Managing Environmental and Social Risks
Long-term business results ensured
Financial institutions are increasingly factoring social and environmental risks
into their project investment decisions. According to a recent FTSE4Good report,
there has been an almost four-fold growth in responsible investments over the last
decade to $10.1tn. Assessing social and environmental impacts is quickly becoming
one of the core criteria used by project and export investors to inform their invest-
ment decisions, recognizing that managing social and environmental risk of invest-
ments makes sound financial sense.
©2016,Sweco–ANI
Sweco plans and designs the communities and cities of the future. Our work results in sustainable
buildings, efficient infrastructure and access to electricity and clean water. With 14,500 employees
in Europe, we offer our customers the right expertise for every situation. We carry out projects in
70 countries annually throughout the world. Sweco is the leading architecture and engineering
consultancy in Europe, with sales of approximately SEK 15.2 billion (EUR 1.7 billion) (pro forma
2014). The company is listed on NASDAQ OMX Stockholm.
Sweco Danmark A/S
Granskoven 8
2600 Glostrup
T +45 4348 6060
www.sweco.dk
VAT 48233511
Managing Environmental and Social Risks
Sweco has developed considerable expertise in reviewing and managing Environmental
and Social (E&S) Risk of projects as third party reviewers in line with international stand-
ards, such as the IFC Performance Standards. Our commercial approach to risk manage-
ment means that our focus is on the long-term profitability of the proposed investment
through reduction of future social and environmental costs.
As our client you can benefit from:
•	 A dialogue based approach to the E&S
review process that is planned in close
cooperation with the client and the
promoter. Our main interest is to ensure
that the proposed project will be profit-
able in the long run and this is best
done when the various perspectives are
integrated into the design of the E&S
review.
•	 A cost-effective assessment of the
proposed project’s compliance with
relevant international standards such
as the Equator Principles, World Bank
Safeguards or the IFC Performance
Standards. Assessments will include
practical advice on potential measures
needed for bringing the project in line
with requirements .
•	 An engineering company, where you
can expect a solid technical foundation
and a practical approach to infrastruc-
ture, construction and environmental
projects. Our key technical expertise
areas are structured along our four
business lines: Planning & Design, Water
& Energy, Testing & Monitoring and
Transportation & Mobility.
•	 A broad experience assessing E&S risks
in over 80 countries and a range of
sectors based on over 300 E&S reviews.
The sectors we have covered include
energy and renewable energy, industry,
transport, utilities, agriculture and food
processing.
•	 A fast track access to a global network
of qualified social and environmental
consultants. We can draw on nearly
14,500 professionals employed within
the Sweco group and supplement with
specialists among our associates and
consultants from our CV database with
6,000+ freelance consultants.
•	 Timely and correct reporting within
very tight deadlines and subjected to
our ISO 9001 certified quality manage-
ment system. Any E&S assignment will
be managed by our dedicated team of
environmental and social experts.
Selected References
Global, Social and environmental Due Diligence, 2002 - on-
going, Danish Export Credit Agency (EKF).
Mongolia, Technical, environmental and social due diligence of
SE Gobi Municipal Infrastructure Project, 2010, EBRD
Central and Eastern Europe, Compliance review of invest-
ment projects, 2006, Investment Fund for Central and Eastern
Europe
China, Social and environmental review of tanker project, 2005
– 2009 , EKF
Russia, Social and environmental review of 11 cement projects,
2005 – 2009, EKF
Turkey, Social and environmental review of 3 power plants,
2005 – 2009, EKF
For further information please visit our website or contact:
Stefan Einarsson, T +45 43 48 44 75, E stefan.einarsson@sweco.dk
Ian Salter, T +45 43 48 45 79, E ian.salter@sweco.dk
Cruise terminal in Jamaica
E&S review process for EKF - Danish Export
Credit Agency
Sweco carried out an E&S review of a pro-
posed cruise terminal in a small harbour on
Jamaica’s north coast where the conditions
are right for luminous phytoplankton forma-
tions, giving it its other name - “Glistening
Waters”. The main issue was effects of
dredging activities located close to sensitive
coral habitats. EKF benefitted from Sweco’s
ability to mobilise Dutch coastal engineer-
ing experts from Sweco Holland to fully
ascertain the environmental impacts of
dredging activities. EKF agreed with the
promoter on a set of mitigation measures,
benefiting both EKF and the promoter.

More Related Content

Similar to E&S Risk Management

International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfzubeditufail
 
Ecocentra Brochure_2015
Ecocentra Brochure_2015Ecocentra Brochure_2015
Ecocentra Brochure_2015Lama Bashour
 
Keypex Value Proposition Web Feb11
Keypex Value Proposition Web Feb11Keypex Value Proposition Web Feb11
Keypex Value Proposition Web Feb11kjellkeypex
 
How Sweco creates operationally high performance buildings and reduce client...
How Sweco creates  operationally high performance buildings and reduce client...How Sweco creates  operationally high performance buildings and reduce client...
How Sweco creates operationally high performance buildings and reduce client...Carita Kottila
 
Citizen act ang_equator_principles
Citizen act ang_equator_principlesCitizen act ang_equator_principles
Citizen act ang_equator_principlesCITIZEN ACT
 
Transition to E-mobility:Technology and innovation role in facilitating the t...
Transition to E-mobility:Technology and innovation role in facilitating the t...Transition to E-mobility:Technology and innovation role in facilitating the t...
Transition to E-mobility:Technology and innovation role in facilitating the t...RCREEE
 
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfRPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfOECD Environment
 
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014OECD Environment
 
Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015Sigve Hamilton Aspelund
 
Royal Vopak - Capital Markets Day 2013 - Frits Eulderink
Royal Vopak - Capital Markets Day 2013 - Frits EulderinkRoyal Vopak - Capital Markets Day 2013 - Frits Eulderink
Royal Vopak - Capital Markets Day 2013 - Frits EulderinkCompany Spotlight
 
Jacobs-SustainabilityConsultingServices-2021_0.pdf
Jacobs-SustainabilityConsultingServices-2021_0.pdfJacobs-SustainabilityConsultingServices-2021_0.pdf
Jacobs-SustainabilityConsultingServices-2021_0.pdfJacob Li
 
DosapacCompanyProfile Eng 6
DosapacCompanyProfile Eng 6DosapacCompanyProfile Eng 6
DosapacCompanyProfile Eng 6Teresa Rabaçal
 
Aninver Development PPP advisory.pdf
Aninver Development PPP advisory.pdfAninver Development PPP advisory.pdf
Aninver Development PPP advisory.pdfJose de la Maza Alba
 

Similar to E&S Risk Management (20)

Kiev presentations validation workshop 24 september
Kiev   presentations validation workshop 24 septemberKiev   presentations validation workshop 24 september
Kiev presentations validation workshop 24 september
 
Kiev presentations validation workshop 24 september
Kiev   presentations validation workshop 24 septemberKiev   presentations validation workshop 24 september
Kiev presentations validation workshop 24 september
 
Development Cooperation
Development CooperationDevelopment Cooperation
Development Cooperation
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
Ecocentra Brochure_2015
Ecocentra Brochure_2015Ecocentra Brochure_2015
Ecocentra Brochure_2015
 
Keypex Value Proposition Web Feb11
Keypex Value Proposition Web Feb11Keypex Value Proposition Web Feb11
Keypex Value Proposition Web Feb11
 
How Sweco creates operationally high performance buildings and reduce client...
How Sweco creates  operationally high performance buildings and reduce client...How Sweco creates  operationally high performance buildings and reduce client...
How Sweco creates operationally high performance buildings and reduce client...
 
Citizen act ang_equator_principles
Citizen act ang_equator_principlesCitizen act ang_equator_principles
Citizen act ang_equator_principles
 
Transition to E-mobility:Technology and innovation role in facilitating the t...
Transition to E-mobility:Technology and innovation role in facilitating the t...Transition to E-mobility:Technology and innovation role in facilitating the t...
Transition to E-mobility:Technology and innovation role in facilitating the t...
 
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdfRPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
RPN 2022 Manila: Session 3.7 Kathleen Mangune NEDA Philippines.pdf
 
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
Climate finance van de ven (ebrd)scaling up cf ccxg gf march2014
 
Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015Sigve Hamilton Aspelund CV linkedin 072015
Sigve Hamilton Aspelund CV linkedin 072015
 
Royal Vopak - Capital Markets Day 2013 - Frits Eulderink
Royal Vopak - Capital Markets Day 2013 - Frits EulderinkRoyal Vopak - Capital Markets Day 2013 - Frits Eulderink
Royal Vopak - Capital Markets Day 2013 - Frits Eulderink
 
Meridiam - ESG Approach by Julia Prescot at GIB Summit
Meridiam - ESG Approach by Julia Prescot at GIB SummitMeridiam - ESG Approach by Julia Prescot at GIB Summit
Meridiam - ESG Approach by Julia Prescot at GIB Summit
 
Curtis Meintjies_Resume_11_Jan_2017
Curtis Meintjies_Resume_11_Jan_2017Curtis Meintjies_Resume_11_Jan_2017
Curtis Meintjies_Resume_11_Jan_2017
 
Jacobs-SustainabilityConsultingServices-2021_0.pdf
Jacobs-SustainabilityConsultingServices-2021_0.pdfJacobs-SustainabilityConsultingServices-2021_0.pdf
Jacobs-SustainabilityConsultingServices-2021_0.pdf
 
DosapacCompanyProfile Eng 6
DosapacCompanyProfile Eng 6DosapacCompanyProfile Eng 6
DosapacCompanyProfile Eng 6
 
Aninver Development PPP advisory.pdf
Aninver Development PPP advisory.pdfAninver Development PPP advisory.pdf
Aninver Development PPP advisory.pdf
 
New cv muhammad
New cv muhammadNew cv muhammad
New cv muhammad
 
New cv muhammad
New cv muhammadNew cv muhammad
New cv muhammad
 

E&S Risk Management

  • 1. Managing Environmental and Social Risks Long-term business results ensured Financial institutions are increasingly factoring social and environmental risks into their project investment decisions. According to a recent FTSE4Good report, there has been an almost four-fold growth in responsible investments over the last decade to $10.1tn. Assessing social and environmental impacts is quickly becoming one of the core criteria used by project and export investors to inform their invest- ment decisions, recognizing that managing social and environmental risk of invest- ments makes sound financial sense. ©2016,Sweco–ANI
  • 2. Sweco plans and designs the communities and cities of the future. Our work results in sustainable buildings, efficient infrastructure and access to electricity and clean water. With 14,500 employees in Europe, we offer our customers the right expertise for every situation. We carry out projects in 70 countries annually throughout the world. Sweco is the leading architecture and engineering consultancy in Europe, with sales of approximately SEK 15.2 billion (EUR 1.7 billion) (pro forma 2014). The company is listed on NASDAQ OMX Stockholm. Sweco Danmark A/S Granskoven 8 2600 Glostrup T +45 4348 6060 www.sweco.dk VAT 48233511 Managing Environmental and Social Risks Sweco has developed considerable expertise in reviewing and managing Environmental and Social (E&S) Risk of projects as third party reviewers in line with international stand- ards, such as the IFC Performance Standards. Our commercial approach to risk manage- ment means that our focus is on the long-term profitability of the proposed investment through reduction of future social and environmental costs. As our client you can benefit from: • A dialogue based approach to the E&S review process that is planned in close cooperation with the client and the promoter. Our main interest is to ensure that the proposed project will be profit- able in the long run and this is best done when the various perspectives are integrated into the design of the E&S review. • A cost-effective assessment of the proposed project’s compliance with relevant international standards such as the Equator Principles, World Bank Safeguards or the IFC Performance Standards. Assessments will include practical advice on potential measures needed for bringing the project in line with requirements . • An engineering company, where you can expect a solid technical foundation and a practical approach to infrastruc- ture, construction and environmental projects. Our key technical expertise areas are structured along our four business lines: Planning & Design, Water & Energy, Testing & Monitoring and Transportation & Mobility. • A broad experience assessing E&S risks in over 80 countries and a range of sectors based on over 300 E&S reviews. The sectors we have covered include energy and renewable energy, industry, transport, utilities, agriculture and food processing. • A fast track access to a global network of qualified social and environmental consultants. We can draw on nearly 14,500 professionals employed within the Sweco group and supplement with specialists among our associates and consultants from our CV database with 6,000+ freelance consultants. • Timely and correct reporting within very tight deadlines and subjected to our ISO 9001 certified quality manage- ment system. Any E&S assignment will be managed by our dedicated team of environmental and social experts. Selected References Global, Social and environmental Due Diligence, 2002 - on- going, Danish Export Credit Agency (EKF). Mongolia, Technical, environmental and social due diligence of SE Gobi Municipal Infrastructure Project, 2010, EBRD Central and Eastern Europe, Compliance review of invest- ment projects, 2006, Investment Fund for Central and Eastern Europe China, Social and environmental review of tanker project, 2005 – 2009 , EKF Russia, Social and environmental review of 11 cement projects, 2005 – 2009, EKF Turkey, Social and environmental review of 3 power plants, 2005 – 2009, EKF For further information please visit our website or contact: Stefan Einarsson, T +45 43 48 44 75, E stefan.einarsson@sweco.dk Ian Salter, T +45 43 48 45 79, E ian.salter@sweco.dk Cruise terminal in Jamaica E&S review process for EKF - Danish Export Credit Agency Sweco carried out an E&S review of a pro- posed cruise terminal in a small harbour on Jamaica’s north coast where the conditions are right for luminous phytoplankton forma- tions, giving it its other name - “Glistening Waters”. The main issue was effects of dredging activities located close to sensitive coral habitats. EKF benefitted from Sweco’s ability to mobilise Dutch coastal engineer- ing experts from Sweco Holland to fully ascertain the environmental impacts of dredging activities. EKF agreed with the promoter on a set of mitigation measures, benefiting both EKF and the promoter.