SlideShare a Scribd company logo
HATEM MOHAMED ABD EL AZIZ
3-tamba st.,from tomanbay
EL_Zaiton - Cairo - Egypt
(+202)22832253 , (+966)508388754
7atemmoh@gmail.commail)-(private E
Hatem.abdulaziz@hailcement.commail)-(Work E
Objective
I am now looking to build on my extensive range of technical skills within a
suitably challenging role. I am keen to achieve further professional
development.
Personal Information
Date of Birth: 1/10/1986
Place of Birth: Cairo
Nationality: Egyptian
Marital Status: married
Military status : Exempt from the army
Education
 B.SC of science (Chemistry)
 University name:Ain Shams university, faculty of science.
 Accumulative rate of appreciation is: Very Good with Honours 80.34%
 Date of graduation : June 2008
Languages
 Fluency in spoken and written Arabic and English.
Personality Key Strength
 Ability to work under pressure.
 Excellent team worker (as both team leader or member)
 Excellent communication skills.
 Totally committed to any work requirment unconditionally.
 Self learning ability.
 Good thinkig in solving problems .
Computer Skills
 Operating Systems (Windows XP,vista , 7, 8 and windows 10).
 Microsoft Office 2003 and higher (Excel, Word, PowerPoint ).
 High Internet and networking knowledge .
 SAP End user at HCC.
Training
 August & Septemper 2008: Summer Training in Arab Swiss Engineering
Company (ASEC) at Helwan cement company site.
 KILN troubleshooting course at April 2011 (ASEC Training center).
 Quality assurance course at september 2011(ASEC Training center).
 Dupont Safety Training observation program at HCC at Dec.2014.
 Managing safety ( system that work for operations managers) at Jan.2015
from Dupont.
 Effective Root cause analysis from APEX at April 2016 inhouse training at
HCC.
 On site training from refratechnique and Fives Pillard at 2014.
 IOSH managing safely at Oct.2016 at HCC.
Employment History and Experience
1- March 2012 up to now :
a- working at Hail Cement Company at (K.S.A) as a Sr.shift Leader with attending and
responsibility at Pre-commissioning & Commissioning period at CDI-Sinoma line 5000 TPD.
b- authorized commissioning supervisor at all equipment areas erection and construction and for
process & operation Troubleshooting .
c- Responsible for preparation of Spare parts annually and refractory bricks and castable needed
and anchors also.
d- Ensure safe working environment as safety is a core value, apply safety advisories, implement
zero safety tolerance, and enhance safety communication, and full responsibility for LOTOTO
Permits Implementation, confined space entry,Working at Hights, isolation and de-isolation
and risk assessment preparation for each section on plant.
e- Supervision and traning new trainees at yammama cement company for two monthes.
f- Supervision of DCS Operating Mimic screens at Chengdu-china and rectify undesirable
parameters before brought to plant at KSA, and modifications were going on as required.
g- Supervision and Mapping of interlocking and auto-loops at Kiln, Raw mill and CM’s.
h- Auditing for operation, interlocking and auto-loops of PFIFFER vertical roller mill of the type
MPS 5300B.
i- Responsible for preparation of Plant Daily Report for production and material stocks and
consumed material at first year of operation.
j- Ensures the housekeeping of work area and machinery is maintained by respective operating
personnel to have trouble-free running of the plant.
k- Supervision on operation parameters to ensure our Targets and optimizing SPC, SHC, UF, RF ,
and coordination with other sections for decrease failure time for any equipment.
l- Responsible for preparation of SOP (standard operation procedure) for Crushers, VRM, kiln,
cement mill, Cyclone blockage, cooler overload, kiln start up after major shut-down, kiln
emergency stoppage due to power failure and others.
m- Performing Kiln audit once a year and tracing out false air on system.
n- Member at at STOP observation team to enhance safety culture for all employees.
o- Team member at RCA for analysis the recent problem specially repeated ones.
p- Team member at Optimization team to achieve best Productivity efficiency.
q- Team leader at Kiln SD and responsible for Kiln Area for brick lining and castable work and
complete supervision on refractory contractor.
r- Received safety award for Best near Miss report for June and Aug. 2016.
s- Assessor of Risk assessments related to Production works .
2- March 2011 to March 2012:
 Working at ASEC Enginering & Management at SINAI(Grey) Cement
Company , as kiln operator ( FLSMIDTH (ILC) type) at both lines with
coolax grate cooler and cross bar cooler With Major responsibility at shut-
dawn to rectify damaged equipment and installation of preheater and kiln
refractory.
3- August 2010 to March 2011:
 Working at ASEC Enginering & Management at AL-TAKAMOL cement
plant-Atbara-SUDAN, working as commissioning Engineer and as operator
for (HUMMER IMPACT crusher operator, ATOX 40 vertical mill operator, kiln
operator ( FLSMIDTH (ILC) type) by meaning of full line operator.
4- August 2008 to August 2010:
1- Working at ASEC Enginering & Management at Misr Beni Suef Cement
Company as Raw Mill (tube mill) & cement Mills & crushers Operator.
2- Kiln Operator from september 2009, working with FLSMIDTH line (ILC) and
attend commissioning of polysius line (OLC) (Second Line).
References
I here declare that all the information mentioned above is true.
(References will be furnished Upon Request)

More Related Content

What's hot

Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)JOHN PRINCE
 
MOHAMED ALI EL SAYED CV
MOHAMED ALI EL SAYED CVMOHAMED ALI EL SAYED CV
MOHAMED ALI EL SAYED CVmohamed ali
 
CV_Mahmoud_Omar (2)
CV_Mahmoud_Omar (2)CV_Mahmoud_Omar (2)
CV_Mahmoud_Omar (2)Mahmoud Omar
 
ATT_1430825566556_osama
ATT_1430825566556_osamaATT_1430825566556_osama
ATT_1430825566556_osamaOsama Ragab
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorAmine Halimi
 
Rolf White C.V. - August 2015
Rolf White C.V. - August 2015Rolf White C.V. - August 2015
Rolf White C.V. - August 2015Rolf White
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical TechnicianRashid Minhas
 
MARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technicianMARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technicianagnel maria
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisornitin mokal
 

What's hot (18)

Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)
 
MOHAMED ALI EL SAYED CV
MOHAMED ALI EL SAYED CVMOHAMED ALI EL SAYED CV
MOHAMED ALI EL SAYED CV
 
K.Miskolczi 2
K.Miskolczi 2K.Miskolczi 2
K.Miskolczi 2
 
Ray Hendriks
Ray HendriksRay Hendriks
Ray Hendriks
 
CV_Mahmoud_Omar (2)
CV_Mahmoud_Omar (2)CV_Mahmoud_Omar (2)
CV_Mahmoud_Omar (2)
 
ATT_1430825566556_osama
ATT_1430825566556_osamaATT_1430825566556_osama
ATT_1430825566556_osama
 
CV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing SupervisorCV Amine Halimi Oilfield Senior Cementing Supervisor
CV Amine Halimi Oilfield Senior Cementing Supervisor
 
my c.v
my c.vmy c.v
my c.v
 
Resume[11 2011]
Resume[11 2011]Resume[11 2011]
Resume[11 2011]
 
SenthilkumarCV
SenthilkumarCVSenthilkumarCV
SenthilkumarCV
 
Rolf White C.V. - August 2015
Rolf White C.V. - August 2015Rolf White C.V. - August 2015
Rolf White C.V. - August 2015
 
C v
C vC v
C v
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
MARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technicianMARIA AGNEL.M mechanical technician
MARIA AGNEL.M mechanical technician
 
mohamed elkamash cv
mohamed elkamash cvmohamed elkamash cv
mohamed elkamash cv
 
C.V,
C.V,C.V,
C.V,
 
Resume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisor
 
Revised Work Resume
Revised Work ResumeRevised Work Resume
Revised Work Resume
 

Viewers also liked

10 questions bunsen burners
10 questions bunsen burners10 questions bunsen burners
10 questions bunsen burners06426345
 
Clinker Liquid Phase
Clinker Liquid PhaseClinker Liquid Phase
Clinker Liquid PhaseRicardoMosci
 
Fireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerFireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerZalak Shah
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and coolingirrraju1976
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systemsIngrid McKenzie
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processHavalarif
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answersNael Shabana
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebookNael Shabana
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsGerard B. Hawkins
 
Cement Process Chemistry
Cement Process ChemistryCement Process Chemistry
Cement Process ChemistryShambhudayal
 
Bag filter operation pradeep kumar
Bag filter operation pradeep kumarBag filter operation pradeep kumar
Bag filter operation pradeep kumarpradeepdeepi
 
Influence of process on quality
Influence of process on qualityInfluence of process on quality
Influence of process on qualitypradeepdeepi
 
Burning zone ref failue f
Burning zone ref failue fBurning zone ref failue f
Burning zone ref failue fpradeepdeepi
 
Red river in clinker cooler
Red river in clinker  coolerRed river in clinker  cooler
Red river in clinker coolerpradeepdeepi
 
Snow ball formation pradeep kumar
Snow ball formation  pradeep kumarSnow ball formation  pradeep kumar
Snow ball formation pradeep kumarpradeepdeepi
 
Snowman formation pradeep kumar
Snowman formation pradeep kumarSnowman formation pradeep kumar
Snowman formation pradeep kumarpradeepdeepi
 

Viewers also liked (20)

Amit_CV
Amit_CVAmit_CV
Amit_CV
 
10 questions bunsen burners
10 questions bunsen burners10 questions bunsen burners
10 questions bunsen burners
 
Clinker Liquid Phase
Clinker Liquid PhaseClinker Liquid Phase
Clinker Liquid Phase
 
Fireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a BoilerFireball Formation and Combustion of Coal in a Boiler
Fireball Formation and Combustion of Coal in a Boiler
 
Cement
CementCement
Cement
 
Pet coke in cement clinker
Pet coke in cement clinkerPet coke in cement clinker
Pet coke in cement clinker
 
Momentum dan impuls
Momentum dan impuls Momentum dan impuls
Momentum dan impuls
 
Burning and cooling
Burning and coolingBurning and cooling
Burning and cooling
 
111658903 kiln-burning-systems
111658903 kiln-burning-systems111658903 kiln-burning-systems
111658903 kiln-burning-systems
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 
Cement rotary kiln questions & answers
Cement rotary kiln questions & answersCement rotary kiln questions & answers
Cement rotary kiln questions & answers
 
Cement mill notebook
Cement mill notebookCement mill notebook
Cement mill notebook
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia Plants
 
Cement Process Chemistry
Cement Process ChemistryCement Process Chemistry
Cement Process Chemistry
 
Bag filter operation pradeep kumar
Bag filter operation pradeep kumarBag filter operation pradeep kumar
Bag filter operation pradeep kumar
 
Influence of process on quality
Influence of process on qualityInfluence of process on quality
Influence of process on quality
 
Burning zone ref failue f
Burning zone ref failue fBurning zone ref failue f
Burning zone ref failue f
 
Red river in clinker cooler
Red river in clinker  coolerRed river in clinker  cooler
Red river in clinker cooler
 
Snow ball formation pradeep kumar
Snow ball formation  pradeep kumarSnow ball formation  pradeep kumar
Snow ball formation pradeep kumar
 
Snowman formation pradeep kumar
Snowman formation pradeep kumarSnowman formation pradeep kumar
Snowman formation pradeep kumar
 

Similar to HATEM MOHAMED ABD EL AZIZ

Similar to HATEM MOHAMED ABD EL AZIZ (20)

My CV2
My CV2My CV2
My CV2
 
eng m hemaid
eng m hemaideng m hemaid
eng m hemaid
 
my C.V Mohanad Zaki
my C.V Mohanad Zakimy C.V Mohanad Zaki
my C.V Mohanad Zaki
 
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)
 
Resume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed ZaherResume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed Zaher
 
Cv qc (002)
Cv qc (002)Cv qc (002)
Cv qc (002)
 
Muh.samir mech power engineer
Muh.samir mech power engineerMuh.samir mech power engineer
Muh.samir mech power engineer
 
Mohanad 123-4
Mohanad 123-4Mohanad 123-4
Mohanad 123-4
 
Eng mostafa magdy cv
Eng mostafa magdy cvEng mostafa magdy cv
Eng mostafa magdy cv
 
C.V ENG.MUSTAFA - 2016 Mech.Engineer
C.V ENG.MUSTAFA - 2016 Mech.EngineerC.V ENG.MUSTAFA - 2016 Mech.Engineer
C.V ENG.MUSTAFA - 2016 Mech.Engineer
 
My Resume
My ResumeMy Resume
My Resume
 
Ehab C V5(2)
Ehab C V5(2)Ehab C V5(2)
Ehab C V5(2)
 
Mechanical Supervisor
Mechanical SupervisorMechanical Supervisor
Mechanical Supervisor
 
Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015Ahmad-Elzidy-CV-12-2015
Ahmad-Elzidy-CV-12-2015
 
Azmy Shata_CV
Azmy Shata_CVAzmy Shata_CV
Azmy Shata_CV
 
E. Mohammad
E. MohammadE. Mohammad
E. Mohammad
 
mohammed ahmed awaad final
mohammed ahmed awaad finalmohammed ahmed awaad final
mohammed ahmed awaad final
 
Mohsen Shalaby
Mohsen Shalaby Mohsen Shalaby
Mohsen Shalaby
 
Nabil suleiman
Nabil suleimanNabil suleiman
Nabil suleiman
 
Personal cv
Personal cvPersonal cv
Personal cv
 

HATEM MOHAMED ABD EL AZIZ

  • 1. HATEM MOHAMED ABD EL AZIZ 3-tamba st.,from tomanbay EL_Zaiton - Cairo - Egypt (+202)22832253 , (+966)508388754 7atemmoh@gmail.commail)-(private E Hatem.abdulaziz@hailcement.commail)-(Work E Objective I am now looking to build on my extensive range of technical skills within a suitably challenging role. I am keen to achieve further professional development. Personal Information Date of Birth: 1/10/1986 Place of Birth: Cairo Nationality: Egyptian Marital Status: married Military status : Exempt from the army Education  B.SC of science (Chemistry)  University name:Ain Shams university, faculty of science.  Accumulative rate of appreciation is: Very Good with Honours 80.34%  Date of graduation : June 2008 Languages  Fluency in spoken and written Arabic and English. Personality Key Strength  Ability to work under pressure.  Excellent team worker (as both team leader or member)  Excellent communication skills.  Totally committed to any work requirment unconditionally.  Self learning ability.  Good thinkig in solving problems . Computer Skills  Operating Systems (Windows XP,vista , 7, 8 and windows 10).  Microsoft Office 2003 and higher (Excel, Word, PowerPoint ).  High Internet and networking knowledge .  SAP End user at HCC.
  • 2. Training  August & Septemper 2008: Summer Training in Arab Swiss Engineering Company (ASEC) at Helwan cement company site.  KILN troubleshooting course at April 2011 (ASEC Training center).  Quality assurance course at september 2011(ASEC Training center).  Dupont Safety Training observation program at HCC at Dec.2014.  Managing safety ( system that work for operations managers) at Jan.2015 from Dupont.  Effective Root cause analysis from APEX at April 2016 inhouse training at HCC.  On site training from refratechnique and Fives Pillard at 2014.  IOSH managing safely at Oct.2016 at HCC. Employment History and Experience 1- March 2012 up to now : a- working at Hail Cement Company at (K.S.A) as a Sr.shift Leader with attending and responsibility at Pre-commissioning & Commissioning period at CDI-Sinoma line 5000 TPD. b- authorized commissioning supervisor at all equipment areas erection and construction and for process & operation Troubleshooting . c- Responsible for preparation of Spare parts annually and refractory bricks and castable needed and anchors also. d- Ensure safe working environment as safety is a core value, apply safety advisories, implement zero safety tolerance, and enhance safety communication, and full responsibility for LOTOTO Permits Implementation, confined space entry,Working at Hights, isolation and de-isolation and risk assessment preparation for each section on plant. e- Supervision and traning new trainees at yammama cement company for two monthes. f- Supervision of DCS Operating Mimic screens at Chengdu-china and rectify undesirable parameters before brought to plant at KSA, and modifications were going on as required. g- Supervision and Mapping of interlocking and auto-loops at Kiln, Raw mill and CM’s. h- Auditing for operation, interlocking and auto-loops of PFIFFER vertical roller mill of the type MPS 5300B. i- Responsible for preparation of Plant Daily Report for production and material stocks and consumed material at first year of operation. j- Ensures the housekeeping of work area and machinery is maintained by respective operating personnel to have trouble-free running of the plant. k- Supervision on operation parameters to ensure our Targets and optimizing SPC, SHC, UF, RF , and coordination with other sections for decrease failure time for any equipment. l- Responsible for preparation of SOP (standard operation procedure) for Crushers, VRM, kiln, cement mill, Cyclone blockage, cooler overload, kiln start up after major shut-down, kiln emergency stoppage due to power failure and others. m- Performing Kiln audit once a year and tracing out false air on system. n- Member at at STOP observation team to enhance safety culture for all employees. o- Team member at RCA for analysis the recent problem specially repeated ones. p- Team member at Optimization team to achieve best Productivity efficiency. q- Team leader at Kiln SD and responsible for Kiln Area for brick lining and castable work and complete supervision on refractory contractor. r- Received safety award for Best near Miss report for June and Aug. 2016. s- Assessor of Risk assessments related to Production works . 2- March 2011 to March 2012:  Working at ASEC Enginering & Management at SINAI(Grey) Cement Company , as kiln operator ( FLSMIDTH (ILC) type) at both lines with coolax grate cooler and cross bar cooler With Major responsibility at shut- dawn to rectify damaged equipment and installation of preheater and kiln refractory.
  • 3. 3- August 2010 to March 2011:  Working at ASEC Enginering & Management at AL-TAKAMOL cement plant-Atbara-SUDAN, working as commissioning Engineer and as operator for (HUMMER IMPACT crusher operator, ATOX 40 vertical mill operator, kiln operator ( FLSMIDTH (ILC) type) by meaning of full line operator. 4- August 2008 to August 2010: 1- Working at ASEC Enginering & Management at Misr Beni Suef Cement Company as Raw Mill (tube mill) & cement Mills & crushers Operator. 2- Kiln Operator from september 2009, working with FLSMIDTH line (ILC) and attend commissioning of polysius line (OLC) (Second Line). References I here declare that all the information mentioned above is true. (References will be furnished Upon Request)