Embed presentation
Download as PDF, PPTX


Over the 12 month period shown, production levels varied between 550 and 700 units per month while average monthly sales were 300 units. The cycle time for production was 8 weeks on average with a minimum of 4 weeks and a maximum of 1.5 weeks for safety stock replenishment. Inventory levels fluctuated between meeting maximum monthly sales of 700 units and the minimum re-order point of 350-400 units plus the 150 unit safety stock level.

