SlideShare a Scribd company logo
FLOTANT has received
funding from the European
Union’s Horizon 2020
research and innovation
programme under grant
agreement No. 815289
www.flotantproject.eu
Innovative, low cost, low weight and safe floating
wind technology optimized for deep water wind sites
O B J E C T I V E S
C H A L L E N G E S & S C O P E
S O L U T I O N S P R O P O S E D B Y F L O TA N T
PROJECT ACRONYM: FLOTANT
PROJECT TITLE: Innovative, low cost, low weight and
safe floating wind technology optimized for deep
water wind sites
FUNDING: EU-H2020-LC-SC3-RES-11-2018, grant
agreement 815289
EU Financial conttribution: 4.9 million Euros
START DATE: April 1, 2019
DURATION: 36 months
PARTNERS: 17 partners from 8 countries
COORDINATOR: Octavio Llinás, PLOCAN
DEPUTY COORDINATOR: Ayoze Castro, PLOCAN
CONTACT: ayoze.castro@plocan.eu
WEBSITE: www.flotantproject.eu
The main objective of FLOTANT project is to develop the conceptual and basic engineering, including performance tests of
the mooring and anchoring systems and the dynamic cable to improve cost-efficiency, increased flexibility and robustness to
a hybrid concrete-plastic floating structure implemented for DWWF. Innovative solutions will be designed to be deployed in
water depths from 100m to 600m, optimizing the LCOE of the floating solution (85-95 €/MWh by 2030).
FLOTANT will develop a cost competitive integrated wind energy system with a LCOE lower than
120€/MWh by 2025 and 85-95€/MWh by 2030, achieved through new innovative technology in
hybrid plastic/concrete substructure, mooring and anchoring, and dynamic cable systems which
can all be used in deeper waters.
FLOTANT will develop lightweight reliable, sustainable and cost-efficient mooring solutions. The
technology challenge will be to integrate the various innovative component behaviours into the
nonlinear global mode prediction software to allow for the development of innovative mooring
systems.
The technology challenge is to design cables that alleviate the severe and repeated loads, whilst
maintaining a reliable and sustainable power connection. This will be addressed by identifying
suitable design solutions for power cables in highly dynamic operating conditions, including
connectors, conductor configuration and cable flexible and high torsion resistance sheathing
options, to ensure safe, reliable, sustainable and cost effective electrical connections for FOW.
Predictive O&M algorithms will be developed to minimize the corrective O&M costs. Use of non-
corrosive materials, anti-fouling additives, non-complex and prefabricated structures and non-
mechanical system to maintain the structure floating will contribute to minimize O&M operations
as well.
FLOTANT project technologies starting from TRL 3-4 will achieve at the end of the project TRL 4-5
based on testings and demonstrations in in relevant environment, including real sea conditions.
Reduction of the materials employed in the FOW components. Recycling and reusing techniques
will be investigated to minimize footprint. Anti-fouling and anti-bite additives will be developed to
ensure that materials do not harm wildlife and flora. Easy structure design to allow an easy and
quickly decommissioning of the components.
Main issues to be addressed by FLOTANT will carefully consider: i) Sharing the use of the sea with
others: fishermen, commercial or recreational navigation, military constraints, ii) Issues related
with proximity to airports or radars; iii) Landscape, when site is close to the coast, and iv) Landing
of evacuation lines: maximum recycling at time of decommissioning.
Improved construction and installation techniques will be developed, reducing logistics costs,
installation and commissioning. The technology developed will enable easy transport of the full
unit to and from low depth harbours using full-blown bags and tugboats.
Technology development
including reliable, sustainable
and cost-efficient anchoring and
mooring system
Power evacuation optimization
and cost reduction
O&M concepts
Proposals with technologies from
TRL 3-4 to TRL 4-5
Lower environmental impacts
Social acceptance or resistance
to new energy technology,
socioeconomic issues
Installation techniques
Cost reductions remain a crucial
necessity for existing or new
technologies
C O N C E P T A N D M E T H O D O L O G Y
COORDINATOR Research and technological development
centres & universities
SME INDUSTRY
FLOTANT proposes to develop an innovative, integrated FOW
solution, optimized to sustain a typical 10+MW WTG in deep
waters (100-600m). It will composed by: a novel anchoring
and mooring systems, a floater & mast, and a power export
system (including a design for a deep-water substation).
A holistic approach will be taken and realistic designs
will be tested in relevant
environments. The design of
a new concept of mooring
system based on the
use of high performance
and lightweight fibres
and elastomers will be
developed. Mooring will be
complemented by a polymer
spring component, and
an anchoring system with
active heave compensation.
The fatigue performance of
new plastic materials will
be improved and additives
to improve state-of-art
dynamic cables. Anti-bite
and anti-fouling properties
to the FOW components
will be provided. In addition,
the suitable floating bags
for a new concept of low
cost floating platform will
be developed. The floating
bags will be designed based
on the technology developed
in the framework REFRESH
project, where a large bag
was designed to transport
water between islands
over the seawater . The bag
will be made with a strong
but flexible plastic-coated
reinforced fabric. These
coated fabrics are widely used in several applications due to
low cost and optimal performance with a good combination
of flexibility, toughness, extensibility and high ratio of
strength to weight.
Software tools for cost-benefit of transmission alternatives
and layouts optimisation including emergency breakaways
will be developed and cable hang-off devices will oversee
required simulations to evaluate the performance of the
individual components and full FOW. The system will be fully
sensing and monitored. The developed FLOTANT integral
system will be validated in a controlled basin and some
of the components in a relevant environment with a real
seawater conditions. Design basis of certain components
and innovations will be certificated, meanwhile tailored O&M
& installation strategies will be defined. The overall cost
reduction as well as environmental, social and economic
impacts vill be assessed.
Flexible dynamic tethers
with high fatigue
resistance
Multiple sensors
& Inertial
measurement unit
Reinforced
plastic bags
Flexible elastomeric
composites for anchoring
and mooring connexion
FLOTANTinnovative, low cost, low weight and safe floating Wind
technology optimized for deep water wind sites
ALGAE
Z
y
x
ALGAE
Anchoring system
with active heave
compensation
ALGAE
wind
turbine
LOW
COST
SIMPLE
DESIGN
REDUCED
O&M
CILINDRIC
CONCRETE
STRUCTURE
High performance and
sensored multi-materials
cables for mooring
ALGAE
GOBIERNO
DE ESPAÑA

More Related Content

Similar to FLOTANT leaflet

road_map (1)
road_map (1)road_map (1)
road_map (1)
Stavros Thomas
 
Float Europe Marine Technologies presents the Float Inc. Security Port with L...
Float Europe Marine Technologies presents the Float Inc. Security Port with L...Float Europe Marine Technologies presents the Float Inc. Security Port with L...
Float Europe Marine Technologies presents the Float Inc. Security Port with L...
Franklin Martin
 
ADROIT_IJAERD
ADROIT_IJAERDADROIT_IJAERD
ADROIT_IJAERD
KAJAL PANDA
 
Windfloat
WindfloatWindfloat
Implementation of Optical wireless communication through underwater channel
Implementation of Optical wireless communication through underwater channelImplementation of Optical wireless communication through underwater channel
Implementation of Optical wireless communication through underwater channel
SANKETLKENDUR
 
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Roxtec UK & Ireland
 
Rotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade designRotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade design
Torben Haagh
 
TPOcean-Strategic_Research_Agenda_Nov2016
TPOcean-Strategic_Research_Agenda_Nov2016TPOcean-Strategic_Research_Agenda_Nov2016
TPOcean-Strategic_Research_Agenda_Nov2016
Nicolas Wallet
 
Jaeger Water Business Jet
Jaeger Water Business JetJaeger Water Business Jet
Jaeger Water Business Jet
Jan-Willem Kuijpers
 
INTCATCH summary
INTCATCH summaryINTCATCH summary
INTCATCH summary
Mark Scrimshaw
 
REMOTE MINES(2)
REMOTE MINES(2)REMOTE MINES(2)
REMOTE MINES(2)
Robert Pell
 
SEA-25th-Anniv-Newsletter- 2013(1)
SEA-25th-Anniv-Newsletter- 2013(1)SEA-25th-Anniv-Newsletter- 2013(1)
SEA-25th-Anniv-Newsletter- 2013(1)
George Christenson
 
Nexans 2014 Group Presentation
Nexans 2014 Group PresentationNexans 2014 Group Presentation
Nexans 2014 Group Presentation
John Giatras
 
Innovation_Review_LAPHIA_(Bordeaux_University)
Innovation_Review_LAPHIA_(Bordeaux_University)Innovation_Review_LAPHIA_(Bordeaux_University)
Innovation_Review_LAPHIA_(Bordeaux_University)
Anne-Lise Bué
 
Innovation and transitions in the oil and gas industry
Innovation and transitions in the oil and gas industry Innovation and transitions in the oil and gas industry
Innovation and transitions in the oil and gas industry
ObiechinaKelvin
 
RECREATE Short Brochure
RECREATE Short BrochureRECREATE Short Brochure
RECREATE Short Brochure
RECREATE6
 
RINA@WORK 1/2015
RINA@WORK 1/2015RINA@WORK 1/2015
RINA@WORK 1/2015
RINA GROUP
 
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Stavros Thomas
 
SMARTI
SMARTISMARTI
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and AirmastsDriving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
3G4G
 

Similar to FLOTANT leaflet (20)

road_map (1)
road_map (1)road_map (1)
road_map (1)
 
Float Europe Marine Technologies presents the Float Inc. Security Port with L...
Float Europe Marine Technologies presents the Float Inc. Security Port with L...Float Europe Marine Technologies presents the Float Inc. Security Port with L...
Float Europe Marine Technologies presents the Float Inc. Security Port with L...
 
ADROIT_IJAERD
ADROIT_IJAERDADROIT_IJAERD
ADROIT_IJAERD
 
Windfloat
WindfloatWindfloat
Windfloat
 
Implementation of Optical wireless communication through underwater channel
Implementation of Optical wireless communication through underwater channelImplementation of Optical wireless communication through underwater channel
Implementation of Optical wireless communication through underwater channel
 
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
 
Rotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade designRotor Blades: The use of composites in rotor blade design
Rotor Blades: The use of composites in rotor blade design
 
TPOcean-Strategic_Research_Agenda_Nov2016
TPOcean-Strategic_Research_Agenda_Nov2016TPOcean-Strategic_Research_Agenda_Nov2016
TPOcean-Strategic_Research_Agenda_Nov2016
 
Jaeger Water Business Jet
Jaeger Water Business JetJaeger Water Business Jet
Jaeger Water Business Jet
 
INTCATCH summary
INTCATCH summaryINTCATCH summary
INTCATCH summary
 
REMOTE MINES(2)
REMOTE MINES(2)REMOTE MINES(2)
REMOTE MINES(2)
 
SEA-25th-Anniv-Newsletter- 2013(1)
SEA-25th-Anniv-Newsletter- 2013(1)SEA-25th-Anniv-Newsletter- 2013(1)
SEA-25th-Anniv-Newsletter- 2013(1)
 
Nexans 2014 Group Presentation
Nexans 2014 Group PresentationNexans 2014 Group Presentation
Nexans 2014 Group Presentation
 
Innovation_Review_LAPHIA_(Bordeaux_University)
Innovation_Review_LAPHIA_(Bordeaux_University)Innovation_Review_LAPHIA_(Bordeaux_University)
Innovation_Review_LAPHIA_(Bordeaux_University)
 
Innovation and transitions in the oil and gas industry
Innovation and transitions in the oil and gas industry Innovation and transitions in the oil and gas industry
Innovation and transitions in the oil and gas industry
 
RECREATE Short Brochure
RECREATE Short BrochureRECREATE Short Brochure
RECREATE Short Brochure
 
RINA@WORK 1/2015
RINA@WORK 1/2015RINA@WORK 1/2015
RINA@WORK 1/2015
 
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
Offshore Wind Energy: Improving Project Development and Supply Chain Processe...
 
SMARTI
SMARTISMARTI
SMARTI
 
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and AirmastsDriving Connectivity in the Scottish Islands: Droneways and Airmasts
Driving Connectivity in the Scottish Islands: Droneways and Airmasts
 

Recently uploaded

Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
q30122000
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
PreethaV16
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Balvir Singh
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
VanTuDuong1
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
PriyankaKilaniya
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptxEV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
nikshimanasa
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
Kamal Acharya
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 

Recently uploaded (20)

Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
OOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming languageOOPS_Lab_Manual - programs using C++ programming language
OOPS_Lab_Manual - programs using C++ programming language
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdfSri Guru Hargobind Ji - Bandi Chor Guru.pdf
Sri Guru Hargobind Ji - Bandi Chor Guru.pdf
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
 
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
Prediction of Electrical Energy Efficiency Using Information on Consumer's Ac...
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptxEV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
EV BMS WITH CHARGE MONITOR AND FIRE DETECTION.pptx
 
Blood finder application project report (1).pdf
Blood finder application project report (1).pdfBlood finder application project report (1).pdf
Blood finder application project report (1).pdf
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 

FLOTANT leaflet

  • 1. FLOTANT has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No. 815289 www.flotantproject.eu Innovative, low cost, low weight and safe floating wind technology optimized for deep water wind sites O B J E C T I V E S C H A L L E N G E S & S C O P E S O L U T I O N S P R O P O S E D B Y F L O TA N T PROJECT ACRONYM: FLOTANT PROJECT TITLE: Innovative, low cost, low weight and safe floating wind technology optimized for deep water wind sites FUNDING: EU-H2020-LC-SC3-RES-11-2018, grant agreement 815289 EU Financial conttribution: 4.9 million Euros START DATE: April 1, 2019 DURATION: 36 months PARTNERS: 17 partners from 8 countries COORDINATOR: Octavio Llinás, PLOCAN DEPUTY COORDINATOR: Ayoze Castro, PLOCAN CONTACT: ayoze.castro@plocan.eu WEBSITE: www.flotantproject.eu The main objective of FLOTANT project is to develop the conceptual and basic engineering, including performance tests of the mooring and anchoring systems and the dynamic cable to improve cost-efficiency, increased flexibility and robustness to a hybrid concrete-plastic floating structure implemented for DWWF. Innovative solutions will be designed to be deployed in water depths from 100m to 600m, optimizing the LCOE of the floating solution (85-95 €/MWh by 2030). FLOTANT will develop a cost competitive integrated wind energy system with a LCOE lower than 120€/MWh by 2025 and 85-95€/MWh by 2030, achieved through new innovative technology in hybrid plastic/concrete substructure, mooring and anchoring, and dynamic cable systems which can all be used in deeper waters. FLOTANT will develop lightweight reliable, sustainable and cost-efficient mooring solutions. The technology challenge will be to integrate the various innovative component behaviours into the nonlinear global mode prediction software to allow for the development of innovative mooring systems. The technology challenge is to design cables that alleviate the severe and repeated loads, whilst maintaining a reliable and sustainable power connection. This will be addressed by identifying suitable design solutions for power cables in highly dynamic operating conditions, including connectors, conductor configuration and cable flexible and high torsion resistance sheathing options, to ensure safe, reliable, sustainable and cost effective electrical connections for FOW. Predictive O&M algorithms will be developed to minimize the corrective O&M costs. Use of non- corrosive materials, anti-fouling additives, non-complex and prefabricated structures and non- mechanical system to maintain the structure floating will contribute to minimize O&M operations as well. FLOTANT project technologies starting from TRL 3-4 will achieve at the end of the project TRL 4-5 based on testings and demonstrations in in relevant environment, including real sea conditions. Reduction of the materials employed in the FOW components. Recycling and reusing techniques will be investigated to minimize footprint. Anti-fouling and anti-bite additives will be developed to ensure that materials do not harm wildlife and flora. Easy structure design to allow an easy and quickly decommissioning of the components. Main issues to be addressed by FLOTANT will carefully consider: i) Sharing the use of the sea with others: fishermen, commercial or recreational navigation, military constraints, ii) Issues related with proximity to airports or radars; iii) Landscape, when site is close to the coast, and iv) Landing of evacuation lines: maximum recycling at time of decommissioning. Improved construction and installation techniques will be developed, reducing logistics costs, installation and commissioning. The technology developed will enable easy transport of the full unit to and from low depth harbours using full-blown bags and tugboats. Technology development including reliable, sustainable and cost-efficient anchoring and mooring system Power evacuation optimization and cost reduction O&M concepts Proposals with technologies from TRL 3-4 to TRL 4-5 Lower environmental impacts Social acceptance or resistance to new energy technology, socioeconomic issues Installation techniques Cost reductions remain a crucial necessity for existing or new technologies
  • 2. C O N C E P T A N D M E T H O D O L O G Y COORDINATOR Research and technological development centres & universities SME INDUSTRY FLOTANT proposes to develop an innovative, integrated FOW solution, optimized to sustain a typical 10+MW WTG in deep waters (100-600m). It will composed by: a novel anchoring and mooring systems, a floater & mast, and a power export system (including a design for a deep-water substation). A holistic approach will be taken and realistic designs will be tested in relevant environments. The design of a new concept of mooring system based on the use of high performance and lightweight fibres and elastomers will be developed. Mooring will be complemented by a polymer spring component, and an anchoring system with active heave compensation. The fatigue performance of new plastic materials will be improved and additives to improve state-of-art dynamic cables. Anti-bite and anti-fouling properties to the FOW components will be provided. In addition, the suitable floating bags for a new concept of low cost floating platform will be developed. The floating bags will be designed based on the technology developed in the framework REFRESH project, where a large bag was designed to transport water between islands over the seawater . The bag will be made with a strong but flexible plastic-coated reinforced fabric. These coated fabrics are widely used in several applications due to low cost and optimal performance with a good combination of flexibility, toughness, extensibility and high ratio of strength to weight. Software tools for cost-benefit of transmission alternatives and layouts optimisation including emergency breakaways will be developed and cable hang-off devices will oversee required simulations to evaluate the performance of the individual components and full FOW. The system will be fully sensing and monitored. The developed FLOTANT integral system will be validated in a controlled basin and some of the components in a relevant environment with a real seawater conditions. Design basis of certain components and innovations will be certificated, meanwhile tailored O&M & installation strategies will be defined. The overall cost reduction as well as environmental, social and economic impacts vill be assessed. Flexible dynamic tethers with high fatigue resistance Multiple sensors & Inertial measurement unit Reinforced plastic bags Flexible elastomeric composites for anchoring and mooring connexion FLOTANTinnovative, low cost, low weight and safe floating Wind technology optimized for deep water wind sites ALGAE Z y x ALGAE Anchoring system with active heave compensation ALGAE wind turbine LOW COST SIMPLE DESIGN REDUCED O&M CILINDRIC CONCRETE STRUCTURE High performance and sensored multi-materials cables for mooring ALGAE GOBIERNO DE ESPAÑA