APPENDIX C

WORK EXAMPLES
Meeting Facilitation - Work Example 1
Our Water - Worth Saving (Gosford City & Wyong Shire Councils)
Role of SMC
•   Development and implementation of a program of stakeholder meetings - as part of an intensive campaign to reduce the amount of town
    water used on the Central Coast, further educate the community as to how/ why they needed to conserve water, change how stakeholders
    view and value water as a limited resource in the future. The Program included:
    -   small Precinct and Progress Association meetings
    -   formal lunches at the regional Chambers of Commerce
    -   town-hall style community forums
    -   industry-specific information sessions
    -   internal staff updates
    -   call centre/customer service training sessions
    -   media conferences
    -   targeted focus groups
    -   manned shopping centre displays
    -   major retail customer information sessions (Bunnings, Harvey Norman)
SMC’s Key Deliverables
•   Development of an appropriate meeting program - including the structure, location, target audiences, timing and content of each meeting
    as well as the choice of presenters
•   Facilitation of each meeting and, where necessary, presentation of the key information / answering of audience questions – due to
    unavailability of the Councils’ senior management
•   Development of all supporting collateral materials – including presentations, FAQs, fact sheets, information packs, website content
•   Monitoring / recording of all stakeholder feedback - including questions asked by the audience and answers provided)
•   Analysis of stakeholder input - and degree of stakeholder engagement achieved including assessment of whether it was increasing or
    decreasing
•   Recommended refinements to the stakeholder meeting program - and overall Our Water – Worth Saving stakeholder engagement /
    community education program
•   Confirmation of the dominant profiles - within GCC’s & WSC’s local communities and other stakeholders to enable future meeting content
    to be carefully tailored to help achieve an even higher degree of engagement and trust
•   Tracking of changes in attitudes/behaviour of GCC’s & WSC’s local communities - through the four phases of change to gauge the impact,
    value and effectiveness of the stakeholder meeting program and overall Our Water – Worth Saving stakeholder engagement /community
    education program
Meeting Facilitation - Work Example 1 (cont)
Our Water - Worth Saving (Gosford City & Wyong Shire Councils)
Outcomes & Results Achieved
•   Above average attendance at all of the meetings - for example the first community Water Forum attracted more than 650
    people compared to a Council anticipated turn out of 100
•   Tangible reduction in community anger towards GCC / WSC as partners in the local Water Authority – following the first round
    of meetings as demonstrated by a 35% movement of the number of stakeholders in the Denial / Anger segments through to the
    Reasoning segment within the four phase change process
•   Better community understanding about the cause / context of the worst drought on record in the region - and how it related
    to what was happening elsewhere in Australia and around the world due to climate change as demonstrated by a change in the
    type of questions and attitude of attendees at subsequent meetings
•   Increased awareness about what the two Councils were doing to mitigate / manage the drought conditions - as demonstrated
    by the type of questions asked at subsequent meetings and attitude of attendees . For example, at the start of the first round of
    meetings, one of the community’s intensively held core beliefs was that the region’s main storage dam (Mangrove Creek Dam)
    had been built in the wrong location . By the start of the second round of meetings, the community no longer asked any
    questions about the location of the dam and as an issue it had dissipated
•   Better understanding about the need for / strong degree of community commitment to use less town water – as well as to use
    water more efficiently and view water as a valuable but limited future resource as demonstrated by a 30% reduction in total
    daily water consumption on the Central Coast within 6 months of the campaign commencing
•   Increase in the number of applications received by Council from individual community members for water related rebates -
    for the installation of water conservation items such as rainwater tanks, water efficient washing machines, grey-water systems
•   Strong demand for items promoting water conservation - such as shower timers, stickers, posters, flyers as part of the Our
    Water – Worth Saving campaign as demonstrated by the large number of written / phone requests received by both Councils via
    their customer service teams
Meeting Facilitation - Work Example 2
Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils)
Role of SMC
•   Development of effective meeting program to help rebuild stakeholder relationships - with landholders, the Yarramalong Valley
    rural community and wider Central Coast community about the need for and progress of this new $170 million water
    infrastructure. Development work included structure, location, target audiences, timing, content and feedback evaluation
    processes for each meeting
SMC’s Key Deliverables
•   Facilitation of each of the meetings - including Open Houses, town hall style meetings, one-on-one briefings with local MPs,
    Councillor briefings, Government Department Workshops, manned information displays at Council organised community events
•   Development of all supporting collateral materials – including presentations, FAQs, fact sheets, information packs, website
    content
•   Training of Project Team presenters - to ensure consistent, best practice performance in sometimes extremely challenging
    circumstances
•   Strong control of the meetings - given that a previous program of meetings (not undertaken by SMC) had resulted in a walk-out
    by community members, negative media coverage and a targeted campaign of complaints from stakeholders to the elected
    Councillors at both Councils
•   Monitoring / recording of all stakeholder feedback - including questions from the audience and the answers provided
•   Analysis of stakeholder input - and the degree of engagement achieved including assessment of whether it was increasing or
    decreasing)
•   Recommend refinements to the MML Stakeholder Engagement program - including the ongoing stakeholder meeting program
•   Confirmation of the dominant profiles within MML’s key stakeholder groups - and other stakeholders to enable future meeting
    content to be carefully tailored to help achieve an even higher degree of engagement and trust
•   Tracking of changes in the attitude/behaviour of MML’s key stakeholders - through the four phases of change to gauge the
    impact, value and effectiveness of the Project’s stakeholder meeting and engagement programs
Meeting Facilitation - Work Example 2 (cont)
Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils)
Outcomes & Results Achieved
•   Gradual increase in degree of stakeholder engagement - particularly among previously angry landholders as demonstrated by
    the degree of emotion and anger shown by stakeholders as the meeting program progressed
•   Reduction in landholder anger towards the Project Team and Councils - due to them having a better understanding about the
    project as a whole and the formal process to identify a recommended water pipeline route through Yarramalong Valley - as
    demonstrated by a drop in complaint numbers and correspondence received reducing from an average of 100 per month to a
    current average of 5 per month
•   Better community understanding about the project - as demonstrated by increasing support for the Project among Councillors
    and the broader Central Coast community
•   Unanimous adoption by both Councils of a final water pipeline route - through Yarramalong Valley
•   Steady flow of landholders signing formal easement agreements - and accepting the compensation payments from the two
    Councils
•   Steady flow of properties available for access by the Project Team’s investigation engineers - to check the route alignment,
    undertake geological testing and drilling, survey and boundary mark individual properties
•   Steady flow of properties available for access by the Project Team’s property managers and valuers - to undertake independent
    valuations of each affected property, identify with landholders their special access arrangements and agree minor route
    modifications where possible to lessen the overall impact of the pipeline
Meeting Facilitation - Work Example 3
Industry Forums – (Our Water – Worth Saving, Gosford City Council)
Role of SMC
•   Development and management of a series of industry forums - to identify additional water saving activities that Council could
    develop to reduce the amount of water used outdoors by commercial users g and content
SMC’s Key Deliverables
•   Development of an appropriate forum structure - to attract as many attendees as possible and develop a viable short-list of
    potential ideas for consideration by Council
•   Effective facilitation to draw out the maximum number of ideas - for further discussion and possible consideration by Council
•   Strong control of the forums - to ensure that it proceeded in a professional manner at all times despite emotions being likely
    to run high due to the imminent introduction of Level 5 water restrictions which prohibited all outdoor use of town water
•   Presentation of all key information and answers to audience questions – due to a Council presenter not being available
•   Development of all supporting collateral materials – including presentations, FAQs, fact sheets, information packs, website
    content
•   Monitoring/recording of all stakeholder feedback - including the questions asked by the audience and the answers given
•   Analysis of stakeholder input - and degree of engagement achieved
•   Identification of a short list of ideas - including a top line review of the value and likely impact of each
•   Confirmation of the dominant profiles - within GCC’s commercial water users stakeholder groups
•   Capturing of benchmarking data re attitude/behaviours/response to suggested innovative water conservation ideas
    including a Water Banking Scheme – which were then used as a comparison to track changes in the degree of stakeholder
    engagement as the new Water Banking Scheme was rolled out
Meeting Facilitation - Work Example 3 (cont)
Industry Forums – (Our Water – Worth Saving, Gosford City Council)
Outcomes & Results Achieved
•   Strong input to the meeting by all attendees - which resulted in identification of the unique Water Banking Scheme for use by
    commercial water users who rely on the outdoor use of town water (swimming pools providers, landscapers, nurseries,
    building trades, car washes, turf farms)
•   Good attendance from a broad cross section of industries - which rely on the daily use of water with more than 300 people
    attending each of the meetings
•   Successful development and adoption of the Water Banking Scheme by Council - less than 6 weeks after the holding of the
    Industry Forums
•   Successful response to the launch of the Water Banking Scheme - as demonstrated by applications to participate being about
    30% higher than anticipated in the first week of implementation (around 250 applications were received)
•   Good implementation and adherence to the Scheme’s protocols / procedures - with around 75% of participants lodging their
    applications on time and correctly
•   Smooth integration of the Scheme into the Council’s every day water management practices - over a relatively short period of
    just 3 months
•   Good support for the Scheme - as demonstrated by the high number of comments and written feedback received by Council
    and the positive media coverage before and after the Scheme’s launch
•   Strong interest from other local government organisations in the Scheme - and how they could apply it to their own region as
    demonstrated by the regular flow of invites to present an overview of the Scheme to other Councils and organisations
Event Management - Work Example 1
Central Coast Water Festival (Gosford City & Wyong Shire Councils)
Role of SMC
•    Development, co-ordination, implementation of a major regional event - including location, exhibitors, speakers, entertainment,
     promotion, media, sponsorships to reinforce the water conservation messages and educate the community about the many programs,
     services and products available to help them save water.
•    Aim was also to help the community better understand - all of the short, medium and long-term work being undertaken by the two
     Councils to combat the worst drought on record
•    Event needed to be more than just a business expo - to ensure sufficient visitors of all age groups/background attended to ensure that
     community awareness about the water situation and the role all water users had to play continued to grow
•    To achieve all of these objectives, a mix of family entertainment was incorporated into the event – including face-painting, street theatre,
     reptile displays, children’s rides, schools’ poster /art displays, musical entertainment
•    Competitions were also held for visitors to win water conservation devices – including a rainwater tank, water-efficient washing machine
     and a refit kit (which comprised a retrofit of their home with a water efficient showerhead, cistern weight, tap aerators).
SMC’s Key Deliverables
•    Creation of a family fun day out during which vital water conservation messages could be shared - through a variety of mechanisms to the
     widest audience possible
•    Securing of a broad range of exhibitors within a water-related theme - to enable them to showcase their water conservation products /
     services to help further educate the community about how easy it is to save water on a daily basis
•    Securing of sufficient business sponsorship - to reduce the total required funding from the two Councils
•    Securing of sufficient high profile speakers, family entertainers and other relevant activities - to attract the maximum number of visitors
     and exhibitors to the event
•    Development and implementation of a broad, integrated promotional campaign - to ensure the widest number of people were aware of
     the event (direct mail, advertising, media, website, third party advocacy)
•    Project management of the overall event - to ensure it progressed as smoothly and efficiently as possible
•    Undertaking of visitor and exhibitor surveys - to gain valuable feedback about the structure, content and overall impact of the event on key
     stakeholder groups
•    Preparation of a detailed report for the two Councils - about the impact and value of the event and its relevance as an annually occurring
     activity as part of the Councils’ continued investment in its water conservation education program
Event Management - Work Example 1 (cont)
Central Coast Water Festival (Gosford City & Wyong Shire Councils)
Outcomes & Results Achieved
•   Attendance by approximately 8,5000 people - to the 2007 Central Coast Water Festival which represented an increase of 20 per
    cent on similar Council organised events in the area
•   Attraction of approximately 40 exhibitors - to the 2007 Central Coast Water Festival which was double the average number of
    sponsors usually involved in similar Council organised events in the area
•   Involvement (directly and indirectly) of a broad range of stakeholders including:
     -       rainwater tank providers
     -       grey water system suppliers
     -       nurseries
     -       turf farmers
     -       pool suppliers
     -       plumbing services
     -       community groups
     -       environment groups
     -       schools
     -       national retailers ( Bunnings, Harvey Norman)
•   Consistent promotion of the ‘need to save water’ message to attendees – as demonstrated by people’s knowledge when it
    came to completing the follow-up surveys distributed to all visitors
•   95% satisfaction among exhibitors with the opportunity to Festival provided - for them to showcase their water-conservation
    products or services
•   Feedback from visitors to the Festival which indicated that around76% of them had learnt something new - on the day about
    water saving products, services, programs or actions
•   Continued acknowledgement among visitors about the need to conserve water – particularly with local school children and
    families
•   Strong media support for the Festival - as indicated by the resulting positive media coverage before and after the Festival
•   Strong support across both Councils and local MPs for the event - to remain a key part of the water conservation education
    program
Event Management - Work Example 2
Community Water Forum – (Our Water – Worth Saving, Gosford City Council)
Role of SMC
•   Development of the Water Forum concept - to enable the community’s dissatisfaction with how the region’s worst drought on record was
    being managed by the two Councils to be tackled head-on
•   This dissatisfaction was mainly the result of a lack of easily available information at the time – which put the drought into some kind of
    context
•   The aim of the Forum was to demonstrate that the region was not alone in its plight – and explain what the two Councils were doing to
    manage the situation
•   The aim of the Forum was also to confirm the role of the community in helping manage the drought – by making it clear the contribution
    waters users had made to causing the drought conditions by their inefficient use of water and the fact that they did not currently see water
    as a valued but limited future resource
•   The Forum also provided an ideal opportunity for Council to put a face to the ‘unidentified’ team - that was responsible for managing the
    region’s water supply
•   The Forum also provided a ideal mechanism for Council to realign some of the community’s core beliefs - about how the region’s water
    supply system worked, where and how water was sourced to ensure people had sufficient drinking water on a daily basis, and the limited
    options available to Council to try and rectify the situation in the short term
SMC’s Key Deliverables
•   Development, implementation and management of a well structured, workable and realistic event - that would attract a large number of
    people so Council could engage with, influence and educate a broad cross section of the community
•   Development of a community event that would accommodate the different ways in which people like to receive and process information
    - for example not everyone wants to sit through a 40 minute presentation, some people may only have 10 minutes to spare to pop in and
    have a look around
•   Development of appropriate evaluation processes that would enable benchmarking data about the community’s perceptions, key issues
    and core beliefs could be captured – and used to assess the impact, value for money and success of the Council’s Our Water – Worth Saving
    campaign over time
•   Development and implementation of an effective promotional campaign in support of the Community Water Forum – to ensure strong
    awareness / interest about the event which would then translate into good attendance levels
•   Development of all collateral materials – including presentations, posters, flyers, advertisements, media releases, website content, displays,
    fact sheets, brochures, other promotional items
Event Management - Work Example 2 (cont)
Community Water Forum – (Our Water – Worth Saving, Gosford City Council)
SMC’s Key Deliverables (cont)
•   Securing of an external high profile ‘climate change and water industry speaker – to provide an outsider’s view and help
    further explain the context of the region’s worst drought on record
•   Training of all of the presenters – to ensure consistent, confident performance on the day
•   Overall project management of the event – including liaison with the venue, catering supplier, security teams, printers,
    advertising company, transport and signage providers etc
•   Liaison with the elected Councillors and local MPs – to ensure they were aware of the event and how they could get involved
•   Provision of all support staff – including the building of all of various displays that were included in the event (water saving
    kitchen, bathroom, laundry, water efficient shower heads, grey water systems etc), and manning them on the day
•   Monitoring/recording of all stakeholder feedback - including the questions asked by the audience and the answers given
•   Analysis of all stakeholder input and feedback - and the degree of engagement achieved
•   Preparation of a detailed report to Council – highlighting the key events of the day, the issues raised by the community, the
    requested actions of the community, the number of people who attended, a summary of the overall community feedback on the
    value/impact of the event
•   Preparation of a detailed report to Council staff – confirming the dominant profiles within GCC’s communities and stakeholder
    groups, benchmarking data regarding the attitudes, behaviours and core beliefs of the Forum attendees, and recommendations
    as to how the Our Water – Worth Saving stakeholder engagement and community education campaign should be refined to
    better engage stakeholders and continue to build community confidence in the Council’s ability to effectively manage the
    region’s water supply during such severe drought conditions
Event Management - Work Example 2 (cont)
Community Water Forum – (Our Water – Worth Saving, Gosford City Council)
Outcomes & Results Achieved
•   Commencement of a rebuilding process between the Council and its stakeholders - based on a two communications process,
    integrity and trust
•   Gradual re-education of the community to better understand the scale and overall workings of the system that supplies their
    drinking water on a daily basis - as indicated by the ongoing feedback received from the community following the Forum
•   Gradual re-education of the community about the important role they have to play in water conservation – and reducing the
    amount of valuable drinking water they use and waste each day as indicated by the ongoing feedback received from the
    community following the Forum
•   Much better understanding by Council about the degree of misinformation that existed in the community about the cause
    and extent of the region’s worst drought on record - as indicated by the questions that were asked at the Forum
•   Creation of a public ‘face’ for the Our Water – Worth Saving campaign – namely the Mayor of Gosford and the Council’s Acting
    Director, Water & Sewer who went on to front a large percentage of the ongoing media and community activities associated with
    the campaign
•   Collection and analysis of valuable stakeholder perception and core belief data – that was used as a benchmark for tracking the
    movement of stakeholders through the four phases of changes as the Our Water – Worth Saving campaign was rolled out . This
    data was also used to assess the overall impact and value of Council’s significant investment in the Our Water – Worth Saving
    campaign as it continued to be rolled out
•   Collection and analysis of valuable stakeholder feedback about the key issues regarding the region’s water supply that were
    keeping the community awake at night – which was then used to help tailor the future content and focus of the Our Water –
    Worth Saving campaign
•   Creation of a number of active and positive ‘advocates’ of the Council’s water conservation methods – who became
    increasingly involved in the Our Water – Worth Saving campaign to help further increase community awareness of and support
    for the Council’s water saving activities, programs and strategies
Event Management - Work Example 3
Launch of WaterPlan 2050 (Gosford/Wyong Councils’ Water Authority)
Role of SMC
•   Development of a series of community events to roll-out the preliminary working draft of WaterPlan 2050 – a blueprint for the
    management of the Central Coast’s water resources over the next 45 years and obtain community feedback on the proposed key actions
    contained in WaterPlan 2050
•   Development of a series of community events to launch the Council endorsed version of WaterPlan 2050 - and garner strong community
    awareness as well as understanding about the key actions and programs included in the plan which required significant community support
    to make them work in the medium to long-term
SMC’s Key Deliverables
•   Identification of the key target stakeholder groups / individuals with the potential to exercise a reliable degree of influence - over the rest
    of the community in terms of generating strong support for WaterPlan 2050
•   Development of an appropriate program of meetings to target these key stakeholder groups and community members – including
    development of the right meeting structure, content, timing and venue
•   Promotion of the meetings to ensure a strong turnout - using the widest possible range of delivery mechanisms
•   Development of all support collateral materials – including presentations, advertisements, posters, flyers, website content, media releases
•   Drafting / finalisation of a summary WaterPlan 2050 brochure and flyer - to highlight the priority actions and key messages of the long-
    term blue print to the community using Plain English for distribution during the meetings and generally to the community
•   Training of all of the Council presenters for the different types of meetings – to ensure a consistent, professional performance
•   Project management of all of the meetings – including liaison with venues, catering suppliers, printers, graphic designers, web site
    managers
•   Monitoring/recording of all stakeholder feedback - including the questions asked by the audience and the answers given
•   Analysis of stakeholder input - and degree of engagement achieved, key issues raised
•   Media liaison and management – to ensure the resulting media coverage was positive and that well prepared, competent and capable
    Council media spokespeople were available for comment at all times
•   Updating of elected Councillors and local MPs – to ensure strong support and consistent use of the agreed key messages
Event Management - Work Example 3 (cont)
Launch of WaterPlan 2050 (Gosford/Wyong Councils’ Water Authority)
Outcomes & Results Achieved
•   Successful roll-out of the preliminary draft /adopted version of WaterPlan 2050 - as demonstrated by the positive community
    feedback received after each of the meetings and the resulting media coverage
•   Creation of strong community interest in the priority actions contained in WaterPlan 2050 – and increased awareness about
    the vital role the community can play in helping secure the region’s water supply over the next 45 years as demonstrated by the
    large number of emails, phone calls and requests for further information received by the two Councils immediately following the
    launch of the preliminary working draft and adopted version
•   Generation of lively community debate about the priorities actions included in WaterPlan 2050 - and the nine capital works
    options that the two Councils decided not to pursue as demonstrated by the type of conversations between Council staff and
    community members at the various WaterPlan 2050 meetings
•   Generation of strong Councillor support for the preliminary working draft / adopted version of WaterPlan 2050 – as
    demonstrated by the amount of public comment made by the Councillors and their willingness to undertake media interviews
    and attend community meetings
•   Strong attendance by a broad cross section of the community at each of the meetings – which ranged from small groups of
    around 20 up to audiences of more than 100
•   Capture and analysis of vital stakeholder feedback about the community’s perceived information gaps – and the issues that
    remained unresolved following each meeting. This data was then used to continually refine the meeting program and the key
    messages/general information provided to stakeholders about WaterPlan 2050
Evaluation & Reports - Work Example 1
Personality Profiling of Key Stakeholder Groups (Gosford City Council)
Role of SMC
•   Preparation of a detailed report identifying the dominant personality profiles within Council’s key stakeholder groups - to help
    ensure key information is shared in the right way at the right time using the right delivery mechanisms
•   The benefit of identifying these personality profiles is that they provide an accurate roadmap for Council - about the specific
    words, phrases and delivery mechanisms that work best with each of the various personality profiles to ensure that the Council’s
    stakeholder engagement activities achieve optimum outcomes
SMC’s Key Deliverables
•   Detailed review of all of the stakeholder feedback previously collected by Council over a two to three year period - including
    survey responses, customer service query reports, community letters, emails, phone calls and all other forms of community
    interaction to accurately ‘type’ the dominant personality profiles
•   Identification of the dominant personality profiles – and drafting of an explanation about how each of them like to receive and
    process information as well as their potential responses to the type of information likely to be shared with them by Council in the
    short and medium term, particularly in regard to the drought conditions and ongoing management of the region’s water supply
•   Presentation of summary results to key Council’s senior management – as part of a series of introductory workshops aimed at
    explaining how the resulting data can be used to improve Council’s understanding about what makes its key stakeholders tick and
    how to best to engage them particularly during times of significant change
Outcomes & Results Achieved
•   Better understanding among Council’s senior management and internal communications staff about how to engage key
    stakeholder groups - as demonstrated by a tangible improvement in the quality and the relevance of the community
    consultation activities undertaken by Council following receipt of the SMC Personality Profiling Report
•   Agreement by Council for all of its senior communications staff and key spokespeople to undertake the Introduction of
    Personality Profiling workshop – as provided by SMC as part of an integrated, long-term program to significantly improve the
    Council’s stakeholder engagement over time
•   Use of the personality profiling data to successfully develop and implement the Our Water – Worth Saving stakeholder
    engagement and community education campaign - which resulted in a 30% reduction in domestic town water consumption on
    the Central Coast in just 6 months
Evaluation & Reports - Work Example 2
Route Selection Report of Community Comment & Feedback (Mardi-Mangrove Link Project,
Gosford City & Wyong Shire Councils)
Role of SMC
•   Development of a Plain English document which explained the formal processes used by the Project Team to identify and
    confirm a recommended water pipeline route through Yarramalong Valley - for review and comment by affected landholders,
    Valley community and other interested parties
SMC’s Key Deliverables
•   Participation in the multi-criteria analysis to provide formal community impact data - as part of the assessment process to
    score each of the potential route options through the 9-sector pipeline
•   Participation in the stringent review process - to test the robustness and accuracy of the pipeline option scores and overall
    analysis
•   Drafting of a summary and supporting detailed explanation of the recommended route for each of the 9 options - including an
    overview of the strengths and weaknesses of each option across the five key assessment, the resulting multi-criteria scores and
    supporting visual materials showing the recommended route through each sector of the Valley
•   Development of appropriate supporting materials - to encourage the maximum number of stakeholders to review and
    comment on the report
•   Development of an appropriate media liaison campaign to promote the launch of the report - to encourage the maximum
    number of stakeholders to review and comment on the report
•   Management of the approvals process report and its timely distribution to the community - using the maximum number of
    delivery mechanisms
•   Management of the informal community feedback process and ongoing liaison with Council - to ensure this feedback is also
    considered as part of the formal public exhibition and comment process
•   Ongoing interaction with stakeholders in particular directly affected landholders - to answer their written and verbal queries
    about the report and its content to ensure the fully understand how the route selection process was implemented, the route
    that has been recommended, how they can share their feedback with Council and what the next decision making steps will be
Evaluation & Reports - Work Example 2 (cont)
Route Selection Report of Community Comment & Feedback (Mardi-Mangrove Link Project,
Gosford City & Wyong Shire Councils)
Outcomes & Results Achieved
•   Successful distribution of the report to the largest number of stakeholders - as demonstrated by the large degree of landholder
    and other community comment about the recommended pipeline route
•   Generation of widespread debate about the recommended water pipeline route - among affected landholders, Yarramalong
    Valley community, elected Councillors and wider Central Coast community as demonstrated by the large degree of
    correspondence, phone calls and interaction about the recommended pipeline route
•   Accurate but mixed media coverage about the recommended pipeline route – which was influenced to some degree by
    proponents of the project (mainly angry landholders who totally oppose the pipeline at all costs) who waged a relatively
    aggressive opposition campaign in the media
•   Strong Councillors and local MP interest in the report – accompanied by their consistent public support for the robustness and
    professionalism of the route selection process
•   Adoption of the recommended route by both Councils for 8 out of the 9 sectors – which make up the overall pipeline route,
    with a decision deferred on only one Sector
•   Receipt of only 14 written submissions by Council in response to the recommended pipeline route report – despite the Project
    directly and indirectly impacting more than 330 Yarramalong Valley residents
Evaluation & Reports - Work Example 3
Ongoing Community Surveys of the Community’s Changing Water Usage Habits (Gosford City &
Wyong Shire Councils)
Role of SMC
•   Development of a easy to use mechanism for capturing and recording the direct feedback of water users - on the Central Coast
    at the many community events organised by the two Councils
SMC’s Key Deliverables
•   Drafting of easy to use, relevant, behavioural change based community surveys - that take only a few minutes to complete but
    which provide the maximum number of insights into the changing water usage habits of the community
•   Development of a data analysis procedure which Councils’ communications staff can use - which is simple, accurate and
    enables top line results to be easily identified by people who are not necessarily experienced in undertaking this type of market
    research
•   Development of an additional layer of data analysis that will confirm the dominant personality profiles of the Councils’ key
    communities – as part of ensuring that all future stakeholder engagement, community liaison and behavioural change activities
    deliver optimum outcomes
•   Development of a simple to use analysis process that enables Council staff to monitor and track the impact of the Councils’
    various water conservation activities - in particular the available community rebates, events, media and advertising campaigns,
    all of which represent a major investment by the two Councils
Outcomes & Results Achieved
•   Capture and analysis of vital benchmarking community water usage habit data - which continues to be used by the two
    Councils to track the impact of its investment in water conservation stakeholder engagement and education activities
•   Tracking of the impact and value of individual stakeholder engagement and education activities on the water usage habits of
    the Central Coast community – which enables Council to update, refresh or change these activities and the degree to which they
    are promoted the community when the market survey data indicates that such activities are no longer successfully influencing
    the community
Engagement Plans & Strategies - Work Example 1
Our Water – Worth Saving (Gosford City Council)
Role of SMC
•   Development of an effective integrated stakeholder engagement and community education campaign - to deliver an
    immediate significant reduction in the amount of town water used on the Central Coast on a daily basis
•   Such a campaign has to target and involve all of the different types of waters users - across the domestic and commercial
    sectors. It also has to align with the current Level 5 water restrictions which are the most stringent in Australia with a complete
    ban on the outdoor use of town water
•   The campaign has not only extremely tight deadlines but also a limited budget - and no access to additional internal Council
    communications staff to help implement the program
SMC’s Key Deliverables
•   High profile, realistic and workable integrated campaign that gets the relevant key message across – including the fact that if
    the community did not start saving water immediately there was a real risk the region would run out of available drinking water
•   Involvement in the campaign of as many community groups as possible – to help achieve maximum community understanding
    about how they can save water
•   Significant changes to the community’s water usage habits to eliminate the large amount of water that is being wasted on a
    daily basis – simply because people do not perceive water as a highly value but limited resource into the future
•   Development of a campaign tag line and a series of hard hitting images – which get the water conservation message easily and
    effectively
•   Securing of as much free advertising, signage, printing and design services as possible – to reduce the required funding from
    Council to support the campaign
•   Development of effective and reliable tracking mechanisms - to enable Council to measure and evaluate the impact its
    significant investment in the campaign is having on water usage levels
•   Sub-campaigns aimed specifically at different industry types, particularly those involved in the tourism interest – to ensure
    that the Council’s water conservation messages are hammered home to all visitors to the region so they do not hamper the
    Central Coast’s ability to reduce the amount of water that is used every day and that they strictly adhere to the region’s Level 5
    water restrictions, even during the hot summer months
Engagement Plans & Strategies - Work Example 1
Our Water – Worth Saving (Gosford City Council)
Innovative Activities Included in the Campaign
•   Free use of roadside illuminated signs - following a donation of all of their empty space by a Sydney based advertising company
•   Distribution and display of Our Water – Worth Saving stickers in all public rest rooms and amenities - across the Central Coast,
    some of which remain in place today
•   Distribution of Our Water – Worth Saving information packs to all accommodation providers, restaurants, clubs, motels, pubs,
    caravan parks, banks, GP surgeries, Surf Life Clubs, RSL Clubs and other tourist related outlets - for display in foyers, individual
    rooms, above room sinks, in rest rooms, beside swimming pools and other water related activities
•   Display of ‘Explanation Signs’ at all beach showers, boat ramps, drinking fountains and other public access points to drinking
    water - to explain why these amenities are no longer available to the water restrictions and impacts of the worst drought on
    record on the Central Coast
•   Display of major campaign banners at all Surf Life Saving Clubs and on all available external community noticeboards – which
    reiterate the campaign water conservation images and key messages
•   Free of charge information displays (manned and unmanned) at all major shopping centres in the region – where Our Water –
    Worth Saving promotion items such as shower timers were handed out to more than 2,000 shoppers and visitors every weekend
•   Insertion of campaign posters in the table tops of more than 500 food court seats free of charge - in the largest shopping
    centre on the Central Coast where footfall on a busy weekend can be as high as 20,000 people
•   Placement of Our Water – Worth Saving on all Council owned and operated vehicles - including Surf Life Saving buggies on the
    region’s beaches
•   Information displays and attendance by the Our Water – Worth Saving team at all Council related and other relevant
    community events - including Kids Day Out, Home Show, Flora Spring Time Show, Oyster Festival, Christmas Parades, Australia
    Day, Anzac Day
Engagement Plans & Strategies - Work Example 1
Our Water – Worth Saving (Gosford City Council)
Outcomes & Results Achieved
•   30% reduction in total water usage levels on the Central Coast - over a 3 to 6 month period. Despite the lifting of water
    restrictions from Level 5 to Level 2B as of 14 June 009, these water usage levels have remained relatively consistent for more
    than two years
•   Strong community involvement and awareness about the campaign - as demonstrated by the large number of posters, stickers
    and banners that are still in place and are regularly placed some two years after the campaign was first rolled-out
•   Investment in the campaign by large number of local businesses – as a result of them feeling they had a key role to play in
    ensuring that their customers (the tourists and visitors) did not breach the strict water restrictions and the concerted effort by
    the community to save water
•   Significant change in the perceptions of the community about water conservation - and the value of water given is was a
    limited resource over time as identified by the regular surveying of the community
•   Increased community confidence in the Councils’ ability to manage the region’s water supply system during the worst drought
    on record - as demonstrated by the drop in negative feedback and comments from the community about the ‘perceived poor
    performance of Council’ which was a common trend prior to the roll-out of the campaign
•   Winning of a Local Government communications award - for the campaign in 2007/08
•   Adoption of many of the innovative aspects of the campaign - by other local government organisations
•   Rebuilding of the community’s trust in the two Councils and the region’s water supply system - as demonstrated by the
    ongoing feedback and comments from the community following the commencement of the campaign
Engagement Plans & Strategies - Work Example 2
Water Quality 21 (Gosford City Council)
Role of SMC
•   Development of an effective strategy to educate the community about why certain areas of the Central Coast were constantly
    subject to ‘dirty water’ - and why this problem seemed to be getting worse as the drought conditions intensified
SMC’s Key Deliverables
•   Development of appropriate procedures to reduce the anger and emotional outbursts of stakeholders when confronted by
    dirty water - and their resulting interaction with Council’s customer service or field staff who were tasked wiwth trying to resovle
    the discoloured water issues
•   Development and roll-out of relevant high impact collateral materials - which explained in Plain English what caused ‘dirty
    water’, why the drought was intensifying its occurrence and what Council was doing to try and reduce its presence in the water
    supply system
•   Conducting of commuity information sesssions across key parts of the water supply system – to allow interested community
    members to see first hand the cause of dirty water and the various activities that Council was undertaking to overcome the
    issues
•   Establishment of a dedicated ‘discoloured water’ hotline within Council’s customer service team during high occurence levels
    - to help speed up Council’s reaction to community reports of dirty water and provision of relevant staff training to ensure
    consistnet key messages and supporting information was provided to the community
•   Effective use of the media to help warn the community when Council activities across the water supply system were likely to
    increase the potental for discoloured water - so water users could make the necessary arrangements to protect their washing
    and ensure they had sufficient clear drinking water while Council sought to rectify the problem
•   Provision of stakeholder engagement training for field operatives – to enable them to calm angry water users when seeking to
    deal with dirty water occurences at people’s homes to reduce the incidences of verbal and physical abuse / assaults to Council
    staff
Engagement Plans & Strategies - Work Example 2
Water Quality 21 (Gosford City Council)
Outcomes & Results Achieved
•   Increased community awareness about the cause of dirty water - and the many factors outside of Council’s control that resulted
    in the its increased occurrence during drought conditions
•   Reduction in the number of verbal and physical abuse of Council staff - while attending to dirty water call outs
•   Reduction in the amount of negative media coverage - generated by complaints from the community to the local newspaper
•   Faster turnaround times for the handling of dirty water complaints by Council’s customer service teams – due to the provision
    of more targeted and easier to understand key messages and a lower level of ‘angry and emotional’ callers
Engagement Plans & Strategies - Work Example 3
Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils)
Role of SMC
•   Development of a master strategy to ensure the effective engagement of all stakeholders during the design, construction and
    commissioning of the largest water infrastructure project - undertaken on the Central Coast in 25 years
•   Development of sub-strategies to ensure an effective response to the various issues that will inevitably arise during the life of
    the project – to ensure it remain on track, on time and on budget
SMC’s Key Deliverables
•   Identification and management of all key stakeholders and interest groups who can exert a major influence on the project - in
    particular those who are known to oppose the project to ensure maximum public support for the project and minimal negative
    comment
•   Development and roll-out of effective, high impact collateral materials in support of the project – which explains why the new
    water infrastructure is needed and the long-term benefits it will deliver for the Central Coast
•   Establishment and maintenance of a dedicated Project website – which is regularly updated as the project progresses
•   Management of all correspondence and telephone calls received from stakeholders – and drafting of relevant written
    responses aimed at mitigating the various issues raised by the community
•   Development and management of an effective Government Relations program - to ensure all local MPs (State and Federal) are
    fully updated and supportive of the project
•   Development and implementation of an effective Government Agency Workshop program as part of the project’s statutory
    approvals process – to ensure a two-way communications process with the key departments that can directly impact the Review
    of Environmental Factors process
•   Management of all Councillor updates and briefings – to help garner the maximum degree of support for the project even
    during the more challenging times of the project
•   Development and implementation of an effective media liaison program – to maximise the amount of positive media coverage
    and minimise the amount of negative media coverage
•   Provision of community consultation and media management training for key Project Team members - to ensure confident,
    consistent performance at all times when interacting with the community and other key stakeholders
Engagement Plans & Strategies - Work Example 3
Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils)
SMC’s Key Deliverables (cont)
•   Development and implementation of regular shopping centre displays (manned and unmanned) at key locations throughout
    the region - to help keep the broader Central Coast community updated and full informed about how the project is progressing
•   Preparation of regular monthly and weekly communication, stakeholder engagement and community liaison reports to the
    Project Team and Council – to demonstrate the value of the two Councils’ continued investment in such activities
•   Attendance and input to fortnightly and monthly Project Team and Project Control Group meetings – to keep the project
    decision makers fully informed as to current stakeholder issues, activities, outcomes and forthcoming challenges
•   Presentations to key community groups on behalf of the Project Team as the project progresses – including the local
    Yarramalong Valley Progress Association
•   Presentations to Council staff on behalf of the Project Team as the project progresses – to help garner widespread support for
    the project within the two Councils
•   Development and implementation of all traffic management communications – during the investigations and construction
    phases of the project
Key Challenges Overcome to Date
•   Widespread opposition to the project by the Yarramalong Valley community - due to misconceptions about the impact of the
    pipeline on the environment and individual landholders
•   Change in Project Director three times - in less than three years
•   Reduced focus on need to save water and/ or expand the water supply system - due to an increase in the amount of average
    rainfall over the past six months and total dam levels rising from below 13% to more than 30%
•   Increased focus on the total cost of the project - due to competing Council capital works priorities
•   Time delays due to the need for the Project Team to undertake additional geological investigations – and Councillor indecision
    over one sector of the pipeline route where landholders were particularly vocal about their opposition to the recommended
    route
•   Resulting flow-on delays to the Review of Environmental Factors and EOI processes
•   Change in elected Councillors – with the arrival of 10 new Councillors who had limited knowledge about the Project and its
    legacy issues and history
Engagement Plans & Strategies - Work Example 3
Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils)
Outcomes & Results Achieved
•   Gradual increase in community awareness and support for the project - following a period of poor consultation by an
    alternative adviser which resulted in a great deal of community angst and misunderstanding about the project
•   Steady increase in the degree of landholder support for the project – and their willingness to accept a 10 metre easement on
    thei properties in return for payment of reasonable and fair compensation
•   Significant reduction in the number of complaints received by the two Councils about the Project and recommened pipleine
    route from stakeholders – down from an average of 100 letters per month to a current average of 5 per month
•   Gradual increase in positive media coverage about the project – as a result of the effective media liaison program, the focus of
    which has been to educate the media about the project and respond more effectively to their queries to ensure a more positive
    working relationship with the two Councils and Project Team
•   Unanimous adoption by both Councils of a final water pipeline route - through Yarramalong Valley
•   Steady flow of landholders signing formal easement agreements - and accepting the compensation payments from the two
    Councils
•   Steady flow of properties available for access by the Project Team’s investigation engineers - to check the route alignment,
    undertake geological testing and drilling, survey and boundary mark individual properties
•   Steady flow of properties available for access by the Project Team’s property managers and valuers - to undertake independent
    valuations of each affected property, identify with landholders their special access arrangements and agree minor route
    modifications where possible to lessen the overall impact of the pipeline
•   Creation and maintenance of a strong working relationship with more than 10 different NSW Government Agencies – all of
    which have the ability to exercise a significant degree of influence over and into the statutory approvals process for the Project
Community Consultation – Work Example 1
Introduction of Temporary Desalination Units (Gosford City & Wyong Shire Councils)
Role of SMC
•   Development of an effective community consultation process to obtain feedback from stakeholders about the placement of
    temporary desalination units - on various beaches around the Central Coast
•   Management of the emotional reaction from stakeholders who are likely to react angrily to the placement of such units on
    the region’s pristine beaches - as well as to the concept of drawing water from the sea and then returning a by-product of the
    process which is perceived to have a high level of salinity back into the ocean
SMC’s Key Deliverables
•   Effective, believable and transparent key messages – and supporting collateral materials to try and garner maximum community
    understanding about why the Councils are considering such an option, how the desalination works, the likely environmental
    impacts, and what’s at risk if the Councils to not find alternative sources of water to bolster the region’s dwindling water supplies
•   Undertaking of widespread community surveys to obtain direct feedback from a cross section of people, interest groups and
    other relevant organisations - about the Councils’ possible investment in such units
•   Development of a recommended stakeholder engagement program aimed at garnering sufficient community support to
    enable the two Councils to proceed with the proposed use of temporary desalination plants if total dam storage levels were
    to drop below 10% - without the risk of vocal community opposition and high profile demonstrations
•   Identification of the key stakeholder issues and development of recommendations as to how these can be mitigated and
    managed to allow the two Councils to proceed with the proposed use of temporary desalination plants - if total dam storage
    levels were to drop below 10%
Outcomes & Results Achieved
•   Collection of a large quantity of high quality community feedback which clearly indicated that the Councils faced a significant
    challenge - if they were to successfully introduce the use of temporary desalination plants
•   Identification of a wide range of community issues about the introduction and placement of temporary desalination units on
    Central Coast beaches that would present significant challenges - in terms of them being successfully mitigated and managed
    by the two Councils
•   Recommendation to the two Councils that they consider the use of temporary desalination units as a last resort - or risk facing
    significant vocal and high profile opposition from a large sector of the community
Community Consultation – Work Example 2
Mardi-Mangrove Link Project
Role of SMC
•   Development of an effective community consultation program to obtain constructive feedback from directly affected
    landholders, the Yarramalong Valley community and all other interested parties - about the recommended water pipeline
    route through a pristine and rural area of the Central Coast
SMC’s Key Deliverables
•   Design and implementation of a formal community feedback process that enabled stakeholders to provide their feedback -
    using as many delivery mechanism as possible
•   Management of those stakeholders who reacted emotionally and angrily to the recommended route – mainly due to a
    misunderstanding about the extent of the impacts on their property
•   Extraction of constructive feedback through the use of behavioural change techniques - which can help stakeholders to move
    back onto a logical state out of a highly emotional state
•   Capture and analysis of stakeholder feedback using a combination of informal (general discussions and interaction) and) and
    formal methods (receipt of written submissions, correspondence, phone calls, comments in the media) to assess the level of
    community support, opposition to and neutrality about the recommended route – to provide the Project Team with an idea of
    the likely degree of community opposition to the recommended pipeline route and the risk of project delays due to possible
    legal challenges by landholders and/or other interested parties
•   Capture and analysis of informal feedback (general discussions and interaction) from Government Agencies, local MPs and
    Councillors to predict the anticipated degree of public opposition or support for the recommended route – to gauge the
    likelihood of the two Councils formally adopting the recommended route
•   Preparation of a formal community feedback report for the Project Team about the anticipated degree of stakeholder support
    for the recommended pipeline route – to enable any necessary refinements to be made to how the recommended route is
    being positioned and explained to stakeholders, development of appropriate mitigating strategies to manage and neutralise
    stakeholder issues, and briefing of key Project Team members and Council staff to ensure they are fully aware of the likely
    behaviour of certain stakeholders as they seek to try and oppose the recommended pipeline route
Community Consultation – Work Example 2 (cont)
Mardi-Mangrove Link Project
Outcomes & Results Achieved
•   Generation of sufficient support among affected landholders for 8 out of the 9 sectors of the recommended
    pipeline route - subject to a number of requested modifications and expansion of the existing community consultation
    process
•   The ability to anticipate the degree of landholder opposition and identification of the key issues enabled the
    Project Team to mitigate and manage these concerns PRIOR to the report on the recommended pipeline route
    being formally considered by the region’s Water Authority and two Councils – this provided the Councillors and
    Board Member with increased comfort that the community was being heard and listened to
•   The community consultation process resulted in increased support among some directly affected
    landholders and the wider Central Coast community – who felt that the Project Team was doing its best to be as
    transparent as possible and was prepared to listen to and respond to the individual concerns of landholders and other
    interested parties
•   Good support among the majority of local MPs who were kept fully about the consultation process and the
    views being expressed by landholders – this reduced the risk of disgruntled landholders and proponents of the
    Project only put their side to this group of influential stakeholders. Instead local MPs were able to make their own
    informed decision having received information from all parties
Community Consultation – Work Example 3
Taste Testing of Recycled Drinking Water (Gosford City Council)
Role of SMC
•   Development of an effective community consultation process to obtain top line feedback about the community’s initial
    attitude towards the gradual introduction of recycled water by the Council as an alternative source of town water for a range
    of potable and non-portable purposes - on the Central Coast during the region’s worst drought on record
•   Review and analysis of the resulting consultation feedback as the basis for the development of a long-term communications
    and education program to support the introduction of a pilot ‘sewer mining’ project - to supply non-potable water to
    commercial water users in the Gosford CBD
SMC’s Key Deliverables
•   Identification of an appropriate program of community consultation over a 3 month period - to obtain a wide cross section of
    community views about the possible future introduction of recycled drinking water into the region’s town water supply
•   Sourcing of fully tested and approved drinking water for use during ‘taste testing’ sessions as part of the community
    consultation process to enable people to make an informed decision about the use of recycled drinking water – the water was
    sourced from Singapore and resulted in resulted in significant negotiations with Australian Customs to gain clearance for entry
    into the country
•   Development and implementation of an integrated promotion campaign advertising the community consultation process -
    with the aim of encouraging as many people as possible to participate in the process and also to take part in the ‘taste testing’
    sessions
•   Identification of suitable venues to undertake the community consultation and taste testing activities where the maximum
    number of community members could participate in the process - the process was undertaken during a week day and weekend
    at local shopping centres across the region
•   Preparation and implementation of all collateral materials in support of the community consultation and taste testing
    activities – including display materials, media releases, website content, posters, flyers, FAQs, Fact Sheets
•   Development of the community consultation survey based on proven core belief research techniques – which included a
    combination of closed and open questions to identify the deep-seated perceptions about the use of recycled drinking water as
    part of the region’s overall water supply
•   Implementation of the community consultation and recycled drinking taste testing activities – which attracted more than
    2,0000 participants over a 3 month period
Community Consultation – Work Example 3 (cont)
Taste Testing of Recycled Drinking Water (Gosford City Council)
SMC’s Key Deliverables (cont)
•   Review and analysis of the community consultation and taste testing data – using proven core belief research techniques to
    provide Council with a clear picture about degree of the challenge if faced over what timeframe to introduce recycled drinking
    water into the region’s town water supply
•   Preparation of a detailed confidential report to Council staff highlighting the top line results – the report also included an
    explanation of what the findings meant for the proposed sewer mining pilot scheme and recommendations as to how Council
    could move the pilot forward
•   Preparation of a recommended long-term community education program over a 3-5 years period - to help garner community
    support for the eventual introduction of recycled water for both potable and non-potable uses on the Central Coast
Outcomes & Results Achieved
•   The findings of the community consultation and taste testing process identified that the community had a deep seated fear of
    the use of recycled water, particularly for drinking purposes and that Council would need to invest significant resources in
    support of the proposed community education program - to generate sufficient support for its long term objectives
•   On the recommendation of SMC, Council made the decision not to proceed with the sewer mining project or community
    education program at this time due to the already ‘emotional’ environment in which these activities would be undertaken –
    as a result of the region’s worst drought on record and continuing Level 5 water restrictions which were the most stringent in the
    country with a total ban on the use of all town water outside
•   The community consultation and taste testing processes have been mirrored by a number of other local government regions and
    water authorities over the past two years – but the depth of opposition to the introduction of recycled water indicated in these
    regions has been found to be very similar to that on the Central Coast
•   To date, no local government organisation or water authority in Australia has yet introduced the widespread use of recycled
    drinking water as part of a region’s town water supplies – SMC is continuing its own research into development of a
    community education program capable of generating significant support to allow the successful introduction of a recycled
    drinking water pilot scheme within a test community somewhere in Australia

More Related Content

Similar to Examples Of Our Work Saunders Mc Dermott Consulting

Sharing, networking, capacity building
Sharing, networking, capacity buildingSharing, networking, capacity building
Sharing, networking, capacity buildinggroundwatercop
 
Addressing Transboundary Concerns in the Volta River Basin and its Downstream...
Addressing Transboundary Concerns in the Volta River Basin and its Downstream...Addressing Transboundary Concerns in the Volta River Basin and its Downstream...
Addressing Transboundary Concerns in the Volta River Basin and its Downstream...Iwl Pcu
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)Iwl Pcu
 
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)Iwl Pcu
 
John Hollister and Rachel Hamblin: Practical matters
John Hollister and Rachel Hamblin: Practical mattersJohn Hollister and Rachel Hamblin: Practical matters
John Hollister and Rachel Hamblin: Practical mattersPAS_Team
 
WASH services that last in Mozambique - from cases to changes
WASH services that last in Mozambique - from cases to changesWASH services that last in Mozambique - from cases to changes
WASH services that last in Mozambique - from cases to changesIRC
 
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...ICIMOD
 
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...ICIMOD
 
Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Trémolet Consulting
 
Atal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptxAtal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptxdcsgsda
 
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable DrainageRobin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable DrainagePAS_Team
 
Planning Performance Agreements in Camden Council
Planning Performance Agreements in Camden CouncilPlanning Performance Agreements in Camden Council
Planning Performance Agreements in Camden CouncilPAS_Team
 
June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water Contract Cities
 
Water Resources Management Financing in Philippine
Water Resources Management Financing in PhilippineWater Resources Management Financing in Philippine
Water Resources Management Financing in PhilippineGWP SOUTHEAST ASIA
 
Developing a Public Outreach Plan for Virginia's MS4 Program
Developing a Public Outreach Plan for Virginia's MS4 ProgramDeveloping a Public Outreach Plan for Virginia's MS4 Program
Developing a Public Outreach Plan for Virginia's MS4 ProgramChesapeake Bay Foundation
 

Similar to Examples Of Our Work Saunders Mc Dermott Consulting (20)

Sharing, networking, capacity building
Sharing, networking, capacity buildingSharing, networking, capacity building
Sharing, networking, capacity building
 
Addressing Transboundary Concerns in the Volta River Basin and its Downstream...
Addressing Transboundary Concerns in the Volta River Basin and its Downstream...Addressing Transboundary Concerns in the Volta River Basin and its Downstream...
Addressing Transboundary Concerns in the Volta River Basin and its Downstream...
 
Revitalising Catchment Management Forums
Revitalising Catchment Management ForumsRevitalising Catchment Management Forums
Revitalising Catchment Management Forums
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
2. 2nd Cycle Draft River Basin Management Plan - Colin Byrne
 
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
 
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
Case study:The Mekong Wetlands Biodiversity Programme (Meynell, Peter-John)
 
John Hollister and Rachel Hamblin: Practical matters
John Hollister and Rachel Hamblin: Practical mattersJohn Hollister and Rachel Hamblin: Practical matters
John Hollister and Rachel Hamblin: Practical matters
 
WASH services that last in Mozambique - from cases to changes
WASH services that last in Mozambique - from cases to changesWASH services that last in Mozambique - from cases to changes
WASH services that last in Mozambique - from cases to changes
 
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
 
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
 
Rachael Edginton
Rachael EdgintonRachael Edginton
Rachael Edginton
 
Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...Water.org approach and activities to promote microfinance for sanitation (Dar...
Water.org approach and activities to promote microfinance for sanitation (Dar...
 
Atal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptxAtal_Bhujal_Yojana_Overview.pptx
Atal_Bhujal_Yojana_Overview.pptx
 
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable DrainageRobin Campbell & Paul Davies - Planning for Sustainable Drainage
Robin Campbell & Paul Davies - Planning for Sustainable Drainage
 
July 29-1050-Amy Miller
July 29-1050-Amy MillerJuly 29-1050-Amy Miller
July 29-1050-Amy Miller
 
Planning Performance Agreements in Camden Council
Planning Performance Agreements in Camden CouncilPlanning Performance Agreements in Camden Council
Planning Performance Agreements in Camden Council
 
June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water June 19, 2014 City Managers Meeting- Storm Water
June 19, 2014 City Managers Meeting- Storm Water
 
Water Resources Management Financing in Philippine
Water Resources Management Financing in PhilippineWater Resources Management Financing in Philippine
Water Resources Management Financing in Philippine
 
Developing a Public Outreach Plan for Virginia's MS4 Program
Developing a Public Outreach Plan for Virginia's MS4 ProgramDeveloping a Public Outreach Plan for Virginia's MS4 Program
Developing a Public Outreach Plan for Virginia's MS4 Program
 

More from Janet Saunders

Core Belief Research Overview
Core Belief Research OverviewCore Belief Research Overview
Core Belief Research OverviewJanet Saunders
 
SMCs Approach To Stakeholder Profiling
SMCs Approach To Stakeholder ProfilingSMCs Approach To Stakeholder Profiling
SMCs Approach To Stakeholder ProfilingJanet Saunders
 
SMC 2009/10 Training Program
SMC 2009/10 Training ProgramSMC 2009/10 Training Program
SMC 2009/10 Training ProgramJanet Saunders
 
Best Practice Crisis And Issues Management A Recommended Approach By SMC
Best Practice Crisis And Issues Management   A Recommended Approach By SMCBest Practice Crisis And Issues Management   A Recommended Approach By SMC
Best Practice Crisis And Issues Management A Recommended Approach By SMCJanet Saunders
 
Some Of Our Recent Training Programs From Saunders Mc Dermott Consulting
Some Of Our Recent Training Programs From Saunders Mc Dermott ConsultingSome Of Our Recent Training Programs From Saunders Mc Dermott Consulting
Some Of Our Recent Training Programs From Saunders Mc Dermott ConsultingJanet Saunders
 
Reuse 07 Presentation By Janet Saunders Session 4 A
Reuse 07   Presentation By Janet Saunders Session 4 AReuse 07   Presentation By Janet Saunders Session 4 A
Reuse 07 Presentation By Janet Saunders Session 4 AJanet Saunders
 
12th National Water Conference Day Three 2.30pm Janet Saunders
12th National Water Conference Day Three 2.30pm Janet Saunders12th National Water Conference Day Three 2.30pm Janet Saunders
12th National Water Conference Day Three 2.30pm Janet SaundersJanet Saunders
 

More from Janet Saunders (7)

Core Belief Research Overview
Core Belief Research OverviewCore Belief Research Overview
Core Belief Research Overview
 
SMCs Approach To Stakeholder Profiling
SMCs Approach To Stakeholder ProfilingSMCs Approach To Stakeholder Profiling
SMCs Approach To Stakeholder Profiling
 
SMC 2009/10 Training Program
SMC 2009/10 Training ProgramSMC 2009/10 Training Program
SMC 2009/10 Training Program
 
Best Practice Crisis And Issues Management A Recommended Approach By SMC
Best Practice Crisis And Issues Management   A Recommended Approach By SMCBest Practice Crisis And Issues Management   A Recommended Approach By SMC
Best Practice Crisis And Issues Management A Recommended Approach By SMC
 
Some Of Our Recent Training Programs From Saunders Mc Dermott Consulting
Some Of Our Recent Training Programs From Saunders Mc Dermott ConsultingSome Of Our Recent Training Programs From Saunders Mc Dermott Consulting
Some Of Our Recent Training Programs From Saunders Mc Dermott Consulting
 
Reuse 07 Presentation By Janet Saunders Session 4 A
Reuse 07   Presentation By Janet Saunders Session 4 AReuse 07   Presentation By Janet Saunders Session 4 A
Reuse 07 Presentation By Janet Saunders Session 4 A
 
12th National Water Conference Day Three 2.30pm Janet Saunders
12th National Water Conference Day Three 2.30pm Janet Saunders12th National Water Conference Day Three 2.30pm Janet Saunders
12th National Water Conference Day Three 2.30pm Janet Saunders
 

Recently uploaded

Book Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near Me
Book Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near MeBook Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near Me
Book Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near Meanamikaraghav4
 
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...ritikasharma
 
Air-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment Booking
Air-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment BookingAir-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment Booking
Air-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment BookingRiya Pathan
 
Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7Riya Pathan
 
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...Riya Pathan
 
Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448ont65320
 
Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...
Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...
Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...Riya Pathan
 
↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...noor ahmed
 
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...anamikaraghav4
 
VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...
VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...
VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...Neha Kaur
 
Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7Riya Pathan
 
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...noor ahmed
 
(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...
VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...
VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...anamikaraghav4
 
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service GulbargaVIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service GulbargaRiya Pathan
 
Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...
Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...
Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...Apsara Of India
 
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969Apsara Of India
 

Recently uploaded (20)

Book Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near Me
Book Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near MeBook Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near Me
Book Call Girls in Panchpota - 8250192130 | 24x7 Service Available Near Me
 
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
 
Air-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment Booking
Air-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment BookingAir-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment Booking
Air-Hostess Call Girls Shobhabazar | 8250192130 At Low Cost Cash Payment Booking
 
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
Call Girls Chirag Delhi Delhi WhatsApp Number 9711199171
 
Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Howrah 👉 8250192130 ❣️💯 Available With Room 24×7
 
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
Housewife Call Girls Sonagachi - 8250192130 Booking and charges genuine rate ...
 
Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448Beautiful 😋 Call girls in Lahore 03210033448
Beautiful 😋 Call girls in Lahore 03210033448
 
Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...
Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...
Independent Hatiara Escorts ✔ 8250192130 ✔ Full Night With Room Online Bookin...
 
↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Howrah ⟟ 8250192130 ⟟ High Class Call Girl In...
 
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service NashikCall Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
Call Girl Nashik Saloni 7001305949 Independent Escort Service Nashik
 
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
Call Girls Service Bantala - Call 8250192130 Rs-3500 with A/C Room Cash on De...
 
VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...
VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...
VIP Call Girls Darjeeling Aaradhya 8250192130 Independent Escort Service Darj...
 
Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7
Kolkata Call Girl Airport Kolkata 👉 8250192130 ❣️💯 Available With Room 24×7
 
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
↑Top Model (Kolkata) Call Girls Behala ⟟ 8250192130 ⟟ High Class Call Girl In...
 
(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(DIVYA) Dhanori Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...
VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...
VIP Call Girls Sonagachi - 8250192130 Escorts Service 50% Off with Cash ON De...
 
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
VIP Call Girls Service Banjara Hills Hyderabad Call +91-8250192130
 
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service GulbargaVIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
VIP Call Girls in Gulbarga Aarohi 8250192130 Independent Escort Service Gulbarga
 
Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...
Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...
Contact:- 8860008073 Call Girls in Karnal Escort Service Available at Afforda...
 
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
Beyond Bar & Club Udaipur CaLL GiRLS 09602870969
 

Examples Of Our Work Saunders Mc Dermott Consulting

  • 2. Meeting Facilitation - Work Example 1 Our Water - Worth Saving (Gosford City & Wyong Shire Councils) Role of SMC • Development and implementation of a program of stakeholder meetings - as part of an intensive campaign to reduce the amount of town water used on the Central Coast, further educate the community as to how/ why they needed to conserve water, change how stakeholders view and value water as a limited resource in the future. The Program included: - small Precinct and Progress Association meetings - formal lunches at the regional Chambers of Commerce - town-hall style community forums - industry-specific information sessions - internal staff updates - call centre/customer service training sessions - media conferences - targeted focus groups - manned shopping centre displays - major retail customer information sessions (Bunnings, Harvey Norman) SMC’s Key Deliverables • Development of an appropriate meeting program - including the structure, location, target audiences, timing and content of each meeting as well as the choice of presenters • Facilitation of each meeting and, where necessary, presentation of the key information / answering of audience questions – due to unavailability of the Councils’ senior management • Development of all supporting collateral materials – including presentations, FAQs, fact sheets, information packs, website content • Monitoring / recording of all stakeholder feedback - including questions asked by the audience and answers provided) • Analysis of stakeholder input - and degree of stakeholder engagement achieved including assessment of whether it was increasing or decreasing • Recommended refinements to the stakeholder meeting program - and overall Our Water – Worth Saving stakeholder engagement / community education program • Confirmation of the dominant profiles - within GCC’s & WSC’s local communities and other stakeholders to enable future meeting content to be carefully tailored to help achieve an even higher degree of engagement and trust • Tracking of changes in attitudes/behaviour of GCC’s & WSC’s local communities - through the four phases of change to gauge the impact, value and effectiveness of the stakeholder meeting program and overall Our Water – Worth Saving stakeholder engagement /community education program
  • 3. Meeting Facilitation - Work Example 1 (cont) Our Water - Worth Saving (Gosford City & Wyong Shire Councils) Outcomes & Results Achieved • Above average attendance at all of the meetings - for example the first community Water Forum attracted more than 650 people compared to a Council anticipated turn out of 100 • Tangible reduction in community anger towards GCC / WSC as partners in the local Water Authority – following the first round of meetings as demonstrated by a 35% movement of the number of stakeholders in the Denial / Anger segments through to the Reasoning segment within the four phase change process • Better community understanding about the cause / context of the worst drought on record in the region - and how it related to what was happening elsewhere in Australia and around the world due to climate change as demonstrated by a change in the type of questions and attitude of attendees at subsequent meetings • Increased awareness about what the two Councils were doing to mitigate / manage the drought conditions - as demonstrated by the type of questions asked at subsequent meetings and attitude of attendees . For example, at the start of the first round of meetings, one of the community’s intensively held core beliefs was that the region’s main storage dam (Mangrove Creek Dam) had been built in the wrong location . By the start of the second round of meetings, the community no longer asked any questions about the location of the dam and as an issue it had dissipated • Better understanding about the need for / strong degree of community commitment to use less town water – as well as to use water more efficiently and view water as a valuable but limited future resource as demonstrated by a 30% reduction in total daily water consumption on the Central Coast within 6 months of the campaign commencing • Increase in the number of applications received by Council from individual community members for water related rebates - for the installation of water conservation items such as rainwater tanks, water efficient washing machines, grey-water systems • Strong demand for items promoting water conservation - such as shower timers, stickers, posters, flyers as part of the Our Water – Worth Saving campaign as demonstrated by the large number of written / phone requests received by both Councils via their customer service teams
  • 4. Meeting Facilitation - Work Example 2 Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils) Role of SMC • Development of effective meeting program to help rebuild stakeholder relationships - with landholders, the Yarramalong Valley rural community and wider Central Coast community about the need for and progress of this new $170 million water infrastructure. Development work included structure, location, target audiences, timing, content and feedback evaluation processes for each meeting SMC’s Key Deliverables • Facilitation of each of the meetings - including Open Houses, town hall style meetings, one-on-one briefings with local MPs, Councillor briefings, Government Department Workshops, manned information displays at Council organised community events • Development of all supporting collateral materials – including presentations, FAQs, fact sheets, information packs, website content • Training of Project Team presenters - to ensure consistent, best practice performance in sometimes extremely challenging circumstances • Strong control of the meetings - given that a previous program of meetings (not undertaken by SMC) had resulted in a walk-out by community members, negative media coverage and a targeted campaign of complaints from stakeholders to the elected Councillors at both Councils • Monitoring / recording of all stakeholder feedback - including questions from the audience and the answers provided • Analysis of stakeholder input - and the degree of engagement achieved including assessment of whether it was increasing or decreasing) • Recommend refinements to the MML Stakeholder Engagement program - including the ongoing stakeholder meeting program • Confirmation of the dominant profiles within MML’s key stakeholder groups - and other stakeholders to enable future meeting content to be carefully tailored to help achieve an even higher degree of engagement and trust • Tracking of changes in the attitude/behaviour of MML’s key stakeholders - through the four phases of change to gauge the impact, value and effectiveness of the Project’s stakeholder meeting and engagement programs
  • 5. Meeting Facilitation - Work Example 2 (cont) Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils) Outcomes & Results Achieved • Gradual increase in degree of stakeholder engagement - particularly among previously angry landholders as demonstrated by the degree of emotion and anger shown by stakeholders as the meeting program progressed • Reduction in landholder anger towards the Project Team and Councils - due to them having a better understanding about the project as a whole and the formal process to identify a recommended water pipeline route through Yarramalong Valley - as demonstrated by a drop in complaint numbers and correspondence received reducing from an average of 100 per month to a current average of 5 per month • Better community understanding about the project - as demonstrated by increasing support for the Project among Councillors and the broader Central Coast community • Unanimous adoption by both Councils of a final water pipeline route - through Yarramalong Valley • Steady flow of landholders signing formal easement agreements - and accepting the compensation payments from the two Councils • Steady flow of properties available for access by the Project Team’s investigation engineers - to check the route alignment, undertake geological testing and drilling, survey and boundary mark individual properties • Steady flow of properties available for access by the Project Team’s property managers and valuers - to undertake independent valuations of each affected property, identify with landholders their special access arrangements and agree minor route modifications where possible to lessen the overall impact of the pipeline
  • 6. Meeting Facilitation - Work Example 3 Industry Forums – (Our Water – Worth Saving, Gosford City Council) Role of SMC • Development and management of a series of industry forums - to identify additional water saving activities that Council could develop to reduce the amount of water used outdoors by commercial users g and content SMC’s Key Deliverables • Development of an appropriate forum structure - to attract as many attendees as possible and develop a viable short-list of potential ideas for consideration by Council • Effective facilitation to draw out the maximum number of ideas - for further discussion and possible consideration by Council • Strong control of the forums - to ensure that it proceeded in a professional manner at all times despite emotions being likely to run high due to the imminent introduction of Level 5 water restrictions which prohibited all outdoor use of town water • Presentation of all key information and answers to audience questions – due to a Council presenter not being available • Development of all supporting collateral materials – including presentations, FAQs, fact sheets, information packs, website content • Monitoring/recording of all stakeholder feedback - including the questions asked by the audience and the answers given • Analysis of stakeholder input - and degree of engagement achieved • Identification of a short list of ideas - including a top line review of the value and likely impact of each • Confirmation of the dominant profiles - within GCC’s commercial water users stakeholder groups • Capturing of benchmarking data re attitude/behaviours/response to suggested innovative water conservation ideas including a Water Banking Scheme – which were then used as a comparison to track changes in the degree of stakeholder engagement as the new Water Banking Scheme was rolled out
  • 7. Meeting Facilitation - Work Example 3 (cont) Industry Forums – (Our Water – Worth Saving, Gosford City Council) Outcomes & Results Achieved • Strong input to the meeting by all attendees - which resulted in identification of the unique Water Banking Scheme for use by commercial water users who rely on the outdoor use of town water (swimming pools providers, landscapers, nurseries, building trades, car washes, turf farms) • Good attendance from a broad cross section of industries - which rely on the daily use of water with more than 300 people attending each of the meetings • Successful development and adoption of the Water Banking Scheme by Council - less than 6 weeks after the holding of the Industry Forums • Successful response to the launch of the Water Banking Scheme - as demonstrated by applications to participate being about 30% higher than anticipated in the first week of implementation (around 250 applications were received) • Good implementation and adherence to the Scheme’s protocols / procedures - with around 75% of participants lodging their applications on time and correctly • Smooth integration of the Scheme into the Council’s every day water management practices - over a relatively short period of just 3 months • Good support for the Scheme - as demonstrated by the high number of comments and written feedback received by Council and the positive media coverage before and after the Scheme’s launch • Strong interest from other local government organisations in the Scheme - and how they could apply it to their own region as demonstrated by the regular flow of invites to present an overview of the Scheme to other Councils and organisations
  • 8. Event Management - Work Example 1 Central Coast Water Festival (Gosford City & Wyong Shire Councils) Role of SMC • Development, co-ordination, implementation of a major regional event - including location, exhibitors, speakers, entertainment, promotion, media, sponsorships to reinforce the water conservation messages and educate the community about the many programs, services and products available to help them save water. • Aim was also to help the community better understand - all of the short, medium and long-term work being undertaken by the two Councils to combat the worst drought on record • Event needed to be more than just a business expo - to ensure sufficient visitors of all age groups/background attended to ensure that community awareness about the water situation and the role all water users had to play continued to grow • To achieve all of these objectives, a mix of family entertainment was incorporated into the event – including face-painting, street theatre, reptile displays, children’s rides, schools’ poster /art displays, musical entertainment • Competitions were also held for visitors to win water conservation devices – including a rainwater tank, water-efficient washing machine and a refit kit (which comprised a retrofit of their home with a water efficient showerhead, cistern weight, tap aerators). SMC’s Key Deliverables • Creation of a family fun day out during which vital water conservation messages could be shared - through a variety of mechanisms to the widest audience possible • Securing of a broad range of exhibitors within a water-related theme - to enable them to showcase their water conservation products / services to help further educate the community about how easy it is to save water on a daily basis • Securing of sufficient business sponsorship - to reduce the total required funding from the two Councils • Securing of sufficient high profile speakers, family entertainers and other relevant activities - to attract the maximum number of visitors and exhibitors to the event • Development and implementation of a broad, integrated promotional campaign - to ensure the widest number of people were aware of the event (direct mail, advertising, media, website, third party advocacy) • Project management of the overall event - to ensure it progressed as smoothly and efficiently as possible • Undertaking of visitor and exhibitor surveys - to gain valuable feedback about the structure, content and overall impact of the event on key stakeholder groups • Preparation of a detailed report for the two Councils - about the impact and value of the event and its relevance as an annually occurring activity as part of the Councils’ continued investment in its water conservation education program
  • 9. Event Management - Work Example 1 (cont) Central Coast Water Festival (Gosford City & Wyong Shire Councils) Outcomes & Results Achieved • Attendance by approximately 8,5000 people - to the 2007 Central Coast Water Festival which represented an increase of 20 per cent on similar Council organised events in the area • Attraction of approximately 40 exhibitors - to the 2007 Central Coast Water Festival which was double the average number of sponsors usually involved in similar Council organised events in the area • Involvement (directly and indirectly) of a broad range of stakeholders including: - rainwater tank providers - grey water system suppliers - nurseries - turf farmers - pool suppliers - plumbing services - community groups - environment groups - schools - national retailers ( Bunnings, Harvey Norman) • Consistent promotion of the ‘need to save water’ message to attendees – as demonstrated by people’s knowledge when it came to completing the follow-up surveys distributed to all visitors • 95% satisfaction among exhibitors with the opportunity to Festival provided - for them to showcase their water-conservation products or services • Feedback from visitors to the Festival which indicated that around76% of them had learnt something new - on the day about water saving products, services, programs or actions • Continued acknowledgement among visitors about the need to conserve water – particularly with local school children and families • Strong media support for the Festival - as indicated by the resulting positive media coverage before and after the Festival • Strong support across both Councils and local MPs for the event - to remain a key part of the water conservation education program
  • 10. Event Management - Work Example 2 Community Water Forum – (Our Water – Worth Saving, Gosford City Council) Role of SMC • Development of the Water Forum concept - to enable the community’s dissatisfaction with how the region’s worst drought on record was being managed by the two Councils to be tackled head-on • This dissatisfaction was mainly the result of a lack of easily available information at the time – which put the drought into some kind of context • The aim of the Forum was to demonstrate that the region was not alone in its plight – and explain what the two Councils were doing to manage the situation • The aim of the Forum was also to confirm the role of the community in helping manage the drought – by making it clear the contribution waters users had made to causing the drought conditions by their inefficient use of water and the fact that they did not currently see water as a valued but limited future resource • The Forum also provided an ideal opportunity for Council to put a face to the ‘unidentified’ team - that was responsible for managing the region’s water supply • The Forum also provided a ideal mechanism for Council to realign some of the community’s core beliefs - about how the region’s water supply system worked, where and how water was sourced to ensure people had sufficient drinking water on a daily basis, and the limited options available to Council to try and rectify the situation in the short term SMC’s Key Deliverables • Development, implementation and management of a well structured, workable and realistic event - that would attract a large number of people so Council could engage with, influence and educate a broad cross section of the community • Development of a community event that would accommodate the different ways in which people like to receive and process information - for example not everyone wants to sit through a 40 minute presentation, some people may only have 10 minutes to spare to pop in and have a look around • Development of appropriate evaluation processes that would enable benchmarking data about the community’s perceptions, key issues and core beliefs could be captured – and used to assess the impact, value for money and success of the Council’s Our Water – Worth Saving campaign over time • Development and implementation of an effective promotional campaign in support of the Community Water Forum – to ensure strong awareness / interest about the event which would then translate into good attendance levels • Development of all collateral materials – including presentations, posters, flyers, advertisements, media releases, website content, displays, fact sheets, brochures, other promotional items
  • 11. Event Management - Work Example 2 (cont) Community Water Forum – (Our Water – Worth Saving, Gosford City Council) SMC’s Key Deliverables (cont) • Securing of an external high profile ‘climate change and water industry speaker – to provide an outsider’s view and help further explain the context of the region’s worst drought on record • Training of all of the presenters – to ensure consistent, confident performance on the day • Overall project management of the event – including liaison with the venue, catering supplier, security teams, printers, advertising company, transport and signage providers etc • Liaison with the elected Councillors and local MPs – to ensure they were aware of the event and how they could get involved • Provision of all support staff – including the building of all of various displays that were included in the event (water saving kitchen, bathroom, laundry, water efficient shower heads, grey water systems etc), and manning them on the day • Monitoring/recording of all stakeholder feedback - including the questions asked by the audience and the answers given • Analysis of all stakeholder input and feedback - and the degree of engagement achieved • Preparation of a detailed report to Council – highlighting the key events of the day, the issues raised by the community, the requested actions of the community, the number of people who attended, a summary of the overall community feedback on the value/impact of the event • Preparation of a detailed report to Council staff – confirming the dominant profiles within GCC’s communities and stakeholder groups, benchmarking data regarding the attitudes, behaviours and core beliefs of the Forum attendees, and recommendations as to how the Our Water – Worth Saving stakeholder engagement and community education campaign should be refined to better engage stakeholders and continue to build community confidence in the Council’s ability to effectively manage the region’s water supply during such severe drought conditions
  • 12. Event Management - Work Example 2 (cont) Community Water Forum – (Our Water – Worth Saving, Gosford City Council) Outcomes & Results Achieved • Commencement of a rebuilding process between the Council and its stakeholders - based on a two communications process, integrity and trust • Gradual re-education of the community to better understand the scale and overall workings of the system that supplies their drinking water on a daily basis - as indicated by the ongoing feedback received from the community following the Forum • Gradual re-education of the community about the important role they have to play in water conservation – and reducing the amount of valuable drinking water they use and waste each day as indicated by the ongoing feedback received from the community following the Forum • Much better understanding by Council about the degree of misinformation that existed in the community about the cause and extent of the region’s worst drought on record - as indicated by the questions that were asked at the Forum • Creation of a public ‘face’ for the Our Water – Worth Saving campaign – namely the Mayor of Gosford and the Council’s Acting Director, Water & Sewer who went on to front a large percentage of the ongoing media and community activities associated with the campaign • Collection and analysis of valuable stakeholder perception and core belief data – that was used as a benchmark for tracking the movement of stakeholders through the four phases of changes as the Our Water – Worth Saving campaign was rolled out . This data was also used to assess the overall impact and value of Council’s significant investment in the Our Water – Worth Saving campaign as it continued to be rolled out • Collection and analysis of valuable stakeholder feedback about the key issues regarding the region’s water supply that were keeping the community awake at night – which was then used to help tailor the future content and focus of the Our Water – Worth Saving campaign • Creation of a number of active and positive ‘advocates’ of the Council’s water conservation methods – who became increasingly involved in the Our Water – Worth Saving campaign to help further increase community awareness of and support for the Council’s water saving activities, programs and strategies
  • 13. Event Management - Work Example 3 Launch of WaterPlan 2050 (Gosford/Wyong Councils’ Water Authority) Role of SMC • Development of a series of community events to roll-out the preliminary working draft of WaterPlan 2050 – a blueprint for the management of the Central Coast’s water resources over the next 45 years and obtain community feedback on the proposed key actions contained in WaterPlan 2050 • Development of a series of community events to launch the Council endorsed version of WaterPlan 2050 - and garner strong community awareness as well as understanding about the key actions and programs included in the plan which required significant community support to make them work in the medium to long-term SMC’s Key Deliverables • Identification of the key target stakeholder groups / individuals with the potential to exercise a reliable degree of influence - over the rest of the community in terms of generating strong support for WaterPlan 2050 • Development of an appropriate program of meetings to target these key stakeholder groups and community members – including development of the right meeting structure, content, timing and venue • Promotion of the meetings to ensure a strong turnout - using the widest possible range of delivery mechanisms • Development of all support collateral materials – including presentations, advertisements, posters, flyers, website content, media releases • Drafting / finalisation of a summary WaterPlan 2050 brochure and flyer - to highlight the priority actions and key messages of the long- term blue print to the community using Plain English for distribution during the meetings and generally to the community • Training of all of the Council presenters for the different types of meetings – to ensure a consistent, professional performance • Project management of all of the meetings – including liaison with venues, catering suppliers, printers, graphic designers, web site managers • Monitoring/recording of all stakeholder feedback - including the questions asked by the audience and the answers given • Analysis of stakeholder input - and degree of engagement achieved, key issues raised • Media liaison and management – to ensure the resulting media coverage was positive and that well prepared, competent and capable Council media spokespeople were available for comment at all times • Updating of elected Councillors and local MPs – to ensure strong support and consistent use of the agreed key messages
  • 14. Event Management - Work Example 3 (cont) Launch of WaterPlan 2050 (Gosford/Wyong Councils’ Water Authority) Outcomes & Results Achieved • Successful roll-out of the preliminary draft /adopted version of WaterPlan 2050 - as demonstrated by the positive community feedback received after each of the meetings and the resulting media coverage • Creation of strong community interest in the priority actions contained in WaterPlan 2050 – and increased awareness about the vital role the community can play in helping secure the region’s water supply over the next 45 years as demonstrated by the large number of emails, phone calls and requests for further information received by the two Councils immediately following the launch of the preliminary working draft and adopted version • Generation of lively community debate about the priorities actions included in WaterPlan 2050 - and the nine capital works options that the two Councils decided not to pursue as demonstrated by the type of conversations between Council staff and community members at the various WaterPlan 2050 meetings • Generation of strong Councillor support for the preliminary working draft / adopted version of WaterPlan 2050 – as demonstrated by the amount of public comment made by the Councillors and their willingness to undertake media interviews and attend community meetings • Strong attendance by a broad cross section of the community at each of the meetings – which ranged from small groups of around 20 up to audiences of more than 100 • Capture and analysis of vital stakeholder feedback about the community’s perceived information gaps – and the issues that remained unresolved following each meeting. This data was then used to continually refine the meeting program and the key messages/general information provided to stakeholders about WaterPlan 2050
  • 15. Evaluation & Reports - Work Example 1 Personality Profiling of Key Stakeholder Groups (Gosford City Council) Role of SMC • Preparation of a detailed report identifying the dominant personality profiles within Council’s key stakeholder groups - to help ensure key information is shared in the right way at the right time using the right delivery mechanisms • The benefit of identifying these personality profiles is that they provide an accurate roadmap for Council - about the specific words, phrases and delivery mechanisms that work best with each of the various personality profiles to ensure that the Council’s stakeholder engagement activities achieve optimum outcomes SMC’s Key Deliverables • Detailed review of all of the stakeholder feedback previously collected by Council over a two to three year period - including survey responses, customer service query reports, community letters, emails, phone calls and all other forms of community interaction to accurately ‘type’ the dominant personality profiles • Identification of the dominant personality profiles – and drafting of an explanation about how each of them like to receive and process information as well as their potential responses to the type of information likely to be shared with them by Council in the short and medium term, particularly in regard to the drought conditions and ongoing management of the region’s water supply • Presentation of summary results to key Council’s senior management – as part of a series of introductory workshops aimed at explaining how the resulting data can be used to improve Council’s understanding about what makes its key stakeholders tick and how to best to engage them particularly during times of significant change Outcomes & Results Achieved • Better understanding among Council’s senior management and internal communications staff about how to engage key stakeholder groups - as demonstrated by a tangible improvement in the quality and the relevance of the community consultation activities undertaken by Council following receipt of the SMC Personality Profiling Report • Agreement by Council for all of its senior communications staff and key spokespeople to undertake the Introduction of Personality Profiling workshop – as provided by SMC as part of an integrated, long-term program to significantly improve the Council’s stakeholder engagement over time • Use of the personality profiling data to successfully develop and implement the Our Water – Worth Saving stakeholder engagement and community education campaign - which resulted in a 30% reduction in domestic town water consumption on the Central Coast in just 6 months
  • 16. Evaluation & Reports - Work Example 2 Route Selection Report of Community Comment & Feedback (Mardi-Mangrove Link Project, Gosford City & Wyong Shire Councils) Role of SMC • Development of a Plain English document which explained the formal processes used by the Project Team to identify and confirm a recommended water pipeline route through Yarramalong Valley - for review and comment by affected landholders, Valley community and other interested parties SMC’s Key Deliverables • Participation in the multi-criteria analysis to provide formal community impact data - as part of the assessment process to score each of the potential route options through the 9-sector pipeline • Participation in the stringent review process - to test the robustness and accuracy of the pipeline option scores and overall analysis • Drafting of a summary and supporting detailed explanation of the recommended route for each of the 9 options - including an overview of the strengths and weaknesses of each option across the five key assessment, the resulting multi-criteria scores and supporting visual materials showing the recommended route through each sector of the Valley • Development of appropriate supporting materials - to encourage the maximum number of stakeholders to review and comment on the report • Development of an appropriate media liaison campaign to promote the launch of the report - to encourage the maximum number of stakeholders to review and comment on the report • Management of the approvals process report and its timely distribution to the community - using the maximum number of delivery mechanisms • Management of the informal community feedback process and ongoing liaison with Council - to ensure this feedback is also considered as part of the formal public exhibition and comment process • Ongoing interaction with stakeholders in particular directly affected landholders - to answer their written and verbal queries about the report and its content to ensure the fully understand how the route selection process was implemented, the route that has been recommended, how they can share their feedback with Council and what the next decision making steps will be
  • 17. Evaluation & Reports - Work Example 2 (cont) Route Selection Report of Community Comment & Feedback (Mardi-Mangrove Link Project, Gosford City & Wyong Shire Councils) Outcomes & Results Achieved • Successful distribution of the report to the largest number of stakeholders - as demonstrated by the large degree of landholder and other community comment about the recommended pipeline route • Generation of widespread debate about the recommended water pipeline route - among affected landholders, Yarramalong Valley community, elected Councillors and wider Central Coast community as demonstrated by the large degree of correspondence, phone calls and interaction about the recommended pipeline route • Accurate but mixed media coverage about the recommended pipeline route – which was influenced to some degree by proponents of the project (mainly angry landholders who totally oppose the pipeline at all costs) who waged a relatively aggressive opposition campaign in the media • Strong Councillors and local MP interest in the report – accompanied by their consistent public support for the robustness and professionalism of the route selection process • Adoption of the recommended route by both Councils for 8 out of the 9 sectors – which make up the overall pipeline route, with a decision deferred on only one Sector • Receipt of only 14 written submissions by Council in response to the recommended pipeline route report – despite the Project directly and indirectly impacting more than 330 Yarramalong Valley residents
  • 18. Evaluation & Reports - Work Example 3 Ongoing Community Surveys of the Community’s Changing Water Usage Habits (Gosford City & Wyong Shire Councils) Role of SMC • Development of a easy to use mechanism for capturing and recording the direct feedback of water users - on the Central Coast at the many community events organised by the two Councils SMC’s Key Deliverables • Drafting of easy to use, relevant, behavioural change based community surveys - that take only a few minutes to complete but which provide the maximum number of insights into the changing water usage habits of the community • Development of a data analysis procedure which Councils’ communications staff can use - which is simple, accurate and enables top line results to be easily identified by people who are not necessarily experienced in undertaking this type of market research • Development of an additional layer of data analysis that will confirm the dominant personality profiles of the Councils’ key communities – as part of ensuring that all future stakeholder engagement, community liaison and behavioural change activities deliver optimum outcomes • Development of a simple to use analysis process that enables Council staff to monitor and track the impact of the Councils’ various water conservation activities - in particular the available community rebates, events, media and advertising campaigns, all of which represent a major investment by the two Councils Outcomes & Results Achieved • Capture and analysis of vital benchmarking community water usage habit data - which continues to be used by the two Councils to track the impact of its investment in water conservation stakeholder engagement and education activities • Tracking of the impact and value of individual stakeholder engagement and education activities on the water usage habits of the Central Coast community – which enables Council to update, refresh or change these activities and the degree to which they are promoted the community when the market survey data indicates that such activities are no longer successfully influencing the community
  • 19. Engagement Plans & Strategies - Work Example 1 Our Water – Worth Saving (Gosford City Council) Role of SMC • Development of an effective integrated stakeholder engagement and community education campaign - to deliver an immediate significant reduction in the amount of town water used on the Central Coast on a daily basis • Such a campaign has to target and involve all of the different types of waters users - across the domestic and commercial sectors. It also has to align with the current Level 5 water restrictions which are the most stringent in Australia with a complete ban on the outdoor use of town water • The campaign has not only extremely tight deadlines but also a limited budget - and no access to additional internal Council communications staff to help implement the program SMC’s Key Deliverables • High profile, realistic and workable integrated campaign that gets the relevant key message across – including the fact that if the community did not start saving water immediately there was a real risk the region would run out of available drinking water • Involvement in the campaign of as many community groups as possible – to help achieve maximum community understanding about how they can save water • Significant changes to the community’s water usage habits to eliminate the large amount of water that is being wasted on a daily basis – simply because people do not perceive water as a highly value but limited resource into the future • Development of a campaign tag line and a series of hard hitting images – which get the water conservation message easily and effectively • Securing of as much free advertising, signage, printing and design services as possible – to reduce the required funding from Council to support the campaign • Development of effective and reliable tracking mechanisms - to enable Council to measure and evaluate the impact its significant investment in the campaign is having on water usage levels • Sub-campaigns aimed specifically at different industry types, particularly those involved in the tourism interest – to ensure that the Council’s water conservation messages are hammered home to all visitors to the region so they do not hamper the Central Coast’s ability to reduce the amount of water that is used every day and that they strictly adhere to the region’s Level 5 water restrictions, even during the hot summer months
  • 20. Engagement Plans & Strategies - Work Example 1 Our Water – Worth Saving (Gosford City Council) Innovative Activities Included in the Campaign • Free use of roadside illuminated signs - following a donation of all of their empty space by a Sydney based advertising company • Distribution and display of Our Water – Worth Saving stickers in all public rest rooms and amenities - across the Central Coast, some of which remain in place today • Distribution of Our Water – Worth Saving information packs to all accommodation providers, restaurants, clubs, motels, pubs, caravan parks, banks, GP surgeries, Surf Life Clubs, RSL Clubs and other tourist related outlets - for display in foyers, individual rooms, above room sinks, in rest rooms, beside swimming pools and other water related activities • Display of ‘Explanation Signs’ at all beach showers, boat ramps, drinking fountains and other public access points to drinking water - to explain why these amenities are no longer available to the water restrictions and impacts of the worst drought on record on the Central Coast • Display of major campaign banners at all Surf Life Saving Clubs and on all available external community noticeboards – which reiterate the campaign water conservation images and key messages • Free of charge information displays (manned and unmanned) at all major shopping centres in the region – where Our Water – Worth Saving promotion items such as shower timers were handed out to more than 2,000 shoppers and visitors every weekend • Insertion of campaign posters in the table tops of more than 500 food court seats free of charge - in the largest shopping centre on the Central Coast where footfall on a busy weekend can be as high as 20,000 people • Placement of Our Water – Worth Saving on all Council owned and operated vehicles - including Surf Life Saving buggies on the region’s beaches • Information displays and attendance by the Our Water – Worth Saving team at all Council related and other relevant community events - including Kids Day Out, Home Show, Flora Spring Time Show, Oyster Festival, Christmas Parades, Australia Day, Anzac Day
  • 21. Engagement Plans & Strategies - Work Example 1 Our Water – Worth Saving (Gosford City Council) Outcomes & Results Achieved • 30% reduction in total water usage levels on the Central Coast - over a 3 to 6 month period. Despite the lifting of water restrictions from Level 5 to Level 2B as of 14 June 009, these water usage levels have remained relatively consistent for more than two years • Strong community involvement and awareness about the campaign - as demonstrated by the large number of posters, stickers and banners that are still in place and are regularly placed some two years after the campaign was first rolled-out • Investment in the campaign by large number of local businesses – as a result of them feeling they had a key role to play in ensuring that their customers (the tourists and visitors) did not breach the strict water restrictions and the concerted effort by the community to save water • Significant change in the perceptions of the community about water conservation - and the value of water given is was a limited resource over time as identified by the regular surveying of the community • Increased community confidence in the Councils’ ability to manage the region’s water supply system during the worst drought on record - as demonstrated by the drop in negative feedback and comments from the community about the ‘perceived poor performance of Council’ which was a common trend prior to the roll-out of the campaign • Winning of a Local Government communications award - for the campaign in 2007/08 • Adoption of many of the innovative aspects of the campaign - by other local government organisations • Rebuilding of the community’s trust in the two Councils and the region’s water supply system - as demonstrated by the ongoing feedback and comments from the community following the commencement of the campaign
  • 22. Engagement Plans & Strategies - Work Example 2 Water Quality 21 (Gosford City Council) Role of SMC • Development of an effective strategy to educate the community about why certain areas of the Central Coast were constantly subject to ‘dirty water’ - and why this problem seemed to be getting worse as the drought conditions intensified SMC’s Key Deliverables • Development of appropriate procedures to reduce the anger and emotional outbursts of stakeholders when confronted by dirty water - and their resulting interaction with Council’s customer service or field staff who were tasked wiwth trying to resovle the discoloured water issues • Development and roll-out of relevant high impact collateral materials - which explained in Plain English what caused ‘dirty water’, why the drought was intensifying its occurrence and what Council was doing to try and reduce its presence in the water supply system • Conducting of commuity information sesssions across key parts of the water supply system – to allow interested community members to see first hand the cause of dirty water and the various activities that Council was undertaking to overcome the issues • Establishment of a dedicated ‘discoloured water’ hotline within Council’s customer service team during high occurence levels - to help speed up Council’s reaction to community reports of dirty water and provision of relevant staff training to ensure consistnet key messages and supporting information was provided to the community • Effective use of the media to help warn the community when Council activities across the water supply system were likely to increase the potental for discoloured water - so water users could make the necessary arrangements to protect their washing and ensure they had sufficient clear drinking water while Council sought to rectify the problem • Provision of stakeholder engagement training for field operatives – to enable them to calm angry water users when seeking to deal with dirty water occurences at people’s homes to reduce the incidences of verbal and physical abuse / assaults to Council staff
  • 23. Engagement Plans & Strategies - Work Example 2 Water Quality 21 (Gosford City Council) Outcomes & Results Achieved • Increased community awareness about the cause of dirty water - and the many factors outside of Council’s control that resulted in the its increased occurrence during drought conditions • Reduction in the number of verbal and physical abuse of Council staff - while attending to dirty water call outs • Reduction in the amount of negative media coverage - generated by complaints from the community to the local newspaper • Faster turnaround times for the handling of dirty water complaints by Council’s customer service teams – due to the provision of more targeted and easier to understand key messages and a lower level of ‘angry and emotional’ callers
  • 24. Engagement Plans & Strategies - Work Example 3 Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils) Role of SMC • Development of a master strategy to ensure the effective engagement of all stakeholders during the design, construction and commissioning of the largest water infrastructure project - undertaken on the Central Coast in 25 years • Development of sub-strategies to ensure an effective response to the various issues that will inevitably arise during the life of the project – to ensure it remain on track, on time and on budget SMC’s Key Deliverables • Identification and management of all key stakeholders and interest groups who can exert a major influence on the project - in particular those who are known to oppose the project to ensure maximum public support for the project and minimal negative comment • Development and roll-out of effective, high impact collateral materials in support of the project – which explains why the new water infrastructure is needed and the long-term benefits it will deliver for the Central Coast • Establishment and maintenance of a dedicated Project website – which is regularly updated as the project progresses • Management of all correspondence and telephone calls received from stakeholders – and drafting of relevant written responses aimed at mitigating the various issues raised by the community • Development and management of an effective Government Relations program - to ensure all local MPs (State and Federal) are fully updated and supportive of the project • Development and implementation of an effective Government Agency Workshop program as part of the project’s statutory approvals process – to ensure a two-way communications process with the key departments that can directly impact the Review of Environmental Factors process • Management of all Councillor updates and briefings – to help garner the maximum degree of support for the project even during the more challenging times of the project • Development and implementation of an effective media liaison program – to maximise the amount of positive media coverage and minimise the amount of negative media coverage • Provision of community consultation and media management training for key Project Team members - to ensure confident, consistent performance at all times when interacting with the community and other key stakeholders
  • 25. Engagement Plans & Strategies - Work Example 3 Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils) SMC’s Key Deliverables (cont) • Development and implementation of regular shopping centre displays (manned and unmanned) at key locations throughout the region - to help keep the broader Central Coast community updated and full informed about how the project is progressing • Preparation of regular monthly and weekly communication, stakeholder engagement and community liaison reports to the Project Team and Council – to demonstrate the value of the two Councils’ continued investment in such activities • Attendance and input to fortnightly and monthly Project Team and Project Control Group meetings – to keep the project decision makers fully informed as to current stakeholder issues, activities, outcomes and forthcoming challenges • Presentations to key community groups on behalf of the Project Team as the project progresses – including the local Yarramalong Valley Progress Association • Presentations to Council staff on behalf of the Project Team as the project progresses – to help garner widespread support for the project within the two Councils • Development and implementation of all traffic management communications – during the investigations and construction phases of the project Key Challenges Overcome to Date • Widespread opposition to the project by the Yarramalong Valley community - due to misconceptions about the impact of the pipeline on the environment and individual landholders • Change in Project Director three times - in less than three years • Reduced focus on need to save water and/ or expand the water supply system - due to an increase in the amount of average rainfall over the past six months and total dam levels rising from below 13% to more than 30% • Increased focus on the total cost of the project - due to competing Council capital works priorities • Time delays due to the need for the Project Team to undertake additional geological investigations – and Councillor indecision over one sector of the pipeline route where landholders were particularly vocal about their opposition to the recommended route • Resulting flow-on delays to the Review of Environmental Factors and EOI processes • Change in elected Councillors – with the arrival of 10 new Councillors who had limited knowledge about the Project and its legacy issues and history
  • 26. Engagement Plans & Strategies - Work Example 3 Mardi-Mangrove Link Project (Gosford City & Wyong Shire Councils) Outcomes & Results Achieved • Gradual increase in community awareness and support for the project - following a period of poor consultation by an alternative adviser which resulted in a great deal of community angst and misunderstanding about the project • Steady increase in the degree of landholder support for the project – and their willingness to accept a 10 metre easement on thei properties in return for payment of reasonable and fair compensation • Significant reduction in the number of complaints received by the two Councils about the Project and recommened pipleine route from stakeholders – down from an average of 100 letters per month to a current average of 5 per month • Gradual increase in positive media coverage about the project – as a result of the effective media liaison program, the focus of which has been to educate the media about the project and respond more effectively to their queries to ensure a more positive working relationship with the two Councils and Project Team • Unanimous adoption by both Councils of a final water pipeline route - through Yarramalong Valley • Steady flow of landholders signing formal easement agreements - and accepting the compensation payments from the two Councils • Steady flow of properties available for access by the Project Team’s investigation engineers - to check the route alignment, undertake geological testing and drilling, survey and boundary mark individual properties • Steady flow of properties available for access by the Project Team’s property managers and valuers - to undertake independent valuations of each affected property, identify with landholders their special access arrangements and agree minor route modifications where possible to lessen the overall impact of the pipeline • Creation and maintenance of a strong working relationship with more than 10 different NSW Government Agencies – all of which have the ability to exercise a significant degree of influence over and into the statutory approvals process for the Project
  • 27. Community Consultation – Work Example 1 Introduction of Temporary Desalination Units (Gosford City & Wyong Shire Councils) Role of SMC • Development of an effective community consultation process to obtain feedback from stakeholders about the placement of temporary desalination units - on various beaches around the Central Coast • Management of the emotional reaction from stakeholders who are likely to react angrily to the placement of such units on the region’s pristine beaches - as well as to the concept of drawing water from the sea and then returning a by-product of the process which is perceived to have a high level of salinity back into the ocean SMC’s Key Deliverables • Effective, believable and transparent key messages – and supporting collateral materials to try and garner maximum community understanding about why the Councils are considering such an option, how the desalination works, the likely environmental impacts, and what’s at risk if the Councils to not find alternative sources of water to bolster the region’s dwindling water supplies • Undertaking of widespread community surveys to obtain direct feedback from a cross section of people, interest groups and other relevant organisations - about the Councils’ possible investment in such units • Development of a recommended stakeholder engagement program aimed at garnering sufficient community support to enable the two Councils to proceed with the proposed use of temporary desalination plants if total dam storage levels were to drop below 10% - without the risk of vocal community opposition and high profile demonstrations • Identification of the key stakeholder issues and development of recommendations as to how these can be mitigated and managed to allow the two Councils to proceed with the proposed use of temporary desalination plants - if total dam storage levels were to drop below 10% Outcomes & Results Achieved • Collection of a large quantity of high quality community feedback which clearly indicated that the Councils faced a significant challenge - if they were to successfully introduce the use of temporary desalination plants • Identification of a wide range of community issues about the introduction and placement of temporary desalination units on Central Coast beaches that would present significant challenges - in terms of them being successfully mitigated and managed by the two Councils • Recommendation to the two Councils that they consider the use of temporary desalination units as a last resort - or risk facing significant vocal and high profile opposition from a large sector of the community
  • 28. Community Consultation – Work Example 2 Mardi-Mangrove Link Project Role of SMC • Development of an effective community consultation program to obtain constructive feedback from directly affected landholders, the Yarramalong Valley community and all other interested parties - about the recommended water pipeline route through a pristine and rural area of the Central Coast SMC’s Key Deliverables • Design and implementation of a formal community feedback process that enabled stakeholders to provide their feedback - using as many delivery mechanism as possible • Management of those stakeholders who reacted emotionally and angrily to the recommended route – mainly due to a misunderstanding about the extent of the impacts on their property • Extraction of constructive feedback through the use of behavioural change techniques - which can help stakeholders to move back onto a logical state out of a highly emotional state • Capture and analysis of stakeholder feedback using a combination of informal (general discussions and interaction) and) and formal methods (receipt of written submissions, correspondence, phone calls, comments in the media) to assess the level of community support, opposition to and neutrality about the recommended route – to provide the Project Team with an idea of the likely degree of community opposition to the recommended pipeline route and the risk of project delays due to possible legal challenges by landholders and/or other interested parties • Capture and analysis of informal feedback (general discussions and interaction) from Government Agencies, local MPs and Councillors to predict the anticipated degree of public opposition or support for the recommended route – to gauge the likelihood of the two Councils formally adopting the recommended route • Preparation of a formal community feedback report for the Project Team about the anticipated degree of stakeholder support for the recommended pipeline route – to enable any necessary refinements to be made to how the recommended route is being positioned and explained to stakeholders, development of appropriate mitigating strategies to manage and neutralise stakeholder issues, and briefing of key Project Team members and Council staff to ensure they are fully aware of the likely behaviour of certain stakeholders as they seek to try and oppose the recommended pipeline route
  • 29. Community Consultation – Work Example 2 (cont) Mardi-Mangrove Link Project Outcomes & Results Achieved • Generation of sufficient support among affected landholders for 8 out of the 9 sectors of the recommended pipeline route - subject to a number of requested modifications and expansion of the existing community consultation process • The ability to anticipate the degree of landholder opposition and identification of the key issues enabled the Project Team to mitigate and manage these concerns PRIOR to the report on the recommended pipeline route being formally considered by the region’s Water Authority and two Councils – this provided the Councillors and Board Member with increased comfort that the community was being heard and listened to • The community consultation process resulted in increased support among some directly affected landholders and the wider Central Coast community – who felt that the Project Team was doing its best to be as transparent as possible and was prepared to listen to and respond to the individual concerns of landholders and other interested parties • Good support among the majority of local MPs who were kept fully about the consultation process and the views being expressed by landholders – this reduced the risk of disgruntled landholders and proponents of the Project only put their side to this group of influential stakeholders. Instead local MPs were able to make their own informed decision having received information from all parties
  • 30. Community Consultation – Work Example 3 Taste Testing of Recycled Drinking Water (Gosford City Council) Role of SMC • Development of an effective community consultation process to obtain top line feedback about the community’s initial attitude towards the gradual introduction of recycled water by the Council as an alternative source of town water for a range of potable and non-portable purposes - on the Central Coast during the region’s worst drought on record • Review and analysis of the resulting consultation feedback as the basis for the development of a long-term communications and education program to support the introduction of a pilot ‘sewer mining’ project - to supply non-potable water to commercial water users in the Gosford CBD SMC’s Key Deliverables • Identification of an appropriate program of community consultation over a 3 month period - to obtain a wide cross section of community views about the possible future introduction of recycled drinking water into the region’s town water supply • Sourcing of fully tested and approved drinking water for use during ‘taste testing’ sessions as part of the community consultation process to enable people to make an informed decision about the use of recycled drinking water – the water was sourced from Singapore and resulted in resulted in significant negotiations with Australian Customs to gain clearance for entry into the country • Development and implementation of an integrated promotion campaign advertising the community consultation process - with the aim of encouraging as many people as possible to participate in the process and also to take part in the ‘taste testing’ sessions • Identification of suitable venues to undertake the community consultation and taste testing activities where the maximum number of community members could participate in the process - the process was undertaken during a week day and weekend at local shopping centres across the region • Preparation and implementation of all collateral materials in support of the community consultation and taste testing activities – including display materials, media releases, website content, posters, flyers, FAQs, Fact Sheets • Development of the community consultation survey based on proven core belief research techniques – which included a combination of closed and open questions to identify the deep-seated perceptions about the use of recycled drinking water as part of the region’s overall water supply • Implementation of the community consultation and recycled drinking taste testing activities – which attracted more than 2,0000 participants over a 3 month period
  • 31. Community Consultation – Work Example 3 (cont) Taste Testing of Recycled Drinking Water (Gosford City Council) SMC’s Key Deliverables (cont) • Review and analysis of the community consultation and taste testing data – using proven core belief research techniques to provide Council with a clear picture about degree of the challenge if faced over what timeframe to introduce recycled drinking water into the region’s town water supply • Preparation of a detailed confidential report to Council staff highlighting the top line results – the report also included an explanation of what the findings meant for the proposed sewer mining pilot scheme and recommendations as to how Council could move the pilot forward • Preparation of a recommended long-term community education program over a 3-5 years period - to help garner community support for the eventual introduction of recycled water for both potable and non-potable uses on the Central Coast Outcomes & Results Achieved • The findings of the community consultation and taste testing process identified that the community had a deep seated fear of the use of recycled water, particularly for drinking purposes and that Council would need to invest significant resources in support of the proposed community education program - to generate sufficient support for its long term objectives • On the recommendation of SMC, Council made the decision not to proceed with the sewer mining project or community education program at this time due to the already ‘emotional’ environment in which these activities would be undertaken – as a result of the region’s worst drought on record and continuing Level 5 water restrictions which were the most stringent in the country with a total ban on the use of all town water outside • The community consultation and taste testing processes have been mirrored by a number of other local government regions and water authorities over the past two years – but the depth of opposition to the introduction of recycled water indicated in these regions has been found to be very similar to that on the Central Coast • To date, no local government organisation or water authority in Australia has yet introduced the widespread use of recycled drinking water as part of a region’s town water supplies – SMC is continuing its own research into development of a community education program capable of generating significant support to allow the successful introduction of a recycled drinking water pilot scheme within a test community somewhere in Australia