4. SCENARIO
CODY RECEIVES NOTIFICATION FROM
STENOCALL THAT THERE ARE
SEVERAL OUTAGES IN THE LAKE
ALAN HENRY AREA. THE CALLER
ALSO STATES THERE ARE SEVERAL
WILD FIRES IN THE AREA DUE TO DRY
LIGHTNING.
5. SCENARIO
CODY CALLS JERRY AND INFORMS HIM
OF THE OUTAGES AND ASK HIM TO
MEET AT THE SPUR OFFICE TO CHECK
FOR ANY ALARMS.
6. SCENARIO
THEY ARRIVE AT THE OFFICE AND
DETERMINE, BY LOOKING AT
ALARMS, THAT THERE IS DAMAGE TO
THE LAKE ALAN HENRY SUBSCRIBER
FIBER OPTIC CABLE
11. SCENARIO
CODY AND JERRY ARRIVE AT L.A.H. TO
FIND A WILD FIRE HAS SEVERELY
DAMAGED SEVERAL THOUSAND FEET
OF FIBER OPTIC CABLE ON THE
NORTH SIDE OF THE LAKE, AS WELL
AS SEVERAL STRUCTURES.
13. SCENARIO
WITH POWER LINES DOWN, THERE IS
NO CELL SERVICE. CODY DRIVES TO
GRUBBS C.O. AND CALLS RILEY AND
JIMMY TO NOTIFY THEM OF THE
SITUATION.
14. EMERGENCY OPPERATIONS
COMMITTEE
AFTER HEARING THE INITIAL
ASSESMENT FROM CODY, JIMMY
ACTIVATES THE EOC. ALL EOC
MEMBRS ARE ASKED TO REPORT TO
THE EMERGENCY COMMAND CENTER
( SPUR OFFICE).
15. EOC
WHILE THE EOC IS IN ROUTE TO THE
ECC, CODY AND JERRY ARE ON SITE
AND BEGIN THE SITE EVALUATION
AND DAMAGE ASSESMENT.
16. EOC
ALL MEMBERS OF THE EOC ARRIVE AT
THE ECC AND RECEIVE A REPORT
FROM THE TWO EMPLOYEES AT L.A.H.
WHO HAVE ASSESED THE DAMAGE.
17. EOC
AFTER HEARING THE EXTENT OF THE
DAMAGE AND LOSS OF SERVICE, THE
EOC ACTIVATES THE EMERGENCY
OPERATIONS PLAN.
18. EOP
ONCE THE EOP IS ACTIVATED, STEPS
AND PROCEDURES WITHIN THE PLAN
WILL TAKE PLACE SIMULTANEOUSLY.