Polymer Modified Bitumen
PRESENTED BY:
NITESH KUMAR JHA(111139)
Department of Civil Engineering
NATIONAL INSTITUTE OF TECHNOLOGY WARANGAL
Date:12/03/15
1
Contents:
 Introduction
 What are plastic roads?
 Need of study
 Concept of plastic roads
 Material used
 Construction process
 Field trials
 Advantages of plastic roads
 Disadvantages of plastic roads
 conclusion
2
Introduction:
 Growth in industries and population together has resulted
in production of various types of waste materials.
 The creation and disposal of non-decaying waste materials
such as Fly-ash, Steel Slag, Scrap Tyres, Plastics etc. have
been posing difficult problems.
 Considerable work has been done in various countries for
the disposal of some of these waste products and
utilisation of some other products.
 There is a long list of published literature dealing with
different aspects of these challenging problems.
3
What are waste plastic roads?
The roads constructed using waste plastic, popularly known
as Plastic Roads , are found to perform better compared
to those constructed with conventional bitumen.
1)The Indian Center for Plastic in the Environment (ICPE) has
been promoting the use of plastic waste to construct asphalt
roads.
2) A few trial roads have been paved successfully by combining
waste plastic with bitumen.
4
Plastic Roads
A Long lasting road from waste plastic for a
better and green world….
5
Need of study
1)Disposal of waste plastic is a major problem.
Waste Plastic dumped on roads
2)It is non-biodegradable.
3)It mainly consists of low-density polyethylene.
6
4)To find its utility in bituminous mixes for road construction.
5)Burning of these waste plastic bags causes environmental
pollution.
6)Laboratory performance studies were conducted on
bituminous mixes.
7)studies proved that waste plastic enhances the property of
the mix.
8)Improvement in properties of bituminous mix provides the
solution for disposal in an useful way.
7
MATERIALS USED:
 AGGREGATE:
 Aggregate of 20mm, 10 mm.
 Stone Dust and Lime as Filler.
 BITUMEN:-
 60/70,80/100 grade bitumen.
8
WASTE PLASTIC:
 Waste plastic in the shredded form are used.
9
Construction of plastic roads
Step 1:
 Plastics waste (bags ,cups , bottles ) made out of PE,PP
and PS cut into a size between 2.36mm and 4.75mm using
shredding machine.
Shredding Shredded Plastics
10
Step 2:
 The aggregate mix is heated to 165°c (as per the HRS
specification) and transferred to mixing chamber.
 Amount of plastic to be added is @8% of bitumen.
 Similarly the bitumen is to be heated up to a maximum of
160°c (HRS Specification) to have good binding property.
(Monitoring the temperature is very important).
11
Heating Of Aggregates
12
Step 3:
At the mixing chamber, the shredded plastics waste is to be
added.
It get coated uniformly over the aggregate within 30 to 60
seconds, giving an oily look.
Addition of shredded Plastics Coated aggregates
13
Step 4
 The plastics waste coated aggregate is mixed with hot
bitumen and the resulted mix is used for road
construction.
 The road laying temperature is between 110°c to 120°c. The
roller used is 8-ton capacity.
Adding of Bitumen
14
Mixing Laying and Compaction
15
16
Field trials
There are two type of field trials-:
1. DRY PROCESS
2.WET PROCESS
1.Dry Process:
The aggregate is heated to 170°C in the Mini hot Mix Plant .
The shredded plastic waste is added in equal proportion.
 Immediately the hot Bitumen 60/70 or 80/100 grade
(160°C) is added.
The mixture is transferred to the road and the road is laid.
17
2.Wet Process:
Waste plastics by direct mixing with hot bitumen at
160°C.
Mechanical stirrer is needed.
Addition of stabilizers and proper cooling.
Since the wet process require a lot of investment and
bigger plants.
Not commonly used.
18
ADVANTAGE OF USING MODIFIED BITUMEN:
 Stronger road with increased Marshall Stability Value.
 Better resistance towards rain water and water stagnation.
 No stripping and no potholes.
 Increase binding and better bonding of the mix.
 Reduction in pores in aggregate and hence less rutting and
raveling.
 Generate jobs for rag pickers.
19
 The strength of the road is increased by 100%.
 For 1km X 3.75m road, 1 ton of plastic (10 lakh carry bags) is
used and 1 ton of bitumen is saved.
 Value addition to the waste plastics (cost per kilogram
increases from Rs 4 to Rs12).
 Reduce the cost to around Rs. 5000/Km. of single lane
road.
 The maintenance cost of road is almost nil.
 Disposal of waste plastic will no longer be a problem
20
DISADVANTAGES OF PLASTIC ROAD
1. Cleaning process -:
Toxics present in the co-mingled plastic waste would
start leaching.
2. During the road laying process -:
In the presence of chlorine will definitely release noxious
HCL gas.
3.After the road laying -:
It is opined that the first rain will trigger leaching. As the
plastics will merely form a sticky layer, (mechanical abrasion).
The components of the road, once it has been laid, are not inert.
21
CONCLUSION
 Plastic will increase the melting point of the bitumen.
 Help to improve the environment.
 Plastic roads would be a boon for India’s hot and extremely
humid climate, leaving most of the roads with big
potholes.
 Waste plastics when mixed with binder is found to give
higher strength, higher resistance to water and better
performance.
22
23

More Related Content

Similar to finalpresentation-150321013956-conversion-gate01 (1).pptx

Plastic roads
Plastic roadsPlastic roads
Plastic roadsSVIST
 
Use of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUT
Use of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUTUse of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUT
Use of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUTAman Kumar
 
use of waste plastics for road construction
use of waste plastics for road constructionuse of waste plastics for road construction
use of waste plastics for road constructiontranslateds
 
I am sharing '2nd seminar topic' with you.pptx
I am sharing '2nd seminar topic' with you.pptxI am sharing '2nd seminar topic' with you.pptx
I am sharing '2nd seminar topic' with you.pptxChandanSoy
 
Use of plastic waste as road construction material
Use of plastic waste as road construction materialUse of plastic waste as road construction material
Use of plastic waste as road construction materialSaief Mondal
 
Plastic Waste Road and its Construction
Plastic Waste Road and its ConstructionPlastic Waste Road and its Construction
Plastic Waste Road and its ConstructionAnoop Chhapola
 
Plastic road Technology in India Presentation
Plastic road Technology in India Presentation Plastic road Technology in India Presentation
Plastic road Technology in India Presentation Arun Arun
 
Sayan Saha 11901320033 Pavement Design Ca1.pptx
Sayan Saha 11901320033 Pavement Design Ca1.pptxSayan Saha 11901320033 Pavement Design Ca1.pptx
Sayan Saha 11901320033 Pavement Design Ca1.pptxNarayanSaha16
 
Utilization of Plastics in Roads
Utilization of Plastics in RoadsUtilization of Plastics in Roads
Utilization of Plastics in RoadsPrashant Kumar
 
Use of Plastic Wastes in Road Construction.ppt
Use of Plastic Wastes in Road Construction.pptUse of Plastic Wastes in Road Construction.ppt
Use of Plastic Wastes in Road Construction.pptRomharshOli1
 
UTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FOR
UTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FORUTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FOR
UTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FORShiva Krishna Gopu
 

Similar to finalpresentation-150321013956-conversion-gate01 (1).pptx (20)

Modern plastic road report
Modern plastic road reportModern plastic road report
Modern plastic road report
 
Plastic roads
Plastic roadsPlastic roads
Plastic roads
 
Use of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUT
Use of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUTUse of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUT
Use of plastic waste in road construction (AMAN KUMAR ) JPIET , MEERUT
 
Plastic Roads
Plastic RoadsPlastic Roads
Plastic Roads
 
Plasticppt.c
Plasticppt.cPlasticppt.c
Plasticppt.c
 
Plastic roads
Plastic roadsPlastic roads
Plastic roads
 
plastic in road construction
plastic in road constructionplastic in road construction
plastic in road construction
 
Plastic Roads
Plastic RoadsPlastic Roads
Plastic Roads
 
use of waste plastics for road construction
use of waste plastics for road constructionuse of waste plastics for road construction
use of waste plastics for road construction
 
I am sharing '2nd seminar topic' with you.pptx
I am sharing '2nd seminar topic' with you.pptxI am sharing '2nd seminar topic' with you.pptx
I am sharing '2nd seminar topic' with you.pptx
 
Use of plastic waste as road construction material
Use of plastic waste as road construction materialUse of plastic waste as road construction material
Use of plastic waste as road construction material
 
Modern plastcs road [PPT]
Modern plastcs road [PPT]Modern plastcs road [PPT]
Modern plastcs road [PPT]
 
Plastic roads
Plastic roadsPlastic roads
Plastic roads
 
Plastic Waste Road and its Construction
Plastic Waste Road and its ConstructionPlastic Waste Road and its Construction
Plastic Waste Road and its Construction
 
H05215767
H05215767H05215767
H05215767
 
Plastic road Technology in India Presentation
Plastic road Technology in India Presentation Plastic road Technology in India Presentation
Plastic road Technology in India Presentation
 
Sayan Saha 11901320033 Pavement Design Ca1.pptx
Sayan Saha 11901320033 Pavement Design Ca1.pptxSayan Saha 11901320033 Pavement Design Ca1.pptx
Sayan Saha 11901320033 Pavement Design Ca1.pptx
 
Utilization of Plastics in Roads
Utilization of Plastics in RoadsUtilization of Plastics in Roads
Utilization of Plastics in Roads
 
Use of Plastic Wastes in Road Construction.ppt
Use of Plastic Wastes in Road Construction.pptUse of Plastic Wastes in Road Construction.ppt
Use of Plastic Wastes in Road Construction.ppt
 
UTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FOR
UTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FORUTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FOR
UTILISATION OF WASTE PLASTIC IN BITUMINOUS MIXES FOR
 

Recently uploaded

Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Colleen Farrelly
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Cantervoginip
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home ServiceSapana Sha
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]📊 Markus Baersch
 
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一F La
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...soniya singh
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfJohn Sterrett
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Sapana Sha
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 

Recently uploaded (20)

Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024Generative AI for Social Good at Open Data Science East 2024
Generative AI for Social Good at Open Data Science East 2024
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Canter
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]GA4 Without Cookies [Measure Camp AMS]
GA4 Without Cookies [Measure Camp AMS]
 
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
办理(UWIC毕业证书)英国卡迪夫城市大学毕业证成绩单原版一比一
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdf
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
Saket, (-DELHI )+91-9654467111-(=)CHEAP Call Girls in Escorts Service Saket C...
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 

finalpresentation-150321013956-conversion-gate01 (1).pptx

  • 1. Polymer Modified Bitumen PRESENTED BY: NITESH KUMAR JHA(111139) Department of Civil Engineering NATIONAL INSTITUTE OF TECHNOLOGY WARANGAL Date:12/03/15 1
  • 2. Contents:  Introduction  What are plastic roads?  Need of study  Concept of plastic roads  Material used  Construction process  Field trials  Advantages of plastic roads  Disadvantages of plastic roads  conclusion 2
  • 3. Introduction:  Growth in industries and population together has resulted in production of various types of waste materials.  The creation and disposal of non-decaying waste materials such as Fly-ash, Steel Slag, Scrap Tyres, Plastics etc. have been posing difficult problems.  Considerable work has been done in various countries for the disposal of some of these waste products and utilisation of some other products.  There is a long list of published literature dealing with different aspects of these challenging problems. 3
  • 4. What are waste plastic roads? The roads constructed using waste plastic, popularly known as Plastic Roads , are found to perform better compared to those constructed with conventional bitumen. 1)The Indian Center for Plastic in the Environment (ICPE) has been promoting the use of plastic waste to construct asphalt roads. 2) A few trial roads have been paved successfully by combining waste plastic with bitumen. 4
  • 5. Plastic Roads A Long lasting road from waste plastic for a better and green world…. 5
  • 6. Need of study 1)Disposal of waste plastic is a major problem. Waste Plastic dumped on roads 2)It is non-biodegradable. 3)It mainly consists of low-density polyethylene. 6
  • 7. 4)To find its utility in bituminous mixes for road construction. 5)Burning of these waste plastic bags causes environmental pollution. 6)Laboratory performance studies were conducted on bituminous mixes. 7)studies proved that waste plastic enhances the property of the mix. 8)Improvement in properties of bituminous mix provides the solution for disposal in an useful way. 7
  • 8. MATERIALS USED:  AGGREGATE:  Aggregate of 20mm, 10 mm.  Stone Dust and Lime as Filler.  BITUMEN:-  60/70,80/100 grade bitumen. 8
  • 9. WASTE PLASTIC:  Waste plastic in the shredded form are used. 9
  • 10. Construction of plastic roads Step 1:  Plastics waste (bags ,cups , bottles ) made out of PE,PP and PS cut into a size between 2.36mm and 4.75mm using shredding machine. Shredding Shredded Plastics 10
  • 11. Step 2:  The aggregate mix is heated to 165°c (as per the HRS specification) and transferred to mixing chamber.  Amount of plastic to be added is @8% of bitumen.  Similarly the bitumen is to be heated up to a maximum of 160°c (HRS Specification) to have good binding property. (Monitoring the temperature is very important). 11
  • 13. Step 3: At the mixing chamber, the shredded plastics waste is to be added. It get coated uniformly over the aggregate within 30 to 60 seconds, giving an oily look. Addition of shredded Plastics Coated aggregates 13
  • 14. Step 4  The plastics waste coated aggregate is mixed with hot bitumen and the resulted mix is used for road construction.  The road laying temperature is between 110°c to 120°c. The roller used is 8-ton capacity. Adding of Bitumen 14
  • 15. Mixing Laying and Compaction 15
  • 16. 16
  • 17. Field trials There are two type of field trials-: 1. DRY PROCESS 2.WET PROCESS 1.Dry Process: The aggregate is heated to 170°C in the Mini hot Mix Plant . The shredded plastic waste is added in equal proportion.  Immediately the hot Bitumen 60/70 or 80/100 grade (160°C) is added. The mixture is transferred to the road and the road is laid. 17
  • 18. 2.Wet Process: Waste plastics by direct mixing with hot bitumen at 160°C. Mechanical stirrer is needed. Addition of stabilizers and proper cooling. Since the wet process require a lot of investment and bigger plants. Not commonly used. 18
  • 19. ADVANTAGE OF USING MODIFIED BITUMEN:  Stronger road with increased Marshall Stability Value.  Better resistance towards rain water and water stagnation.  No stripping and no potholes.  Increase binding and better bonding of the mix.  Reduction in pores in aggregate and hence less rutting and raveling.  Generate jobs for rag pickers. 19
  • 20.  The strength of the road is increased by 100%.  For 1km X 3.75m road, 1 ton of plastic (10 lakh carry bags) is used and 1 ton of bitumen is saved.  Value addition to the waste plastics (cost per kilogram increases from Rs 4 to Rs12).  Reduce the cost to around Rs. 5000/Km. of single lane road.  The maintenance cost of road is almost nil.  Disposal of waste plastic will no longer be a problem 20
  • 21. DISADVANTAGES OF PLASTIC ROAD 1. Cleaning process -: Toxics present in the co-mingled plastic waste would start leaching. 2. During the road laying process -: In the presence of chlorine will definitely release noxious HCL gas. 3.After the road laying -: It is opined that the first rain will trigger leaching. As the plastics will merely form a sticky layer, (mechanical abrasion). The components of the road, once it has been laid, are not inert. 21
  • 22. CONCLUSION  Plastic will increase the melting point of the bitumen.  Help to improve the environment.  Plastic roads would be a boon for India’s hot and extremely humid climate, leaving most of the roads with big potholes.  Waste plastics when mixed with binder is found to give higher strength, higher resistance to water and better performance. 22
  • 23. 23