Name: Fern Disney issued 20/04/2017
A2 Photography students
Aim: Prepare shoot proposal for the set exam
 Identify materials equipment processes required for the set exam
 Demonstrate an ability to plan for the exam paper
Set exam dates: 25th, 27th April, 2nd, 4th ,9th, 11th, May, 16th
Note: dates highlighted in red applies only to students with
exam concession.
My exam proposal is: -
I will be working in the following locations (maximum no = 2)
Planning.
I need the following resources(include studio and materials/backdrops, tripods,
lights, etc).
I intend to shoot 1 shoot focusing on comparing Old with new images. A second
shoot focusing on pub fronts. A third shoot focusing on different shop fronts
All of my shoots will be around the same locations- Waltham Abbey Sun street- The
town high street
A tripod
I am planning my shoots on the following dates/times
If working on location be aware that the first shoot must be for a three hour
location excluding travel time.
You will need to plan your shoots and include the writing material within the set
time schedule… The total exam time is 10 hours
All students working on location must allow sufficient time to complete their write-
up within the set exam times
ALL STUDENTS MUST COMPLETE THIS FORM AND HAND A COPY TO THE
TUTOR
Students are advised to ensure that their exam piece addresses the set
assessment objectives.
 Links to “known/established photographers”
 A personal response (original/creative work)
 Record of how the photographs were taken/edited
 How work links with previous posts within the blogger
Refer to the presentation on Qube for full details of the assessment objectives.
All students will need to create the same blog structure as outlined in the hand-
out.
ON THURSDAY THE 20TH ALL STUDENTS MUST provide an invite to
jbell@harlow.college.co.uk to have administration rights on their COMPONENT 1
AND 2 blogger.
Your unit COMPONENT 1 & 2 blogger will be locked on the 24th of April
25th May- Old Vs New
27th May- Pub
2nd May- Shop

Exam proposal a2photo

  • 1.
    Name: Fern Disneyissued 20/04/2017 A2 Photography students Aim: Prepare shoot proposal for the set exam  Identify materials equipment processes required for the set exam  Demonstrate an ability to plan for the exam paper Set exam dates: 25th, 27th April, 2nd, 4th ,9th, 11th, May, 16th Note: dates highlighted in red applies only to students with exam concession. My exam proposal is: - I will be working in the following locations (maximum no = 2) Planning. I need the following resources(include studio and materials/backdrops, tripods, lights, etc). I intend to shoot 1 shoot focusing on comparing Old with new images. A second shoot focusing on pub fronts. A third shoot focusing on different shop fronts All of my shoots will be around the same locations- Waltham Abbey Sun street- The town high street A tripod
  • 2.
    I am planningmy shoots on the following dates/times If working on location be aware that the first shoot must be for a three hour location excluding travel time. You will need to plan your shoots and include the writing material within the set time schedule… The total exam time is 10 hours All students working on location must allow sufficient time to complete their write- up within the set exam times ALL STUDENTS MUST COMPLETE THIS FORM AND HAND A COPY TO THE TUTOR Students are advised to ensure that their exam piece addresses the set assessment objectives.  Links to “known/established photographers”  A personal response (original/creative work)  Record of how the photographs were taken/edited  How work links with previous posts within the blogger Refer to the presentation on Qube for full details of the assessment objectives. All students will need to create the same blog structure as outlined in the hand- out. ON THURSDAY THE 20TH ALL STUDENTS MUST provide an invite to jbell@harlow.college.co.uk to have administration rights on their COMPONENT 1 AND 2 blogger. Your unit COMPONENT 1 & 2 blogger will be locked on the 24th of April 25th May- Old Vs New 27th May- Pub 2nd May- Shop