SlideShare a Scribd company logo
1 of 108
Download to read offline
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
1
Henan Dingli Pole&Tower CO.,LTD.
Qualification Documents
In 2015
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
2
Ⅰ.Company Profile........................................................................................................4
1. Brief introduction..............................................................................................4
2.Organization Strcture........................................................................................6
3.Development Process........................................................................................7
4.Capacity.............................................................................................................7
ⅡBusiness License........................................................................................................9
1.BUSINESS LICENSE OF INCORPORATION ................................................9
2.TAX REGISTRATION CERTIFICATE..........................................................13
3.ORGANIZATION CODE CERTIFICATE......................................................15
4.CERTIFICATE.................................................................................................17
CERTIFICATE....................................................................................................18
5.ISO System Certificate .....................................................................................19
Ⅲ.Product Certification...............................................................................................21
1..PRODUCT TEST REPORT 500KV Tower....................................................24
2. PRODUCT TEST REPORT 750KV tower.....................................................32
3. Report for 220kV steel tubular pole ..............................................................40
4. Report for 750kV steel tubular substation strucure .........................................43
4. Report for 1000kV steel tubular tower ............................................................46
Ⅱ.Equipment list.........................................................................................................50
1.Main production equipment condition,quantity and technological level .......61
1.1The main production equipment of steel products................................61
Production Equipment.................................................................................61
3.Test Equipment.................................................................................................66
4. Cone - shaped concrete steel mold for electric pole.......................................68
5. Assembling Mold ..........................................................................................69
Ⅳ.Experience.......................................................................................................71
1.Oversea Experience in 10 years-Part1..............................................................71
2.TABLE OF EXPERIENCE MANUFACTURER .................................................75
Ⅳ.Quality System..........................................................................................................1
1 Raw material procurement and quality control documents ................................1
2) Quality Control System..........................................................................2
2 Quality Guarantee Measures...............................................................................3
Quality Guarantee Measures of Lattice Steel Tower.............................3
1. Quality Guarantee Measures of Working Drawing Setting out : .....3
2. Quality Guarantee Measures of Raw Materials:................................3
3. Quality Guarantee Measures of Processing: .....................................4
4. Quality Guarantee Measures of Welding............................................4
5. Ensuring measures for the inspection and test..................................5
3.Quality Guarantee Measures of Concrete Pole...................................................7
Raw materials procurement and quality control regulations .................................7
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
3
4.Verification test of program raw materials testing or validation and periodic .12
5.Table 1 Inspection items of steel materials, inspection quantity, and
implementation of standard..................................................................................14
6.Table 1 Implementation standard for Inspection items.....................................16
Inspection frequency of concrete materials .........................................................16
Ⅴ.HOT-DIP GALVANIZING PROCESS INSTRUCTION......................................20
Forward..........................................................................................................................I
1.Objective.............................................................................................................3
2.Scope...................................................................................................................3
3.Job responsibilities..............................................................................................3
4.Reference ............................................................................................................4
5.Working Process .................................................................................................4
6.Specifications......................................................................................................9
7.Quality Requirement.........................................................................................10
8.Working Environment and Safety ....................................................................11
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
4
Ⅰ.Company Profile
1. Brief introduction
Henan Dingli Pole&Tower Co., Ltd.is located in "Chinese Ancestor cultural village, China
Metallurgical cast-iron sword," and the Xiping County, Henan Province, is the largest
transmission line tower, Henan Province, substation steel frame, electrified railway catenary
pillars of professional production manufacturers, Henan Building Materials Industry Association.
The company's existing plant structures, concrete products plants, three hot-dip galvanizing
plant plant, covering 300,000 square meters, registered capital of 50 million yuan, annual output
value of 500 million yuan.
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
5
1.Brief Introduction
The company has 40 years of production history, with Wangjiagongcheng Transmission
Technology Research Center of Henan Province, earth power design companies and other
research institutions, many times assume the provincial, city major scientific and technological
projects.
Produced 220BSSZ-30 with four towers centrifugal thin-walled steel concrete pole back for
Henan Science and Technology Achievement Award in 2007; single tube continuous beam 220KV
power station in Henan Science and Technology Achievement Award obtained in 2009 ; station
steel frame of new technology applied to Shaanxi Weinan 750KV substation; communications
tower technology to study Hefei - Wuhan, Wuhan - Guangzhou Passenger Line GSM-R
communication system. Number of research provincial and municipal scientific and technological
progress awards, more than ten patents protected by the State.
The company is equipped with advanced CNC 3200 tons hydraulic bending machine, CNC
angle line, CNC intersection Cutting, CNC gantry drilling machine, CNC flange assembly and
welding production lines, CNC concrete stir bar stations, automatic submerged arc welding
machine, coil machines, shears, universal testing machine, salt spray test machine, impact testing
machine, five elemental analyzer, ultrasonic flaw detector, etc. more than four hundred pieces
(sets) of production, inspection and test equipment. Mature technology, advanced technology,
strong product development and innovation, manufacturing capacity. UHV main products are
steel towers, substation steel frame, single-column steel pole, steel centrifugal thin-walled
concrete poles, angle steel tower, communication tower, concrete poles, pillars and other
electrified railway catenary.
In 1999 the company took the lead through peer quality management system certification in
2007 through energy (Beijing) Certification Center PCCC certification, the company in 2008 was
named "Henan Quality Management Business Excellence." "Full" brand was named "Henan
Province", the Henan provincial government awarded the "Henan Province Famous Brand" title,
year after year won Henan Province, "Quality Trustworthy Enterprise" and Henan Province, "the
contract and trustworthy enterprises". Products sold in more than 20 provinces and cities
including Beijing, Tianjin, etc., into the Beijing Olympic project, Xiaolangdi Project, and exported
to India, Zambia, Pakistan and other countrie
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
6
2.Organization Strcture
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
7
3.Development Process
In 1996, Xiping Country Concrete Pole Making Factory was established.
In 1998,transformed into-joint-stock enterprises with modernization management.
In 2002,it was change registered as Xiping County Xiping Electric Pole.,LTD.
In 2003,it was change registered as Henan Dingli Steel Pole CO.,LTD.with the
registered capital of 17.06 million RMB,extending the production line from concrete
poles to tranmission line tower series.
In 2004,substation structure produced by us exported to Zambia,we began to expand
the global market.
In 2008,it was change registered as “Henan Dingli Pole&Tower CO.,LTD.”,the
registered capital increased to 50 million RMB.
In 2010,the products enter into the America market,completion timely the production
and supply mission of 2700 tons of steel tubular pole for Trinidad and Tobago.
In 2011,passed the strict authentication of the China Sate Grid Corporation and
become one of the fifteen among first batch 1000kV UHV steel tubular tower
manufacturer.
In 2014,become qualified supplier of China Electric Power Equipment and
technology CO.,LTD,besides,more than 1500 ton substation steel structure was
supplied for 500 GDHA engineering project in Ethiopia.
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
8
4. Capacity
Main products and production capacity of bidding products
Main products:
Transmission angle steel tower, transmission steel tube pole,
substation structures, radio TV tower, microwave communication
tower, lightning protection decoration tower
Yearly output 9600 tons
Monthly output 8000 tons
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
9
ⅡBusiness License
1.BUSINESS LICENSE OF INCORPORATION
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
10
BUSINESS LICENSE OF INCORPORATION
[COPY]
(TRANSLATION)
REGISTRATION NO:YGSQ4100001007570-1/1
Name: Henan Dingli pole & tower co., Ltd
Type of Enterprise: Joint-stock Limited Liability company
Address: Middle of Yingbin Av. Xiping County, Henan province
Legal Representative: Li Liucheng
Registered Capital: RMB 50 Million
Establishment Date: March 26, 2001
Business Validity: From March 26, 2001 to Nov 30, 2033
Business Scope: Production & sales of concrete wire pole, transmission line tower,
steel-pipe pole (tower), lamp pole of road light, drainage water pipe, steel pole,
communication tower, substation steel structure, electrified railway overhead contact
system of electrified railway, circular prestressed concrete pole and prestressed
concrete pole with acrossed-webmember, communication tower, steel structure of
substation. import and export business (except for a limited countries). (not including
the items that must be examined and approved as per the laws and regulations issued
by the state)
Registration Authority: Henan Administration for Industry & Commerce
Henan Administration for Industry & Commerce (seal)
Record of Annual Renewal:
REMARKS:
1: BUSINESS LICENSE OF INCORPORATION is the legal certificate of the
Incorporation and the legal business;
2: BUSINESS LICENSE OF INCORPOTATION includes original and copy and
the original and copy have the same legal effect; and the BUSINESS LICENSE OF
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
11
INCORPORATION must be put in the place publicly; the Incorporation can obtain
some copies as per the requirement of its business;
3: BUSINESS LICENSE OF INCORPORATION cannot be counterfeited,
altered, rented, borrowed and transferred and it cannot be detained and withdrawn and
cancelled by any unit and individual except the registration authority;
4: The Incorporation must carry out its business activities as per the registered
business scope;
5: If any of the registered items changes, the Incorporation should submit the
application concerning the alteration and change to the registration authority;
6: The annual renewal should be handled with the registration authority from
Mar 1 to Jun 30 of each year;
7: While the Incorporation meets cancellation, the original and copy must be
returned returned to the registration authority. The BUSINESS LICENSE OF
INCORPORATION will be in invalidity if it is cancelled by the registration authority;
CERTIFICATE OF QUALITY MANAGEMENT SYSTEM IDENTIFICATION;
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
12
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
13
2.TAX REGISTRATION CERTIFICATE
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
14
TAX REGISTRATION CERTIFICATE
(copy)
NO: YG(S)XP(Z)412824176075049
Taxpayers Name: Henan Dingli pole & tower co., Ltd
The legal representative (responsible person): Li Liucheng
Address: Middle of Yingbin Av. Xiping County, Henan province
Registration Type: Joint-stock Limited Liability company
Business Scope: Production & sales of concrete wire pole, transmission line tower,
steel-pipe pole (tower), lamp pole of road light, drainage water pipe, steel pole,
communication tower, substation steel structure, electrified railway overhead contact
system of electrified railway, circular prestressed concrete pole and prestressed
concrete pole with acrossed-webmember, communication tower, steel structure of
substation. import and export business;
Approval Authority: Business Administration bureau of Xiping County, Henan
province
Withholding obligations: according to the law to determine
Issuing the tax authorities: State Administration of Taxation Xiping County,
Zhumadian City (seal)
Date of Issue: June 17,2008
State Administration of Taxation Producer
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
15
3.ORGANIZATION CODE CERTIFICATE
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
16
Organization Code Certificate
The People’s Republic of China
(TRANSLATION)
(copy)
Code: 17607504-9
Name of Organization: Henan Dingli pole & tower co., Ltd
Address: Middle of Yingbin Av. Xiping County, Henan province
Duration:June 16 2008 to June 16 2012
Issuing unit: Quality and Technical Supervision Bureau
Registration number: ZDG411700-012205-1
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
17
4.CERTIFICATE
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
18
CERTIFICATE
(TRANSLATION)
Henan Dingli steel pole Co., Ltd is approved of the registration to
Business Administration bureau of Zhumadian City. Change the name of
the company is : Henan Dingli pole & tower co., Ltd
Hereby certify
Business Administration bureau of Xiping County
June 26, 2008
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
19
5.ISO System Certificate
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
20
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
21
Ⅲ.Product Certification
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
22
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
23
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
24
2.PRODUCT TEST REPORT 500KV
Tower
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
25
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
26
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
27
PRODUCT TEST REPORT (Translation)
Electric Power of Tower Industry Quality Inspection Testing Center
Product Test Report
NO. (WJ)Z 002
Inspected Unit: Henan Dingli Pole & Tower Co., Ltd
The Name of Product: Transmission Line Tower
Test Category: 500KV
Testing Center Seal: Power Industry Electric Equipment and lines
Material Quality Inspection Test Center
Report Sent Date: 5 Feb, 2007
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
28
Electric Power of Tower Industry Quality Inspection Testing Center
Inspected Unit
Henan Dingli Pole & Tower
Co., Ltd
Business
license
Delegate
unit
Henan Dingli Pole &
Tower Co., Ltd
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
29
No. :200702001
Legal
Representative
Li Liucheng Issued of
Units
Henan Administration for
Industry & Commerce
Type of Enterprise
Joint-stock Limited Liability
company Issue of time 18 Apr, 2006
Address
Middle of Yingbin Av.
Xiping County, Henan
province
Test Category 500KV
The Name of
Product
Transmission Line Tower standard GB/T2694-2003
Quantity of Sample ZBV11(type)995(parts)
Quantity of
Sample
ZBV11(type)118(parts)
Location of
Sampling
Scene
Location of
Test
Scene
Sampling Zhang Enping Verifier Qian qiang
Main Tesing Equipment
layer Intellective Thickness Tester, Caliper, Ultrasonic Wave Detection
Equipment
Test
Results
Test results meet the standard requirements
Inspector
Qian Qiang
Zhang Enping
writer Qian Qiang checker Yu Li
Verifier Wang Zaifei Approved Li Jinchun
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
30
Electric Power of Tower Industry Quality Inspection Testing Center
No.:200702001
No. Type Inspection Item
Quality
Index
Sampl
e Size
Determin
e number
of group
Measured results
Determin
e results
Ac Re
number
Qualifie
d
Number
failed
1
ItemA
Steel Dimensions standard 32 0 1 32 0 Qualified
2
Parts
size
Main material
Pass
Rate
%
≥95 8 1 2 8 0 100%
3 connector ≥95 3 0 1 3 0 100%
4 plate ≥90 13 1 2 13 0 99.7%
5 Belly material ≥85 20 2 3 20 0 100%
6 Weldment ≥85 2 0 1 2 0 99.6%
7
Test
assembly
Place of
the rate
%
≥99 1 0 1 1 0 99.6%
8
Concentric
rate
≥96 1 0 1 1 0 99.6%
9
Zinc
coating
Thickness
standard
32 2 3 31 1 Qualified
Appearanc
e
32 2 3 32 0 Qualified
10
ItemB
Steel Material
Meet
requirement
of
Drawing
2 0 1 2 0 Qualified
11
Zinc
coating
Average
meet the
standard
3 0 1 3 0 Qualified
12 Adhesion
meet the
standard
3
0 1 3 0 Qualified
13 Size of Test assembly
Meet
requirement
of
Drawing
1 0 1 1 0 Qualified
Conclusion Qualified
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
31
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
32
2. PRODUCT TEST REPORT 750KV tower
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
33
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
34
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
35
PRODUCT TEST REPORT(Translation )
Power Industry Power Equipment and Transmission Materials
Test Center
Product Test Report
NO. (WJ)Z(2012)286
Product: Transmission Line Tower
Unit Name: Transmission Line Tower 750KV
Inspected Unit: Henan Dingli Pole & Tower Co., Ltd
Test Category: Production License Inspection
Seal of the Detection Center : Power Industry Electric Equipment and
lines Material Quality Inspection Test Center
Date of Issue: 08 Dec, 2012
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
36
Power Industry Electric Equipment and lines Material Quality Inspection Test
Center
Report NO.: NO. (WJ)Z(2012)286 Page1/2
Product Name Transmission Line
Tower
Specification
Type
750KV-ZB1292-36.0m
Inspected Unit Henan Dingli Pole
&Tower
CO.,LTD.
Address of
Inspected Unit
Middle of Yingbin
Ave. Xiping County,
Henan Province,
Sampling Site Finish Product
Warehouse of
Henan Dingli Pole
&Tower
CO.,LTD.
Sample Level Qualified
Sampling
Personnel
Jindong
Ren,Wenhui Shi
Number of Type 1 Base( 1549 Pieces)
Batch
NO./Production
Date
October 10th
,2012 Number of
Sample
1 Base( 172Pieces)
Sampling Date October 10th
,2012 Inspection Site Steel Test: In the Lab
Other item: Inspected
Unit
Inspection
Standard
GB/T269-2010 Transmission line tower manufacturing technical
conditions
Inspection Date On site inspection date: October 28th
,2012 Materials Inspection
Date: Dec 07th
,2012
Inspection
Conclusion
The product inspection about transmission lien tower is
conducted under the standard of GB/T2694-2010,it meet all the
requirement in the specification standard.
Notes 1. Experience environment: temperature:22 Celsius
degree ,humidity 55%.
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
37
2. Responsible for sampling test.
No. :200702001
Power Industry Electric Equipment and lines Material Quality Inspection Test
Center
NO. (WJ)Z(2012)286
No.
Item
Type
Inspection Item
Quality
Index
Sampl
e Size
Determine
number of
group
Measured results
Results
Ac Re
Qualifie
d
number
unqualifie
d number
1
ItemA
Internal
quality of
welding
seam
Class A UT B I / / / / / /
Class B UT B II
3
0 1 3 0
Qualifi
ed
2 Steel material
Consistent
with the
requirement
s of the
drawing
2 0 1 2 0
3
Zinc
Coatin
g
Uniformity
Meet
requirement
of standard
3 0 1 3 0
4 Adhesive
Meet
requirement
of standard
3 0 1 3 0
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
38
5 Prototyping Size
Consistent
with the
requirement
s of the
drawing
1 0 1 1 0
Appearance of Steel
Meet
requirement
of standard
50 0 1 50 0
Dimension of Steel
Meet
requirement
of Technical
agreement
50 0 1 50 0
6
Dimensio
n of parts
Zinc
coating
Main
Materials
Item
quali
fied
Rate
%
≥95 8 1 2 8 0
7 Connector ≥95 8 1 2 8 0
Plate ≥90 20 1 2 20 0
Belly
Materials
≥85 32 2 3 32 0
8 Weldment
Item
quali
fied
Rate
%
≥95 3 0 1 3 0 Qualified
9
ItemB
Quality of
Welding
Materials
Class 1 ≥95 / / / / / Qualified
Class 2 ≥95 3 0 1 3 0 Qualified
Class 3 ≥95 / / / / / Qualified
Appearance Size of
Welding seam
≥95 3 0
1
3 0 Qualified
10
Pre-As
sembly
In position
Rate
%
≥99 3 0 1 3 0 Qualified
11
Rate of
Concentric
Hole
≥96 3 0 1 3 0 Qualified
Zinc
Coatin
g
Thickness Meet
requirement
of standard
40 3 4 40 0 Qualified
Appearance 40 3 4 40 0 Qualified
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
39
12 Size of Test assembly
Meet
requirement
of
Drawing
1 0 1 1 0 Qualified
Conclusion Qualified
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
40
3. Report for 220kV steel tubular pole
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
41
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
42
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
43
4. Report for 750kV steel tubular substation strucure
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
44
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
45
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
46
4.Report for 1000kV steel tubular tower
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
47
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
48
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
49
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
50
3.Raw Materials Testing Report
品种 Type:角钢 Profile
编号 No.:BLWY-J-003
序
号
Item
制 造 单
位
Manufact
urer
规格
Profile
牌号
Material
炉批号
Batch No.
试验
编号
Test No.
化 学 成 分
Chemical(%)
力 学 性 能 Mechanical
结论
Result碳
C
硅Si
锰
Mn
磷
P
硫
S
屈服
强度
MPa
抗拉
强度
MPa
断 后
伸 长
率 A%
冷弯
180º
冲击吸收能量 KV2
J(20℃)
1 2 3
平
均
AVG
标准要求值 Standard Value
≤0.2
0
≤0.5
0
≤1.7
0
≤0.0
3
5
≤0.0
3
5
≥345
470-63
0
≥20 ≥34
1
河北唐
山
Tangshan
∠ 140×
10
Q345B
3B03830B
E0
2015-J-6
60
0.14 0.32 1.28 0.026
0.01
1
376 535 33.0
合格
Qualifi
ed
11
6
122 108 115
合格
Qualifie
d
2
河北唐
山
∠ 125×
8
Q345B
3B14408B
E0
2015-J-6
62
0.15 0.32 1.40 0.018
0.02
1
390 538 32.0
合格
Qualifi
10
8
100 106 104
合格
Qualifie
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
51
Tangshan ed d
3
河北宣
化
Xuanhua
∠ 180×
16
Q345B
14250065
0
2015-J-6
76
0.07
8
0.31 1.37 0.024
0.01
8
400 584 30.0
合格
Qualifi
ed
10
0
114 106 107
合格
Qualifie
d
执行标准
Material
Standard
GB700-2006 碳素结构钢 carbon structureal steel
GB/T1591-2008 低合金高强度结构钢 low alloy high intensity
structure steel
检 测 设 备 及
状态 Status
WE-60、LSK750B、良好
Good
备注 Remark
“化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同;
The content of chemical should be correspond with manufacturer’s quality certificate.
试验员 Inspect: 审核 Revise:
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
52
品种 Type:角钢 Profile
编号 No.:BLWY-J-002
序
号
Item
制 造 单
位
Manufact
urer
规格
Profile
牌号
Material
炉批号
Batch No.
试验
编号
Test No.
化 学 成 分
Chemical(%)
力 学 性 能 Mechanical
结论
Result碳
C
硅Si
锰
Mn
磷
P
硫
S
屈服
强度
MPa
抗拉
强度
MPa
断 后
伸 长
率 A%
冷弯
180º
冲击吸收能量
KV2 J(20℃)
1 2 3
平
均
AVG
标准要求值 Standard Value
≤0.2
0
≤0.5
0
≤1.7
0
≤0.0
3
5
≤0.0
3
5
≥345
470-63
0
≥20 ≥27
1
河北唐
山
Tangshan
∠45×
4
Q235B 152326
2015-J-5
35
0.12 0.30 0.34 0.018
0.01
1
304 427 30.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
2
青县冀
丰
QingXian
∠75×
5
Q235B 07-2456
2015-J-5
48
0.15 0.28 0.36 0.021
0.01
7
280 429 32.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
3
青县冀
丰
∠100
×7
Q235B 04-0722
2015-J-5
38
0.14 0.28 0.34 0.27
0.01
9
284 422 31.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
53
QingXian
4
青县冀
丰
QingXian
∠70×
5
Q235B 07-1456
2015-J-5
54
0.15 0.26 0.44 0.011
0.01
3
284 450 30.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
5
天津仁
翼
TianJin
∠50×
5
Q235B 15051204
2015-J-5
57
0.14 0.26 0.38 0.019
0.02
3
305 446 30.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
执行标准
Material
Standard
GB700-2006 碳素结构钢 carbon structureal steel
GB/T1591-2008 低合金高强度结构钢 low alloy high intensity
structure steel
检 测 设 备 及
状态 Status
WE-60、LSK750B、良好
Good
备注 Remark
“化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同;
The content of chemical should be correspond with manufacturer’s quality certificate.
试验员 Inspect: 审核 Revise:
品种 Type:角钢 Profile
编号 No.:BLWY-J-001
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
54
序
号
Item
制 造 单
位
Manufact
urer
规格
Profile
牌号
Material
炉批号
Batch No.
试验
编号
Test No.
化 学 成 分
Chemical(%)
力 学 性 能 Mechanical
结论
Result碳
C
硅Si
锰
Mn
磷
P
硫
S
屈服
强度
MPa
抗拉
强度
MPa
断 后
伸 长
率 A%
冷弯
180º
冲击吸收能量 KV2
J(20℃)
1 2 3
平
均
AVG
标准要求值 Standard Value
≤0.2
0
≤0.5
0
≤1.7
0
≤0.0
3
5
≤0.0
3
5
≥345
470-63
0
≥20 ≥34
1
河北宣
化
XuanHua
∠125
×
10
Q345B
14250973
8
2015-J-5
20
0.16 0.30 1.28 0.025
0.01
7
404 584 27.0
合格
Qualifi
ed
12
0
114 110 115
合格
Qualifie
d
2
河北宣
化
XuanHua
∠100
×7
Q345B
14250974
1
2015-J-5
21
0.14 0.31 1.22 0.019
0.02
0
388 554 31.0
合格
Qualifi
ed
66 74 78 73
合格
Qualifie
d
3
青县冀
丰
QingXian
∠90×
7
Q345B 07-2323
2015-J-5
50
0.14 0.30 1.17 0.018
0.02
0
380 527 30.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
4
安阳钢
铁
∠63×
5
Q345B
5S11437E
2
2015-J-5
78
0.15 0.30 1.29 0.018
0.01
6
406 566 29.0
合格
Qualifi
/ / / /
合格
Qualifie
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
55
AnYang ed d
5
安阳钢
铁
AnYang
∠75×
5
Q345B
5W06130
15A
2015-J-5
79
0.15 0.33 1.29 0.018
0.01
6
430 547 28.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
6
安阳钢
铁
AnYang
∠75×
6
Q345B
5W07090
18
2015-J-5
80
0.14 0.30 1.28 0.016
0.01
5
351 533 37.0
合格
Qualifi
ed
/ / / /
合格
Qualifie
d
执行标准
Material
Standard
GB700-2006 碳素结构钢 carbon structureal steel
GB/T1591-2008 低合金高强度结构钢 low alloy high intensity
structure steel
检 测 设 备 及
状态 Status
WE-60、LSK750B、良好
Good
备注 Remark
“化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同;
The content of chemical should be correspond with manufacturer’s quality certificate.
试验员 Inspect: 审核 Revise:
品种 Type:钢板 Plate
编号 No.:BLWY-B-001
序 制 造 单 规格 牌号 炉批号 试验 化 学 成 分 力 学 性 能 Mechanical 结论
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
56
号
Item
位
Manufact
urer
Profile Material Batch No. 编号
Test No.
Chemical(%) Result
碳
C
硅Si
锰
Mn
磷
P
硫
S
屈服
强度
MPa
抗拉
强度
MPa
断 后
伸 长
率 A%
冷弯
180º
弯曲/压
扁
冲击吸收
能量 KV2
J (20℃)
标准要求值 Standard Value
≤0.2
0
≤0.3
5
≤1.4
0
≤0.0
4
5
≤0.0
4
5
≥235
370-50
0
≥26 ≥27
1
安阳钢
铁
Anyang
8 Q235B /
2015-B-3
19
0.16 0.20 0.52 0.022
0.01
2
319 448 31
合格
Qualifi
ed
/ /
合格
Qualifie
d
2
中普邯
郸
Handan
10 Q235B
15101018
48
2015-B-4
01
0.14 0.22 0.52 0.020
0.01
2
311 470 32
合格
Qualifi
ed
/ /
合格
Qualifie
d
3
邯宝钢
铁
Hanbao
6 Q235B 1511621
2015-B-4
36
0.14 0.19 0.46 0.020
0.01
0
299 438 31
合格
Qualifi
ed
/ /
合格
Qualifie
d
4
安阳钢
铁
Anyan
12 Q235B L516625
2015-B-3
30
0.15 0.21 0.46 0.020
0.01
6
355 469 32
合格
Qualifi
ed
/ /
合格
Qualifie
d
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
57
执行标准
Material
Standard
GB700-2006 碳素结构钢 carbon structureal steel
GB/T1591-2008 低合金高强度结构钢 low alloy high intensity
structure steel
检 测 设 备 及
状态 Status
WE-60、LSK750B、良好
Good
备注 Remark
“化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同;
The content of chemical should be correspond with manufacturer’s quality certificate.
试验员 Inspect: 审核 Revise:
S t e e l T e s t i n g R e p o r t
Project Name: Kaifeng Xu county Xiangfu-Minghe 220KV Transmission line Page1/2
Executive
Standard
GB/T706-2006、GB/T709-2006、GB/T1591-2008 Physical Performance Chemical Analysis % Testin
g
Sum
mary
Report NO. Manufacturer
Batch
(t)
Name
of
Angle
Steel
Type
Specificati
on
(mm)
Yield
Strengt
h
Tensile
Strengt
h
Elong
ation
δ5%
Cold
Bendi
ng
C
%
Si
%
Mn
%
P
%
S
%
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
58
Steel (Mpa)(Mpa)
2014-J-1095
Tangshan
Yuefeng
1.738
Angle
Steel
Q235B ∠ 90×7 308 471 34.0
Qualif
ied
0.16 0.26 0.45 0.016 0.022
Qualif
ied
2014-J-1096 Qingxian Jifeng 0.945
Angle
Steel
Q235B ∠ 100×8 285 425 36.0
Qualif
ied
0.15 0.26 0.52 0.020 0.022
Qualif
ied
2014-J-1098 Hebei steel 2.089
Angle
Steel
Q345B ∠ 180×12 396 572 30.5
Qualif
ied
0.16 0.27 1.32 0.018 0.019
Qualif
ied
2014-J-1099 Hebei stee 1.375
Angle
Steel
Q420B ∠ 140×10 458 608 29.0
Qualif
ied
0.14 0.27 1.46 0.019 0.022
Qualif
ied
2014-J-1100 Hebei stee 5.589
Angle
Steel
Q420B ∠ 140×12 457 613 28.0
Qualif
ied
0.14 0.31 1.46 0.020 0.008
Qualif
ied
2014-J-1101 Hebei stee 1.088
Angle
Steel
Q420B ∠ 200×18 467 600 27.0
Qualif
ied
0.18 0.27 1.36 0.017 0.024
Qualif
ied
2014-J-1102 Hebei stee 4.805
Angle
Steel
Q420B ∠ 200×20 514 629 26.0
Qualif
ied
0.18 0.30 1.52 0.019 0.007
Qualif
ied
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
59
Test: Examine:wanghuijie Date:May
20th,,2012
S t e e l T e s t i n g R e p o r t
Name of Project: Luoyang 11kV expansion transmission and transformation line project
Page2/2
Executive
Standard
GB/T700-2006、GB/T709-2006、GB/T1591-2008 Physical Performance Chemical Analysis %
Testi
ng
Sum
mary
Report NO. Manufacturer
Batch
(t)
Name
of
Angle
Steel
Steel
Type
Specificati
on
(mm)
Yield
Strength
(Mpa)
Tensile
Strength
(Mpa)
Elong
ation
δ5%
Cold
Bend
ing
C
%
Si
%
Mn
%
P
%
S
%
2014-B-360 Anyang Steel 5.775
Steel
Plate
Q420B δ16 427 567 30.0
Quali
fied
0.14 0.27 1.58 0.017 0.014
Quali
fied
2014-B-361 Anyang Steel 2.798 Steel Q420B δ20 428 571 31.0 Quali 0.14 0.27 1.53 0.012 0.011 Quali
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
60
Plate fied fied
2014-B-362 Anyang Steel 4.179
Steel
Plate
Q420B δ22 441 580 25.0
Quali
fied
0.13 0.26 1.30 0.014 0.012
Quali
fied
2014-B-363 Anyang Steel 2.981
Steel
Plate
Q420B δ18 424 540 32.0
Quali
fied
0.13 0.26 1.51 0.014 0.013
Quali
fied
Test: Examine:wanghuijie Date:
May 20th,,20
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
61
Ⅱ.Equipment list
1.Main production equipment condition,quantity and technological level
1.1The main production equipment of steel products
Production Equipment
Name of Equipment Type of Equipment Quantity Equipment Band &Origin Ensure process quality
CNC-Angle Steel Hole Drilling
Production Line
BL2532 1
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of Punching
Accuracy
CNC-Angle Steel Hole
Punching Production Line
JX20 1
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of Punching
Accuracy
CNC-Angle Steel Hole
Punching Production Line
BL1412 1
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of Punching
Accuracy
CNC-Angle Steel Hole
Punching Production Line
AP16 2
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of Punching
Accuracy
CNC-Angle Steel Hole
Punching Production Line
BL2020C 1
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of Punching
Accuracy
Steel Plate Automatic
Production Line
PP103 2
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of Punching
Accuracy
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
62
Steel Plate Automatic
Production Line
CJ-100 1
Jinan Fenster CNC machinery
CO.,LTD.
Qualified of Punching
Accuracy
Plate Shearing Machine Q12Y-16×3200 2 Taian hualu Machinery Co., Ltd. Qualified of Baiting Size
Plate Shearing Machine Q12Y-20×2500 1
Tianshui Metalforming
Machinery tool CO.,LTD.
Qualified of Baiting Size
Plate Shearing Machine QC12Y-25×2500 2
Wuxi Golden Machinery
CO.,LTD.
Qualified of Baiting Size
CNC Bending Machine WE67K-300/7000 2
Wuxi Golden Machinery
CO.,LTD.
Qualified of Machining
Accuracy
CNC Bending Machine WE67K-600/6000 2
Wuxi Golden Machinery
CO.,LTD.
Qualified of Machining
Accuracy
CNC Bending Machine WE67K-1600/7000 2
Wuxi Golden Machinery
CO.,LTD.
Qualified of Machining
Accuracy
CNC Intersecting Cutting
Machine
GS/G-600 1
WUXI Hualian Precision
Machinery Co., Ltd. Qualified of Baiting Size
CNC Vertical Cutting Machine GS/Z-4000 3
WUXI Hualian Precision
Machinery Co., Ltd.
Qualified of Baiting Size
CNC Flame Cutting
Machine/CNC Plasma
Machine
BODA-4000 1
Jiangsu Boda Equipment
CO.,LTD.
Qualified of Baiting Size
CNC Plane Drilling Machine ZK-5550 1
WUXI Hualian Precision
Machinery Co., Ltd.
Qualified of Drilling
Accuracy
CNC Plane Drilling Machine PLD2016 2
Shandong Fin CNC Machine
Co.,Ltd.
φ80 Drilling Machine Z3080×25 1 Shenyang Czech
Qualified of Drilling
Accuracy
Radial Drilling Machine Z3050×16 3 Shenyang Czech
Qualified of Drilling
Accuracy
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
63
Radial Drilling Machine Z3032×8 6 Shenyang Czech
Qualified of Drilling
Accuracy
Rolling Shear Chamfering
Machine
GD-20 1
WUXI Sanlian Machinery Co.,
Ltd.
Qualified of Machining Size
Pipe Beveling Machine SDJ-800 1 Wuxi Yexin Qualified of Machining Size
Name of Equipment Type of Equipment Quantity Equipment Band &Origin Ensure process quality
Rolling Shear Chamfering
Machine
JD-20 2
Jinan Fenster CNC machinery
CO.,LTD.
Qualified of Machining Size
Fixed Type Tube Two-way
Sloping Machine
FPEBM-16D1 1
Shanghai qianshan piping
technology limited company
Qualified of Machining Size
Lathe CW61253B 1 Shenyang machine tool factory Qualified of Machining Size
Lathe CW6163B 3
Anyang Lathing Equipment
Factory Qualified of Machining Size
Lathe C630 1
Anyang Lathing Equipment
Factory
Qualified of Machining Size
Open-type press with fixed
bed
J21-80 3
Xingyang Hengli Lathing
Machine Production Factory
Qualified of Punching Hole
Accurate
Multi-point Forming Machine YQ32-31.5T 1
Tengzhou hydraulic equipment
CO.,LTD.
Accept Standard of
Pressure
Straight Pipe flange
automatic welding
production line
PLHZ-1000 1
Tangshan Kaiyuan Panasonic
welding equipment CO.,LTD.
Accept Standard of
Welding
Automatic welding machine
for pipe prefabrication
PPAWM-24A6 1
Shanghai qianshan piping
technology limited company
Accept Standard of
Welding
Automatic welding machine
for pipe prefabrication
PPAWM-40A8 1
Shanghai qianshan piping
technology limited company
Accept Standard of
Welding
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
64
Submerged arc welding
machine
ZD5-1000 3
Tangshan Kaiyuan Panasonic
welding equipment CO.,LTD.
Accept Standard of
Welding
Submerged arc welding
machine
ZD5-630 2
Tangshan Kaiyuan Panasonic
welding equipment CO.,LTD.
Accept Standard of
Welding
Submerged AC arc welding
machine
BX3-500 60
Shanghai electric welding
machine works
Accept Standard of
Welding
CO2 Gas-shielded welding
machine
NBC-500Ⅱ 70 Aotai Electric Co.,Ltd
Accept Standard of
Welding
CNC Divisional fire machine THQ250-600B 1
Zhucheng Ivy machinery
technology limited
Qualified Size of Bending
precision
Steel pipe baiting machine GGX-100 1
Henan Dingli Pole&Tower
CO.,LTD.
Qualified Size of Pipe
Baiting
Sense Heating Machine WH-Ⅷ-160 1
Zhengzhou Guoyun Electric
Technology CO.,LTD.
Qualified Size of Bending
precision
CNC Control double-ended
notching machine
JQC-426-12 1
Tangshan Kaiyuan Panasonic
welding equipment CO.,LTD.
Qualified Size of Grooving
precision
Planning Machine (Trip
Planer is not less than
1000mm)
BY-2500 1 Fujian Machine Tool Factory
Qualified of maching
dimension
Lathe B665 1 Jianxian Lathe Mahine Factory
Qualified of maching
dimension
Shaping Machine BY60100B 1 Tianshui Machine Tools Factory
Qualified of maching
dimension
Hydraulic Angle cutter QJ-200 2
Shandong Fin CNC Machine
Co.,Ltd.
Qualified of maching
dimension
Metal band sawing machine G4240/50 2 Zhejiang Chenglong
Qualified of baiting
dimension
Plasma cutting machine
YP-060PS 4
Tangshan Kaiyuan Panasonic
welding equipment CO.,LTD.
Qualified of baiting
dimension
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
65
Name of Equipment Type of Equipment Quantity Equipment Band &Origin Ensure process quality
Hydraulic Printer DZJ-100 3
Jinan Vart CNC machinery
CO.,LTD.
Type Standard
Hydraulic Printer DZJ-50 4
Henan Dingli Pole&Tower
CO.,LTD.
Type Standard
Milling Machine X6135 1
Nantiong the fifth machine
factory
Qualified of Inspection
Assembling Platform 1.5 ×15m 13 Potou Qualified of Inspection
Assembling Site
Equipment(Crane)
QTZ250 1
Henan crane finished
machinery company Qualified of Inspection
Crane QY8D 2 Xugong Group Vehicle Inspection
Crane QY12 1 Xugong Group Vehicle Inspection
Crane CPC-30 6
Anhui Heli forklift company
limited
Vehicle Inspection
Knife Grinting Machine LMD-1500 1 Linyi Li Lian machinery factory Qualified of Inspection
Universal Cutting Grinding
Machine
MS-32 1
Shanghai Meishan Precision
Machinery CO.,LTD.
Qualified of Inspection
Drill Grinding Machine DG6-60 1 Jinan Machine CO.,LTD. Qualified of Inspection
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
66
3.Test Equipment
Type of
Equipment
Name of
Equipment
Model of Equipment
Quantit
y
Purchase Date Manufacturing Inspection Item
Physical
Property
600kNHydraulic
Testing Machine
WE-60 1 1985.6.1
Tianshui
Hongshan
Tensile Steel Cold
Bending
Electro-hydrauli
c Servo
Universal
Testing
Machines
WAW-300B 1
2011.3..1
Jinan Fangzhen
Tensile Steel Cold
Bending
Impact test
machine ( Low
Temperature
tester,
projector, Gap
broaching
machine )
JB-300B 1 2009.8.1 Jinan Fangzhen Steel Impact Test
optical
theodolite
TDJ6E 1 2001.8.1 Beijing Feibo
Mechanical
deflection
examination
compression
testing machine
YES-2000 1 2003.10.1
Middle of Jinan
Road
Pressure Test
Digital pressure
testing machine
YE-3000A 1 2011.3.1 Jinan Fangzhen Pressure Test
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
67
Rockwell
apparatus
HR-150A 1 2008.2.1 Mecmesin
Re-insepct of
fastener
Chemical
Analysis
direct-reading
spectrometer
LABSPARK750B 1 2011.9.1 Wuxi 15 elements of steel
Thickness of
Steel sonigauge TT110 2 2009.2.15 Beijing Times Steel Tickness
Zinc Plating Test
Covering
Thickness Tester
TT220 2 2010.8.1 Beijing Times Coating Thickness
Zinc coating
adhesion Tester
45 1 2003.2.1 Henan Dingli Adhesiveness
Welding Test
Magnetic flaw
detector
TCJE-1 2 2010.9.1 Beijing Times
Surface qualifty of
Welding
Welding seam
test
40 1
2003.4.1 Kaifeng
Measuring Tools
welding dimension
X ray detector XXG2505 1 2012.7.1 Wuhan Huahai
Internal Quality of
welding seam
reflectogage HS610e 3 2009.10.1 Wuhan Zhongke
Internal Quality of
welding seam
reflectogage PXUT-28 1 2000.7.1. Nantong Union
Internal Quality of
welding seam
Size of
Appearance
Surface
roughometer
TR100 1
2013.3
20
Chongqing Leeb
Roughness of flange
and holes on the
surface roughness
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
68
4. Cone - shaped concrete steel mold for electric pole
NO. Name of Equipment Specification Manufacturer Unit
Qua
ntity
1
Steel mold for concrete
pole
φ150×8.5
WUXI building
materials
machinery factory
Set 15
2
Steel mold for concrete
pole
φ150×9.5
WUXI building
materials
machinery factory
Set 20
3
Steel mold for concrete
pole
φ150×10
WUXI building
materials
machinery factory
Set 15
4
Steel mold for concrete
pole
φ150×11
WUXI building
materials
machinery factory
Set 12
5
Steel mold for concrete
pole
φ170×8
WUXI building
materials
machinery factory
Set 15
6
Steel mold for concrete
pole
φ170×9
WUXI building
materials
machinery factory
Set 20
7
Steel mold for concrete
pole
φ170×10
WUXI building
materials
machinery factory
Set 16
8
Steel mold for concrete
pole
φ170×11
WUXI building
materials
machinery factory
Set
16
9
Steel mold for concrete
pole
φ190×10
WUXI building
materials
machinery factory
Set 40
10
Steel mold for concrete
pole
φ190×11
WUXI building
materials
machinery factory
Set 26
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
69
11
Steel mold for concrete
pole
φ190×12
WUXI building
materials
machinery factory
Set 42
12
Steel mold for concrete
pole
φ190×13
WUXI building
materials
machinery factory
Set 21
13
Steel mold for concrete
pole
φ190×15
WUXI building
materials
machinery factory
Set 25
14
Steel mold for concrete
pole
φ190×18
WUXI building
materials
machinery factory
Set 15
5. Assembling Mold
NO. Name of Equipment Specification Manufacturer Unit
Qua
ntity
15
Steel mold for
concrete pole
φ310×6m
WUXI building
materials
machinery factory
Set 30
16
Steel mold for
concrete pole
φ310×9m
WUXI building
materials
machinery factory
Set 26
17
Steel mold for
concrete pole
φ230/350×9m
WUXI building
materials
machinery factory
Set 28
18
Steel mold for
concrete pole
φ230/390×12m
WUXI building
materials
machinery factory
Set 26
19
Steel mold for
concrete pole
φ270/390×9m
WUXI building
materials
machinery factory
Set 25
20
Steel mold for
concrete pole
φ310/390×6m
Taizhou building
materials
machinery factory
Set 26
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
70
21
Steel mold for
concrete pole
φ310/430×9m
Taizhou building
materials
machinery factory
Set 34
22
Steel mold for
concrete pole
φ350/430×6m
Taizhou building
materials
machinery factory
Set 24
23
Steel mold for
concrete pole
φ350/470×9m
WUXI building
materials
machinery factory
Set 23
24
Steel mold for
concrete pole
φ390/470×6m
WUXI building
materials
machinery factory
Set 33
25
Steel mold for
concrete pole
φ390/510×9m
WUXI building
materials
machinery factory
Set 24
26
Steel mold for
concrete pole
φ430/510×6m
WUXI building
materials
machinery factory
Set 22
27
Steel mold for
concrete pole
φ510/630×9m
Taizhou building
materials
machinery factory
Set 33
28
Steel mold for
concrete pole
φ550/630×6m
Taizhou building
materials
machinery factory
Set 23
29
Steel mold for
concrete pole
φ590/670×6m
Taizhou building
materials
machinery factory
Set 32
30
Steel mold for
concrete pole
φ630/710×6
Taizhou building
materials
machinery factory
Set 26
31
Steel mold for
concrete pole
φ630/750×9
Taizhou building
materials
machinery factory
Set 28
32
Steel mold for
concrete pole
φ670/790×6
Taizhou building
materials
machinery factory
Set 26
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
71
Ⅳ. Experience
1.Oversea Experience in 10 years-Part1
NO. Year Contract NO. Product Buyer Project Name Weight(Ton) Amount(USD)
1 2014
XS6-2014-02-0
05
Concrete Pole
China Railway
Electrification Group
International Railway
CO.,LTD
Uzbekistan National
Railway Company - karshi
electrification project
1932 3180298.046
2 2014
XS5-2014-05-0
20
Steel Lattice
Tower
Hong kong Electric
Power Equipment and
technology CO.,LTD.
Ethiopia Dedesa
Transmission and
Transformation Project
467.21 639178.4365
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
72
3 2014
XS5-2014-05-0
21
Substaion Steel
Structure
Hong kong Electric
Power Equipment and
technology CO.,LTD.
500kV Ethiopia GDHA
Transmission and
Distribution Project
3026 3513905.537
4 2013
XS5-2013-04-0
23
Steel Tower
Henan Electric Power
Industrial Group
CO.,LTD
230KV Expansion Project of
Stung Hav transmission and
transformation engineering
in Cambodia
883.6 1182627.524
5 2013
XS5-2013-05-0
26
Substaion Steel
Structure
Cambodia Project
Department of Henan
Electric Power Industrial
Group CO.,LTD Ca
230KV Power Station of
Cambodia Norodom
Sihanouk
4839 7265258.958
6 2013
XS5-2013-05-0
30
Substaion Steel
Structure
Henan Electric Power
Industrial Group
CO.,LTD
West Port Substation
115KV Project of Cambodia
552.29 74208.77524
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
73
7 2013
XS5-2013-07-0
59
Lattice Steel
tower
Henan Electric Power
Industrial Group
CO.,LTD
230KV CSS Transmission
Project of Cambodian
1013.91 1374608.844
8 2012
XS5-2012-10-0
98
Substaion Steel
Structure
Shangdong Taikai
Electric Power
Construction
Engineering CO.,LTD
DISI Station of 132KV
Substation Equipment Total
Package contractor of Jordan
State Grid
1081 1658257.329
9 2012
XS5-2012-10-0
99
Substaion Steel
Structure
Shangdong Taikai
Electric Power
Construction
Engineering CO.,LTD
QW Station of 132KV
Substation Equipment Total
Package contractor of Jordan
State Grid
2345 1228338.762
10 2012
XS2-2012-03-0
20
Lattice Steel
tower
Cambodia Lancang River
engineering CO.,LTD
115KV Gongbu Province
Buge Mountain Power
Transmission Project
1896.3 2243798.046
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
74
13 2010 XS-2010-08-075
Steel Tubular
Pole
Zhengzhou Sangka
Technology and Trade
CO.,LTD.
Tobago transmission and
tranformation line
engineering
6000 18,840,000.00
14 2008
XS4-2008-11-06
1
Steel Tubular
Tower
Henan Electric Power
Industrial Group CO.,LTD
115kV transmission line
project in Cambodia
150 1920000
15 2008
XS2-2008-11-04
5
Microwave
Tower
China Nonferrous Metal
Mining Group
China Nonferrous Metal
Mining delegation from the
economic and trade
cooperation zones in Zambia
modest Chambishi 330kV
transmission and
transformation line project
20.0566 212599
16 2007
XS5-2007-04-01
1
Substaion Steel
Structure
CHICO
330kV LUMWANA substaion
extension project in Zambia
450 4221000
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
75
17 2008
XS5-2006-10-02
4
Substaion Steel
Structure
CHICO
330kV substaion project in
Zambia
200 1876000
18 2009 G-2004-014
Substaion Steel
Structure
CHICO
KANSNSHI/LUANO300kv
substation in Zambia
254.7836 2379678.82
2.TABLE OF EXPERIENCE MANUFACTURER
Nº COMPANY OR CLIENT
DATE OF
SUPPLY
DESCRIPTION OF SUPPLY
(Type structures in kV voltage and ton)
COST OF PROCUREMENT (Usd)
1
Henan Electric Power Transmission &
Transformation
2006.06
220kV Pakistan Malakand Hydropower Project Substation
(691 tons)
1014209.676
2 Zhengzhou Sangka Technology and Trade CO.,LTD. 2006.10
Tobago 230kv transmission and tranformation line
engineering (6000 tons)
3068403.909
3 Belize National Electric Corporation 2007.01
Belize Chalillo Hydraulic Power Station and 115kv Power
Transmisison Line Project (575.2 tons)
899909.678
4 Cambodia Lancangjiang Engineering CO.,LTD 2007.02
115kV Gongbu Province Buge Mountain Power Transmission
Project (1896.3 tons)
2243798.046
5 Angola Urban Construction Ministry 2007.11 Línea 115kV – Angostura (1750 tons) 2681451.613
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
76
6 Pakistan Electric Power Company (PEPCO) 2008.05 Pakistan 220kV Steel Structure Tower Project (1510 tons) 2167580.645
7
Shangdong Taikai Electric Power Construction
Engineering CO.,LTD
2008.05
QW Station of 132KV Substation Equipment Total Package
contractor of Jordan State Grid (2345 tons)
1228338.762
8
Shangdong Taikai Electric Power Construction
Engineering CO.,LTD
2008.12
DISI Station of 132kV Substation Equipment Total Package
contractor of Jordan State Grid (1081 tons)
1658257.329
9 Henan Electric Power Industrial Group CO.,LTD 2009.02 230kV CSS Transmission Project of Cambodian (1013.91 tons) 1374608.844
10 Belize National Electric Corporation 2009.06
Belize Chalillo Hydraulic Power Station and 115kv Power
Transmisison Line Project (948.9 tons)
1408045.16
11 INSTRUMENTAL INC.(Ecuador) 2009.07
330kV Power Transmission Line And Substation Project (1030
tons)
1594838.71
12 Henan Electric Power Industrial Group CO.,LTD 2010.03
230kV Expansion Project of Stung Hav transmission and
transformation engineering in Cambodia (883.6 tons)
1182627.524
13
Cambodia Project Department of Henan Electric
Power Industrial Group CO.,LTD Ca
2010.04
230KV Power Station of Cambodia Norodom Sihanouk (4839
tons)
7265258.958
14 INSTRUMENTAL INC.(Ecuador) 2010.10 330kV Power Transmission Liner Project (776 tons) 1214064.516
15 Terra Firma Soluciones Integrales S.A. 2011.01
230kv Transmission Line From Cochabamba To La Paz (821.9
tons)
1299132.258
16
Hong kong Electric Power Equipment and
technology CO.,LTD.
2011.06
500kV Ethiopia GDHA Transmission and Distribution Project
(3026 tons)
3513905.537
17
Hong kong Electric Power Equipment and
technology CO.,LTD.
2012.01
500kV Ethiopia Dedesa Transmission and Transformation
Project (467.21 tons)
639178.4365
18 Terra Firma Soluciones Integrales S.A. 2012.01 230kv In Bulo Bulo Power Station (737 tons) 1212483.871
19 China Railway Electrification Group International 2012.09 220kV Uzbekistan National Railway Company - karshi 3180298.046
Address:Zhengzhou City,Henan Province, P.R.China 450000
Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn
Website: www.hndlgt.com.cn
77
Railway CO.,LTD electrification project (1932 tons)
20 Cambodia Lancangjiang Engineering CO.,LTD 2012.09
230kV Transmission Lines and Transformer Substations Under
Kamchay Hydropower Plant (1012.6 tons)
1551564.516
21 Terra Firma Soluciones Integrales S.A. 2013.02 230kV Transmission Line From Sucre to Santa Cruz (866 tons) 1368838.71
22 INGELCO SRL. 2013.03
115kV Power Transmission Line and Substation Project in
Paraguay (1368.4 tons)
2096741.936
23 OAO"YUAIZ"(Russia) 2013.03
Russia-China Back to Back 500kV Power Transmission Project
(500 tons)
823387.097
24 POWERCHINA 2014.01 Zimbabwe State Grid Net Expanding Project (3457.6 tons) 5297935.484
25
The Power Transmission Company NO2
(Vietnam)
2014.05 220 KV Transmission Line Tower Project (969 tons) 1516016.129
26 ODEBRECHT - OLEX China 2015.01
60kV Power transmission line and substation project (263
tons)
360564.516
27 Venezuela National Electric Corporation 2015.03
115kV New Units of Electricity Generation for National
Interconnected System (810 tons)
1149677.419
1
Ⅳ.Quality System
Quality System
1 Raw material procurement and quality control
documents
NO. Raw material procurement Content
1
Raw materials / components
management rules and
regulations
Control files:
1. Provisions on Administration of steel.
2. Provisions on Administration of Welding Materials.
3. Provisions on Administration of Fastening Pieces.
4. Provisions on Administration of Gas
5. Provisions on Administration of Spare Parts
2
Storage places environment
of Raw materials and spare
parts
Raw materials, welding materials, fasteners was placed neatly in the
warehouse, marking clear and detailed.
3
Raw materials/components
management agencies and
managers
Finance Department
↓
Property Management
Section
↙ ↓ ↘
Warehouse of Steel
Materials Warehouse of Spare parts
Warehouse of
Gas
Chief of Property Management Section:Zhihua Li
Keeper of Steel Materials Warehouse: Xiaoke Qi、Jinliang Sun
Keeper of Spare parts Warehouse:Jingyu Wei.Peixiu Duan
warehouse Administrator:Yunjie Yang
4
Raw materials /Components
Inspection Procedures
Testing procedures:
1. Provision Inspection of steel Materials
2. Provision Inspection of Welding Materials
3. Provision Inspection of fastener
5
Traceability of Raw materials
/Components Inspection
Raw materials, welding materials, fasteners can be traced back,
there are records of receiving and issuing
2
6
Field Implementation of Raw
materials / components
manage files
1. Raw materials can only be put in the storage after check and
issued qualified by the laboratory, and completes the record
2. Welding materials can only be put in the storage after check and
issued qualified by the laboratory, and completes the record
3. Fasteners can only be put in the storage after check and issued
qualified by the laboratory, and completes the record.
2) Quality Control System
3
2 Quality Guarantee Measures
Quality Guarantee Measures of Lattice Steel Tower
We have 750kV lattice Steel tower production qualification, all related facilities is equipped
to meet your production requirement. For our bid, our company is comply in accordance with a
strict quality assurance system to ensure the quality of the products, specific measures are as
follows
1. Quality Guarantee Measures of Working Drawing Setting
out :
We owned a provincial transmission and transformation network engineering technology
research center with all kinds of expertise in architecture, machinery, electricity, technology,
welding, materials, and other professional fields. For companies drawn to this project design,
process design, frame design, complemented by appropriate review, audit, drawings and other
technical personnel in order to ensure the quality of processing maps. Professional lofting
software TMA is using for lattice steel tower setting out to ensure accuracy of setting out.
2. Quality Guarantee Measures of Raw Materials:
The raw materials we use for bidding and procurement: Angle steel, steel plates, fasteners,
welding material is preferred from the State Grid Corporation approved qualified suppliers in
procurement and recheck all the raw materials into the factory, ensure qualified before use.
Testing Center is responsible for the inspection and acceptance of entry materials, the Incoming
inspection is conduct according to design requirement. the relevant work instructions.
Acceptance specification and operation method. All procurement of raw materials should be
conduct according to demand Planning schedule. A clear understanding of each batch of the
material delivery deadlines, specifications, quality, quantity, adoption of technical standards.
During the raw materials procurement, not only requirements for documentation check, Visual
inspection, laboratory testing, mechanical performance test technology performance
4
assessment, inspection, proper stowage, labeling, storage, storage of materials is needed , but
also should assess the subcontractor as required.
3. Quality Guarantee Measures of Processing:
Company production center set up the project quality assurance group, Chaired by the
director himself, Product quality management and inspection efforts should be enhanced
according to the characteristics of Engineering. Principal control point (shop drawings, materials,
cutting, drilling, bending, cutting limbs, cutting corners, trying to assemble and splicing, soldering
quality, etc.) are strictly controlled by QC team, Turn sequence is not allowed without
acceptance, clarified the responsibility and increase inspector during the key position. Product is
processing by using advanced equipment and manufacturing technique to ensure coordination
of all aspects. Angle steel and steel plate adopts automatic drilling equipment. Inspection
according to the design requirements, work instructions, inspection procedures, fabrication and
processing should be done three checks. For specified welds and nodes, flaw detection,
destructive inspection and other necessary test shall be carried out. For trial piece assembling is
must take to make sure the after trial assembly finished products meet the processing
requirements of the design drawings. First article inspection qualified before mass production, In
order to ensure that products manufactured in conformity with the relevant technical
requirements, mass production can begin only after first article inspection qualified.
4. Quality Guarantee Measures of Welding
Welding must be carried out according to shop drawings and design requirements and comply
with related regulations like GB50205-2001 construction and inspection standard of steel
structure and JGJ81-2002 technical standard of construction steel structure. Welding materials:
welding rod, welding wire, welding compound grades and specification should be classified and
pile up in dry storage room. Wire removal of rust, grease and other dirt: it is prohibited to use
medicine to peel off, weld cores rusty electrode welding machines and lumped. The CO2 gas for
welding should be purified more than 99.4%. Manual arc electric welding with covered electrode
5
should oven bake for 1 hour at 340-440 ℃ before use, welding electrodes should be placed in
insulation barrel and use within access. Electrodes shall not exceed the allowed exposed time in
the atmosphere: E40 low hydrogen electrode up to 4 hours, E50 low hydrogen electrode up to 9
hours, hydrogen electrode up to the time above, existing dry needed to be confirmed before use.
Submerged arc automatic welding flux should be drying in the 250 °c oven for 2 hours.
68 staff with Welder's Certificate issued by the State Grid Corporation, Welding workers
must be trained and the exam the competency of personnel, who also need re-take the exam if
stop the welding work for 6 months. Their own print code should be marked after welding the
welding seam.
When welding, the welder should be compliance with Welding Procedure, free welding and
prohibited in the road outside the base metal arc welding. Multi - layer welding should be
continuous sequence, each layer should be checked after the finished weld.
5. Ensuring measures for the inspection and test
Inspection and test personnel hold position, timely completion of appearance inspection,
flaw detection, geometry test, strength test, while production processing, also monitoring,
supervision and inspection environmental ,inspection on the implementation process, log files
should be collected. Problems founded must report to the relevant person in charge
immediately.
Company quality management system runs according to ISO9001 standard operation; does
not turn sequence without qualified inspection, unqualified product is not allowed to leave the
factory. Products, packaged by the person in charge, do not send missing part, wrong piece,
and mixed pieces. Bundles off package and damage are not allowed during the transportation
and be shipped to the destination in time and effectively as the tender requirements.
Quality Guarantee Measures of Steel Tubular Pole
The raw materials we use for bidding and procurement: Angle steel, steel plates, fasteners,
welding material is preferred from the State Grid Corporation approved qualified suppliers in
procurement and recheck all the raw materials into the factory, ensure qualified before use.
6
Product is processing by using advanced equipment and manufacturing technique to
ensure coordination of all aspects. Angle steel adopts automatic drilling equipment. Steel
structure is produced by using 3200ton heavy-duty bending machine. Segment components
process with the automatic assembly line for locating, assembling TO ensure the cooperation of
all aspects. Setting out with professional software like TMA,LMA is vital step before mass
production of Each type of product. There’s 68 staff with Welder's Certificate issued by the State
Grid Corporation,
We owns a provincial Power Transmission and Transformation project technology research
center and equipped with all necessary production facilities. Products are strictly inspected
according to national standard GB50205-2001. For trial piece assembling must take to make
sure the after trial assembly finished products meet the processing requirements of the design
drawings. First article inspection should be qualified before mass production to ensure that meet
the relevant technical requirements.
Steel Tubular structure adopts individual package, uniform packages for spare parts which ease
the procedure of construction. All the leaders and staff has paid great attention to this project,
therefore a special leading team is established for the program and following processing ensure
measure is taken against this case:
Only LMA computer lofting is allowed for the process of setting out, which also should be
convert to parts drawing by CAD software.
Angle steel parts produced by using CNC steel production line.
Pipe beveling adopts special steel pipe beveling machine and lathe processing.
Using hydraulic shears with CNC cutting of steel plate parts machining ,section steel parts
using saw for swaging, Tubular joints using intersecting Line CNC for cutting.
Groove plug board processed by CNC hydraulic press brake.
Assembling and welding of steel tubular and hot flange is produce by using welding
semiautomatic assembly line.
Steel tubular and linking board assembled completely by dihedral control machine.
Raw materials require re-inspection qualified before into the factory. Passed the first piece
inspection of semi-finished products and finished products should be used in production.
7
Factory inspection comply exactly with manufacturing technical conditions of transmission and
transformation steel structure .Company quality management system runs according to
ISO9001 standard operation; does not turn sequence without qualified inspection, unqualified
product is not allowed to leave the factory. Products, packaged by the person in charge, do not
send missing part, wrong piece, and mixed pieces. Bundles off package and damage are not
allowed during the transportation and be shipped to the destination in time and effectively as the
tender requirements.
3.Quality Guarantee Measures of Concrete Pole
Raw materials procurement and quality control
regulations
Purchasing Control Procedure
Q/DLCX-18-2013
1. Purpose:
Control on the purchasing process and supplier to ensure that purchased product conforms
to the requirements of the quality and the environment.
2. Scope of application
Suitable for the production of raw materials procurement, control of sub-contractors and
suppliers providing services, and related environmental impact.
3. Obligation
8
3.1
1) Responsible for evaluation of suppliers according to company's requirement, the supplier
should filled list of qualified supplier and regular evaluation of supplier delivery performance and
establish supplier files.
2) Procurement operations according o procurement plan, the implementation of procurement
operations.
3.2 Production Center
1) Procurement plans is established according to material usage sheet offered by technical
center.
2) Production Director is responsible for approving the list of evaluation on supplier performance
and purchasing plan.
3.3 Testing Center
3) Responsible for incoming inspection and testing of procurement of goods, which shall issue
inspection reports.
3.4 Technical Center
Be responsible for formulating technical standards for procurement of goods.
4 working procedures
4.1 procurement classification
According to the impact on product realization processes and resulting output, the
procurement is divided into three categories:
Important goods: constitutes a major part of products or key components, a direct impact on
the use and safety of the final product properties, materials that may lead to serious customer
complaints. Including: steel, cement, welding materials, etc.;
Materials: product key parts of non-bulk goods, other generally do not affect the quality of
the final product or effects, but you can take measures to correct material.
3) Auxiliary materials: non-direct used to play a supporting role in materials of the product itself.
Included: equipment and so on.
4.2 New vendor selection process
9
4.2.1 For important goods supplier selection, qualified Supplier identified process:
By primary suppliers—suppliers to be inspected-potential suppliers to determine – sample
test--small batch trial-determination process-qualified suppliers;
4.2.2 General goods vendor selection, by primary suppliers--suppliers-potential suppliers to
determine--small batch trial-determination process-qualified suppliers;
4.2.3 For the auxiliary material supplier selection should be--small batch trial – by primary
suppliers qualified suppliers to determine process; retail purchases or purchasing of auxiliary
materials at once, its purchase validation records shall be the evaluation of the vendor.
4.3 Supplier Selection
4.3.1Implement the supplier selection and evaluation procedures for supplier selection
4.3.2 Supply department should select several qualified suppliers in accordance with technical
standards for the procurement of needs of important goods and materials. And be responsible
for establish and maintain qualified supplier quality records.
4.3.3 Procurement of Goods must be carried out among the qualified suppliers.
4.3.4 Determined the way and degree for the control of suppliers according to supplier
evaluation results.
4.3.5 The supply department should be issued a notice of correction (preventive) measures
records when there are serious quality problems with vendor’s products. The vendor should be
disqualified without significantly improved in quality after noticed twice.
4.3.6 Qualified suppliers should be re-valuation by the supply department once a year, fill out the
list of supplier performance evaluation, evaluate by hundred - mark system. 60% of quality. 20%
of delivery, 10% of price .services accounted for 10%. Assessment score below 60 ( or quality
score below 48 ), its qualified supplier qualification should be withdrawal ; retained as a result of
special circumstances, should be approved by the Director of production, but it should
strengthen supplies purchasing verified. Failed passing grade for second time in a row, their
qualifications should be canceled.
4.3.7 Supplier control of external processing, should also implement the above-mentioned
provisions.
4.3.8 Choice for service supplier
10
The supplier for the company to provide services, such as transport, testing, training institutions,
but also classics appraisal qualification is rear to provide services to the company. For
measuring laboratory authorized by the state can do without service evaluation.
4.4 Procurement
4.4.1 Procurement Document
Production centers should compile the schedule list according to BOM and inventory balance
sheet from technology center in accordance with the plan of production. Purchase requisition list
should be filled for Interim purchasing material, reported to director for approval and hand over
to supply department for purchasing according to technical requirement of procurement
materials among the supplier in qualified supplier list.
4.4.2 Information on the products to be procured
① Quality requirements for the product (Various standards, provision and drawings can be
quoted directly).
② Requirements for product acceptance.
③ Other requirements. Such as: Price.quantity.consign.
4.4.3 Company procurement documents include: procurement list. Procurement application
form. Purchasing contract and attachments, this should be keeping by supply department.
Department manager is in charge to decide to appropriateness of the requirements before the
documents issued.
4.4.4 Also include:
①Requests for approval or accreditation requirements about suppliers’ product. Process,
equipment and employees. Like safety certification requirements, processing requirements,
testing services, equipment and personnel requirements.
②Applicable quality and environmental management system requirements.
4.5 Purchase controlling
4.5.1 Purchasing contract should be signed for the first time when important goods and
materials purchased from qualified supplier, requirements like specification.quantity.quality
requirements, inspection conditions, should be specified in the contract.
11
4.5.2 Technical center should provide the technical requirements for procurement materials to
supplier as appendix.
4.5.3 Before purchase, the buyer shall verify the effectiveness of the technical requirements
provided to the vendor, which should meet the implementation of procurement the procurement
list.
4.5.4 For long-term procurement of essential supplies vendors., a framework agreement should
signed each year to establish a strategic partnership to restraining supply and demand action of
both sides, which should be conducted by supply department.
4.5.5 Purchase price implement the method of centralized bidding, bidding office is responsible
for inquiry, comparison, shop around; any other departments have no right to interfere in tender
and calibration process.
4.5.6 Information like procurement number delivery time, delivery, quality .quality inspection and
after-service set up by supply department ledger as the basis for annual supplier evaluation.
4.6 Request verification of the product
4.6.1 For purchased products can be one of the following authentication methods:
1) validated by the quality inspection Center for purchase;
2) validated by the customer at the company site;
3) implemented by the company in the supplier site verification;
4) Carried out by the customer at the vendor site validation.
For the last two methods, supply department serving in procurement documents should provide
for verification of product release.
4.6.2 verification activities include inspection, measurement, observation, process validation,
providing certificates and other means. In the corresponding test procedures should be provided
for in their authentication method.
4.6.3 purchasing goods, supply Department buyers fill out the notice of inspection with the
procurement list, the quality certificate sent quality inspection center, and quality testing center
carried out according the product realization planning of the review, issued by the review report.
Qualified storage, unqualified by the supply Department is responsible for the return shipping.
4.6.4 The unverified material, shall not be reported as finished.
12
4.6.5 Customer verification shall not exonerate the company's responsibility to provide qualified
products, and subsequent rejection by the customer cannot be ruled out.
5 Related documents
5.1 Technical requirements for procurement of goods
6 Quality records
6.1 Qualified vendor list
6.2 The supplier performance evaluation form
6.3 Procurement list
6.4 Purchase requisitions
6.5 Inspection notice
4.Verification test of program raw materials testing or
validation and periodic
Q/DLCX-26-2013
1 Objective
In order to ensure that the raw material is applicable to products purchased standards,
ensure the quality of the product, the confirmation program for inspection or verification of raw
materials is fixed.
2 Scope
This procedure is applicable to procurement of raw materials.
3 Duties
3.1 The laboratory is responsible for the inspection or verification of raw materials
3.2 Quality inspection centers are responsible for the preparation of raw material inspection
instructions, and are responsible for tests on a regular basis.
3.3 Deputy General Manager is responsible for review and approval of Quality technical
inspection instructions for raw material.
13
3.4 Supply department is responsible for the periodic confirmation of the raw material
4 Working procedure
4.1 Materials Classification
4.1.1Materials classified as steel, welding materials, concrete fasteners and concrete products.
4.2 The notice of inspection and certification offering
4.2.1 After the arrival of materials, Ministry of Supply should provided the laboratory the notice of
inspection and quality certification by instalment
a. The notice of inspection should include materials used of project name, product name,
material specifications, sizes, grades, standards and so on.
b. Copy of quality certificates must be legible and stamped with supplier product quality seal
(Red cap) is valid.
4.2.2 Sand and stone inspection notice must be issued after the delivery; the inspection
notification should indicate the materials specifications, manufacturers, and supplier.
4.3 Verification of raw materials
Laboratories should first confirm the compatibility of inspection notice, certificate of quality
and quantity of goods, specifications, and brands after receiving the notice of inspection, quality
certificates and related documents
Reported by the certificates of quality inspection data conforms to national standards, with red
seal of manufacturers or suppliers on quality certificate. Notified the supply department with an
unqualified list there’s no corresponding.
4.4 Testing of raw materials
4.4.1 Testing of steel type
4.4.1.1 Batch
Steel mass acceptance, each batch from the same brand, same number, same class, same
variety, steel components of the same size, weighs less than 60t per batch.
4.4.1.2 Inspection item, criteria of steel materials are shown in table 1.
4.4.2 Concrete materials testing
4.4.2.1 Cement
4.4.2.1.1 Bulk
14
Cement of Same manufacturer, same breed, same strength, the same number does not exceed
400 tons as a test batch.
4.4.2.1.3 Cement testing
Inspection item, criteria of cement are shown in table 2
4.4.2.2 Sand
4.4.2.2.1 Batch
Product of Same manufacturer, same breed, same strength, the same number does not exceed
300 tons as a test batch.
4.4.2.2.2 Testing of sand
Items like inspection item, frequency of sampling. Standard of sand are shown in table 2
4.4.2.3 Gravel
4.4.2.3.1 Bulk
Product of Same manufacturer, same breed, same strength, the same nominal size
Dose not exceeds 300 tons as a test batch.
4.4.2.3.2 Inspection of gravel
Gravel inspection, sampling frequency, the implementation of standards according to table 2
4.4.2.4 Coal ash
4.4.2.4.1 Bulk
Coal ash of same manufacturer, same level, and same kind does not exceed more than 10 tons
as a test batch.
Testing of 4.4.2.4.2 Coal ash
Testing item. Sampling frequency and the implementation standards of coal ash carry out
according to table 2.
5.Table 1 Inspection items of steel materials, inspection
quantity, and implementation of standard
15
4.4.2.5 Granulated blast furnace slag
N
O.
Name of
steel
materials
Inspection items & The number of samples Executive Standard
Appearance Physical Mechanics Chemical
Standard
method of
sampling
Standard
method of
Testing
Product
standard
1
Steel
plate,
angle
steel
5pieces of
random test
The tensile, bending,
impact test according to
the Contract and
Technical Agreement
requirements
Take test
for one
piece C、
S、Si、
Mn、P
physical:
GB/T2975
Chemical
:
GB/T2006
6
GB/T228.1
GB/T232
GB/T229
GB/T244
GB/T246
GB/T4336
GB/T709
GB/T706
GB/T700
GB/T1591
2
Steel
tubular
Stretching, Cold bending
( compressed ) one each,
the impact test in
accordance with the
Contract and Technical
Agreement requirements
Take test
for one
piece C、
S、Si、
Mn、P
GB/T3091
GB/T13793
GB/T8162
3
Beam
Channel
Stretching, Cold bending
( compressed ) one each
Take test
for one
piece C、
S、Si、
Mn、P
GB/T706
GB/T700
4 H-Beam
Stretching, Cold bending
( compressed ) one each ,
the impact test in
accordance with the
Contract and Technical
Agreement requirements
Take test
for one
piece C、
S、Si、
Mn、P
GB/T11263
GB/T700
5
H-beam
steel
Stretching, Cold bending
( compressed ) one each
Take test
for one
piece C、
S、Si、
Mn、P
GB/T706
GB/T700
6 Steel bar
round wire
rod
Stretching, Cold bending
( compressed )one each
-
GB/T228.1
GB/T232
GB/T238
GB/T701
plain round
bar Stretching, Cold bending
( compressed ) two each
GB/T1499.
1
ribbed bars
GB/T1499.
2
Pre-stressed
wire
Stretching, Cold bending
( compressed )one each
GB/T5223
16
4.4.2.5.1 Bulk
Product of Same manufacturer, same level, same pattern NO., dose not exceeds 2 tons as a
test batch.
4.4.2.5.2 Testing of blast furnace slag powder
Testing of blast-furnace slag project, sampling frequency, and the implementation of standards
according to table 2.
4.4.2.6 Superplasticizer
4.4.2.6.1 Bulk
Product of same manufacturer, same level, same for an inspection lot numbering no more than
2 tons.
Testing of 4.4.2.6.2 water reducer
Reducing agent inspection, sampling frequency, the implementation of standards according to
table 2.
6.Table 1 Implementation standard for Inspection items
Inspection frequency of concrete materials
NO. Test Item
Sampling
Frequency
Executive Standard
1 Cement
Packing Mark
400
Ton/Once
GB/T175
general purpose Portland cement
GB/T1346
Cement water requirement of normal consistency,
setting time and soundness test method
soundness of cement
17
4.4.3 Testing of welding materials
4.4.3.1 New vendor for welding material must carry out Visual inspection of size and mechanical
properties of deposited metal for the first time. Long-term supplier must take inspection every
three months, required by contract and the technical agreement.
4.4.3.2 Test Project and verification interval of welding materials is listed in Table 3
resist compression of cement
mortar GB/T17671
Method of testing cement-Determination of strength
folding strength
Of cement
2 Sand
separator-size distribution of
Sand
300
Ton/Once
Sand for construction: GB/T14684
silt carrying capacity of sand
moisture content of sand
Robustness of sand
Sand packing density
3
Gravel
Particle gradation of gravel
300
Ton/Once
Pebble and crushed stone for construction GB/T14685
Gravel mud content
Gravel crushing Index
Gravel content of Crystals
shaped in needle flake
Packing density of gravel
4 Coal ash
packing mark
10
Ton/Once
GB1596 Coal Ash used for Cement and Concrete
GB/T1346 Testing method of Cement water requirement
of normal consistency, setting time and stability
activity index
stability
5
blast
furnace
cinder
packing mark
2 Ton/Once
GB/T 18046 Ground Granulated Blast furnace slag used
for Cement and Concrete powder
activity index
6
water
reducer
Concrete water-reducing ratio,
Compressive Strength ratio 2 Ton/Once GB8076 concrete admixture
18
Table 3 Testing project, Inspection Frequency .the implementation of standards for
Welding Materials
NO.
Name of
welding
Test Item
Inspection
frequency
Executive
Standard
1 carbon steel
Dimension The first inspection
/each batch A
routine inspection
each three months
GB/T5117Mechanical tests for
deposited metal
2
Welding wires
for gas shielded
arc welding
Dimension The first inspection
/each batch A
routine inspection
each three months
GB/T8110Mechanical tests for
deposited metal
3
Submerged arc
welding wire
and welding
flux
Dimension The first inspection
/each batch A
routine inspection
each three months
GB/T5293
GB/T12470
Mechanical tests for
deposited metal
Solder particle
inspection
4.4.4 Fasteners testing
4.4.4.1 Batch
Fastener of Same manufacturer, same specification, and same quality level are tested by 5000
suits at most as same batch.
4.4.4.2 Fastener testing
Fasteners - inspection items, frequency, quantity and performance standards as indicated in
table 4
4.5 Period validation inspection of raw materials
Annual evaluation of raw materials for qualified supplier should be organized by supply
department, which include field trips, supplier qualification files, type Test Report.
4.6 Record
Inspection test result and testing equipment used, environment condition should be recorded in
time after examination.
4.7 Disposition
Qualified raw materials should be issued Incoming Material Quality Certificate and kept by
property management department, unqualified raw materials should filled in the unqualified form
to supply department for refund.
5 Related documents
19
5.1 Control Procedure recording
5.2 Nonconforming Product Control Procedure
5.3 Raw materials related standards
Table 4 Fasteners, inspection and sampling table
NO.
Faste
ners
Inspection Item
Inspection frequency
and quantity Executive Standard
1 Nut
Dimension 32 Piece/ per batch
GB/T41、GB/T6170、DL/T284、
GB/T1229
Proof Load 8 Piece/ per batch GB/T3098.2 、DL/T284 、GB/T1231
Rockwell hardness 8 Piece/ per batch GB/T3098.1、GB/T1231、DL/T284
Zinc thickness;
For uniformity of
galvanized coating;
Adhesion of the zinc
coating
8 Piece/ per batch
GB/T5267.3
2 Bolts
Dimension 32 Piece/ per batch
GB/T5780、GB/T5781、GB/T5782、
GB/T1228
Proof Load 8 Piece/ per batch GB/T3098.1 、DL/T284 、GB/T1231
Rockwell hardness 8 Piece/ per batch GB/T3098.1、DL/T284 、GB/T1231
Zinc thickness;
For uniformity of
galvanized coating;
Adhesion of the zinc
coating
8 Piece/ per batch GB/T3098.1 、DL/T284、GB/T1231
6 Records
6.1 Quality inspection records of cement;
6.2 Metal inspection record (a);
6.3 Water reducer inspection records
6.4 Admixture test records;
6.5 Sands indicators test records;
6.6 Fastener inspection records
6.7 Gravel indicators test records;
6.8 Welding electrodes, welding wire, flux inspection records;
6.9 Metal inspection records.
20
Controlled Standard Documents of Henan Dingli Pole & Tower CO.,LTD.
Q/DLZY-08-2013
Ⅴ .HOT-DIP GALVANIZING PROCESS
INSTRUCTION
2 0 1 3 - 0 1 - 2 0 P u b l i s h 2 0 1 3 - 0 1 - 2 0 I m p l e m e n t
PUBLISHED BY HENAN DINGLI POLE & TOWER CO., LTD
I
Forward
This working instruction aims at ensure quality of galvanized steel products and
control the product implementation process.
The working instruction refer to the requirement of technical standard
GB/T2694-2010 transmission line steel tower production technical specification.
DL/T646-2006 transmission line steel tubular structure production technical
specification. Q/GDW384-2009 transmission line steel tubular tower production
technical specification. GB50205-2001 steel structure construction quality
inspection code,and practical production ,in order to guide the operating staff.
This instruction is revised for the first time after the issuing of DL/T646-2012 of
the power transmission steel structure manufacturing specifications, is consistent
with the DL/T646-2012 standard and modified some of the deviation requirements.
File numbers in accordance with the requirements of the document control numbers
unified
The writting format of the instruction is prepare according to standard
GB/T1.1-2009 Part I: Standard structure and writting.
The instruction is presented by Henan Dingli Pole&Tower CO.,LTD,drafted by
technical department
2
Hot-dip Galvanizing Working
Instructions
3
Hot-dip Galvanizing Working Instructions
1.Objective
To normalized the hot-dip galvanizing process of company's steel
products, guiding the staff operations, instructions are formulated.
2.Scope
This instruction provides hot-dip galvanizing operation procedures,
technical and quality requirements.
This instruction is applicable to steel products of hot-dip galvanizing
process.
3.Job responsibilities
3.1 In strict compliance with the relevant regulations of the technical
standard and quality management to ensure product quality, prevent errors,
eliminate the quality accidents.
3.2 In strict compliance with safety technical specification,prevent any
occurrence of safety accidents, ensuring personal safety accidents to zero
3.3 Care of equipment, careful operation, saving electricity, water, gas,
reduce production cost.
3.4 Devote themselves deeply into their business, improve their technical
quality, and actively participate in job training and technology public relations
activities.
4
4.Reference
GB/T2694 Transmission line towers--Technical requirements for
manufacturing
GB50205 Steel structure project construction quality approval
standard
GB/T13912 Metallic coatings,Technical requirements for hot-dip
zinc coating steel products
DL/T646 Manufacturing technical Conditions of transmission
steel structure
Q/GDW384 Transmission line steel Tower processing technical
specification
5.Working Process
5.1 Diagram of working Process
5.2 Unprocessed parts inspection
5.2.1 All the galvanized product should be visual check before zinc coating.
5.2.2 Extra work need to be done if follow situation occur while unprocessed
parts checking(or Special technique need to be done )
5
1)Dimension of work piece beyond the zinc plating pot
2)Work piece without vent, half closed leakage of liquid zinc hole or
fully closed plating, and no suspension pints.
3)Welding seam of coated parts that is not closed, welding coating
and slag of welding seam does not clean, as well as more serious defect of
coated parts.
5.3 Hang material
5.3.1 Plating rack should be inspected before hang
materials,deformation.cracks.tripping, corrosion and surface adhesion large
area with zinc layer is found and, may not continue to use.
5.3.2 Sort component according to the type.length.materials and surface
condition while hanging.
5.4 Pickling
5.4.1 Hydrochloric acid aqueous solution is used for pickling, hydrochloric
concentration is 40~160 g/l, room temperature as working tempreture.
5.4.2 Compound of pickling liquor
32% industrial concentration hydrochloric acid, 1:1 mixed with water to
produce hydrochloric acid content of 160 g/l concentration of acid pickling
solution. Preparation before adding water and then adding acid, add tube
immersed in the water of hydrochloric acid, and acid fog inhibitor (otherwise
stated) During the pickling liquid in use generally do not add acid until the
reduced content of 40~45 hydrochloride g/l of solution concentration and
solution of ferrous chloride (FeCL2) content of up to 200 g/l, pumping of
waste acid storage tank, and processing.
5.4.3 Acid pickling solution testing once for each class,result posted on the
signs to guide the pickling operation treatment.
6
5.4.4 Pickling time is made according to the plating surface oxide layer and
acid concentration. Pickling operation to speed up the reaction speed,move
from top to bottom plating in acid pickling process must be two to three times,
and then pull above fluid level to check quality of pickling
5.5 Rinsing
Qualified rinse galvanized components must be rinsed in the double
rinsing craft tank through flowing water to erase the surface remaining
pickling liquid and other debris, and then immediately into the plating bath by
flux process.
5.6 Fluxing
5.6.1 Plating agents are ammonium chloride (NH4CL) solution, the working
temperature is 60~80℃, proportion is the solution: 1.03~1.05g/cm3 (room
temperature measurement). Plating agents used in the process should be
supplemented and adjusted in proportion within the limits prescribed.
Assistant pools keep the water level of the low water line and between the
highest water level.
5.6.2 Flux test for twice each batch, its iron content in solution at 10
grams/liter. PH=3~5, quality control. Assistant quality control in the
regeneration cycle, flux heating by heater.
5.6.3 Full immersion plating after rinsing solvent treatment in plating solution,
soak time of 3-5 minutes.
5.6.4 Work piece treat after flux,, chemical treatment and quality inspection is
needed.. Local paint or for any other reason fails to acid clean surface
grinding wheels, wire brushes, scrapers and other tools for processing,
repeat the pickling process operation, rack zinc plating after chemical
qualifying.
5.7 Second-hanging Before Galvanizing
7
5.7.1 If pickling qualified, the work piece which well handled after plating auxiliary should
go on to proceed second-hanging before galvanizing.
5.7.2 Pay attention to the position of hole and characteristics of work piece while
second-hanging and select the applicable hanging point and right direction of zinc flow in
case of any quality problem such as unfavorable air-out, smooth zinc flow and zinc
heaping etc. Second-hanging should reach hot-dip galvanizing requirement.
5.8 Preheating & Drying
After second-hanging procedure, stay in drying tank and make sure the work piece
dry enough and then go on to do hot-dip galvanizing.
5.9 Hot-dip Galvanizing
5.9.1 Zinc Bath
5.9.1.1 Zinc bath is mainly composed of molten zinc. The chemical ingredients of zinc
ingot have to reach GB470 standard. Add proper aluminum alloy in zinc melt which
should net exceed 50g/ton(zinc).
5.9.1.2 Galvanizing work should be started as long as the zinc melt temperature up to
455℃-460℃. Meanwhile, the temperature should stay between 420℃ ~ 430℃ if
production paused.
5.9.1.3 Fill the zinc everyday while off work to make sure lower the pressure of zinc
melting pot and stay 10-30cm distance between zinc melt and edge of zinc melting pot.
During special producing situation in large use of zinc should fill at anytime.
5.9.1.4 Thickness of the residues in zinc melting pot cannot over 8cm to lower the
possibility of zinc pot corrosion. To do at least twice totally salvaging zinc residue work
each week, the salvager should salve evenly from one side of the pot to another side
and each time should repeat one third of the site where have been salved already. If
miss any work-piece into the zinc pot, salve immediately to avoid corrosion and produce
much more zinc residue.
General Profile
General Profile
General Profile
General Profile

More Related Content

Viewers also liked

Viewers also liked (15)

TsunamiPaperPrestn
TsunamiPaperPrestnTsunamiPaperPrestn
TsunamiPaperPrestn
 
Tarea edmodo hoy
Tarea edmodo hoyTarea edmodo hoy
Tarea edmodo hoy
 
Populismo, vicio o enfermedad
Populismo, vicio o enfermedadPopulismo, vicio o enfermedad
Populismo, vicio o enfermedad
 
Carmen
CarmenCarmen
Carmen
 
Folha Dominical - 18.04.10 Nº317
Folha Dominical - 18.04.10 Nº317Folha Dominical - 18.04.10 Nº317
Folha Dominical - 18.04.10 Nº317
 
Tutoria
TutoriaTutoria
Tutoria
 
Folha Dominical - 31.11.10 Nº345
Folha Dominical - 31.11.10 Nº345Folha Dominical - 31.11.10 Nº345
Folha Dominical - 31.11.10 Nº345
 
Kelli Slide Show
Kelli Slide ShowKelli Slide Show
Kelli Slide Show
 
Folha Dominical - 20.03.11 Nº 367
Folha Dominical - 20.03.11 Nº 367Folha Dominical - 20.03.11 Nº 367
Folha Dominical - 20.03.11 Nº 367
 
Calendario escolar 15 16 cra
Calendario escolar 15 16 craCalendario escolar 15 16 cra
Calendario escolar 15 16 cra
 
Seminario Sellos de Confianza- Gabriela Szlak- Abril 2012
 Seminario Sellos de Confianza- Gabriela Szlak- Abril 2012 Seminario Sellos de Confianza- Gabriela Szlak- Abril 2012
Seminario Sellos de Confianza- Gabriela Szlak- Abril 2012
 
Content Strategy Frameworks (from KBS)
Content Strategy Frameworks (from KBS)Content Strategy Frameworks (from KBS)
Content Strategy Frameworks (from KBS)
 
Where to Eat in Taipei - the Good Food Guide!
Where to Eat in Taipei - the Good Food Guide!Where to Eat in Taipei - the Good Food Guide!
Where to Eat in Taipei - the Good Food Guide!
 
Variation Toolkit
Variation ToolkitVariation Toolkit
Variation Toolkit
 
Presentac..
Presentac..Presentac..
Presentac..
 

Similar to General Profile

2014春季刊第1册
2014春季刊第1册2014春季刊第1册
2014春季刊第1册sally xu
 
Active Products Brochure 080219
Active Products Brochure 080219Active Products Brochure 080219
Active Products Brochure 080219aaron_telestone
 
Adigun_R_O _Assess4_report_23 April 15===1
Adigun_R_O _Assess4_report_23 April 15===1Adigun_R_O _Assess4_report_23 April 15===1
Adigun_R_O _Assess4_report_23 April 15===1Rafiat omoyayi Adigun
 
Longtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittingsLongtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittingsJason Liu
 
China forging machinery brief introduction
China forging machinery brief introductionChina forging machinery brief introduction
China forging machinery brief introductionWanli He
 
CE/EMC TEST REPORT
CE/EMC TEST REPORTCE/EMC TEST REPORT
CE/EMC TEST REPORTElektrumlv
 
Kiln support roller, support roller for rotary kiln
Kiln support roller, support roller for rotary kilnKiln support roller, support roller for rotary kiln
Kiln support roller, support roller for rotary kilnIris Han
 
Team ArcelorMittal Final Report
Team ArcelorMittal Final ReportTeam ArcelorMittal Final Report
Team ArcelorMittal Final ReportJoey F An
 
Comparative assessment and safety issues in state of the art hydrogen product...
Comparative assessment and safety issues in state of the art hydrogen product...Comparative assessment and safety issues in state of the art hydrogen product...
Comparative assessment and safety issues in state of the art hydrogen product...NavalKoralkarChemica
 
Korean hydraulic angle punch
Korean hydraulic angle punchKorean hydraulic angle punch
Korean hydraulic angle punchOnplus
 
Guidance on bolted_joints
Guidance on bolted_jointsGuidance on bolted_joints
Guidance on bolted_jointsPrince Nwabuko
 
ASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdfASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdfEduardoGuzmn55
 
Proposal 2014
Proposal 2014Proposal 2014
Proposal 2014Helen YU
 
Corporate profile 20150520-English
Corporate profile 20150520-EnglishCorporate profile 20150520-English
Corporate profile 20150520-EnglishDavid Zhang
 
Shenzhen benky industrial co. ltd introduction die casting factory
Shenzhen benky industrial co. ltd introduction   die casting factoryShenzhen benky industrial co. ltd introduction   die casting factory
Shenzhen benky industrial co. ltd introduction die casting factoryWasenZhou1
 
A study on manufacturing process of centrifugal pumps in Milnars pumps limited
A study on manufacturing process of centrifugal pumps in Milnars pumps limitedA study on manufacturing process of centrifugal pumps in Milnars pumps limited
A study on manufacturing process of centrifugal pumps in Milnars pumps limitedMd Rohel Uddin
 

Similar to General Profile (20)

2014春季刊第1册
2014春季刊第1册2014春季刊第1册
2014春季刊第1册
 
Manual técnico nov
Manual técnico novManual técnico nov
Manual técnico nov
 
PEAK 2016 CATALOG_opt
PEAK 2016 CATALOG_optPEAK 2016 CATALOG_opt
PEAK 2016 CATALOG_opt
 
Active Products Brochure 080219
Active Products Brochure 080219Active Products Brochure 080219
Active Products Brochure 080219
 
Adigun_R_O _Assess4_report_23 April 15===1
Adigun_R_O _Assess4_report_23 April 15===1Adigun_R_O _Assess4_report_23 April 15===1
Adigun_R_O _Assess4_report_23 April 15===1
 
Longtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittingsLongtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittings
 
China forging machinery brief introduction
China forging machinery brief introductionChina forging machinery brief introduction
China forging machinery brief introduction
 
CE/EMC TEST REPORT
CE/EMC TEST REPORTCE/EMC TEST REPORT
CE/EMC TEST REPORT
 
ASME_SEC_IX.pdf
ASME_SEC_IX.pdfASME_SEC_IX.pdf
ASME_SEC_IX.pdf
 
Kiln support roller, support roller for rotary kiln
Kiln support roller, support roller for rotary kilnKiln support roller, support roller for rotary kiln
Kiln support roller, support roller for rotary kiln
 
Team ArcelorMittal Final Report
Team ArcelorMittal Final ReportTeam ArcelorMittal Final Report
Team ArcelorMittal Final Report
 
Comparative assessment and safety issues in state of the art hydrogen product...
Comparative assessment and safety issues in state of the art hydrogen product...Comparative assessment and safety issues in state of the art hydrogen product...
Comparative assessment and safety issues in state of the art hydrogen product...
 
Korean hydraulic angle punch
Korean hydraulic angle punchKorean hydraulic angle punch
Korean hydraulic angle punch
 
Guidance on bolted_joints
Guidance on bolted_jointsGuidance on bolted_joints
Guidance on bolted_joints
 
ASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdfASME BPVC 2021 Section V.pdf
ASME BPVC 2021 Section V.pdf
 
Proposal 2014
Proposal 2014Proposal 2014
Proposal 2014
 
Corporate profile 20150520-English
Corporate profile 20150520-EnglishCorporate profile 20150520-English
Corporate profile 20150520-English
 
ASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductosASME-B31.4-2019-estandar para diseño de ductos
ASME-B31.4-2019-estandar para diseño de ductos
 
Shenzhen benky industrial co. ltd introduction die casting factory
Shenzhen benky industrial co. ltd introduction   die casting factoryShenzhen benky industrial co. ltd introduction   die casting factory
Shenzhen benky industrial co. ltd introduction die casting factory
 
A study on manufacturing process of centrifugal pumps in Milnars pumps limited
A study on manufacturing process of centrifugal pumps in Milnars pumps limitedA study on manufacturing process of centrifugal pumps in Milnars pumps limited
A study on manufacturing process of centrifugal pumps in Milnars pumps limited
 

More from vivian zheng

Testing Report for Material made by Costa Rica
Testing Report for Material made by Costa RicaTesting Report for Material made by Costa Rica
Testing Report for Material made by Costa Ricavivian zheng
 
ASTM Certification
ASTM  CertificationASTM  Certification
ASTM Certificationvivian zheng
 
Company Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&TowerCompany Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&Towervivian zheng
 
Company Presentation for Dingli -
Company Presentation for Dingli -Company Presentation for Dingli -
Company Presentation for Dingli -vivian zheng
 
Concrete Poles business of Dingli
Concrete Poles business of DingliConcrete Poles business of Dingli
Concrete Poles business of Dinglivivian zheng
 
Company Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&TowerCompany Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&Towervivian zheng
 

More from vivian zheng (6)

Testing Report for Material made by Costa Rica
Testing Report for Material made by Costa RicaTesting Report for Material made by Costa Rica
Testing Report for Material made by Costa Rica
 
ASTM Certification
ASTM  CertificationASTM  Certification
ASTM Certification
 
Company Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&TowerCompany Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&Tower
 
Company Presentation for Dingli -
Company Presentation for Dingli -Company Presentation for Dingli -
Company Presentation for Dingli -
 
Concrete Poles business of Dingli
Concrete Poles business of DingliConcrete Poles business of Dingli
Concrete Poles business of Dingli
 
Company Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&TowerCompany Brochure of Dingli Pole&Tower
Company Brochure of Dingli Pole&Tower
 

General Profile

  • 1. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 1 Henan Dingli Pole&Tower CO.,LTD. Qualification Documents In 2015
  • 2. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 2 Ⅰ.Company Profile........................................................................................................4 1. Brief introduction..............................................................................................4 2.Organization Strcture........................................................................................6 3.Development Process........................................................................................7 4.Capacity.............................................................................................................7 ⅡBusiness License........................................................................................................9 1.BUSINESS LICENSE OF INCORPORATION ................................................9 2.TAX REGISTRATION CERTIFICATE..........................................................13 3.ORGANIZATION CODE CERTIFICATE......................................................15 4.CERTIFICATE.................................................................................................17 CERTIFICATE....................................................................................................18 5.ISO System Certificate .....................................................................................19 Ⅲ.Product Certification...............................................................................................21 1..PRODUCT TEST REPORT 500KV Tower....................................................24 2. PRODUCT TEST REPORT 750KV tower.....................................................32 3. Report for 220kV steel tubular pole ..............................................................40 4. Report for 750kV steel tubular substation strucure .........................................43 4. Report for 1000kV steel tubular tower ............................................................46 Ⅱ.Equipment list.........................................................................................................50 1.Main production equipment condition,quantity and technological level .......61 1.1The main production equipment of steel products................................61 Production Equipment.................................................................................61 3.Test Equipment.................................................................................................66 4. Cone - shaped concrete steel mold for electric pole.......................................68 5. Assembling Mold ..........................................................................................69 Ⅳ.Experience.......................................................................................................71 1.Oversea Experience in 10 years-Part1..............................................................71 2.TABLE OF EXPERIENCE MANUFACTURER .................................................75 Ⅳ.Quality System..........................................................................................................1 1 Raw material procurement and quality control documents ................................1 2) Quality Control System..........................................................................2 2 Quality Guarantee Measures...............................................................................3 Quality Guarantee Measures of Lattice Steel Tower.............................3 1. Quality Guarantee Measures of Working Drawing Setting out : .....3 2. Quality Guarantee Measures of Raw Materials:................................3 3. Quality Guarantee Measures of Processing: .....................................4 4. Quality Guarantee Measures of Welding............................................4 5. Ensuring measures for the inspection and test..................................5 3.Quality Guarantee Measures of Concrete Pole...................................................7 Raw materials procurement and quality control regulations .................................7
  • 3. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 3 4.Verification test of program raw materials testing or validation and periodic .12 5.Table 1 Inspection items of steel materials, inspection quantity, and implementation of standard..................................................................................14 6.Table 1 Implementation standard for Inspection items.....................................16 Inspection frequency of concrete materials .........................................................16 Ⅴ.HOT-DIP GALVANIZING PROCESS INSTRUCTION......................................20 Forward..........................................................................................................................I 1.Objective.............................................................................................................3 2.Scope...................................................................................................................3 3.Job responsibilities..............................................................................................3 4.Reference ............................................................................................................4 5.Working Process .................................................................................................4 6.Specifications......................................................................................................9 7.Quality Requirement.........................................................................................10 8.Working Environment and Safety ....................................................................11
  • 4. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 4 Ⅰ.Company Profile 1. Brief introduction Henan Dingli Pole&Tower Co., Ltd.is located in "Chinese Ancestor cultural village, China Metallurgical cast-iron sword," and the Xiping County, Henan Province, is the largest transmission line tower, Henan Province, substation steel frame, electrified railway catenary pillars of professional production manufacturers, Henan Building Materials Industry Association. The company's existing plant structures, concrete products plants, three hot-dip galvanizing plant plant, covering 300,000 square meters, registered capital of 50 million yuan, annual output value of 500 million yuan.
  • 5. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 5 1.Brief Introduction The company has 40 years of production history, with Wangjiagongcheng Transmission Technology Research Center of Henan Province, earth power design companies and other research institutions, many times assume the provincial, city major scientific and technological projects. Produced 220BSSZ-30 with four towers centrifugal thin-walled steel concrete pole back for Henan Science and Technology Achievement Award in 2007; single tube continuous beam 220KV power station in Henan Science and Technology Achievement Award obtained in 2009 ; station steel frame of new technology applied to Shaanxi Weinan 750KV substation; communications tower technology to study Hefei - Wuhan, Wuhan - Guangzhou Passenger Line GSM-R communication system. Number of research provincial and municipal scientific and technological progress awards, more than ten patents protected by the State. The company is equipped with advanced CNC 3200 tons hydraulic bending machine, CNC angle line, CNC intersection Cutting, CNC gantry drilling machine, CNC flange assembly and welding production lines, CNC concrete stir bar stations, automatic submerged arc welding machine, coil machines, shears, universal testing machine, salt spray test machine, impact testing machine, five elemental analyzer, ultrasonic flaw detector, etc. more than four hundred pieces (sets) of production, inspection and test equipment. Mature technology, advanced technology, strong product development and innovation, manufacturing capacity. UHV main products are steel towers, substation steel frame, single-column steel pole, steel centrifugal thin-walled concrete poles, angle steel tower, communication tower, concrete poles, pillars and other electrified railway catenary. In 1999 the company took the lead through peer quality management system certification in 2007 through energy (Beijing) Certification Center PCCC certification, the company in 2008 was named "Henan Quality Management Business Excellence." "Full" brand was named "Henan Province", the Henan provincial government awarded the "Henan Province Famous Brand" title, year after year won Henan Province, "Quality Trustworthy Enterprise" and Henan Province, "the contract and trustworthy enterprises". Products sold in more than 20 provinces and cities including Beijing, Tianjin, etc., into the Beijing Olympic project, Xiaolangdi Project, and exported to India, Zambia, Pakistan and other countrie
  • 6. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 6 2.Organization Strcture
  • 7. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 7 3.Development Process In 1996, Xiping Country Concrete Pole Making Factory was established. In 1998,transformed into-joint-stock enterprises with modernization management. In 2002,it was change registered as Xiping County Xiping Electric Pole.,LTD. In 2003,it was change registered as Henan Dingli Steel Pole CO.,LTD.with the registered capital of 17.06 million RMB,extending the production line from concrete poles to tranmission line tower series. In 2004,substation structure produced by us exported to Zambia,we began to expand the global market. In 2008,it was change registered as “Henan Dingli Pole&Tower CO.,LTD.”,the registered capital increased to 50 million RMB. In 2010,the products enter into the America market,completion timely the production and supply mission of 2700 tons of steel tubular pole for Trinidad and Tobago. In 2011,passed the strict authentication of the China Sate Grid Corporation and become one of the fifteen among first batch 1000kV UHV steel tubular tower manufacturer. In 2014,become qualified supplier of China Electric Power Equipment and technology CO.,LTD,besides,more than 1500 ton substation steel structure was supplied for 500 GDHA engineering project in Ethiopia.
  • 8. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 8 4. Capacity Main products and production capacity of bidding products Main products: Transmission angle steel tower, transmission steel tube pole, substation structures, radio TV tower, microwave communication tower, lightning protection decoration tower Yearly output 9600 tons Monthly output 8000 tons
  • 9. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 9 ⅡBusiness License 1.BUSINESS LICENSE OF INCORPORATION
  • 10. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 10 BUSINESS LICENSE OF INCORPORATION [COPY] (TRANSLATION) REGISTRATION NO:YGSQ4100001007570-1/1 Name: Henan Dingli pole & tower co., Ltd Type of Enterprise: Joint-stock Limited Liability company Address: Middle of Yingbin Av. Xiping County, Henan province Legal Representative: Li Liucheng Registered Capital: RMB 50 Million Establishment Date: March 26, 2001 Business Validity: From March 26, 2001 to Nov 30, 2033 Business Scope: Production & sales of concrete wire pole, transmission line tower, steel-pipe pole (tower), lamp pole of road light, drainage water pipe, steel pole, communication tower, substation steel structure, electrified railway overhead contact system of electrified railway, circular prestressed concrete pole and prestressed concrete pole with acrossed-webmember, communication tower, steel structure of substation. import and export business (except for a limited countries). (not including the items that must be examined and approved as per the laws and regulations issued by the state) Registration Authority: Henan Administration for Industry & Commerce Henan Administration for Industry & Commerce (seal) Record of Annual Renewal: REMARKS: 1: BUSINESS LICENSE OF INCORPORATION is the legal certificate of the Incorporation and the legal business; 2: BUSINESS LICENSE OF INCORPOTATION includes original and copy and the original and copy have the same legal effect; and the BUSINESS LICENSE OF
  • 11. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 11 INCORPORATION must be put in the place publicly; the Incorporation can obtain some copies as per the requirement of its business; 3: BUSINESS LICENSE OF INCORPORATION cannot be counterfeited, altered, rented, borrowed and transferred and it cannot be detained and withdrawn and cancelled by any unit and individual except the registration authority; 4: The Incorporation must carry out its business activities as per the registered business scope; 5: If any of the registered items changes, the Incorporation should submit the application concerning the alteration and change to the registration authority; 6: The annual renewal should be handled with the registration authority from Mar 1 to Jun 30 of each year; 7: While the Incorporation meets cancellation, the original and copy must be returned returned to the registration authority. The BUSINESS LICENSE OF INCORPORATION will be in invalidity if it is cancelled by the registration authority; CERTIFICATE OF QUALITY MANAGEMENT SYSTEM IDENTIFICATION;
  • 12. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 12
  • 13. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 13 2.TAX REGISTRATION CERTIFICATE
  • 14. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 14 TAX REGISTRATION CERTIFICATE (copy) NO: YG(S)XP(Z)412824176075049 Taxpayers Name: Henan Dingli pole & tower co., Ltd The legal representative (responsible person): Li Liucheng Address: Middle of Yingbin Av. Xiping County, Henan province Registration Type: Joint-stock Limited Liability company Business Scope: Production & sales of concrete wire pole, transmission line tower, steel-pipe pole (tower), lamp pole of road light, drainage water pipe, steel pole, communication tower, substation steel structure, electrified railway overhead contact system of electrified railway, circular prestressed concrete pole and prestressed concrete pole with acrossed-webmember, communication tower, steel structure of substation. import and export business; Approval Authority: Business Administration bureau of Xiping County, Henan province Withholding obligations: according to the law to determine Issuing the tax authorities: State Administration of Taxation Xiping County, Zhumadian City (seal) Date of Issue: June 17,2008 State Administration of Taxation Producer
  • 15. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 15 3.ORGANIZATION CODE CERTIFICATE
  • 16. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 16 Organization Code Certificate The People’s Republic of China (TRANSLATION) (copy) Code: 17607504-9 Name of Organization: Henan Dingli pole & tower co., Ltd Address: Middle of Yingbin Av. Xiping County, Henan province Duration:June 16 2008 to June 16 2012 Issuing unit: Quality and Technical Supervision Bureau Registration number: ZDG411700-012205-1
  • 17. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 17 4.CERTIFICATE
  • 18. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 18 CERTIFICATE (TRANSLATION) Henan Dingli steel pole Co., Ltd is approved of the registration to Business Administration bureau of Zhumadian City. Change the name of the company is : Henan Dingli pole & tower co., Ltd Hereby certify Business Administration bureau of Xiping County June 26, 2008
  • 19. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 19 5.ISO System Certificate
  • 20. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 20
  • 21. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 21 Ⅲ.Product Certification
  • 22. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 22
  • 23. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 23
  • 24. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 24 2.PRODUCT TEST REPORT 500KV Tower
  • 25. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 25
  • 26. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 26
  • 27. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 27 PRODUCT TEST REPORT (Translation) Electric Power of Tower Industry Quality Inspection Testing Center Product Test Report NO. (WJ)Z 002 Inspected Unit: Henan Dingli Pole & Tower Co., Ltd The Name of Product: Transmission Line Tower Test Category: 500KV Testing Center Seal: Power Industry Electric Equipment and lines Material Quality Inspection Test Center Report Sent Date: 5 Feb, 2007
  • 28. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 28 Electric Power of Tower Industry Quality Inspection Testing Center Inspected Unit Henan Dingli Pole & Tower Co., Ltd Business license Delegate unit Henan Dingli Pole & Tower Co., Ltd
  • 29. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 29 No. :200702001 Legal Representative Li Liucheng Issued of Units Henan Administration for Industry & Commerce Type of Enterprise Joint-stock Limited Liability company Issue of time 18 Apr, 2006 Address Middle of Yingbin Av. Xiping County, Henan province Test Category 500KV The Name of Product Transmission Line Tower standard GB/T2694-2003 Quantity of Sample ZBV11(type)995(parts) Quantity of Sample ZBV11(type)118(parts) Location of Sampling Scene Location of Test Scene Sampling Zhang Enping Verifier Qian qiang Main Tesing Equipment layer Intellective Thickness Tester, Caliper, Ultrasonic Wave Detection Equipment Test Results Test results meet the standard requirements Inspector Qian Qiang Zhang Enping writer Qian Qiang checker Yu Li Verifier Wang Zaifei Approved Li Jinchun
  • 30. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 30 Electric Power of Tower Industry Quality Inspection Testing Center No.:200702001 No. Type Inspection Item Quality Index Sampl e Size Determin e number of group Measured results Determin e results Ac Re number Qualifie d Number failed 1 ItemA Steel Dimensions standard 32 0 1 32 0 Qualified 2 Parts size Main material Pass Rate % ≥95 8 1 2 8 0 100% 3 connector ≥95 3 0 1 3 0 100% 4 plate ≥90 13 1 2 13 0 99.7% 5 Belly material ≥85 20 2 3 20 0 100% 6 Weldment ≥85 2 0 1 2 0 99.6% 7 Test assembly Place of the rate % ≥99 1 0 1 1 0 99.6% 8 Concentric rate ≥96 1 0 1 1 0 99.6% 9 Zinc coating Thickness standard 32 2 3 31 1 Qualified Appearanc e 32 2 3 32 0 Qualified 10 ItemB Steel Material Meet requirement of Drawing 2 0 1 2 0 Qualified 11 Zinc coating Average meet the standard 3 0 1 3 0 Qualified 12 Adhesion meet the standard 3 0 1 3 0 Qualified 13 Size of Test assembly Meet requirement of Drawing 1 0 1 1 0 Qualified Conclusion Qualified
  • 31. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 31
  • 32. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 32 2. PRODUCT TEST REPORT 750KV tower
  • 33. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 33
  • 34. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 34
  • 35. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 35 PRODUCT TEST REPORT(Translation ) Power Industry Power Equipment and Transmission Materials Test Center Product Test Report NO. (WJ)Z(2012)286 Product: Transmission Line Tower Unit Name: Transmission Line Tower 750KV Inspected Unit: Henan Dingli Pole & Tower Co., Ltd Test Category: Production License Inspection Seal of the Detection Center : Power Industry Electric Equipment and lines Material Quality Inspection Test Center Date of Issue: 08 Dec, 2012
  • 36. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 36 Power Industry Electric Equipment and lines Material Quality Inspection Test Center Report NO.: NO. (WJ)Z(2012)286 Page1/2 Product Name Transmission Line Tower Specification Type 750KV-ZB1292-36.0m Inspected Unit Henan Dingli Pole &Tower CO.,LTD. Address of Inspected Unit Middle of Yingbin Ave. Xiping County, Henan Province, Sampling Site Finish Product Warehouse of Henan Dingli Pole &Tower CO.,LTD. Sample Level Qualified Sampling Personnel Jindong Ren,Wenhui Shi Number of Type 1 Base( 1549 Pieces) Batch NO./Production Date October 10th ,2012 Number of Sample 1 Base( 172Pieces) Sampling Date October 10th ,2012 Inspection Site Steel Test: In the Lab Other item: Inspected Unit Inspection Standard GB/T269-2010 Transmission line tower manufacturing technical conditions Inspection Date On site inspection date: October 28th ,2012 Materials Inspection Date: Dec 07th ,2012 Inspection Conclusion The product inspection about transmission lien tower is conducted under the standard of GB/T2694-2010,it meet all the requirement in the specification standard. Notes 1. Experience environment: temperature:22 Celsius degree ,humidity 55%.
  • 37. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 37 2. Responsible for sampling test. No. :200702001 Power Industry Electric Equipment and lines Material Quality Inspection Test Center NO. (WJ)Z(2012)286 No. Item Type Inspection Item Quality Index Sampl e Size Determine number of group Measured results Results Ac Re Qualifie d number unqualifie d number 1 ItemA Internal quality of welding seam Class A UT B I / / / / / / Class B UT B II 3 0 1 3 0 Qualifi ed 2 Steel material Consistent with the requirement s of the drawing 2 0 1 2 0 3 Zinc Coatin g Uniformity Meet requirement of standard 3 0 1 3 0 4 Adhesive Meet requirement of standard 3 0 1 3 0
  • 38. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 38 5 Prototyping Size Consistent with the requirement s of the drawing 1 0 1 1 0 Appearance of Steel Meet requirement of standard 50 0 1 50 0 Dimension of Steel Meet requirement of Technical agreement 50 0 1 50 0 6 Dimensio n of parts Zinc coating Main Materials Item quali fied Rate % ≥95 8 1 2 8 0 7 Connector ≥95 8 1 2 8 0 Plate ≥90 20 1 2 20 0 Belly Materials ≥85 32 2 3 32 0 8 Weldment Item quali fied Rate % ≥95 3 0 1 3 0 Qualified 9 ItemB Quality of Welding Materials Class 1 ≥95 / / / / / Qualified Class 2 ≥95 3 0 1 3 0 Qualified Class 3 ≥95 / / / / / Qualified Appearance Size of Welding seam ≥95 3 0 1 3 0 Qualified 10 Pre-As sembly In position Rate % ≥99 3 0 1 3 0 Qualified 11 Rate of Concentric Hole ≥96 3 0 1 3 0 Qualified Zinc Coatin g Thickness Meet requirement of standard 40 3 4 40 0 Qualified Appearance 40 3 4 40 0 Qualified
  • 39. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 39 12 Size of Test assembly Meet requirement of Drawing 1 0 1 1 0 Qualified Conclusion Qualified
  • 40. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 40 3. Report for 220kV steel tubular pole
  • 41. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 41
  • 42. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 42
  • 43. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 43 4. Report for 750kV steel tubular substation strucure
  • 44. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 44
  • 45. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 45
  • 46. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 46 4.Report for 1000kV steel tubular tower
  • 47. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 47
  • 48. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 48
  • 49. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 49
  • 50. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 50 3.Raw Materials Testing Report 品种 Type:角钢 Profile 编号 No.:BLWY-J-003 序 号 Item 制 造 单 位 Manufact urer 规格 Profile 牌号 Material 炉批号 Batch No. 试验 编号 Test No. 化 学 成 分 Chemical(%) 力 学 性 能 Mechanical 结论 Result碳 C 硅Si 锰 Mn 磷 P 硫 S 屈服 强度 MPa 抗拉 强度 MPa 断 后 伸 长 率 A% 冷弯 180º 冲击吸收能量 KV2 J(20℃) 1 2 3 平 均 AVG 标准要求值 Standard Value ≤0.2 0 ≤0.5 0 ≤1.7 0 ≤0.0 3 5 ≤0.0 3 5 ≥345 470-63 0 ≥20 ≥34 1 河北唐 山 Tangshan ∠ 140× 10 Q345B 3B03830B E0 2015-J-6 60 0.14 0.32 1.28 0.026 0.01 1 376 535 33.0 合格 Qualifi ed 11 6 122 108 115 合格 Qualifie d 2 河北唐 山 ∠ 125× 8 Q345B 3B14408B E0 2015-J-6 62 0.15 0.32 1.40 0.018 0.02 1 390 538 32.0 合格 Qualifi 10 8 100 106 104 合格 Qualifie
  • 51. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 51 Tangshan ed d 3 河北宣 化 Xuanhua ∠ 180× 16 Q345B 14250065 0 2015-J-6 76 0.07 8 0.31 1.37 0.024 0.01 8 400 584 30.0 合格 Qualifi ed 10 0 114 106 107 合格 Qualifie d 执行标准 Material Standard GB700-2006 碳素结构钢 carbon structureal steel GB/T1591-2008 低合金高强度结构钢 low alloy high intensity structure steel 检 测 设 备 及 状态 Status WE-60、LSK750B、良好 Good 备注 Remark “化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同; The content of chemical should be correspond with manufacturer’s quality certificate. 试验员 Inspect: 审核 Revise:
  • 52. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 52 品种 Type:角钢 Profile 编号 No.:BLWY-J-002 序 号 Item 制 造 单 位 Manufact urer 规格 Profile 牌号 Material 炉批号 Batch No. 试验 编号 Test No. 化 学 成 分 Chemical(%) 力 学 性 能 Mechanical 结论 Result碳 C 硅Si 锰 Mn 磷 P 硫 S 屈服 强度 MPa 抗拉 强度 MPa 断 后 伸 长 率 A% 冷弯 180º 冲击吸收能量 KV2 J(20℃) 1 2 3 平 均 AVG 标准要求值 Standard Value ≤0.2 0 ≤0.5 0 ≤1.7 0 ≤0.0 3 5 ≤0.0 3 5 ≥345 470-63 0 ≥20 ≥27 1 河北唐 山 Tangshan ∠45× 4 Q235B 152326 2015-J-5 35 0.12 0.30 0.34 0.018 0.01 1 304 427 30.0 合格 Qualifi ed / / / / 合格 Qualifie d 2 青县冀 丰 QingXian ∠75× 5 Q235B 07-2456 2015-J-5 48 0.15 0.28 0.36 0.021 0.01 7 280 429 32.0 合格 Qualifi ed / / / / 合格 Qualifie d 3 青县冀 丰 ∠100 ×7 Q235B 04-0722 2015-J-5 38 0.14 0.28 0.34 0.27 0.01 9 284 422 31.0 合格 Qualifi ed / / / / 合格 Qualifie d
  • 53. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 53 QingXian 4 青县冀 丰 QingXian ∠70× 5 Q235B 07-1456 2015-J-5 54 0.15 0.26 0.44 0.011 0.01 3 284 450 30.0 合格 Qualifi ed / / / / 合格 Qualifie d 5 天津仁 翼 TianJin ∠50× 5 Q235B 15051204 2015-J-5 57 0.14 0.26 0.38 0.019 0.02 3 305 446 30.0 合格 Qualifi ed / / / / 合格 Qualifie d 执行标准 Material Standard GB700-2006 碳素结构钢 carbon structureal steel GB/T1591-2008 低合金高强度结构钢 low alloy high intensity structure steel 检 测 设 备 及 状态 Status WE-60、LSK750B、良好 Good 备注 Remark “化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同; The content of chemical should be correspond with manufacturer’s quality certificate. 试验员 Inspect: 审核 Revise: 品种 Type:角钢 Profile 编号 No.:BLWY-J-001
  • 54. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 54 序 号 Item 制 造 单 位 Manufact urer 规格 Profile 牌号 Material 炉批号 Batch No. 试验 编号 Test No. 化 学 成 分 Chemical(%) 力 学 性 能 Mechanical 结论 Result碳 C 硅Si 锰 Mn 磷 P 硫 S 屈服 强度 MPa 抗拉 强度 MPa 断 后 伸 长 率 A% 冷弯 180º 冲击吸收能量 KV2 J(20℃) 1 2 3 平 均 AVG 标准要求值 Standard Value ≤0.2 0 ≤0.5 0 ≤1.7 0 ≤0.0 3 5 ≤0.0 3 5 ≥345 470-63 0 ≥20 ≥34 1 河北宣 化 XuanHua ∠125 × 10 Q345B 14250973 8 2015-J-5 20 0.16 0.30 1.28 0.025 0.01 7 404 584 27.0 合格 Qualifi ed 12 0 114 110 115 合格 Qualifie d 2 河北宣 化 XuanHua ∠100 ×7 Q345B 14250974 1 2015-J-5 21 0.14 0.31 1.22 0.019 0.02 0 388 554 31.0 合格 Qualifi ed 66 74 78 73 合格 Qualifie d 3 青县冀 丰 QingXian ∠90× 7 Q345B 07-2323 2015-J-5 50 0.14 0.30 1.17 0.018 0.02 0 380 527 30.0 合格 Qualifi ed / / / / 合格 Qualifie d 4 安阳钢 铁 ∠63× 5 Q345B 5S11437E 2 2015-J-5 78 0.15 0.30 1.29 0.018 0.01 6 406 566 29.0 合格 Qualifi / / / / 合格 Qualifie
  • 55. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 55 AnYang ed d 5 安阳钢 铁 AnYang ∠75× 5 Q345B 5W06130 15A 2015-J-5 79 0.15 0.33 1.29 0.018 0.01 6 430 547 28.0 合格 Qualifi ed / / / / 合格 Qualifie d 6 安阳钢 铁 AnYang ∠75× 6 Q345B 5W07090 18 2015-J-5 80 0.14 0.30 1.28 0.016 0.01 5 351 533 37.0 合格 Qualifi ed / / / / 合格 Qualifie d 执行标准 Material Standard GB700-2006 碳素结构钢 carbon structureal steel GB/T1591-2008 低合金高强度结构钢 low alloy high intensity structure steel 检 测 设 备 及 状态 Status WE-60、LSK750B、良好 Good 备注 Remark “化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同; The content of chemical should be correspond with manufacturer’s quality certificate. 试验员 Inspect: 审核 Revise: 品种 Type:钢板 Plate 编号 No.:BLWY-B-001 序 制 造 单 规格 牌号 炉批号 试验 化 学 成 分 力 学 性 能 Mechanical 结论
  • 56. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 56 号 Item 位 Manufact urer Profile Material Batch No. 编号 Test No. Chemical(%) Result 碳 C 硅Si 锰 Mn 磷 P 硫 S 屈服 强度 MPa 抗拉 强度 MPa 断 后 伸 长 率 A% 冷弯 180º 弯曲/压 扁 冲击吸收 能量 KV2 J (20℃) 标准要求值 Standard Value ≤0.2 0 ≤0.3 5 ≤1.4 0 ≤0.0 4 5 ≤0.0 4 5 ≥235 370-50 0 ≥26 ≥27 1 安阳钢 铁 Anyang 8 Q235B / 2015-B-3 19 0.16 0.20 0.52 0.022 0.01 2 319 448 31 合格 Qualifi ed / / 合格 Qualifie d 2 中普邯 郸 Handan 10 Q235B 15101018 48 2015-B-4 01 0.14 0.22 0.52 0.020 0.01 2 311 470 32 合格 Qualifi ed / / 合格 Qualifie d 3 邯宝钢 铁 Hanbao 6 Q235B 1511621 2015-B-4 36 0.14 0.19 0.46 0.020 0.01 0 299 438 31 合格 Qualifi ed / / 合格 Qualifie d 4 安阳钢 铁 Anyan 12 Q235B L516625 2015-B-3 30 0.15 0.21 0.46 0.020 0.01 6 355 469 32 合格 Qualifi ed / / 合格 Qualifie d
  • 57. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 57 执行标准 Material Standard GB700-2006 碳素结构钢 carbon structureal steel GB/T1591-2008 低合金高强度结构钢 low alloy high intensity structure steel 检 测 设 备 及 状态 Status WE-60、LSK750B、良好 Good 备注 Remark “化学成分”一栏所化验的项目应与对应的钢厂厂家所出质保单所化验的项目相同; The content of chemical should be correspond with manufacturer’s quality certificate. 试验员 Inspect: 审核 Revise: S t e e l T e s t i n g R e p o r t Project Name: Kaifeng Xu county Xiangfu-Minghe 220KV Transmission line Page1/2 Executive Standard GB/T706-2006、GB/T709-2006、GB/T1591-2008 Physical Performance Chemical Analysis % Testin g Sum mary Report NO. Manufacturer Batch (t) Name of Angle Steel Type Specificati on (mm) Yield Strengt h Tensile Strengt h Elong ation δ5% Cold Bendi ng C % Si % Mn % P % S %
  • 58. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 58 Steel (Mpa)(Mpa) 2014-J-1095 Tangshan Yuefeng 1.738 Angle Steel Q235B ∠ 90×7 308 471 34.0 Qualif ied 0.16 0.26 0.45 0.016 0.022 Qualif ied 2014-J-1096 Qingxian Jifeng 0.945 Angle Steel Q235B ∠ 100×8 285 425 36.0 Qualif ied 0.15 0.26 0.52 0.020 0.022 Qualif ied 2014-J-1098 Hebei steel 2.089 Angle Steel Q345B ∠ 180×12 396 572 30.5 Qualif ied 0.16 0.27 1.32 0.018 0.019 Qualif ied 2014-J-1099 Hebei stee 1.375 Angle Steel Q420B ∠ 140×10 458 608 29.0 Qualif ied 0.14 0.27 1.46 0.019 0.022 Qualif ied 2014-J-1100 Hebei stee 5.589 Angle Steel Q420B ∠ 140×12 457 613 28.0 Qualif ied 0.14 0.31 1.46 0.020 0.008 Qualif ied 2014-J-1101 Hebei stee 1.088 Angle Steel Q420B ∠ 200×18 467 600 27.0 Qualif ied 0.18 0.27 1.36 0.017 0.024 Qualif ied 2014-J-1102 Hebei stee 4.805 Angle Steel Q420B ∠ 200×20 514 629 26.0 Qualif ied 0.18 0.30 1.52 0.019 0.007 Qualif ied
  • 59. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 59 Test: Examine:wanghuijie Date:May 20th,,2012 S t e e l T e s t i n g R e p o r t Name of Project: Luoyang 11kV expansion transmission and transformation line project Page2/2 Executive Standard GB/T700-2006、GB/T709-2006、GB/T1591-2008 Physical Performance Chemical Analysis % Testi ng Sum mary Report NO. Manufacturer Batch (t) Name of Angle Steel Steel Type Specificati on (mm) Yield Strength (Mpa) Tensile Strength (Mpa) Elong ation δ5% Cold Bend ing C % Si % Mn % P % S % 2014-B-360 Anyang Steel 5.775 Steel Plate Q420B δ16 427 567 30.0 Quali fied 0.14 0.27 1.58 0.017 0.014 Quali fied 2014-B-361 Anyang Steel 2.798 Steel Q420B δ20 428 571 31.0 Quali 0.14 0.27 1.53 0.012 0.011 Quali
  • 60. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 60 Plate fied fied 2014-B-362 Anyang Steel 4.179 Steel Plate Q420B δ22 441 580 25.0 Quali fied 0.13 0.26 1.30 0.014 0.012 Quali fied 2014-B-363 Anyang Steel 2.981 Steel Plate Q420B δ18 424 540 32.0 Quali fied 0.13 0.26 1.51 0.014 0.013 Quali fied Test: Examine:wanghuijie Date: May 20th,,20
  • 61. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 61 Ⅱ.Equipment list 1.Main production equipment condition,quantity and technological level 1.1The main production equipment of steel products Production Equipment Name of Equipment Type of Equipment Quantity Equipment Band &Origin Ensure process quality CNC-Angle Steel Hole Drilling Production Line BL2532 1 Shandong Fin CNC Machine Co.,Ltd. Qualified of Punching Accuracy CNC-Angle Steel Hole Punching Production Line JX20 1 Shandong Fin CNC Machine Co.,Ltd. Qualified of Punching Accuracy CNC-Angle Steel Hole Punching Production Line BL1412 1 Shandong Fin CNC Machine Co.,Ltd. Qualified of Punching Accuracy CNC-Angle Steel Hole Punching Production Line AP16 2 Shandong Fin CNC Machine Co.,Ltd. Qualified of Punching Accuracy CNC-Angle Steel Hole Punching Production Line BL2020C 1 Shandong Fin CNC Machine Co.,Ltd. Qualified of Punching Accuracy Steel Plate Automatic Production Line PP103 2 Shandong Fin CNC Machine Co.,Ltd. Qualified of Punching Accuracy
  • 62. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 62 Steel Plate Automatic Production Line CJ-100 1 Jinan Fenster CNC machinery CO.,LTD. Qualified of Punching Accuracy Plate Shearing Machine Q12Y-16×3200 2 Taian hualu Machinery Co., Ltd. Qualified of Baiting Size Plate Shearing Machine Q12Y-20×2500 1 Tianshui Metalforming Machinery tool CO.,LTD. Qualified of Baiting Size Plate Shearing Machine QC12Y-25×2500 2 Wuxi Golden Machinery CO.,LTD. Qualified of Baiting Size CNC Bending Machine WE67K-300/7000 2 Wuxi Golden Machinery CO.,LTD. Qualified of Machining Accuracy CNC Bending Machine WE67K-600/6000 2 Wuxi Golden Machinery CO.,LTD. Qualified of Machining Accuracy CNC Bending Machine WE67K-1600/7000 2 Wuxi Golden Machinery CO.,LTD. Qualified of Machining Accuracy CNC Intersecting Cutting Machine GS/G-600 1 WUXI Hualian Precision Machinery Co., Ltd. Qualified of Baiting Size CNC Vertical Cutting Machine GS/Z-4000 3 WUXI Hualian Precision Machinery Co., Ltd. Qualified of Baiting Size CNC Flame Cutting Machine/CNC Plasma Machine BODA-4000 1 Jiangsu Boda Equipment CO.,LTD. Qualified of Baiting Size CNC Plane Drilling Machine ZK-5550 1 WUXI Hualian Precision Machinery Co., Ltd. Qualified of Drilling Accuracy CNC Plane Drilling Machine PLD2016 2 Shandong Fin CNC Machine Co.,Ltd. φ80 Drilling Machine Z3080×25 1 Shenyang Czech Qualified of Drilling Accuracy Radial Drilling Machine Z3050×16 3 Shenyang Czech Qualified of Drilling Accuracy
  • 63. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 63 Radial Drilling Machine Z3032×8 6 Shenyang Czech Qualified of Drilling Accuracy Rolling Shear Chamfering Machine GD-20 1 WUXI Sanlian Machinery Co., Ltd. Qualified of Machining Size Pipe Beveling Machine SDJ-800 1 Wuxi Yexin Qualified of Machining Size Name of Equipment Type of Equipment Quantity Equipment Band &Origin Ensure process quality Rolling Shear Chamfering Machine JD-20 2 Jinan Fenster CNC machinery CO.,LTD. Qualified of Machining Size Fixed Type Tube Two-way Sloping Machine FPEBM-16D1 1 Shanghai qianshan piping technology limited company Qualified of Machining Size Lathe CW61253B 1 Shenyang machine tool factory Qualified of Machining Size Lathe CW6163B 3 Anyang Lathing Equipment Factory Qualified of Machining Size Lathe C630 1 Anyang Lathing Equipment Factory Qualified of Machining Size Open-type press with fixed bed J21-80 3 Xingyang Hengli Lathing Machine Production Factory Qualified of Punching Hole Accurate Multi-point Forming Machine YQ32-31.5T 1 Tengzhou hydraulic equipment CO.,LTD. Accept Standard of Pressure Straight Pipe flange automatic welding production line PLHZ-1000 1 Tangshan Kaiyuan Panasonic welding equipment CO.,LTD. Accept Standard of Welding Automatic welding machine for pipe prefabrication PPAWM-24A6 1 Shanghai qianshan piping technology limited company Accept Standard of Welding Automatic welding machine for pipe prefabrication PPAWM-40A8 1 Shanghai qianshan piping technology limited company Accept Standard of Welding
  • 64. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 64 Submerged arc welding machine ZD5-1000 3 Tangshan Kaiyuan Panasonic welding equipment CO.,LTD. Accept Standard of Welding Submerged arc welding machine ZD5-630 2 Tangshan Kaiyuan Panasonic welding equipment CO.,LTD. Accept Standard of Welding Submerged AC arc welding machine BX3-500 60 Shanghai electric welding machine works Accept Standard of Welding CO2 Gas-shielded welding machine NBC-500Ⅱ 70 Aotai Electric Co.,Ltd Accept Standard of Welding CNC Divisional fire machine THQ250-600B 1 Zhucheng Ivy machinery technology limited Qualified Size of Bending precision Steel pipe baiting machine GGX-100 1 Henan Dingli Pole&Tower CO.,LTD. Qualified Size of Pipe Baiting Sense Heating Machine WH-Ⅷ-160 1 Zhengzhou Guoyun Electric Technology CO.,LTD. Qualified Size of Bending precision CNC Control double-ended notching machine JQC-426-12 1 Tangshan Kaiyuan Panasonic welding equipment CO.,LTD. Qualified Size of Grooving precision Planning Machine (Trip Planer is not less than 1000mm) BY-2500 1 Fujian Machine Tool Factory Qualified of maching dimension Lathe B665 1 Jianxian Lathe Mahine Factory Qualified of maching dimension Shaping Machine BY60100B 1 Tianshui Machine Tools Factory Qualified of maching dimension Hydraulic Angle cutter QJ-200 2 Shandong Fin CNC Machine Co.,Ltd. Qualified of maching dimension Metal band sawing machine G4240/50 2 Zhejiang Chenglong Qualified of baiting dimension Plasma cutting machine YP-060PS 4 Tangshan Kaiyuan Panasonic welding equipment CO.,LTD. Qualified of baiting dimension
  • 65. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 65 Name of Equipment Type of Equipment Quantity Equipment Band &Origin Ensure process quality Hydraulic Printer DZJ-100 3 Jinan Vart CNC machinery CO.,LTD. Type Standard Hydraulic Printer DZJ-50 4 Henan Dingli Pole&Tower CO.,LTD. Type Standard Milling Machine X6135 1 Nantiong the fifth machine factory Qualified of Inspection Assembling Platform 1.5 ×15m 13 Potou Qualified of Inspection Assembling Site Equipment(Crane) QTZ250 1 Henan crane finished machinery company Qualified of Inspection Crane QY8D 2 Xugong Group Vehicle Inspection Crane QY12 1 Xugong Group Vehicle Inspection Crane CPC-30 6 Anhui Heli forklift company limited Vehicle Inspection Knife Grinting Machine LMD-1500 1 Linyi Li Lian machinery factory Qualified of Inspection Universal Cutting Grinding Machine MS-32 1 Shanghai Meishan Precision Machinery CO.,LTD. Qualified of Inspection Drill Grinding Machine DG6-60 1 Jinan Machine CO.,LTD. Qualified of Inspection
  • 66. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 66 3.Test Equipment Type of Equipment Name of Equipment Model of Equipment Quantit y Purchase Date Manufacturing Inspection Item Physical Property 600kNHydraulic Testing Machine WE-60 1 1985.6.1 Tianshui Hongshan Tensile Steel Cold Bending Electro-hydrauli c Servo Universal Testing Machines WAW-300B 1 2011.3..1 Jinan Fangzhen Tensile Steel Cold Bending Impact test machine ( Low Temperature tester, projector, Gap broaching machine ) JB-300B 1 2009.8.1 Jinan Fangzhen Steel Impact Test optical theodolite TDJ6E 1 2001.8.1 Beijing Feibo Mechanical deflection examination compression testing machine YES-2000 1 2003.10.1 Middle of Jinan Road Pressure Test Digital pressure testing machine YE-3000A 1 2011.3.1 Jinan Fangzhen Pressure Test
  • 67. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 67 Rockwell apparatus HR-150A 1 2008.2.1 Mecmesin Re-insepct of fastener Chemical Analysis direct-reading spectrometer LABSPARK750B 1 2011.9.1 Wuxi 15 elements of steel Thickness of Steel sonigauge TT110 2 2009.2.15 Beijing Times Steel Tickness Zinc Plating Test Covering Thickness Tester TT220 2 2010.8.1 Beijing Times Coating Thickness Zinc coating adhesion Tester 45 1 2003.2.1 Henan Dingli Adhesiveness Welding Test Magnetic flaw detector TCJE-1 2 2010.9.1 Beijing Times Surface qualifty of Welding Welding seam test 40 1 2003.4.1 Kaifeng Measuring Tools welding dimension X ray detector XXG2505 1 2012.7.1 Wuhan Huahai Internal Quality of welding seam reflectogage HS610e 3 2009.10.1 Wuhan Zhongke Internal Quality of welding seam reflectogage PXUT-28 1 2000.7.1. Nantong Union Internal Quality of welding seam Size of Appearance Surface roughometer TR100 1 2013.3 20 Chongqing Leeb Roughness of flange and holes on the surface roughness
  • 68. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 68 4. Cone - shaped concrete steel mold for electric pole NO. Name of Equipment Specification Manufacturer Unit Qua ntity 1 Steel mold for concrete pole φ150×8.5 WUXI building materials machinery factory Set 15 2 Steel mold for concrete pole φ150×9.5 WUXI building materials machinery factory Set 20 3 Steel mold for concrete pole φ150×10 WUXI building materials machinery factory Set 15 4 Steel mold for concrete pole φ150×11 WUXI building materials machinery factory Set 12 5 Steel mold for concrete pole φ170×8 WUXI building materials machinery factory Set 15 6 Steel mold for concrete pole φ170×9 WUXI building materials machinery factory Set 20 7 Steel mold for concrete pole φ170×10 WUXI building materials machinery factory Set 16 8 Steel mold for concrete pole φ170×11 WUXI building materials machinery factory Set 16 9 Steel mold for concrete pole φ190×10 WUXI building materials machinery factory Set 40 10 Steel mold for concrete pole φ190×11 WUXI building materials machinery factory Set 26
  • 69. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 69 11 Steel mold for concrete pole φ190×12 WUXI building materials machinery factory Set 42 12 Steel mold for concrete pole φ190×13 WUXI building materials machinery factory Set 21 13 Steel mold for concrete pole φ190×15 WUXI building materials machinery factory Set 25 14 Steel mold for concrete pole φ190×18 WUXI building materials machinery factory Set 15 5. Assembling Mold NO. Name of Equipment Specification Manufacturer Unit Qua ntity 15 Steel mold for concrete pole φ310×6m WUXI building materials machinery factory Set 30 16 Steel mold for concrete pole φ310×9m WUXI building materials machinery factory Set 26 17 Steel mold for concrete pole φ230/350×9m WUXI building materials machinery factory Set 28 18 Steel mold for concrete pole φ230/390×12m WUXI building materials machinery factory Set 26 19 Steel mold for concrete pole φ270/390×9m WUXI building materials machinery factory Set 25 20 Steel mold for concrete pole φ310/390×6m Taizhou building materials machinery factory Set 26
  • 70. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 70 21 Steel mold for concrete pole φ310/430×9m Taizhou building materials machinery factory Set 34 22 Steel mold for concrete pole φ350/430×6m Taizhou building materials machinery factory Set 24 23 Steel mold for concrete pole φ350/470×9m WUXI building materials machinery factory Set 23 24 Steel mold for concrete pole φ390/470×6m WUXI building materials machinery factory Set 33 25 Steel mold for concrete pole φ390/510×9m WUXI building materials machinery factory Set 24 26 Steel mold for concrete pole φ430/510×6m WUXI building materials machinery factory Set 22 27 Steel mold for concrete pole φ510/630×9m Taizhou building materials machinery factory Set 33 28 Steel mold for concrete pole φ550/630×6m Taizhou building materials machinery factory Set 23 29 Steel mold for concrete pole φ590/670×6m Taizhou building materials machinery factory Set 32 30 Steel mold for concrete pole φ630/710×6 Taizhou building materials machinery factory Set 26 31 Steel mold for concrete pole φ630/750×9 Taizhou building materials machinery factory Set 28 32 Steel mold for concrete pole φ670/790×6 Taizhou building materials machinery factory Set 26
  • 71. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 71 Ⅳ. Experience 1.Oversea Experience in 10 years-Part1 NO. Year Contract NO. Product Buyer Project Name Weight(Ton) Amount(USD) 1 2014 XS6-2014-02-0 05 Concrete Pole China Railway Electrification Group International Railway CO.,LTD Uzbekistan National Railway Company - karshi electrification project 1932 3180298.046 2 2014 XS5-2014-05-0 20 Steel Lattice Tower Hong kong Electric Power Equipment and technology CO.,LTD. Ethiopia Dedesa Transmission and Transformation Project 467.21 639178.4365
  • 72. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 72 3 2014 XS5-2014-05-0 21 Substaion Steel Structure Hong kong Electric Power Equipment and technology CO.,LTD. 500kV Ethiopia GDHA Transmission and Distribution Project 3026 3513905.537 4 2013 XS5-2013-04-0 23 Steel Tower Henan Electric Power Industrial Group CO.,LTD 230KV Expansion Project of Stung Hav transmission and transformation engineering in Cambodia 883.6 1182627.524 5 2013 XS5-2013-05-0 26 Substaion Steel Structure Cambodia Project Department of Henan Electric Power Industrial Group CO.,LTD Ca 230KV Power Station of Cambodia Norodom Sihanouk 4839 7265258.958 6 2013 XS5-2013-05-0 30 Substaion Steel Structure Henan Electric Power Industrial Group CO.,LTD West Port Substation 115KV Project of Cambodia 552.29 74208.77524
  • 73. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 73 7 2013 XS5-2013-07-0 59 Lattice Steel tower Henan Electric Power Industrial Group CO.,LTD 230KV CSS Transmission Project of Cambodian 1013.91 1374608.844 8 2012 XS5-2012-10-0 98 Substaion Steel Structure Shangdong Taikai Electric Power Construction Engineering CO.,LTD DISI Station of 132KV Substation Equipment Total Package contractor of Jordan State Grid 1081 1658257.329 9 2012 XS5-2012-10-0 99 Substaion Steel Structure Shangdong Taikai Electric Power Construction Engineering CO.,LTD QW Station of 132KV Substation Equipment Total Package contractor of Jordan State Grid 2345 1228338.762 10 2012 XS2-2012-03-0 20 Lattice Steel tower Cambodia Lancang River engineering CO.,LTD 115KV Gongbu Province Buge Mountain Power Transmission Project 1896.3 2243798.046
  • 74. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 74 13 2010 XS-2010-08-075 Steel Tubular Pole Zhengzhou Sangka Technology and Trade CO.,LTD. Tobago transmission and tranformation line engineering 6000 18,840,000.00 14 2008 XS4-2008-11-06 1 Steel Tubular Tower Henan Electric Power Industrial Group CO.,LTD 115kV transmission line project in Cambodia 150 1920000 15 2008 XS2-2008-11-04 5 Microwave Tower China Nonferrous Metal Mining Group China Nonferrous Metal Mining delegation from the economic and trade cooperation zones in Zambia modest Chambishi 330kV transmission and transformation line project 20.0566 212599 16 2007 XS5-2007-04-01 1 Substaion Steel Structure CHICO 330kV LUMWANA substaion extension project in Zambia 450 4221000
  • 75. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 75 17 2008 XS5-2006-10-02 4 Substaion Steel Structure CHICO 330kV substaion project in Zambia 200 1876000 18 2009 G-2004-014 Substaion Steel Structure CHICO KANSNSHI/LUANO300kv substation in Zambia 254.7836 2379678.82 2.TABLE OF EXPERIENCE MANUFACTURER Nº COMPANY OR CLIENT DATE OF SUPPLY DESCRIPTION OF SUPPLY (Type structures in kV voltage and ton) COST OF PROCUREMENT (Usd) 1 Henan Electric Power Transmission & Transformation 2006.06 220kV Pakistan Malakand Hydropower Project Substation (691 tons) 1014209.676 2 Zhengzhou Sangka Technology and Trade CO.,LTD. 2006.10 Tobago 230kv transmission and tranformation line engineering (6000 tons) 3068403.909 3 Belize National Electric Corporation 2007.01 Belize Chalillo Hydraulic Power Station and 115kv Power Transmisison Line Project (575.2 tons) 899909.678 4 Cambodia Lancangjiang Engineering CO.,LTD 2007.02 115kV Gongbu Province Buge Mountain Power Transmission Project (1896.3 tons) 2243798.046 5 Angola Urban Construction Ministry 2007.11 Línea 115kV – Angostura (1750 tons) 2681451.613
  • 76. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 76 6 Pakistan Electric Power Company (PEPCO) 2008.05 Pakistan 220kV Steel Structure Tower Project (1510 tons) 2167580.645 7 Shangdong Taikai Electric Power Construction Engineering CO.,LTD 2008.05 QW Station of 132KV Substation Equipment Total Package contractor of Jordan State Grid (2345 tons) 1228338.762 8 Shangdong Taikai Electric Power Construction Engineering CO.,LTD 2008.12 DISI Station of 132kV Substation Equipment Total Package contractor of Jordan State Grid (1081 tons) 1658257.329 9 Henan Electric Power Industrial Group CO.,LTD 2009.02 230kV CSS Transmission Project of Cambodian (1013.91 tons) 1374608.844 10 Belize National Electric Corporation 2009.06 Belize Chalillo Hydraulic Power Station and 115kv Power Transmisison Line Project (948.9 tons) 1408045.16 11 INSTRUMENTAL INC.(Ecuador) 2009.07 330kV Power Transmission Line And Substation Project (1030 tons) 1594838.71 12 Henan Electric Power Industrial Group CO.,LTD 2010.03 230kV Expansion Project of Stung Hav transmission and transformation engineering in Cambodia (883.6 tons) 1182627.524 13 Cambodia Project Department of Henan Electric Power Industrial Group CO.,LTD Ca 2010.04 230KV Power Station of Cambodia Norodom Sihanouk (4839 tons) 7265258.958 14 INSTRUMENTAL INC.(Ecuador) 2010.10 330kV Power Transmission Liner Project (776 tons) 1214064.516 15 Terra Firma Soluciones Integrales S.A. 2011.01 230kv Transmission Line From Cochabamba To La Paz (821.9 tons) 1299132.258 16 Hong kong Electric Power Equipment and technology CO.,LTD. 2011.06 500kV Ethiopia GDHA Transmission and Distribution Project (3026 tons) 3513905.537 17 Hong kong Electric Power Equipment and technology CO.,LTD. 2012.01 500kV Ethiopia Dedesa Transmission and Transformation Project (467.21 tons) 639178.4365 18 Terra Firma Soluciones Integrales S.A. 2012.01 230kv In Bulo Bulo Power Station (737 tons) 1212483.871 19 China Railway Electrification Group International 2012.09 220kV Uzbekistan National Railway Company - karshi 3180298.046
  • 77. Address:Zhengzhou City,Henan Province, P.R.China 450000 Contact: Vivian Zheng Cell:008615938850803 E-mail:inter@hndlgt.com.cn Website: www.hndlgt.com.cn 77 Railway CO.,LTD electrification project (1932 tons) 20 Cambodia Lancangjiang Engineering CO.,LTD 2012.09 230kV Transmission Lines and Transformer Substations Under Kamchay Hydropower Plant (1012.6 tons) 1551564.516 21 Terra Firma Soluciones Integrales S.A. 2013.02 230kV Transmission Line From Sucre to Santa Cruz (866 tons) 1368838.71 22 INGELCO SRL. 2013.03 115kV Power Transmission Line and Substation Project in Paraguay (1368.4 tons) 2096741.936 23 OAO"YUAIZ"(Russia) 2013.03 Russia-China Back to Back 500kV Power Transmission Project (500 tons) 823387.097 24 POWERCHINA 2014.01 Zimbabwe State Grid Net Expanding Project (3457.6 tons) 5297935.484 25 The Power Transmission Company NO2 (Vietnam) 2014.05 220 KV Transmission Line Tower Project (969 tons) 1516016.129 26 ODEBRECHT - OLEX China 2015.01 60kV Power transmission line and substation project (263 tons) 360564.516 27 Venezuela National Electric Corporation 2015.03 115kV New Units of Electricity Generation for National Interconnected System (810 tons) 1149677.419
  • 78. 1 Ⅳ.Quality System Quality System 1 Raw material procurement and quality control documents NO. Raw material procurement Content 1 Raw materials / components management rules and regulations Control files: 1. Provisions on Administration of steel. 2. Provisions on Administration of Welding Materials. 3. Provisions on Administration of Fastening Pieces. 4. Provisions on Administration of Gas 5. Provisions on Administration of Spare Parts 2 Storage places environment of Raw materials and spare parts Raw materials, welding materials, fasteners was placed neatly in the warehouse, marking clear and detailed. 3 Raw materials/components management agencies and managers Finance Department ↓ Property Management Section ↙ ↓ ↘ Warehouse of Steel Materials Warehouse of Spare parts Warehouse of Gas Chief of Property Management Section:Zhihua Li Keeper of Steel Materials Warehouse: Xiaoke Qi、Jinliang Sun Keeper of Spare parts Warehouse:Jingyu Wei.Peixiu Duan warehouse Administrator:Yunjie Yang 4 Raw materials /Components Inspection Procedures Testing procedures: 1. Provision Inspection of steel Materials 2. Provision Inspection of Welding Materials 3. Provision Inspection of fastener 5 Traceability of Raw materials /Components Inspection Raw materials, welding materials, fasteners can be traced back, there are records of receiving and issuing
  • 79. 2 6 Field Implementation of Raw materials / components manage files 1. Raw materials can only be put in the storage after check and issued qualified by the laboratory, and completes the record 2. Welding materials can only be put in the storage after check and issued qualified by the laboratory, and completes the record 3. Fasteners can only be put in the storage after check and issued qualified by the laboratory, and completes the record. 2) Quality Control System
  • 80. 3 2 Quality Guarantee Measures Quality Guarantee Measures of Lattice Steel Tower We have 750kV lattice Steel tower production qualification, all related facilities is equipped to meet your production requirement. For our bid, our company is comply in accordance with a strict quality assurance system to ensure the quality of the products, specific measures are as follows 1. Quality Guarantee Measures of Working Drawing Setting out : We owned a provincial transmission and transformation network engineering technology research center with all kinds of expertise in architecture, machinery, electricity, technology, welding, materials, and other professional fields. For companies drawn to this project design, process design, frame design, complemented by appropriate review, audit, drawings and other technical personnel in order to ensure the quality of processing maps. Professional lofting software TMA is using for lattice steel tower setting out to ensure accuracy of setting out. 2. Quality Guarantee Measures of Raw Materials: The raw materials we use for bidding and procurement: Angle steel, steel plates, fasteners, welding material is preferred from the State Grid Corporation approved qualified suppliers in procurement and recheck all the raw materials into the factory, ensure qualified before use. Testing Center is responsible for the inspection and acceptance of entry materials, the Incoming inspection is conduct according to design requirement. the relevant work instructions. Acceptance specification and operation method. All procurement of raw materials should be conduct according to demand Planning schedule. A clear understanding of each batch of the material delivery deadlines, specifications, quality, quantity, adoption of technical standards. During the raw materials procurement, not only requirements for documentation check, Visual inspection, laboratory testing, mechanical performance test technology performance
  • 81. 4 assessment, inspection, proper stowage, labeling, storage, storage of materials is needed , but also should assess the subcontractor as required. 3. Quality Guarantee Measures of Processing: Company production center set up the project quality assurance group, Chaired by the director himself, Product quality management and inspection efforts should be enhanced according to the characteristics of Engineering. Principal control point (shop drawings, materials, cutting, drilling, bending, cutting limbs, cutting corners, trying to assemble and splicing, soldering quality, etc.) are strictly controlled by QC team, Turn sequence is not allowed without acceptance, clarified the responsibility and increase inspector during the key position. Product is processing by using advanced equipment and manufacturing technique to ensure coordination of all aspects. Angle steel and steel plate adopts automatic drilling equipment. Inspection according to the design requirements, work instructions, inspection procedures, fabrication and processing should be done three checks. For specified welds and nodes, flaw detection, destructive inspection and other necessary test shall be carried out. For trial piece assembling is must take to make sure the after trial assembly finished products meet the processing requirements of the design drawings. First article inspection qualified before mass production, In order to ensure that products manufactured in conformity with the relevant technical requirements, mass production can begin only after first article inspection qualified. 4. Quality Guarantee Measures of Welding Welding must be carried out according to shop drawings and design requirements and comply with related regulations like GB50205-2001 construction and inspection standard of steel structure and JGJ81-2002 technical standard of construction steel structure. Welding materials: welding rod, welding wire, welding compound grades and specification should be classified and pile up in dry storage room. Wire removal of rust, grease and other dirt: it is prohibited to use medicine to peel off, weld cores rusty electrode welding machines and lumped. The CO2 gas for welding should be purified more than 99.4%. Manual arc electric welding with covered electrode
  • 82. 5 should oven bake for 1 hour at 340-440 ℃ before use, welding electrodes should be placed in insulation barrel and use within access. Electrodes shall not exceed the allowed exposed time in the atmosphere: E40 low hydrogen electrode up to 4 hours, E50 low hydrogen electrode up to 9 hours, hydrogen electrode up to the time above, existing dry needed to be confirmed before use. Submerged arc automatic welding flux should be drying in the 250 °c oven for 2 hours. 68 staff with Welder's Certificate issued by the State Grid Corporation, Welding workers must be trained and the exam the competency of personnel, who also need re-take the exam if stop the welding work for 6 months. Their own print code should be marked after welding the welding seam. When welding, the welder should be compliance with Welding Procedure, free welding and prohibited in the road outside the base metal arc welding. Multi - layer welding should be continuous sequence, each layer should be checked after the finished weld. 5. Ensuring measures for the inspection and test Inspection and test personnel hold position, timely completion of appearance inspection, flaw detection, geometry test, strength test, while production processing, also monitoring, supervision and inspection environmental ,inspection on the implementation process, log files should be collected. Problems founded must report to the relevant person in charge immediately. Company quality management system runs according to ISO9001 standard operation; does not turn sequence without qualified inspection, unqualified product is not allowed to leave the factory. Products, packaged by the person in charge, do not send missing part, wrong piece, and mixed pieces. Bundles off package and damage are not allowed during the transportation and be shipped to the destination in time and effectively as the tender requirements. Quality Guarantee Measures of Steel Tubular Pole The raw materials we use for bidding and procurement: Angle steel, steel plates, fasteners, welding material is preferred from the State Grid Corporation approved qualified suppliers in procurement and recheck all the raw materials into the factory, ensure qualified before use.
  • 83. 6 Product is processing by using advanced equipment and manufacturing technique to ensure coordination of all aspects. Angle steel adopts automatic drilling equipment. Steel structure is produced by using 3200ton heavy-duty bending machine. Segment components process with the automatic assembly line for locating, assembling TO ensure the cooperation of all aspects. Setting out with professional software like TMA,LMA is vital step before mass production of Each type of product. There’s 68 staff with Welder's Certificate issued by the State Grid Corporation, We owns a provincial Power Transmission and Transformation project technology research center and equipped with all necessary production facilities. Products are strictly inspected according to national standard GB50205-2001. For trial piece assembling must take to make sure the after trial assembly finished products meet the processing requirements of the design drawings. First article inspection should be qualified before mass production to ensure that meet the relevant technical requirements. Steel Tubular structure adopts individual package, uniform packages for spare parts which ease the procedure of construction. All the leaders and staff has paid great attention to this project, therefore a special leading team is established for the program and following processing ensure measure is taken against this case: Only LMA computer lofting is allowed for the process of setting out, which also should be convert to parts drawing by CAD software. Angle steel parts produced by using CNC steel production line. Pipe beveling adopts special steel pipe beveling machine and lathe processing. Using hydraulic shears with CNC cutting of steel plate parts machining ,section steel parts using saw for swaging, Tubular joints using intersecting Line CNC for cutting. Groove plug board processed by CNC hydraulic press brake. Assembling and welding of steel tubular and hot flange is produce by using welding semiautomatic assembly line. Steel tubular and linking board assembled completely by dihedral control machine. Raw materials require re-inspection qualified before into the factory. Passed the first piece inspection of semi-finished products and finished products should be used in production.
  • 84. 7 Factory inspection comply exactly with manufacturing technical conditions of transmission and transformation steel structure .Company quality management system runs according to ISO9001 standard operation; does not turn sequence without qualified inspection, unqualified product is not allowed to leave the factory. Products, packaged by the person in charge, do not send missing part, wrong piece, and mixed pieces. Bundles off package and damage are not allowed during the transportation and be shipped to the destination in time and effectively as the tender requirements. 3.Quality Guarantee Measures of Concrete Pole Raw materials procurement and quality control regulations Purchasing Control Procedure Q/DLCX-18-2013 1. Purpose: Control on the purchasing process and supplier to ensure that purchased product conforms to the requirements of the quality and the environment. 2. Scope of application Suitable for the production of raw materials procurement, control of sub-contractors and suppliers providing services, and related environmental impact. 3. Obligation
  • 85. 8 3.1 1) Responsible for evaluation of suppliers according to company's requirement, the supplier should filled list of qualified supplier and regular evaluation of supplier delivery performance and establish supplier files. 2) Procurement operations according o procurement plan, the implementation of procurement operations. 3.2 Production Center 1) Procurement plans is established according to material usage sheet offered by technical center. 2) Production Director is responsible for approving the list of evaluation on supplier performance and purchasing plan. 3.3 Testing Center 3) Responsible for incoming inspection and testing of procurement of goods, which shall issue inspection reports. 3.4 Technical Center Be responsible for formulating technical standards for procurement of goods. 4 working procedures 4.1 procurement classification According to the impact on product realization processes and resulting output, the procurement is divided into three categories: Important goods: constitutes a major part of products or key components, a direct impact on the use and safety of the final product properties, materials that may lead to serious customer complaints. Including: steel, cement, welding materials, etc.; Materials: product key parts of non-bulk goods, other generally do not affect the quality of the final product or effects, but you can take measures to correct material. 3) Auxiliary materials: non-direct used to play a supporting role in materials of the product itself. Included: equipment and so on. 4.2 New vendor selection process
  • 86. 9 4.2.1 For important goods supplier selection, qualified Supplier identified process: By primary suppliers—suppliers to be inspected-potential suppliers to determine – sample test--small batch trial-determination process-qualified suppliers; 4.2.2 General goods vendor selection, by primary suppliers--suppliers-potential suppliers to determine--small batch trial-determination process-qualified suppliers; 4.2.3 For the auxiliary material supplier selection should be--small batch trial – by primary suppliers qualified suppliers to determine process; retail purchases or purchasing of auxiliary materials at once, its purchase validation records shall be the evaluation of the vendor. 4.3 Supplier Selection 4.3.1Implement the supplier selection and evaluation procedures for supplier selection 4.3.2 Supply department should select several qualified suppliers in accordance with technical standards for the procurement of needs of important goods and materials. And be responsible for establish and maintain qualified supplier quality records. 4.3.3 Procurement of Goods must be carried out among the qualified suppliers. 4.3.4 Determined the way and degree for the control of suppliers according to supplier evaluation results. 4.3.5 The supply department should be issued a notice of correction (preventive) measures records when there are serious quality problems with vendor’s products. The vendor should be disqualified without significantly improved in quality after noticed twice. 4.3.6 Qualified suppliers should be re-valuation by the supply department once a year, fill out the list of supplier performance evaluation, evaluate by hundred - mark system. 60% of quality. 20% of delivery, 10% of price .services accounted for 10%. Assessment score below 60 ( or quality score below 48 ), its qualified supplier qualification should be withdrawal ; retained as a result of special circumstances, should be approved by the Director of production, but it should strengthen supplies purchasing verified. Failed passing grade for second time in a row, their qualifications should be canceled. 4.3.7 Supplier control of external processing, should also implement the above-mentioned provisions. 4.3.8 Choice for service supplier
  • 87. 10 The supplier for the company to provide services, such as transport, testing, training institutions, but also classics appraisal qualification is rear to provide services to the company. For measuring laboratory authorized by the state can do without service evaluation. 4.4 Procurement 4.4.1 Procurement Document Production centers should compile the schedule list according to BOM and inventory balance sheet from technology center in accordance with the plan of production. Purchase requisition list should be filled for Interim purchasing material, reported to director for approval and hand over to supply department for purchasing according to technical requirement of procurement materials among the supplier in qualified supplier list. 4.4.2 Information on the products to be procured ① Quality requirements for the product (Various standards, provision and drawings can be quoted directly). ② Requirements for product acceptance. ③ Other requirements. Such as: Price.quantity.consign. 4.4.3 Company procurement documents include: procurement list. Procurement application form. Purchasing contract and attachments, this should be keeping by supply department. Department manager is in charge to decide to appropriateness of the requirements before the documents issued. 4.4.4 Also include: ①Requests for approval or accreditation requirements about suppliers’ product. Process, equipment and employees. Like safety certification requirements, processing requirements, testing services, equipment and personnel requirements. ②Applicable quality and environmental management system requirements. 4.5 Purchase controlling 4.5.1 Purchasing contract should be signed for the first time when important goods and materials purchased from qualified supplier, requirements like specification.quantity.quality requirements, inspection conditions, should be specified in the contract.
  • 88. 11 4.5.2 Technical center should provide the technical requirements for procurement materials to supplier as appendix. 4.5.3 Before purchase, the buyer shall verify the effectiveness of the technical requirements provided to the vendor, which should meet the implementation of procurement the procurement list. 4.5.4 For long-term procurement of essential supplies vendors., a framework agreement should signed each year to establish a strategic partnership to restraining supply and demand action of both sides, which should be conducted by supply department. 4.5.5 Purchase price implement the method of centralized bidding, bidding office is responsible for inquiry, comparison, shop around; any other departments have no right to interfere in tender and calibration process. 4.5.6 Information like procurement number delivery time, delivery, quality .quality inspection and after-service set up by supply department ledger as the basis for annual supplier evaluation. 4.6 Request verification of the product 4.6.1 For purchased products can be one of the following authentication methods: 1) validated by the quality inspection Center for purchase; 2) validated by the customer at the company site; 3) implemented by the company in the supplier site verification; 4) Carried out by the customer at the vendor site validation. For the last two methods, supply department serving in procurement documents should provide for verification of product release. 4.6.2 verification activities include inspection, measurement, observation, process validation, providing certificates and other means. In the corresponding test procedures should be provided for in their authentication method. 4.6.3 purchasing goods, supply Department buyers fill out the notice of inspection with the procurement list, the quality certificate sent quality inspection center, and quality testing center carried out according the product realization planning of the review, issued by the review report. Qualified storage, unqualified by the supply Department is responsible for the return shipping. 4.6.4 The unverified material, shall not be reported as finished.
  • 89. 12 4.6.5 Customer verification shall not exonerate the company's responsibility to provide qualified products, and subsequent rejection by the customer cannot be ruled out. 5 Related documents 5.1 Technical requirements for procurement of goods 6 Quality records 6.1 Qualified vendor list 6.2 The supplier performance evaluation form 6.3 Procurement list 6.4 Purchase requisitions 6.5 Inspection notice 4.Verification test of program raw materials testing or validation and periodic Q/DLCX-26-2013 1 Objective In order to ensure that the raw material is applicable to products purchased standards, ensure the quality of the product, the confirmation program for inspection or verification of raw materials is fixed. 2 Scope This procedure is applicable to procurement of raw materials. 3 Duties 3.1 The laboratory is responsible for the inspection or verification of raw materials 3.2 Quality inspection centers are responsible for the preparation of raw material inspection instructions, and are responsible for tests on a regular basis. 3.3 Deputy General Manager is responsible for review and approval of Quality technical inspection instructions for raw material.
  • 90. 13 3.4 Supply department is responsible for the periodic confirmation of the raw material 4 Working procedure 4.1 Materials Classification 4.1.1Materials classified as steel, welding materials, concrete fasteners and concrete products. 4.2 The notice of inspection and certification offering 4.2.1 After the arrival of materials, Ministry of Supply should provided the laboratory the notice of inspection and quality certification by instalment a. The notice of inspection should include materials used of project name, product name, material specifications, sizes, grades, standards and so on. b. Copy of quality certificates must be legible and stamped with supplier product quality seal (Red cap) is valid. 4.2.2 Sand and stone inspection notice must be issued after the delivery; the inspection notification should indicate the materials specifications, manufacturers, and supplier. 4.3 Verification of raw materials Laboratories should first confirm the compatibility of inspection notice, certificate of quality and quantity of goods, specifications, and brands after receiving the notice of inspection, quality certificates and related documents Reported by the certificates of quality inspection data conforms to national standards, with red seal of manufacturers or suppliers on quality certificate. Notified the supply department with an unqualified list there’s no corresponding. 4.4 Testing of raw materials 4.4.1 Testing of steel type 4.4.1.1 Batch Steel mass acceptance, each batch from the same brand, same number, same class, same variety, steel components of the same size, weighs less than 60t per batch. 4.4.1.2 Inspection item, criteria of steel materials are shown in table 1. 4.4.2 Concrete materials testing 4.4.2.1 Cement 4.4.2.1.1 Bulk
  • 91. 14 Cement of Same manufacturer, same breed, same strength, the same number does not exceed 400 tons as a test batch. 4.4.2.1.3 Cement testing Inspection item, criteria of cement are shown in table 2 4.4.2.2 Sand 4.4.2.2.1 Batch Product of Same manufacturer, same breed, same strength, the same number does not exceed 300 tons as a test batch. 4.4.2.2.2 Testing of sand Items like inspection item, frequency of sampling. Standard of sand are shown in table 2 4.4.2.3 Gravel 4.4.2.3.1 Bulk Product of Same manufacturer, same breed, same strength, the same nominal size Dose not exceeds 300 tons as a test batch. 4.4.2.3.2 Inspection of gravel Gravel inspection, sampling frequency, the implementation of standards according to table 2 4.4.2.4 Coal ash 4.4.2.4.1 Bulk Coal ash of same manufacturer, same level, and same kind does not exceed more than 10 tons as a test batch. Testing of 4.4.2.4.2 Coal ash Testing item. Sampling frequency and the implementation standards of coal ash carry out according to table 2. 5.Table 1 Inspection items of steel materials, inspection quantity, and implementation of standard
  • 92. 15 4.4.2.5 Granulated blast furnace slag N O. Name of steel materials Inspection items & The number of samples Executive Standard Appearance Physical Mechanics Chemical Standard method of sampling Standard method of Testing Product standard 1 Steel plate, angle steel 5pieces of random test The tensile, bending, impact test according to the Contract and Technical Agreement requirements Take test for one piece C、 S、Si、 Mn、P physical: GB/T2975 Chemical : GB/T2006 6 GB/T228.1 GB/T232 GB/T229 GB/T244 GB/T246 GB/T4336 GB/T709 GB/T706 GB/T700 GB/T1591 2 Steel tubular Stretching, Cold bending ( compressed ) one each, the impact test in accordance with the Contract and Technical Agreement requirements Take test for one piece C、 S、Si、 Mn、P GB/T3091 GB/T13793 GB/T8162 3 Beam Channel Stretching, Cold bending ( compressed ) one each Take test for one piece C、 S、Si、 Mn、P GB/T706 GB/T700 4 H-Beam Stretching, Cold bending ( compressed ) one each , the impact test in accordance with the Contract and Technical Agreement requirements Take test for one piece C、 S、Si、 Mn、P GB/T11263 GB/T700 5 H-beam steel Stretching, Cold bending ( compressed ) one each Take test for one piece C、 S、Si、 Mn、P GB/T706 GB/T700 6 Steel bar round wire rod Stretching, Cold bending ( compressed )one each - GB/T228.1 GB/T232 GB/T238 GB/T701 plain round bar Stretching, Cold bending ( compressed ) two each GB/T1499. 1 ribbed bars GB/T1499. 2 Pre-stressed wire Stretching, Cold bending ( compressed )one each GB/T5223
  • 93. 16 4.4.2.5.1 Bulk Product of Same manufacturer, same level, same pattern NO., dose not exceeds 2 tons as a test batch. 4.4.2.5.2 Testing of blast furnace slag powder Testing of blast-furnace slag project, sampling frequency, and the implementation of standards according to table 2. 4.4.2.6 Superplasticizer 4.4.2.6.1 Bulk Product of same manufacturer, same level, same for an inspection lot numbering no more than 2 tons. Testing of 4.4.2.6.2 water reducer Reducing agent inspection, sampling frequency, the implementation of standards according to table 2. 6.Table 1 Implementation standard for Inspection items Inspection frequency of concrete materials NO. Test Item Sampling Frequency Executive Standard 1 Cement Packing Mark 400 Ton/Once GB/T175 general purpose Portland cement GB/T1346 Cement water requirement of normal consistency, setting time and soundness test method soundness of cement
  • 94. 17 4.4.3 Testing of welding materials 4.4.3.1 New vendor for welding material must carry out Visual inspection of size and mechanical properties of deposited metal for the first time. Long-term supplier must take inspection every three months, required by contract and the technical agreement. 4.4.3.2 Test Project and verification interval of welding materials is listed in Table 3 resist compression of cement mortar GB/T17671 Method of testing cement-Determination of strength folding strength Of cement 2 Sand separator-size distribution of Sand 300 Ton/Once Sand for construction: GB/T14684 silt carrying capacity of sand moisture content of sand Robustness of sand Sand packing density 3 Gravel Particle gradation of gravel 300 Ton/Once Pebble and crushed stone for construction GB/T14685 Gravel mud content Gravel crushing Index Gravel content of Crystals shaped in needle flake Packing density of gravel 4 Coal ash packing mark 10 Ton/Once GB1596 Coal Ash used for Cement and Concrete GB/T1346 Testing method of Cement water requirement of normal consistency, setting time and stability activity index stability 5 blast furnace cinder packing mark 2 Ton/Once GB/T 18046 Ground Granulated Blast furnace slag used for Cement and Concrete powder activity index 6 water reducer Concrete water-reducing ratio, Compressive Strength ratio 2 Ton/Once GB8076 concrete admixture
  • 95. 18 Table 3 Testing project, Inspection Frequency .the implementation of standards for Welding Materials NO. Name of welding Test Item Inspection frequency Executive Standard 1 carbon steel Dimension The first inspection /each batch A routine inspection each three months GB/T5117Mechanical tests for deposited metal 2 Welding wires for gas shielded arc welding Dimension The first inspection /each batch A routine inspection each three months GB/T8110Mechanical tests for deposited metal 3 Submerged arc welding wire and welding flux Dimension The first inspection /each batch A routine inspection each three months GB/T5293 GB/T12470 Mechanical tests for deposited metal Solder particle inspection 4.4.4 Fasteners testing 4.4.4.1 Batch Fastener of Same manufacturer, same specification, and same quality level are tested by 5000 suits at most as same batch. 4.4.4.2 Fastener testing Fasteners - inspection items, frequency, quantity and performance standards as indicated in table 4 4.5 Period validation inspection of raw materials Annual evaluation of raw materials for qualified supplier should be organized by supply department, which include field trips, supplier qualification files, type Test Report. 4.6 Record Inspection test result and testing equipment used, environment condition should be recorded in time after examination. 4.7 Disposition Qualified raw materials should be issued Incoming Material Quality Certificate and kept by property management department, unqualified raw materials should filled in the unqualified form to supply department for refund. 5 Related documents
  • 96. 19 5.1 Control Procedure recording 5.2 Nonconforming Product Control Procedure 5.3 Raw materials related standards Table 4 Fasteners, inspection and sampling table NO. Faste ners Inspection Item Inspection frequency and quantity Executive Standard 1 Nut Dimension 32 Piece/ per batch GB/T41、GB/T6170、DL/T284、 GB/T1229 Proof Load 8 Piece/ per batch GB/T3098.2 、DL/T284 、GB/T1231 Rockwell hardness 8 Piece/ per batch GB/T3098.1、GB/T1231、DL/T284 Zinc thickness; For uniformity of galvanized coating; Adhesion of the zinc coating 8 Piece/ per batch GB/T5267.3 2 Bolts Dimension 32 Piece/ per batch GB/T5780、GB/T5781、GB/T5782、 GB/T1228 Proof Load 8 Piece/ per batch GB/T3098.1 、DL/T284 、GB/T1231 Rockwell hardness 8 Piece/ per batch GB/T3098.1、DL/T284 、GB/T1231 Zinc thickness; For uniformity of galvanized coating; Adhesion of the zinc coating 8 Piece/ per batch GB/T3098.1 、DL/T284、GB/T1231 6 Records 6.1 Quality inspection records of cement; 6.2 Metal inspection record (a); 6.3 Water reducer inspection records 6.4 Admixture test records; 6.5 Sands indicators test records; 6.6 Fastener inspection records 6.7 Gravel indicators test records; 6.8 Welding electrodes, welding wire, flux inspection records; 6.9 Metal inspection records.
  • 97. 20 Controlled Standard Documents of Henan Dingli Pole & Tower CO.,LTD. Q/DLZY-08-2013 Ⅴ .HOT-DIP GALVANIZING PROCESS INSTRUCTION 2 0 1 3 - 0 1 - 2 0 P u b l i s h 2 0 1 3 - 0 1 - 2 0 I m p l e m e n t PUBLISHED BY HENAN DINGLI POLE & TOWER CO., LTD
  • 98. I Forward This working instruction aims at ensure quality of galvanized steel products and control the product implementation process. The working instruction refer to the requirement of technical standard GB/T2694-2010 transmission line steel tower production technical specification. DL/T646-2006 transmission line steel tubular structure production technical specification. Q/GDW384-2009 transmission line steel tubular tower production technical specification. GB50205-2001 steel structure construction quality inspection code,and practical production ,in order to guide the operating staff. This instruction is revised for the first time after the issuing of DL/T646-2012 of the power transmission steel structure manufacturing specifications, is consistent with the DL/T646-2012 standard and modified some of the deviation requirements. File numbers in accordance with the requirements of the document control numbers unified The writting format of the instruction is prepare according to standard GB/T1.1-2009 Part I: Standard structure and writting. The instruction is presented by Henan Dingli Pole&Tower CO.,LTD,drafted by technical department
  • 100. 3 Hot-dip Galvanizing Working Instructions 1.Objective To normalized the hot-dip galvanizing process of company's steel products, guiding the staff operations, instructions are formulated. 2.Scope This instruction provides hot-dip galvanizing operation procedures, technical and quality requirements. This instruction is applicable to steel products of hot-dip galvanizing process. 3.Job responsibilities 3.1 In strict compliance with the relevant regulations of the technical standard and quality management to ensure product quality, prevent errors, eliminate the quality accidents. 3.2 In strict compliance with safety technical specification,prevent any occurrence of safety accidents, ensuring personal safety accidents to zero 3.3 Care of equipment, careful operation, saving electricity, water, gas, reduce production cost. 3.4 Devote themselves deeply into their business, improve their technical quality, and actively participate in job training and technology public relations activities.
  • 101. 4 4.Reference GB/T2694 Transmission line towers--Technical requirements for manufacturing GB50205 Steel structure project construction quality approval standard GB/T13912 Metallic coatings,Technical requirements for hot-dip zinc coating steel products DL/T646 Manufacturing technical Conditions of transmission steel structure Q/GDW384 Transmission line steel Tower processing technical specification 5.Working Process 5.1 Diagram of working Process 5.2 Unprocessed parts inspection 5.2.1 All the galvanized product should be visual check before zinc coating. 5.2.2 Extra work need to be done if follow situation occur while unprocessed parts checking(or Special technique need to be done )
  • 102. 5 1)Dimension of work piece beyond the zinc plating pot 2)Work piece without vent, half closed leakage of liquid zinc hole or fully closed plating, and no suspension pints. 3)Welding seam of coated parts that is not closed, welding coating and slag of welding seam does not clean, as well as more serious defect of coated parts. 5.3 Hang material 5.3.1 Plating rack should be inspected before hang materials,deformation.cracks.tripping, corrosion and surface adhesion large area with zinc layer is found and, may not continue to use. 5.3.2 Sort component according to the type.length.materials and surface condition while hanging. 5.4 Pickling 5.4.1 Hydrochloric acid aqueous solution is used for pickling, hydrochloric concentration is 40~160 g/l, room temperature as working tempreture. 5.4.2 Compound of pickling liquor 32% industrial concentration hydrochloric acid, 1:1 mixed with water to produce hydrochloric acid content of 160 g/l concentration of acid pickling solution. Preparation before adding water and then adding acid, add tube immersed in the water of hydrochloric acid, and acid fog inhibitor (otherwise stated) During the pickling liquid in use generally do not add acid until the reduced content of 40~45 hydrochloride g/l of solution concentration and solution of ferrous chloride (FeCL2) content of up to 200 g/l, pumping of waste acid storage tank, and processing. 5.4.3 Acid pickling solution testing once for each class,result posted on the signs to guide the pickling operation treatment.
  • 103. 6 5.4.4 Pickling time is made according to the plating surface oxide layer and acid concentration. Pickling operation to speed up the reaction speed,move from top to bottom plating in acid pickling process must be two to three times, and then pull above fluid level to check quality of pickling 5.5 Rinsing Qualified rinse galvanized components must be rinsed in the double rinsing craft tank through flowing water to erase the surface remaining pickling liquid and other debris, and then immediately into the plating bath by flux process. 5.6 Fluxing 5.6.1 Plating agents are ammonium chloride (NH4CL) solution, the working temperature is 60~80℃, proportion is the solution: 1.03~1.05g/cm3 (room temperature measurement). Plating agents used in the process should be supplemented and adjusted in proportion within the limits prescribed. Assistant pools keep the water level of the low water line and between the highest water level. 5.6.2 Flux test for twice each batch, its iron content in solution at 10 grams/liter. PH=3~5, quality control. Assistant quality control in the regeneration cycle, flux heating by heater. 5.6.3 Full immersion plating after rinsing solvent treatment in plating solution, soak time of 3-5 minutes. 5.6.4 Work piece treat after flux,, chemical treatment and quality inspection is needed.. Local paint or for any other reason fails to acid clean surface grinding wheels, wire brushes, scrapers and other tools for processing, repeat the pickling process operation, rack zinc plating after chemical qualifying. 5.7 Second-hanging Before Galvanizing
  • 104. 7 5.7.1 If pickling qualified, the work piece which well handled after plating auxiliary should go on to proceed second-hanging before galvanizing. 5.7.2 Pay attention to the position of hole and characteristics of work piece while second-hanging and select the applicable hanging point and right direction of zinc flow in case of any quality problem such as unfavorable air-out, smooth zinc flow and zinc heaping etc. Second-hanging should reach hot-dip galvanizing requirement. 5.8 Preheating & Drying After second-hanging procedure, stay in drying tank and make sure the work piece dry enough and then go on to do hot-dip galvanizing. 5.9 Hot-dip Galvanizing 5.9.1 Zinc Bath 5.9.1.1 Zinc bath is mainly composed of molten zinc. The chemical ingredients of zinc ingot have to reach GB470 standard. Add proper aluminum alloy in zinc melt which should net exceed 50g/ton(zinc). 5.9.1.2 Galvanizing work should be started as long as the zinc melt temperature up to 455℃-460℃. Meanwhile, the temperature should stay between 420℃ ~ 430℃ if production paused. 5.9.1.3 Fill the zinc everyday while off work to make sure lower the pressure of zinc melting pot and stay 10-30cm distance between zinc melt and edge of zinc melting pot. During special producing situation in large use of zinc should fill at anytime. 5.9.1.4 Thickness of the residues in zinc melting pot cannot over 8cm to lower the possibility of zinc pot corrosion. To do at least twice totally salvaging zinc residue work each week, the salvager should salve evenly from one side of the pot to another side and each time should repeat one third of the site where have been salved already. If miss any work-piece into the zinc pot, salve immediately to avoid corrosion and produce much more zinc residue.