Film production risk assessment 2
1. Film Production Risk Assessment
SCENE/LOCATION: Scene 3 - Urbis
HAZARD: Weather Issues Trailing Wires
RISK RATING (1 = Low 3 3
Risk, 5 = Mass Effect):
Action to avoid: Cover all equipment. Ensure all wires are
taped down or out the
way.
SCENE/LOCATION: Scene 1 – Living Room
HAZARD: Door (trapped fingers, Spatial Issues
etc)
RISK RATING (1 = Low 2 2
Risk, 5 = Mass Effect):
Action to avoid: Put a sign on the door Make sure little
to indicate when amount of people as
filming. possible in one room.
SCENE/LOCATION: Scene 4 – Starbucks
HAZARD: Hot food and drink Overcrowding
RISK RATING (1 = Low 4 2
Risk, 5 = Mass Effect):
Action to avoid: Carry as little items as If the shop is busy wait
needed and have lids a bit for it to empty.
on drinks.
SCENE/LOCATION: Scene 5 - Alleyway
HAZARD: Slippery Ground Weather Issues
RISK RATING (1 = Low 4 3
Risk, 5 = Mass Effect):
Action to avoid: Wear appropriate Cover all equipment
footwear for surface.