Michael Vargas presents on CMTC's Facility Optimization (F1) services. F1 aims to help clients balance environmental stewardship and economic benefits through strategic asset management, energy as a service, expanded facility services like ISO 50001 integration and energy accounting. Vargas discusses CMTC's framework including energy management, community engagement, and climate change adaptation. He outlines current energy services, value proposition, growth track through account management and IOU programs, and presents a case study. Next steps include presenting to operations, creating a business case, getting feedback, and piloting programs.
Managing Massive Updates - Using GIS to Fuel Gas ComplianceSSP Innovations
NIPSCO was required to undergo massive data updates to their GIS to meet new gas regulation. A series of projects allowed for the rectification of all gas transmission assets and the manual update of system-wide records to accommodate the requirements. SSP technology was implemented to allow for outsourced updates to be replayed into the versioned production GIS while maintaining fulltime day-to-day editing. This provided maximum flexibility while minimizing downtime and any performance impact.
An overview of the Guaranteed Energy Savings Program, a state-led initiative that helps Minnesota local governments, schools, and agencies finance energy-saving improvements through performance contracting. Learn more at http://mncerts.org.gesp
Managing Massive Updates - Using GIS to Fuel Gas ComplianceSSP Innovations
NIPSCO was required to undergo massive data updates to their GIS to meet new gas regulation. A series of projects allowed for the rectification of all gas transmission assets and the manual update of system-wide records to accommodate the requirements. SSP technology was implemented to allow for outsourced updates to be replayed into the versioned production GIS while maintaining fulltime day-to-day editing. This provided maximum flexibility while minimizing downtime and any performance impact.
An overview of the Guaranteed Energy Savings Program, a state-led initiative that helps Minnesota local governments, schools, and agencies finance energy-saving improvements through performance contracting. Learn more at http://mncerts.org.gesp
Why Partner With American Finance Solutions & Small Business Financing / Loan...Scott Griest
Overview of why regional banks & small- to large-finance companies choose to partner with American Finance Solutions as their trusted source for referring their small business clientele
Frustrated by the newest Facebook Algorithm change? Don't know what to do about it and feel like you should maybe abandon Facebook forever? I feel your pain and I do think it's time for an adjustment in how we approach Facebook Marketing. Here is what to do about it.
Whether you are new in the CIO/CTO role or considering applying for a CIO/CTO position, you get one chance to build your credibility and create a sense of trust with your peers,
your team, your customers and your boss.
The CIO/CTO First 90 Days PowerPoint framework delivers a concrete plan of key activities and expected outcomes related to their Prepare, Assess, Plan, Act, Measure and Communicate efforts. Rather than creating a first-90-day plan from
scratch, leverage this PowerPoint as a timesaver and a way to hasten early wins and achieve business results.
Please connect with me on Allie Gentry LinkedIn if you found this helpful.
https://www.linkedin.com/in/alliegentry/
Allie Gentry
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.DQS Inc.
ISO 50001 is designed to help companies enhance their use of energy-consuming assets, evaluate and prioritize the implementation of energy-efficient technology, and promote efficiency throughout the supply chain.
Engagement Coordinator Megan Hoye gave a presentation on CEE's research projects to the American Institute of Architects Minnesota's, Committee on the Environment.
A printed circuit board (PCB) is a fundamental component in modern electronics that serves as a platform for assembling and connecting electronic components. It provides a solid foundation for the interconnection of various electronic elements, including integrated circuits (ICs), resistors, capacitors, and other passive and active components.
The construction of a PCB typically involves a thin board made of non-conductive material, often fiberglass reinforced with epoxy resin or other laminates. The surface of the board is coated with a layer of copper, which serves as the conductive material for the electrical pathways.
PCB design involves a meticulous layout of conductive traces, which form the pathways for electrical signals to flow between components. These traces are usually etched onto the copper layer through a process of chemical etching or mechanical milling. The layout of the traces is determined by the circuit schematic, aiming to minimize signal interference, optimize signal integrity, and ensure efficient electrical connectivity.
In addition to the conductive traces, a PCB features various other elements. These include pads and vias. Pads are small areas of exposed copper where electronic components are soldered onto the board. Vias are holes drilled through the board that connect different layers of the PCB, facilitating the routing of traces between them.
PCBs can have multiple layers, ranging from single-sided boards with components mounted on one side, to double-sided and multi-layer boards, which have components mounted on both sides and multiple layers of conductive traces sandwiched between insulating layers.
The manufacturing process for PCBs involves several steps, including design and layout, fabrication of the board itself, application of the copper layer, etching or milling of the traces, drilling of holes for components and vias, and finally, assembly of components onto the board through soldering or other methods.
PCBs are essential in a wide range of electronic devices, from simple consumer electronics like calculators and remote controls to complex systems like computers, smartphones, and medical equipment. Their compact design, reliability, and scalability make them indispensable in the world of modern electronics, enabling the creation of increasingly sophisticated and efficient electronic devices.
Achieving Superior Energy Performance (SEP) - U.S. DOEDQS Inc.
Superior Energy Performance® (SEP), administered by the U.S. Department of Energy’s (DOE) Advanced Manufacturing Office, is a certification program that verifies improvements in energy management and performance in industrial facilities. Industrial facilities can take advantage of SEP tools, resources, and protocols to set energy performance targets and then achieve and measure sustained savings to earn certification at the Silver, Gold, or Platinum level. Nine SEP certified facilities realized $87,000 to $984,000 in annual savings from no-cost or low-cost operational measures and have saved an average of 10% of energy costs within 18 months of implementing SEP.
Learn more about SEP:
- What is SEP?
- What have been the results manufacturers have achieved?
- What are the benefits that manufacturers claim about SEP?
- How is DOE supporting SEP?
- How does a manufacturing facility implement SEP?
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015Arantico Ltd
Enerit, CEO, MIke Brogan presented at the Industrial Energy Technology Conference (IETC 2015) recently in New Orleans, USA. he presentation concentrated on the ISO 50001 Energy Planning process and why it is important the proper tools are used for carrying out energy review, identifying improvement opportunities and implementing a systematic approach for setting targets and prioritizing energy efficiency projects.
The IETC is hosted by the Energy Systems Laboratory at Texas A&M University and the Louisiana Department of Natural Resources. It is a one-of-a kind conference featuring a topics important to industrial energy managers, utility experts, government program managers, vendors and others.
Why Partner With American Finance Solutions & Small Business Financing / Loan...Scott Griest
Overview of why regional banks & small- to large-finance companies choose to partner with American Finance Solutions as their trusted source for referring their small business clientele
Frustrated by the newest Facebook Algorithm change? Don't know what to do about it and feel like you should maybe abandon Facebook forever? I feel your pain and I do think it's time for an adjustment in how we approach Facebook Marketing. Here is what to do about it.
Whether you are new in the CIO/CTO role or considering applying for a CIO/CTO position, you get one chance to build your credibility and create a sense of trust with your peers,
your team, your customers and your boss.
The CIO/CTO First 90 Days PowerPoint framework delivers a concrete plan of key activities and expected outcomes related to their Prepare, Assess, Plan, Act, Measure and Communicate efforts. Rather than creating a first-90-day plan from
scratch, leverage this PowerPoint as a timesaver and a way to hasten early wins and achieve business results.
Please connect with me on Allie Gentry LinkedIn if you found this helpful.
https://www.linkedin.com/in/alliegentry/
Allie Gentry
ISO 50001 Energy Management, SEP Executive Briefing - UL DQS Inc.DQS Inc.
ISO 50001 is designed to help companies enhance their use of energy-consuming assets, evaluate and prioritize the implementation of energy-efficient technology, and promote efficiency throughout the supply chain.
Engagement Coordinator Megan Hoye gave a presentation on CEE's research projects to the American Institute of Architects Minnesota's, Committee on the Environment.
A printed circuit board (PCB) is a fundamental component in modern electronics that serves as a platform for assembling and connecting electronic components. It provides a solid foundation for the interconnection of various electronic elements, including integrated circuits (ICs), resistors, capacitors, and other passive and active components.
The construction of a PCB typically involves a thin board made of non-conductive material, often fiberglass reinforced with epoxy resin or other laminates. The surface of the board is coated with a layer of copper, which serves as the conductive material for the electrical pathways.
PCB design involves a meticulous layout of conductive traces, which form the pathways for electrical signals to flow between components. These traces are usually etched onto the copper layer through a process of chemical etching or mechanical milling. The layout of the traces is determined by the circuit schematic, aiming to minimize signal interference, optimize signal integrity, and ensure efficient electrical connectivity.
In addition to the conductive traces, a PCB features various other elements. These include pads and vias. Pads are small areas of exposed copper where electronic components are soldered onto the board. Vias are holes drilled through the board that connect different layers of the PCB, facilitating the routing of traces between them.
PCBs can have multiple layers, ranging from single-sided boards with components mounted on one side, to double-sided and multi-layer boards, which have components mounted on both sides and multiple layers of conductive traces sandwiched between insulating layers.
The manufacturing process for PCBs involves several steps, including design and layout, fabrication of the board itself, application of the copper layer, etching or milling of the traces, drilling of holes for components and vias, and finally, assembly of components onto the board through soldering or other methods.
PCBs are essential in a wide range of electronic devices, from simple consumer electronics like calculators and remote controls to complex systems like computers, smartphones, and medical equipment. Their compact design, reliability, and scalability make them indispensable in the world of modern electronics, enabling the creation of increasingly sophisticated and efficient electronic devices.
Achieving Superior Energy Performance (SEP) - U.S. DOEDQS Inc.
Superior Energy Performance® (SEP), administered by the U.S. Department of Energy’s (DOE) Advanced Manufacturing Office, is a certification program that verifies improvements in energy management and performance in industrial facilities. Industrial facilities can take advantage of SEP tools, resources, and protocols to set energy performance targets and then achieve and measure sustained savings to earn certification at the Silver, Gold, or Platinum level. Nine SEP certified facilities realized $87,000 to $984,000 in annual savings from no-cost or low-cost operational measures and have saved an average of 10% of energy costs within 18 months of implementing SEP.
Learn more about SEP:
- What is SEP?
- What have been the results manufacturers have achieved?
- What are the benefits that manufacturers claim about SEP?
- How is DOE supporting SEP?
- How does a manufacturing facility implement SEP?
ISO 50001 Presentation by Enerit at Industrial Energy Technology Conference 2015Arantico Ltd
Enerit, CEO, MIke Brogan presented at the Industrial Energy Technology Conference (IETC 2015) recently in New Orleans, USA. he presentation concentrated on the ISO 50001 Energy Planning process and why it is important the proper tools are used for carrying out energy review, identifying improvement opportunities and implementing a systematic approach for setting targets and prioritizing energy efficiency projects.
The IETC is hosted by the Energy Systems Laboratory at Texas A&M University and the Louisiana Department of Natural Resources. It is a one-of-a kind conference featuring a topics important to industrial energy managers, utility experts, government program managers, vendors and others.