FOOTING PLAN
SCALE-1:100
2'-0"
3'-0"
8'-6"
8'-6"
3'-9"
8'-6"
8'-6"
8'-6" 8'-6" 8'-6" 8'-6"
3'-9"
19'-10"
15'-6"
7'
8'-6"
8'-6"
15'-6"
17'-2"
8'-6"
8'-6" 8'-6"
8'-6"
8'-6"
8'-6"
8'-6"
8'-6"
8'-6"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
FB
14"X22"
F1
F1
F1 F1 F1 F1
F1 F1 F1 F1
F3
F4
F2 F2 F2 F2
THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22"
THK: 22"
THK: 22"
THK: 22"
THK: 22"
THK: 22"
THK: 22"
THK: 22"
THK: 22" THK: 22"
THK: 22"
15'-6"
15'-6"
8'-6"
11'-10" 11'-10"
12' 11'-10" 11'-10" 11'-10" 11'-10"
20'-6"
7'-1"
20'-6"
16mm @ 150mm C/C
Top and Bottom
16mm
@
150mm
C/C
Top
and
Bottom
16mm @ 150mm C/C
Top and Bottom
16mm
@
150mm
C/C
Top
and
Bottom
20 mm @ 150mm C/C Bottom
16 mm @ 150mm C/C Top
20 mm @ 150mm C/C Bottom
16 mm @ 150mm C/C Top
20
mm
@
150mm
C/C
Bottom
16
mm
@
150mm
C/C
Top
16mm @ 150mm C/C
Top and Bottom
X
X
1
2
3
4
Ground Lvl
8mm-2L @ 150mm C/C
1'-10"
8'-6" 11'-9" 15'-6" 10'-6" 8'-6"
FB 14"X22" FB 14"X22"
16mm @ 150mm C/C 16mm @ 150mm C/C 20mm @ 150mm C/C 16mm @ 150mm C/C
3-16mm th
2-16mm ex
3-16mm th
Footing Section at X-X
FOOTING ID L1 L2 DEPTH (D)
REINFORCEMENT DETAILS
RAFT SCHEDULE FOR 80 kN/m2 (BOTTOM & TOP REINFOREMENT)
BOTTOM BARS
16Ø @ 150 C/C
BOTH DIRECTIONS
F1 8'6" 22"
TOP BARS
16Ø @ 150 C/C
BOTH DIRECTIONS
8'6"
10Ø @ 150 C/C
BOTH DIRECTIONS
F2 15'6" 22" 16Ø @ 150 C/C
BOTH DIRECTIONS
8'6"
16Ø @ 150 C/C
BOTH DIRECTIONS
F3 17'6" 22" 16Ø @ 150 C/C
BOTH DIRECTIONS
8'6"
16Ø @ 150 C/C
BOTH DIRECTIONS
F4 15'6" 22" 16Ø @ 150 C/C
BOTH DIRECTIONS
19'10"
COLUMN REINFORCEMENT DETAILS
S. NO.
1
2
BASE TO PLINTH
PLINT TO FIRST
FLOOR
FIRST TO SECOND
FLOOR
SECOND TO THIRD
FLOOR
COLUMN
C1
COLUMN SIZE
(18"X18")
3
4
STIRRUPS
6
8 NOS. -20mmØ
8 NOS. -20mmØ
+
FIFTH TO TOP
FLOOR
5
A: 2L-8Ø @ 100mm c/c &
B: 2Nos-2L-8Ø @ 100mm c/c
1'-6"
1'-6"
FORTH TO FIFTH
FLOOR
4
THIRD TO FORTH
FLOOR
4
8 NOS. -20mmØ
8 NOS. -20mmØ
+
1'-6"
1'-6"
8 NOS. -20mmØ
8 NOS. -20mmØ
+
1'-6"
1'-6"
8 NOS. -16mmØ
8 NOS. -20mmØ
+
1'-6"
1'-6"
8 NOS. -16mmØ
8 NOS. -20mmØ
+
1'-6"
1'-6"
8 NOS. -16mmØ
8 NOS. -20mmØ
+
1'-6"
1'-6"
8 NOS. -16mmØ
8 NOS. -20mmØ
+
1'-6"
1'-6"
6. DEVELOPMENT / LAP LENGTH (Ld.) FOR BARS.
1. USE M20 GRADE CONCRETE FOR SLAB, BEAM,
2. USE Fe500 GRADE STEEL (fy=500N/mm² )
3. CLEAR COVER TO BARS
a. FOR CONCRETE MEMBERS IN CONTACT WITH SOIL = MIN 50mm
b. FOR COLUMN (FROM FACE TO LATERAL TIES) = 40mm
c. FOR BEAMS (FROM FACE TO LATERAL STIRRUPS) = 25mm
d. FOR OUTER BARS IN SLAB = 15mm
4. BARS IN COLUMNS SHALL BE SPLICED ONLY AT MID HEIGHT OF COLUMN.
5. BARS SPLICING IN BEAM SHALL BE AVOIDED IN THE SPAN WHERE
INTERMEDIATE BEAM IS CONNECTED AND SHALL BE ONLY AS SHOWN IN DWG.
7. TEMP./DISTRIBUTION REINFORCEMENT FOR SLAB - TMT 8Ø @ 200 C/C
8. CLEAR VERTICAL DISTANCE BETWEEN TWO ROWS (LAYERS) OF BARS=25mm OR MAXIMUM SIZE OF REBAR
BAR DIA-(mm) 8 10 12 16 20 25
FOR M20 Ld 456 570 684 912 1140 1425
COLUMN, FOUNDATION, SILL & LINTEL BANDS (ALL RCC WORKS)
e. FOR STAIRCASE = 20mm
9. PROVIDE STIRRUPS OR TIES AT MIN 150 C/C AT LAP LOCATIONS IN BEAM AND AT MIN 100 C/C AT LAP LOCATION IN COLUMNS.
50mm (MAX.)
50mm (MAX.)
Stirrups-100mm C/C
50mm (MAX.)
1:6 SLOPE RATIO
NOT MORE THAN 50% BAR
SHOULD BE LAP AT ONE
POSITION
(First stirrup from column)
1:6 SLOPE RATIO Stirrups-100mm C/C
NOT MORE THAN 50% BAR
SHOULD BE LAP AT ONE
POSITION
50mm (MAX.)
FLOOR BEAM
50mm (MAX.)
TYP. COLUMN SHEAR
REINFORCEMENT DETAIL
Ld (Extra Bars) (Extra Bars)
CHAIR RESTING ON BOTTOM BARS
@600 - 900 mm staggered position
60
5
0
75
NEGATIVE BAR (N)
NEGATIVE BAR (N)
FLOOR BEAM
(Lap Zone for Bottom Bars)
(No Lap Shall be
allowed for Bottom
(Extra Bars)
Bars)
13.
12.
11.
D=DEPTH OF BEAM
d=EFFECTIVE DEPTH OF BEAM
H = CLEAR SPAN OF FLOOR.
GENERAL NOTES:
TYPICAL LAP LOCATION FOR BEAM BARS
FLOOR BEAM
L2
TYPICAL DETAIL FOR SLAB BARS
1:6 SLOPE RATIO
LAPPING METHOD
Ld
0.25*L1
40
40
(Not to Scale)
Øb
DETAIL OF HOOK
1
0
*
Ø
b
L1
0.15*L1 or Ld
(whichever is greater)
0.25*L2
0.3*L1 or Ld (whichever is greater)
125
SLAB
THICK
2d
Ld
>0.25L or Ld
whichever is greater
Ld
>0.25L or Ld
whichever is greater
>0.25L or Ld
whichever is greater
d
L/3 L/3
L
0.15*L1
0.15*L1 or Ld
(whichever is greater)
0.3*L2 or Ld (whichever is greater)
0.15*L2 or Ld
(whichever is greater)
LAP ZONE FOR TOP BARS
<50mm(Typ.)
Ld
H
D
D
H/4
Ld
H/4
H
H/4
H/4
Ld
ZONE
FOR
LAP
SPLICING
(STIRRUPS NOT SHOWN FOR CLARITY)
STIRRUPS 100 C/C
MINIMUM 3 SETS OF STIRRUPS
STIRRUPS 100 C/C
MINIMUM 3 SETS OF STIRRUPS
MINIMUM 3 SETS OF STIRRUPS
STIRRUPS 100 C/C
10. FOUNDATION
10.1 FOUNDATION DESIGN HAVE BEEN PROVIDED FOR SAFE BEARING CAPACITY OF 150kN/m2.
10.2 IF SAFE BEARING CAPACITY OF SOIL IS FOUND LESS THAN 100KN/m2, SPECIAL STUDY FOR FOUNDATION DESIGN IS
REQUIRED.
14. Ld=DEVELOPMENT LENGHT
15. SYMBOLS USED IN BEAM DETAILS
S1 = 8mm dia 4"C/C
S2 = 8mm dia 6"C/C
CONNECTION OF BAND REBARS AND COLUMN
Ld
Ld
OPTION 1
DRILL AND ANCHOR BARS
WITH ANCHOR CHEMICALS
OPTION 2
COLUMN
TYPICAL FOUNDATION WALL DETAIL
(Scale= 1:20)
75mm P.C.C.(1:3:6)
RAMMED EARTH
600mm R.C.C. RAFT
200mm GRAVEL COMPACTION
9"
1:4 C/S Brickwork
75mm P.C.C.(1:3:6)
38mm FF
200mm GRAVEL COMPACTION
3 -16mm Ø (th)
3-16mmØ (th.)
22"
14"
2-16mmØ(ex)
Strap
beam
:
01
NORTH JOBNUMBER/DRAWINGNUMBER SHEET
Signature:
Plot No: 647
Checked By: Bharat Acharya
Scale:
1:100
Date: Sep 2019
Dwg.Title:
Registration No.:2602
Location:Dhumbarahi
Area: 0-5-3-3
Building Type:
Owner :Safala Upreti
General Notes, Footing Detail, Column Schedule
Residential
OFFICIAL USE ONLY
Designer / Consultant: Bharat Acharya

More Related Content

Similar to Footing

STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdf
Adnan Lazem
 
YDM Laboratory Technique Catalogue
YDM Laboratory Technique CatalogueYDM Laboratory Technique Catalogue
YDM Laboratory Technique Catalogue
vlnkhn
 
Cembre Pin Crimp Terminals, Yellow - GF-P
Cembre Pin Crimp Terminals, Yellow - GF-PCembre Pin Crimp Terminals, Yellow - GF-P
Cembre Pin Crimp Terminals, Yellow - GF-P
Thorne & Derrick International
 
Cembre Pin Crimp Terminals, Red - RF-P
Cembre Pin Crimp Terminals, Red - RF-PCembre Pin Crimp Terminals, Red - RF-P
Cembre Pin Crimp Terminals, Red - RF-P
Thorne & Derrick International
 
Cembre Pin Terminals
Cembre Pin TerminalsCembre Pin Terminals
Cembre Pin Terminals
Thorne & Derrick International
 
Cembre Blade Terminals Red - RF-PP
Cembre Blade Terminals Red - RF-PPCembre Blade Terminals Red - RF-PP
Cembre Blade Terminals Red - RF-PP
Thorne & Derrick International
 
Cembre Pin Crimp Terminals, Blue - BF-P
Cembre Pin Crimp Terminals, Blue - BF-PCembre Pin Crimp Terminals, Blue - BF-P
Cembre Pin Crimp Terminals, Blue - BF-P
Thorne & Derrick International
 
Cembre Blade Terminals Blue - BF-PP
Cembre Blade Terminals Blue - BF-PPCembre Blade Terminals Blue - BF-PP
Cembre Blade Terminals Blue - BF-PP
Thorne & Derrick International
 
Cembre Blade Terminals Yellow - GF-PP
Cembre Blade Terminals Yellow - GF-PPCembre Blade Terminals Yellow - GF-PP
Cembre Blade Terminals Yellow - GF-PP
Thorne & Derrick International
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
EduardoFarfan14
 
Copper bonded-earthing-rod-manufacturer
Copper bonded-earthing-rod-manufacturerCopper bonded-earthing-rod-manufacturer
Copper bonded-earthing-rod-manufacturer
Ujjwal Shah
 
Copper bonded earthing rod manufacturer
Copper bonded earthing rod manufacturerCopper bonded earthing rod manufacturer
Copper bonded earthing rod manufacturer
Ujjwal Shah
 
Inertia dynamic type fsb_specsheet
Inertia dynamic type fsb_specsheetInertia dynamic type fsb_specsheet
Inertia dynamic type fsb_specsheet
Electromate
 
Shafts
ShaftsShafts
8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper
BGS Institute of Technology, Adichunchanagiri University (ACU)
 
Copper bonded-grounding-rod-manufacturer
Copper bonded-grounding-rod-manufacturerCopper bonded-grounding-rod-manufacturer
Copper bonded-grounding-rod-manufacturer
Ujjwal Shah
 
Copper bonded-earth-rod-manufacturer
Copper bonded-earth-rod-manufacturerCopper bonded-earth-rod-manufacturer
Copper bonded-earth-rod-manufacturer
Ujjwal Shah
 
Kingsmill Copper Earth Bars - 10 Way
Kingsmill Copper Earth Bars - 10 WayKingsmill Copper Earth Bars - 10 Way
Kingsmill Copper Earth Bars - 10 Way
Thorne & Derrick International
 
Kingsmill Copper Earth Bars - 24 Way
Kingsmill Copper Earth Bars - 24 WayKingsmill Copper Earth Bars - 24 Way
Kingsmill Copper Earth Bars - 24 Way
Thorne & Derrick International
 

Similar to Footing (20)

STEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdfSTEEL BUILDING DETAILs -006.pdf
STEEL BUILDING DETAILs -006.pdf
 
YDM Laboratory Technique Catalogue
YDM Laboratory Technique CatalogueYDM Laboratory Technique Catalogue
YDM Laboratory Technique Catalogue
 
Cembre Pin Crimp Terminals, Yellow - GF-P
Cembre Pin Crimp Terminals, Yellow - GF-PCembre Pin Crimp Terminals, Yellow - GF-P
Cembre Pin Crimp Terminals, Yellow - GF-P
 
Cembre Pin Crimp Terminals, Red - RF-P
Cembre Pin Crimp Terminals, Red - RF-PCembre Pin Crimp Terminals, Red - RF-P
Cembre Pin Crimp Terminals, Red - RF-P
 
Cembre Pin Terminals
Cembre Pin TerminalsCembre Pin Terminals
Cembre Pin Terminals
 
Cembre Blade Terminals Red - RF-PP
Cembre Blade Terminals Red - RF-PPCembre Blade Terminals Red - RF-PP
Cembre Blade Terminals Red - RF-PP
 
Cembre Pin Crimp Terminals, Blue - BF-P
Cembre Pin Crimp Terminals, Blue - BF-PCembre Pin Crimp Terminals, Blue - BF-P
Cembre Pin Crimp Terminals, Blue - BF-P
 
Cembre Blade Terminals Blue - BF-PP
Cembre Blade Terminals Blue - BF-PPCembre Blade Terminals Blue - BF-PP
Cembre Blade Terminals Blue - BF-PP
 
Cembre Blade Terminals Yellow - GF-PP
Cembre Blade Terminals Yellow - GF-PPCembre Blade Terminals Yellow - GF-PP
Cembre Blade Terminals Yellow - GF-PP
 
54307684 beam-column
54307684 beam-column54307684 beam-column
54307684 beam-column
 
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdfBOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
BOQ - 945.23 Rev.00 - Warehouse - Colombia.pdf
 
Copper bonded-earthing-rod-manufacturer
Copper bonded-earthing-rod-manufacturerCopper bonded-earthing-rod-manufacturer
Copper bonded-earthing-rod-manufacturer
 
Copper bonded earthing rod manufacturer
Copper bonded earthing rod manufacturerCopper bonded earthing rod manufacturer
Copper bonded earthing rod manufacturer
 
Inertia dynamic type fsb_specsheet
Inertia dynamic type fsb_specsheetInertia dynamic type fsb_specsheet
Inertia dynamic type fsb_specsheet
 
Shafts
ShaftsShafts
Shafts
 
8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper8th Semester (June; July-2014) Civil Engineering Question Paper
8th Semester (June; July-2014) Civil Engineering Question Paper
 
Copper bonded-grounding-rod-manufacturer
Copper bonded-grounding-rod-manufacturerCopper bonded-grounding-rod-manufacturer
Copper bonded-grounding-rod-manufacturer
 
Copper bonded-earth-rod-manufacturer
Copper bonded-earth-rod-manufacturerCopper bonded-earth-rod-manufacturer
Copper bonded-earth-rod-manufacturer
 
Kingsmill Copper Earth Bars - 10 Way
Kingsmill Copper Earth Bars - 10 WayKingsmill Copper Earth Bars - 10 Way
Kingsmill Copper Earth Bars - 10 Way
 
Kingsmill Copper Earth Bars - 24 Way
Kingsmill Copper Earth Bars - 24 WayKingsmill Copper Earth Bars - 24 Way
Kingsmill Copper Earth Bars - 24 Way
 

Recently uploaded

SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
eloprejohn333
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
9a93xvy
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
cy0krjxt
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
TE Studio
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
jyz59f4j
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
7sd8fier
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
184804
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
smpc3nvg
 
Moldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo espMoldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo esp
Hess9
 
Timeless Principles of Good Design
Timeless Principles of Good DesignTimeless Principles of Good Design
Timeless Principles of Good Design
Carolina de Bartolo
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
Febless Hernane
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
contactproperweb2014
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
Chiara Aliotta
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
9a93xvy
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
millarj46
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
7sd8fier
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
GOWSIKRAJA PALANISAMY
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
7sd8fier
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
708pb191
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
Knight Moves
 

Recently uploaded (20)

SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdfSECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
SECURING BUILDING PERMIT CITY OF CALOOCAN.pdf
 
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
一比一原版(RHUL毕业证书)伦敦大学皇家霍洛威学院毕业证如何办理
 
Design Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinkingDesign Thinking Design thinking Design thinking
Design Thinking Design thinking Design thinking
 
Connect Conference 2022: Passive House - Economic and Environmental Solution...
Connect Conference 2022: Passive House -  Economic and Environmental Solution...Connect Conference 2022: Passive House -  Economic and Environmental Solution...
Connect Conference 2022: Passive House - Economic and Environmental Solution...
 
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
一比一原版(LSE毕业证书)伦敦政治经济学院毕业证成绩单如何办理
 
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
一比一原版(UNUK毕业证书)诺丁汉大学毕业证如何办理
 
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With DesignsGame Concept Presentation for Ukrainian Mythology Based Game With Designs
Game Concept Presentation for Ukrainian Mythology Based Game With Designs
 
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
一比一原版(Bristol毕业证书)布里斯托大学毕业证成绩单如何办理
 
Moldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo espMoldes de letra 3D Alfabeto completo esp
Moldes de letra 3D Alfabeto completo esp
 
Timeless Principles of Good Design
Timeless Principles of Good DesignTimeless Principles of Good Design
Timeless Principles of Good Design
 
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANEEASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
EASY TUTORIAL OF HOW TO USE CAPCUT BY: FEBLESS HERNANE
 
Impact of Fonts: in Web and Apps Design
Impact of Fonts:  in Web and Apps DesignImpact of Fonts:  in Web and Apps Design
Impact of Fonts: in Web and Apps Design
 
Storytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design ProcessStorytelling For The Web: Integrate Storytelling in your Design Process
Storytelling For The Web: Integrate Storytelling in your Design Process
 
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
一比一原版(CITY毕业证书)谢菲尔德哈勒姆大学毕业证如何办理
 
Virtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburghVirtual Tour Application Powerpoint for museum of edinburgh
Virtual Tour Application Powerpoint for museum of edinburgh
 
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
一比一原版(MMU毕业证书)曼彻斯特城市大学毕业证成绩单如何办理
 
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptxUNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
UNIT V ACTIONS AND COMMANDS, FORMS AND CONTROLS.pptx
 
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
一比一原版(NCL毕业证书)纽卡斯尔大学毕业证成绩单如何办理
 
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
一比一原版(UAL毕业证书)伦敦艺术大学毕业证成绩单如何办理
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
 

Footing

  • 1. A A B B C C D D E E F F 1 1 2 2 3 3 4 FOOTING PLAN SCALE-1:100 2'-0" 3'-0" 8'-6" 8'-6" 3'-9" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 3'-9" 19'-10" 15'-6" 7' 8'-6" 8'-6" 15'-6" 17'-2" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" FB 14"X22" F1 F1 F1 F1 F1 F1 F1 F1 F1 F1 F3 F4 F2 F2 F2 F2 THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" THK: 22" 15'-6" 15'-6" 8'-6" 11'-10" 11'-10" 12' 11'-10" 11'-10" 11'-10" 11'-10" 20'-6" 7'-1" 20'-6" 16mm @ 150mm C/C Top and Bottom 16mm @ 150mm C/C Top and Bottom 16mm @ 150mm C/C Top and Bottom 16mm @ 150mm C/C Top and Bottom 20 mm @ 150mm C/C Bottom 16 mm @ 150mm C/C Top 20 mm @ 150mm C/C Bottom 16 mm @ 150mm C/C Top 20 mm @ 150mm C/C Bottom 16 mm @ 150mm C/C Top 16mm @ 150mm C/C Top and Bottom X X 1 2 3 4 Ground Lvl 8mm-2L @ 150mm C/C 1'-10" 8'-6" 11'-9" 15'-6" 10'-6" 8'-6" FB 14"X22" FB 14"X22" 16mm @ 150mm C/C 16mm @ 150mm C/C 20mm @ 150mm C/C 16mm @ 150mm C/C 3-16mm th 2-16mm ex 3-16mm th Footing Section at X-X FOOTING ID L1 L2 DEPTH (D) REINFORCEMENT DETAILS RAFT SCHEDULE FOR 80 kN/m2 (BOTTOM & TOP REINFOREMENT) BOTTOM BARS 16Ø @ 150 C/C BOTH DIRECTIONS F1 8'6" 22" TOP BARS 16Ø @ 150 C/C BOTH DIRECTIONS 8'6" 10Ø @ 150 C/C BOTH DIRECTIONS F2 15'6" 22" 16Ø @ 150 C/C BOTH DIRECTIONS 8'6" 16Ø @ 150 C/C BOTH DIRECTIONS F3 17'6" 22" 16Ø @ 150 C/C BOTH DIRECTIONS 8'6" 16Ø @ 150 C/C BOTH DIRECTIONS F4 15'6" 22" 16Ø @ 150 C/C BOTH DIRECTIONS 19'10" COLUMN REINFORCEMENT DETAILS S. NO. 1 2 BASE TO PLINTH PLINT TO FIRST FLOOR FIRST TO SECOND FLOOR SECOND TO THIRD FLOOR COLUMN C1 COLUMN SIZE (18"X18") 3 4 STIRRUPS 6 8 NOS. -20mmØ 8 NOS. -20mmØ + FIFTH TO TOP FLOOR 5 A: 2L-8Ø @ 100mm c/c & B: 2Nos-2L-8Ø @ 100mm c/c 1'-6" 1'-6" FORTH TO FIFTH FLOOR 4 THIRD TO FORTH FLOOR 4 8 NOS. -20mmØ 8 NOS. -20mmØ + 1'-6" 1'-6" 8 NOS. -20mmØ 8 NOS. -20mmØ + 1'-6" 1'-6" 8 NOS. -16mmØ 8 NOS. -20mmØ + 1'-6" 1'-6" 8 NOS. -16mmØ 8 NOS. -20mmØ + 1'-6" 1'-6" 8 NOS. -16mmØ 8 NOS. -20mmØ + 1'-6" 1'-6" 8 NOS. -16mmØ 8 NOS. -20mmØ + 1'-6" 1'-6" 6. DEVELOPMENT / LAP LENGTH (Ld.) FOR BARS. 1. USE M20 GRADE CONCRETE FOR SLAB, BEAM, 2. USE Fe500 GRADE STEEL (fy=500N/mm² ) 3. CLEAR COVER TO BARS a. FOR CONCRETE MEMBERS IN CONTACT WITH SOIL = MIN 50mm b. FOR COLUMN (FROM FACE TO LATERAL TIES) = 40mm c. FOR BEAMS (FROM FACE TO LATERAL STIRRUPS) = 25mm d. FOR OUTER BARS IN SLAB = 15mm 4. BARS IN COLUMNS SHALL BE SPLICED ONLY AT MID HEIGHT OF COLUMN. 5. BARS SPLICING IN BEAM SHALL BE AVOIDED IN THE SPAN WHERE INTERMEDIATE BEAM IS CONNECTED AND SHALL BE ONLY AS SHOWN IN DWG. 7. TEMP./DISTRIBUTION REINFORCEMENT FOR SLAB - TMT 8Ø @ 200 C/C 8. CLEAR VERTICAL DISTANCE BETWEEN TWO ROWS (LAYERS) OF BARS=25mm OR MAXIMUM SIZE OF REBAR BAR DIA-(mm) 8 10 12 16 20 25 FOR M20 Ld 456 570 684 912 1140 1425 COLUMN, FOUNDATION, SILL & LINTEL BANDS (ALL RCC WORKS) e. FOR STAIRCASE = 20mm 9. PROVIDE STIRRUPS OR TIES AT MIN 150 C/C AT LAP LOCATIONS IN BEAM AND AT MIN 100 C/C AT LAP LOCATION IN COLUMNS. 50mm (MAX.) 50mm (MAX.) Stirrups-100mm C/C 50mm (MAX.) 1:6 SLOPE RATIO NOT MORE THAN 50% BAR SHOULD BE LAP AT ONE POSITION (First stirrup from column) 1:6 SLOPE RATIO Stirrups-100mm C/C NOT MORE THAN 50% BAR SHOULD BE LAP AT ONE POSITION 50mm (MAX.) FLOOR BEAM 50mm (MAX.) TYP. COLUMN SHEAR REINFORCEMENT DETAIL Ld (Extra Bars) (Extra Bars) CHAIR RESTING ON BOTTOM BARS @600 - 900 mm staggered position 60 5 0 75 NEGATIVE BAR (N) NEGATIVE BAR (N) FLOOR BEAM (Lap Zone for Bottom Bars) (No Lap Shall be allowed for Bottom (Extra Bars) Bars) 13. 12. 11. D=DEPTH OF BEAM d=EFFECTIVE DEPTH OF BEAM H = CLEAR SPAN OF FLOOR. GENERAL NOTES: TYPICAL LAP LOCATION FOR BEAM BARS FLOOR BEAM L2 TYPICAL DETAIL FOR SLAB BARS 1:6 SLOPE RATIO LAPPING METHOD Ld 0.25*L1 40 40 (Not to Scale) Øb DETAIL OF HOOK 1 0 * Ø b L1 0.15*L1 or Ld (whichever is greater) 0.25*L2 0.3*L1 or Ld (whichever is greater) 125 SLAB THICK 2d Ld >0.25L or Ld whichever is greater Ld >0.25L or Ld whichever is greater >0.25L or Ld whichever is greater d L/3 L/3 L 0.15*L1 0.15*L1 or Ld (whichever is greater) 0.3*L2 or Ld (whichever is greater) 0.15*L2 or Ld (whichever is greater) LAP ZONE FOR TOP BARS <50mm(Typ.) Ld H D D H/4 Ld H/4 H H/4 H/4 Ld ZONE FOR LAP SPLICING (STIRRUPS NOT SHOWN FOR CLARITY) STIRRUPS 100 C/C MINIMUM 3 SETS OF STIRRUPS STIRRUPS 100 C/C MINIMUM 3 SETS OF STIRRUPS MINIMUM 3 SETS OF STIRRUPS STIRRUPS 100 C/C 10. FOUNDATION 10.1 FOUNDATION DESIGN HAVE BEEN PROVIDED FOR SAFE BEARING CAPACITY OF 150kN/m2. 10.2 IF SAFE BEARING CAPACITY OF SOIL IS FOUND LESS THAN 100KN/m2, SPECIAL STUDY FOR FOUNDATION DESIGN IS REQUIRED. 14. Ld=DEVELOPMENT LENGHT 15. SYMBOLS USED IN BEAM DETAILS S1 = 8mm dia 4"C/C S2 = 8mm dia 6"C/C CONNECTION OF BAND REBARS AND COLUMN Ld Ld OPTION 1 DRILL AND ANCHOR BARS WITH ANCHOR CHEMICALS OPTION 2 COLUMN TYPICAL FOUNDATION WALL DETAIL (Scale= 1:20) 75mm P.C.C.(1:3:6) RAMMED EARTH 600mm R.C.C. RAFT 200mm GRAVEL COMPACTION 9" 1:4 C/S Brickwork 75mm P.C.C.(1:3:6) 38mm FF 200mm GRAVEL COMPACTION 3 -16mm Ø (th) 3-16mmØ (th.) 22" 14" 2-16mmØ(ex) Strap beam : 01 NORTH JOBNUMBER/DRAWINGNUMBER SHEET Signature: Plot No: 647 Checked By: Bharat Acharya Scale: 1:100 Date: Sep 2019 Dwg.Title: Registration No.:2602 Location:Dhumbarahi Area: 0-5-3-3 Building Type: Owner :Safala Upreti General Notes, Footing Detail, Column Schedule Residential OFFICIAL USE ONLY Designer / Consultant: Bharat Acharya