Erha North
Phase 2
Client:
Exxon Exploration and
Production Nigeria Limited
Location:
Nigeria
Project type:
SURF and Topsides
seabed-to-surface
The Erha North Phase 2 development is
an extension of the existing Erha subsea
system and infrastructure, currently
producing to the existing Erha FPSO
located in OML 133 in Nigerian waters.
All new subsea wells will be clustered into four new drill centres
connected to existing subsea facilities and to the existing floating
production, storage and offloading (FPSO) vessel.
www.subsea7.com
© Subsea 7, 2014. Information correct at time of going to press.
March2014
Seven Borealis
Seven Pacific
Simar Esperança
Erha North Phase 2
Overview
The overall scope of work can be summarised as follows:
• EPCI of the new production lines and associated
structures, jumpers and steel catenary riser;
• EPCI of new water injection lines and associated
structures jumpers and steel catenary riser;
• Transport and installation of umbilicals and associated
UTA, SDU, flying leads;
• Transport and installation of production and water
injection manifolds;
• Transport and installation of a gas lift module;
• Transport and installation of a pigging loop module,
including removal of existing jumpers and flying leads and
EPCI of new jumpers;
• Modifications on the existing FPSO, including detailed
engineering, procurement, pre-fabrication, installation and
tie-in.
The scope of work also includes all required survey,
interfaces, pre-commissioning and commissioning
activities.
Project
Erha North Phase 2
Client
Exxon Exploration and
Production Nigeria
Limited
Location
Nigeria
Project type
SURF and Topsides
Water depth
from 1000 to 1200m
Date awarded
15th
december 2012
Planned end date
30th
april 2015
Vessels/Spoolbases
utilised
Seven Borealis
Seven Pacific
Simar Esperança
30th October 2015

More Related Content

What's hot

J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore ApproachMohd Zaini Baharum
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso designChieu Nguyen
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020David Seow
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Emeka Ngwobia
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasAshwin Gadgil
 
Indonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - OffshoreIndonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - OffshoreNurdin .
 
Intelligent well completio nm
Intelligent well completio nmIntelligent well completio nm
Intelligent well completio nmbasil_c
 

What's hot (11)

J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
 
0020 introduction to fpso design
0020 introduction to fpso design0020 introduction to fpso design
0020 introduction to fpso design
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
C7a Mooring Layouts_2020
C7a Mooring Layouts_2020C7a Mooring Layouts_2020
C7a Mooring Layouts_2020
 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_ThomasSubsea689_FinalSubmission_Ashwin_Kim_Thomas
Subsea689_FinalSubmission_Ashwin_Kim_Thomas
 
Indonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - OffshoreIndonesia flow station lifted in simultaneous jacking operation - Offshore
Indonesia flow station lifted in simultaneous jacking operation - Offshore
 
Intelligent well completio nm
Intelligent well completio nmIntelligent well completio nm
Intelligent well completio nm
 
Intelligent well completions
Intelligent well completionsIntelligent well completions
Intelligent well completions
 

Similar to ExxonMobil Erha North P2

Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webNora Kohlhase
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webPaul Heinrich
 
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel isiwu
 
Xaris concept study report- lng costal facility - prdw
Xaris   concept study report- lng costal facility - prdw Xaris   concept study report- lng costal facility - prdw
Xaris concept study report- lng costal facility - prdw Alvaro Barros
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALRichard Exley
 
julian sharman CV 2016
julian sharman CV 2016julian sharman CV 2016
julian sharman CV 2016Julian Sharman
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014Dylan Olivier
 
D Campbell CV Jan 2015
D Campbell CV Jan 2015D Campbell CV Jan 2015
D Campbell CV Jan 2015Dave Campbell
 

Similar to ExxonMobil Erha North P2 (11)

Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Short Resume
Short Resume Short Resume
Short Resume
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Sal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_webSal offshore brochure_2016-05-03_web
Sal offshore brochure_2016-05-03_web
 
Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016Muller Mats Werner - CV May, 2016
Muller Mats Werner - CV May, 2016
 
Emmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy PolarisEmmanuel Uchenna Isiwu - Acergy Polaris
Emmanuel Uchenna Isiwu - Acergy Polaris
 
Xaris concept study report- lng costal facility - prdw
Xaris   concept study report- lng costal facility - prdw Xaris   concept study report- lng costal facility - prdw
Xaris concept study report- lng costal facility - prdw
 
NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
 
julian sharman CV 2016
julian sharman CV 2016julian sharman CV 2016
julian sharman CV 2016
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
D Campbell CV Jan 2015
D Campbell CV Jan 2015D Campbell CV Jan 2015
D Campbell CV Jan 2015
 

ExxonMobil Erha North P2

  • 1. Erha North Phase 2 Client: Exxon Exploration and Production Nigeria Limited Location: Nigeria Project type: SURF and Topsides seabed-to-surface The Erha North Phase 2 development is an extension of the existing Erha subsea system and infrastructure, currently producing to the existing Erha FPSO located in OML 133 in Nigerian waters. All new subsea wells will be clustered into four new drill centres connected to existing subsea facilities and to the existing floating production, storage and offloading (FPSO) vessel.
  • 2. www.subsea7.com © Subsea 7, 2014. Information correct at time of going to press. March2014 Seven Borealis Seven Pacific Simar Esperança Erha North Phase 2 Overview The overall scope of work can be summarised as follows: • EPCI of the new production lines and associated structures, jumpers and steel catenary riser; • EPCI of new water injection lines and associated structures jumpers and steel catenary riser; • Transport and installation of umbilicals and associated UTA, SDU, flying leads; • Transport and installation of production and water injection manifolds; • Transport and installation of a gas lift module; • Transport and installation of a pigging loop module, including removal of existing jumpers and flying leads and EPCI of new jumpers; • Modifications on the existing FPSO, including detailed engineering, procurement, pre-fabrication, installation and tie-in. The scope of work also includes all required survey, interfaces, pre-commissioning and commissioning activities. Project Erha North Phase 2 Client Exxon Exploration and Production Nigeria Limited Location Nigeria Project type SURF and Topsides Water depth from 1000 to 1200m Date awarded 15th december 2012 Planned end date 30th april 2015 Vessels/Spoolbases utilised Seven Borealis Seven Pacific Simar Esperança 30th October 2015