Eurofighter Typhoon - Production Programme                                                           http://www.eurofighter.com/news/article134.asp




                                                                                     Search | Links | Sitemap | Contact Us       Text Size: A   AA


                                             Home   /   News
           Home

           Eurofighter Typhoon

           Organisation                      News

           Interactive                       Production Programme
           Press Office
                                             The overall production contract for the initial purchase of 620 aircraft plus an
           Media Library
                                             option for 90 aircraft was signed by NETMA and Eurofighter GmbH on 30 January
           IASS                              1998. Production of 232 aircraft for the UK, 180 aircraft for Germany, 121
                                             aircraft for Italy, and 87 aircraft for Spain will be in three tranches each with
                                             148, 236 and 236 aircraft respectively.


                                             Under this maximum price Umbrella Contract, were the following agreements:



                                                Supplement 1 for Production Investment for the 620 aircraft, and long lead
                                                items for the first batch of 148 aircraft
                                                A framing agreement for Integrated Logistic Support for the whole programme


                                             On 18 September 1998, the Supplement 2 fixed price agreements were signed
                                             between the NATO Eurofighter Management Agency (NETMA), Eurofighter GmbH
                                             and Eurojet GmbH. These agreements translate the maximum prices defined in
                                             the Production Umbrella contracts into firm orders at fixed prices for a first
                                             Tranche of weapon systems comprising 148 aircraft.


                                             The agreements also include spare engines and role equipment for the Tranche 1
                                             aircraft, and long lead-time items for Tranche 2 of 236 aircraft. Further orders for
                                             the full range of spares, ground support equipment, training aids, and support
                                             for the first Tranche of aircraft have been finalised for the first five years of
                                             service and support.


                                             First metal was cut in the second quarter of 1998 and assembly of the Front and
                                             Centre Fuselage for the first production aircraft began by the end of 1998. Work
                                             on the first right and left wing started early 1999. Deliveries of aircraft to the Air
                                             Forces started in Summer 2003. All 148 aircraft (including one airframe for
                                             fatigue testing) were delivered by June 2008.


                                             The production contract for the second Tranche of 236 aircraft was signed on 14
                                             December 2004. The first Tranche 2 aircraft took to the air on 16 January 2008
                                             at EADS Military Air Systems in Manching. Deliveries started in October 2008.


                                             The proposal for 236 aircraft in Tranche 3 was submitted by Eurofighter GmbH to




1 sur 3                                                                                                                                  07/04/2010 14:34
Eurofighter Typhoon - Production Programme                                                          http://www.eurofighter.com/news/article134.asp



                                             NETMA on 14 December 2007. Industry and the Nations intend to sign the
                                             production contract by end 2008.


                                             The first export contract was signed in July 2003 for 18 aircraft (Tranche 2) to
                                             Austria. The contract was revised in 2007, and Austria will receive 15 aircraft out
                                             of Tranche 1 between 2007 and 2009. The four nations had agreed to divert 15
                                             Tranche 1 aircraft to Austria and receive additional Tranche 2 standard aircraft
                                             instead.


                                             In September 2007 a second export contract for Eurofighter Typhoon was signed
                                             between the Kingdom of Saudi Arabia and the United Kingdom. Based on the
                                             industrial contracts finalized early December 2007 Saudi Arabia will receive 72
                                             aircraft beginning 2009.


                                             Production of Eurofighter Typhoon is characterized by modern manufacturing
                                             techniques and principles. Integrated Product Teams look at lean manufacturing
                                             methods to cut down delivery lead-times, to keep cost down and to increase
                                             productivity. The use of advanced materials like carbon-fibre keeps the
                                             complexity of parts low and reduces the total number of parts. A high level of
                                             automation has been achieved by using CATIA for designing the tools and
                                             programming numerical controlled machines on the shop floor.


                                             Following the single-source principle, the four partners share production as
                                             follows:


                                             Alenia
                                                                left hand wing, outboard flaperons, rear fuselage
                                             Aeronautica

                                                                front fuselage, foreplanes, windscreen and canopy, centre
                                             BAE SYSTEMS        fuselage frames, dorsal spine, fin, inboard flaperons and rear
                                                                fuselage stage 1

                                             EADS (Spain)       right hand wing and leading-edge slats

                                             EADS
                                                                centre fuselage
                                             (Germany)

                                             Four final assembly lines have been set up by the four partner companies:


                                             Alenia Aeronautica             Caselle near Turin

                                             BAE SYSTEMS                    Warton

                                             EADS (Spain)                   Getafe near Madrid

                                             EADS (Germany)                 Manching



                                             Production by Tranches
                                             Tranche       Aircraft   Timescale for deliveries

                                             1             148        2003 to 2008

                                             2             236        2008 to 2013

                                             3             236        After 2012

                                             Sub-total     620

                                                           15         Austria - 2007 to 2009

                                                           72         Saudi Arabia - 2009 onwards




2 sur 3                                                                                                                            07/04/2010 14:34
Eurofighter Typhoon - Production Programme                                                                http://www.eurofighter.com/news/article134.asp



                                             Total           707



                                             High Resolution images of the Eurofighter Typhoon can be downloaded from our
                                             web site. Hard Copy images are available on request.


                                             www.eurofighter.com/medialibrary


                                             For more information contact
                                             Marco Valerio Bonelli
                                             Head of PR & Communications
                                             Eurofighter GmbH
                                             +49 811 801 555 (Office)
                                             +49 811 801557 (Fax)
                                             +49 172 842 6017 (Mobile)
                                             marco-valerio.bonelli@eurofighter.com




                                                                                                                            Back to Top




                                       Data Protection | Accessibility | Terms of Use | Privacy Policy | Impressum
                                             Developed by: Open Platform      © Eurofighter Typhoon 2010




3 sur 3                                                                                                                                   07/04/2010 14:34

Eurofighter Production Programme

  • 1.
    Eurofighter Typhoon -Production Programme http://www.eurofighter.com/news/article134.asp Search | Links | Sitemap | Contact Us Text Size: A AA Home / News Home Eurofighter Typhoon Organisation News Interactive Production Programme Press Office The overall production contract for the initial purchase of 620 aircraft plus an Media Library option for 90 aircraft was signed by NETMA and Eurofighter GmbH on 30 January IASS 1998. Production of 232 aircraft for the UK, 180 aircraft for Germany, 121 aircraft for Italy, and 87 aircraft for Spain will be in three tranches each with 148, 236 and 236 aircraft respectively. Under this maximum price Umbrella Contract, were the following agreements: Supplement 1 for Production Investment for the 620 aircraft, and long lead items for the first batch of 148 aircraft A framing agreement for Integrated Logistic Support for the whole programme On 18 September 1998, the Supplement 2 fixed price agreements were signed between the NATO Eurofighter Management Agency (NETMA), Eurofighter GmbH and Eurojet GmbH. These agreements translate the maximum prices defined in the Production Umbrella contracts into firm orders at fixed prices for a first Tranche of weapon systems comprising 148 aircraft. The agreements also include spare engines and role equipment for the Tranche 1 aircraft, and long lead-time items for Tranche 2 of 236 aircraft. Further orders for the full range of spares, ground support equipment, training aids, and support for the first Tranche of aircraft have been finalised for the first five years of service and support. First metal was cut in the second quarter of 1998 and assembly of the Front and Centre Fuselage for the first production aircraft began by the end of 1998. Work on the first right and left wing started early 1999. Deliveries of aircraft to the Air Forces started in Summer 2003. All 148 aircraft (including one airframe for fatigue testing) were delivered by June 2008. The production contract for the second Tranche of 236 aircraft was signed on 14 December 2004. The first Tranche 2 aircraft took to the air on 16 January 2008 at EADS Military Air Systems in Manching. Deliveries started in October 2008. The proposal for 236 aircraft in Tranche 3 was submitted by Eurofighter GmbH to 1 sur 3 07/04/2010 14:34
  • 2.
    Eurofighter Typhoon -Production Programme http://www.eurofighter.com/news/article134.asp NETMA on 14 December 2007. Industry and the Nations intend to sign the production contract by end 2008. The first export contract was signed in July 2003 for 18 aircraft (Tranche 2) to Austria. The contract was revised in 2007, and Austria will receive 15 aircraft out of Tranche 1 between 2007 and 2009. The four nations had agreed to divert 15 Tranche 1 aircraft to Austria and receive additional Tranche 2 standard aircraft instead. In September 2007 a second export contract for Eurofighter Typhoon was signed between the Kingdom of Saudi Arabia and the United Kingdom. Based on the industrial contracts finalized early December 2007 Saudi Arabia will receive 72 aircraft beginning 2009. Production of Eurofighter Typhoon is characterized by modern manufacturing techniques and principles. Integrated Product Teams look at lean manufacturing methods to cut down delivery lead-times, to keep cost down and to increase productivity. The use of advanced materials like carbon-fibre keeps the complexity of parts low and reduces the total number of parts. A high level of automation has been achieved by using CATIA for designing the tools and programming numerical controlled machines on the shop floor. Following the single-source principle, the four partners share production as follows: Alenia left hand wing, outboard flaperons, rear fuselage Aeronautica front fuselage, foreplanes, windscreen and canopy, centre BAE SYSTEMS fuselage frames, dorsal spine, fin, inboard flaperons and rear fuselage stage 1 EADS (Spain) right hand wing and leading-edge slats EADS centre fuselage (Germany) Four final assembly lines have been set up by the four partner companies: Alenia Aeronautica Caselle near Turin BAE SYSTEMS Warton EADS (Spain) Getafe near Madrid EADS (Germany) Manching Production by Tranches Tranche Aircraft Timescale for deliveries 1 148 2003 to 2008 2 236 2008 to 2013 3 236 After 2012 Sub-total 620 15 Austria - 2007 to 2009 72 Saudi Arabia - 2009 onwards 2 sur 3 07/04/2010 14:34
  • 3.
    Eurofighter Typhoon -Production Programme http://www.eurofighter.com/news/article134.asp Total 707 High Resolution images of the Eurofighter Typhoon can be downloaded from our web site. Hard Copy images are available on request. www.eurofighter.com/medialibrary For more information contact Marco Valerio Bonelli Head of PR & Communications Eurofighter GmbH +49 811 801 555 (Office) +49 811 801557 (Fax) +49 172 842 6017 (Mobile) marco-valerio.bonelli@eurofighter.com Back to Top Data Protection | Accessibility | Terms of Use | Privacy Policy | Impressum Developed by: Open Platform © Eurofighter Typhoon 2010 3 sur 3 07/04/2010 14:34