for information only and are not a prospectus, offering circular or admission document. This presentation does not form a part of, and should not be construed as, an offer, invitation or solicitation to subscribe for or purchase, or dispose of any of the securities of the companies mentioned in this presentation. These materials do not constitute an offer of securities for sale in the United States or an invitation or an offer to the public or form of application to subscribe for securities. Neither this presentation nor anything contained herein shall form the basis of, or be relied on in connection with, any offer or commitment whatsoever. The information contained in this presentation has not been independently verified. No representation or warranty, express or implied, is made as to, and no reliance should be placed on, the fairness, accuracy or completeness of the information or the opinions contained herein. The Company and its advisors are under no obligation to update or keep current the information contained in this presentation. To the extent allowed by law, none of the Company or its affiliates, advisors or representatives accept any liability whatsoever (in negligence or otherwise) for any loss howsoever arising from any use of this presentation or its contents or otherwise arising in connection with the presentation. Certain statements in this presentation constitute forward-looking statements, including statements regarding the Company's financial position, business strategy, plans and objectives of management for future operations. These statements, which contain the words "believe,” “expect,” “anticipate,” “intends,” “estimate,” “forecast,” “project,” “will,” “may,” “should” and similar expressions, reflect the beliefs and expectations of the management board of directors of the Company and are subject to risks and uncertainties that may cause actual results to differ materially. These risks and uncertainties include, among other factors, the achievement of the anticipated levels of profitability, growth, cost and synergy of the Company’s recent acquisitions, the timely development and acceptance of new products, the impact of competitive pricing, the ability to obtain necessary regulatory approvals, and the impact of general business and global economic conditions. These and other factors could adversely affect the outcome and financial effects of the plans and events described herein. Neither the Company, nor any of its respective agents, employees or advisors intend or have any duty or obligation to supplement, amend, update or revise any of the forward- looking statements contained in this presentation. The information and opinions contained in this document are provided as at the date of this presentation and are subject to change without notice. This document has not been approved by any competent regulatory or supervisory authority. 2
  • 3. G L O B A L T R E N D S C O 2 e m i s s i o n r e d u c t i o n , p o p u l a t i o n g r o w t h , i n c r e a s i n g a f f l u e n c e , a n d e n e r g y e f f i c i e n c y D E M A N D I n n o v a t i v e n e w p r o d u c t s t h a t a r e l i g h t e r , s t r o n g e r , a n d r e s i s t a n t t o h i g h e r t e m p e r a t u r e s S U P P L Y A M G s o u r c e s , p r o c e s s e s , a n d s u p p l i e s t h e c r i t i c a l m a t e r i a l s t h a t t h e m a r k e t d e m a n d s AMG IS A CRITICAL MATERIALS COMPANY
  • 4. L EAD ER IN AD VAN C ED TEC H N O L O G IES TO AD D R ESS C O 2 R ED U C TIO N AMG: MITIGATING TECHNOLOGIES Products and processes saving raw materials, energy and CO2 emissions during manufacturing (e.g., recycling of Ferrovanadium) AMG: ENABLING TECHNOLOGIES Products and processes saving CO2 emissions during use (e.g., light-weighting and fuel efficiency in the aerospace and automotive industries) A GLOBAL IMPERATIVE FOR THE 21ST CENTURY CO2 REDUCTION
  • 5. AMG AT A G L AN C E AMG IS A GLOBAL SUPPLIER OF CRITICAL MATERIALS TO: Q1 2018 REVENUE TRANSPORTATIONENERGY INFRASTRUCTURE SPECIALTY METALS AND CHEMICALS BY END MARKET: BY REGION:BY SEGMENT: 46% Europe 33% North America 16% Asia 5% ROW 19% Engineering 81% Critical Materials 29% Infrastructure 22% Specialty Metals & Chemicals 39% Transportation 10% Energy Market leading producer of highly engineered specialty metals and vacuum furnace systems ~3,300 Employees ~$1 billion Annual Revenues At the forefront of CO2 Reduction 5
  • 6. H EALTH AN D SAFETY: SU STAIN ED IMPR O VEMEN T LOST TIME INCIDENT RATE 0.82 1.04 1.12 1.19 1.95 TOTAL INCIDENT RATE 2017 2016 2015 2014 2013 1.31 1.68 2.02 2.23 3.30 6
  • 7. STR ATEG IC H ISTO RY COST REDUCTION SUPPLY CHAIN EXCELLENCE SCALING PROFITABLE GROWTH PRODUCT MIX OPTIMIZATION TARGETED W/C & DEBT LEVELS Cost-reduction and capex discipline in response to global economic slowdown Competitive advantage through manufacturing and supply chain excellence, accelerating cost-reduction efforts Properly positioned, financially and operationally, to pursue growth targets across portfolio Streamlined operations and improved operating performance by eliminating low-margin product lines Further reduction in both working capital and net debt, strengthening the balance sheet 2012 2013 2014 2015 2016 - 2017 7
  • 8. MISSION STATEMENT To increase long term value through industry leadership, operational expertise and efficient deployment of capital STRATEGIC OBJECTIVE Identifying long term trends and leveraging those trends through technological excellence and innovations in the indispensable areas of critical materials and vacuum technologies PATHS TO GROWTH Routine organic growth of existing business lines Non-routine expansion of existing business lines Transformational projectsA B C C U R R EN T STR ATEG Y 8
  • 9. L ITH IU M & TAN TAL U M BU IL D O U T – MAY 2 0 1 8 STATU S Structured, sequenced approach to maximizing the value of our Mibra Mine asset 2017 2018 Tantalum Spodumene SP I SP II Lithium Carbonate I PRODUCTION CAPEX SPEND EXPANDED PRODUCTION CAPEX SPEND CAPEX SPEND PRODUCTION 202120202019 PRODUCTION CAPEX SPEND PRODUCTION 9
  • 10. L ITH IU M PR O J EC T PH ASES Construction of a lithium concentrate plant to produce 90,000 mt of spodumene per year Approved capex: $50M Start-up has commenced Construction of second lithium concentrate plant, resulting in capacity expansion from 90,000 mt to 180,000 mt per year Approved capex: $110M* Construction of lithium chemical plants for the downstream conversion of lithium concentrate into lithium carbonate PHASE I & PHASE II PHASE III LITHIUM CONCENTRATE PRODUCTION LITHIUM CHEMICAL PRODUCTION LITHIUM CONCENTRATE PLANT I LITHIUM CONCENTRATE PLANT II LITHIUM CHEMICAL PLANTS *Phase II capex includes investments related to the expansion of existing tantalum operations in addition to the development and expansion of the existing mining infrastructure
  • 11. O PER ATIN G C O STS FO R SPO D U MEN E PR O D U C TIO N 0 50 100 150 200 250 300 Talison - Greenbushes (Australia) Pilbara - Pilgangoora (Australia) Altura - Pilgangoora (Australia) Galaxy Resources Mt. Cattlin (Australia) Process Minerals Mt. Marion (Australia) AMG ($134/mt) Operating costs for spodumene production, 2017 ($/mt) Sources: Roskill, AMG management estimates Notes: AMG is by-product from tantalum/feldspar production; Pilbara and Galaxy includes credits from tantalite production Market price: ~$1,000/mt At current market prices, AMG’s lithium concentrate projects (Spodumene I & II) would generate annual incremental EBITDA of ~$130M at $1,000/mt 11
  • 12. AMG - VAN AD IU M: O H IO EXPAN SIO N Timeline Cement market- leading position in North America Sourcing simplification and inventory reduction Strategic Rationale 2018 • Basic engineering • Environmental approval • Detailed engineering and construction 2019 • Construction • Commissioning (Q4) 2020 • Ramp-up and operation Summary • $35M investment to expand total spent catalyst roasting capacity by 9,000 ST in Cambridge, Ohio facility • 30% increase in roasting capacity to gold-standard recycling process – 99% of solids produced throughout process are saleable material • Well aligned with attractive vanadium market dynamics Customers are looking for additional recycling capacity; expansion enables AMG-V to take on additional spent catalyst Allows AMG-V to run 100% on roasted catalyst, simplifying sourcing process and significantly reducing inventory 12
  • 13. AMG VAN AD IU M: G O IN G G L O BAL Partnership between two market leaders to develop a sustainable 'cradle-to-grave' solution for catalyst supply and reclamation + 13
  • 14. VAN AD IU M: IN VEN TO RY VS FE- V PR IC E Slight under-supply position is forecasted to continue for the next several years, driving down global inventories to near-record lows 14 $0 $5 $10 $15 $20 $25 $30 $35 $40 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Ryan’s Notes Fe-V Price Vanadium Inventory VanadiumInventory (MonthsofConsumption) Fe-VPrice(US$/poundFe-V) Source for Fe-V price: CRU Ryan’s Notes – average monthly US FeV 80% V Mid
  • 15. VAN AD IU M D EMAN D : C H IN ESE R EBAR Source: China Iron & Steel Research Institute Group (CISRI) – March 2018 New standard enacted 50,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 45,000 350 250 200 150 100 50 0 300 2005 2006 2007 2008 2009 2010 2011 2012 2013 2020E2019E2018E2017E201620152014 VanadiumConsumptioninChinaRebar(mt-V) HSRebarsProduction(millionsoftons) HS Rebars Production V-Gr.3, 60% V-Gr.3, 70% V-Gr.3, 80% 15
  • 16. FER R O VAN AD IU M: 5 - YEAR PR IC E TR EN D $0 $5 $10 $15 $20 $25 $30 $35 Ferrovanadium($perlb) Ferrovanadium 16Source: CRU Ryan’s Notes – average monthly US FeV 80% V Mid
  • 17. FIN AN C IAL H IG H L IG H TS 17 $33.0 $31.9 $27.6 $33.0 $44.5 Q1 17 Q2 17 Q3 17 Q4 17 Q1 18 $258.0 $262.0 $258.9 $280.7 $308.4 Q1 17 Q2 17 Q3 17 Q4 17 Q1 18 $52.5 $54.3 $51.3 $56.5 $70.1 Q1 17 Q2 17 Q3 17 Q4 17 Q1 18 REVENUE (IN MILLIONS OF US DOLLARS) $81.8 $76.9 $40.5 $91.0 $104.8 Q1 17 Q2 17 Q3 17 Q4 17 Q1 18 GROSS PROFIT (IN MILLIONS OF US DOLLARS) ORDER INTAKE (IN MILLIONS OF US DOLLARS)EBITDA (IN MILLIONS OF US DOLLARS) 20% YoY 35% YoY 28% YoY 34% YoY
  • 18. FIN AN C IAL D ATA: R O C E & EBITD A • Q1 ‘18 EBITDA up 35% versus Q1 ‘17 due to improved profitability within AMG Critical Materials • Q1 2018 annualized ROCE improved to 28.4% from 25.5% in Q1 2017 • ROCE improvements are the result of efficient use of capital and improved profitability Annualized ROCE EBITDA (IN MILLIONS OF US DOLLARS) $33.0 $31.9 $27.6 $33.0 $44.5 Q1 '17 Q2 '17 Q3 '17 Q4 '17 Q1 '18 Q1 ‘18 ROCE IMPROVED TO 28.4% FROM 25.5% IN Q1 ‘17 Q1 ‘18 EBITDA UP 35% VERSUS Q1 ‘17 7.4% 11.9% 12.0% 18.8% 25.5% 28.4% 2013 2014 2015 2016 Q1 2017 Q1 2018 18
  • 19. FIN AN C IAL D ATA: N ET D EBT & N ET C ASH FR O M O PER ATIO N S • Net debt: $9.4 million o $184.8 million reduction of net debt since December 31, 2012 • AMG’s primary debt facility is a $650 million multicurrency term loan and revolving credit facility o $350 million 7-year senior secured term loan B facility, a $200 million 5-year senior secured revolving credit facility, and a $100 million 5-year letter of credit facility to support AMG Engineering o In compliance with all debt covenants • AMG generated cash from operating activities of $24.8 million during Q1 2018, $7.0 million higher than in Q1 2017 $194.2 $160.5 $87.8 ($1.0) $7.3 ($0.5) $9.4 2012 2013 2014 2015 2016 Q1 2017 Q1 2018 -$10 $5 $20 $35 $50 Q1 Q2 Q3 Q4 2012 2013 2014 2015 2016 2018 NET DEBT (CASH) (IN MILLIONS OF US DOLLARS) OPERATING CASH FLOW (IN MILLIONS OF US DOLLARS) $185M REDUCTION IN NET DEBT SINCE 2012 Q1 2018 OPERATING CASH FLOW OF $24.8M 19
  • 20. AMG C R ITIC AL MATER IAL S • Q1 2018 revenue of $248.4 million was 28% higher than Q1 2017 • EBITDA increased by $11.4 million over Q1 2017 to $37.1 million in Q1 2018, driven primarily by higher vanadium and silicon metal prices, improved product mix and strong sales volumes • Capital expenditures increased to $22.0 million in Q1 2018 vs. $9.5 million in Q1 2017 • The largest expansion capital project was AMG’s lithium project in Brazil $194.5 $202.6 $203.4 $214.0 $248.4 $25.7 $23.9 $23.5 $26.9 $37.1 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Revenue EBITDA $9.5 $16.9 $21.6 $26.9 $22.0 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 REVENUE & EBITDA (IN MILLIONS OF US DOLLARS) CAPITAL EXPENDITURES (IN MILLIONS OF US DOLLARS) Q1 2018 EBITDA INCREASED BY $11.4M OVER Q1 2017 INCREASE OF $12.5M IN Q1 ‘18 VS. Q1 ’17 DUE TO LITHIUM PROJECT 20
  • 21. AMG C R ITIC AL MATER IAL S – Q U ARTER LY R EVEN U E D R IVER S • AMG Critical Materials revenue in the first quarter increased by $53.8 million, or 28%, to $248.4 million • This was driven by improved vanadium, silicon, aluminum, antimony, graphite and titanium prices, and higher sales volumes of vanadium, aluminum, chrome, graphite, tantalum and titanium products • Lower tantalum sales prices were partially offset by higher sales volumes KEY PRODUCT Q1 ‘18 REV ($M) Q1 ‘17 REV ($M) VOLUME PRICE FeV & FeNiMo $55.2 $27.0 Al Master Alloys & Powders $51.1 $43.4 Chromium Metal $26.0 $21.3 Tantalum & Niobium $13.0 $19.6 Titanium Alloys & Coatings $30.1 $22.5 Antimony $28.2 $25.4 Graphite $20.1 $14.9 Silicon Metal $24.7 $20.5 21
  • 22. C R ITIC AL MATER IAL S PR IC ES: H ISTO R IC AL PR IC IN G 22 • Metal prices are measured on a scale of 0 to 10, with 0 and 10 representing the minimum and maximum average quarterly prices occurring since the end of 2005 • The positions demonstrate the current price level of each metal with respect to their various historical price points since the end of 2005 AMG’s relevant prices have started to move out of the bottom quartiles 6.0 2.8 1.2 7.7 3.6 4.0 8.7 7.9 6.6 8.6 5.1 3.7 3.1 1.4 0.5 1.9 3.2 3.2 0.0 5.4 3.0 6.8 0.7 3.7 0 2.5 5 7.5 10 Scale Metals Mar 2018 Position Mar 2017 Position Highest Price Lowest Price Note: Metal Positions are measured on a scale of 0 to 10, with 0 being the minimum price and 10 being the maximum price. They are calculated using the formula [(Dec ‘05 ending value – min. monthly avg) / (max. monthly avg – min. monthly avg) *10] where maximum and minimum monthly averages are measured over the period 31 Dec ‘05 through 31 Mar ’18; graphite prices are per Benchmark Minerals, showing five year historical data. Cr Mo Ni FeV Ti Al C Si Ta SbNbLi [unchanged]
  • 23. AMG EN G IN EER IN G • EBITDA increased by $0.1 million in Q1 2018 versus Q1 2017 • Revenue in the quarter was adversely impacted by timing effects, namely early stage engineering work underway on a number of large orders received in recent months • Order backlog of $255.8 million as of March 31, 2018, a 24% increase compared to December 31, 2017 • Signed $104.8 million in new orders during Q1 2018, a 1.74x book to bill ratio $63.5 $59.4 $55.6 $66.7 $60.1 $7.3 $8.0 $4.1 $6.1 $7.4 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 Revenue EBITDA $81.8 $76.9 $40.5 $91.0 $104.8 Q1 2017 Q2 2017 Q3 2017 Q4 2017 Q1 2018 REVENUE & EBITDA (IN MILLIONS OF US DOLLARS) ORDER INTAKE (IN MILLIONS OF US DOLLARS) REVENUE DECLINED BY 5% VS. Q1 2017 DUE TO TIMING EFFECTS BOOK TO BILL RATIO OF 1.74X IN Q1 2018 23
  • 24. A E R O S PA C E : D R I V I N G G R O W T H I N T H E C O R E B U S I N E S S Underlying fundamentals point to continued growth in this critical end market Sources: Boeing; Airbus; Statista; Deloitte Development of Order Backlog Forecasted Production Levels of Commercial Aircraft Numberofaircraftproduced OBAirbusinthousandAircrafts OBBoeinginbillionsofUSD BOEING AIRBUS 24
  • 25. W O R KIN G C APITAL R ED U C TIO N WORKING CAPITAL DAYS REDUCED BY 80% SINCE Q3’10 79 69 70 70 70 65 65 65 65 62 61 53 47 43 47 42 31 23 28 30 30 19 26 17 17 15 18 22 22 16 25 54 DAYS, OR 68% REDUCTION 25 Q1 ‘11 Q2 ‘11 Q3 ‘11 Q4 ‘11 Q1 ‘12 Q2 ‘12 Q3 ‘12 Q4 ‘12 Q1 ‘13 Q2 ‘13 Q3 ‘13 Q4 ‘13 Q1 ‘14 Q2 ‘14 Q3 ‘14 Q3 ‘10 Q4 ‘10 Q4 ‘14 Q1 ‘15 Q2 ‘15 Q3 ‘15 Q4 ‘15 Q1 ‘16 Q2 ‘16 Q3 ‘16 Q4 ‘16 Q1 ‘17 Q2 ‘17 Q3 ‘17 Q4 ‘17 Q1 ‘18
  • 26. Management’s priority in 2018 is to execute on our highly accretive lithium project 2 0 1 8 O U TL O O K & L ITH IU M PR O J EC T U PD ATE L I T H I U M P R O J E C T U P D AT EO U T L O O K We believe we can achieve our goals earlier than previously expected and can commit to turning the present EBITDA level into $200 million, or more, in the fiscal year ending December 31, 2020, or earlier. As demonstrated in the first quarter of 2018, AMG expects full year 2018 EBITDA to improve considerably compared to the prior year. AMG's management team is focused on delivering our highly accretive lithium project and executing our long term lithium strategy. In addition, we will continue to pursue other acquisition opportunities and organic growth projects in order to generate long term value for our shareholders. Project is progressing in-line with expectations – commissioning has commenced as of May 15, 2018. Phase I - Lithium Concentrate Plant 1: our first lithium concentrate plant has now commenced start-up and will reach full name-plate operating capacity of 90,000 tons per annum of lithium concentrate in the fourth quarter of 2018. Phase II - Lithium Concentrate Plant 2: work on our second lithium concentrate plant is also well underway and we expect to complete detailed engineering and commence construction in the third quarter of 2018. Furthermore, we expect to begin production by the end of 2019. Phase III - Lithium Carbonate: we are preparing a definitive concept to move downstream into the production of lithium chemicals, to capture the incremental value associated with this part of the value chain. We look forward to providing further updates in due course. 26