SlideShare a Scribd company logo
PARITOSH KUMAR
Mob: - 8016763271/9205803664
Email: - kumar6156@gmail.com
Add:- J&K Block , Laxmi nagar
Delhi -110092
OBJECTIVES
To work in a challenging environment demanding all my skill and efforts to contribute to the development
of my organization and myself with impressive performance.
AN OVERVIEW
 Bachelor of Electrical Engineering from Priyadarshini college of Eng. Nagpur with 5 years of experience
in Erection, Testing, Commissioning ,Designing and Maintenance.
 Successfully completed Electrical Design Engineering Course from Delhi
 Successfully completed AutoCAD course from Delhi.
 Successfully completed Certified Automation Engineer Certification (CAE).
 Well versed with Erection & Commissioning, Designing, Cost Control, Project Execution and
Coordination.
 Acquired extensive knowledge of subjects like Transmission & Distribution System,
6.6/11 /33KV Switchgear and Protection.
 Proficient in DOS, MS Office and Operating system.
 Ability to manage various operations as per the set parameters & standards and in developing
procedures for operational excellence.
 Possess strong communication, planning and team management skills with abilities in handling
multiple tasks/ projects simultaneously.
WORK EXPERIENCE
1. Electrical Design Engineering Course and Project (Advance Electrical Designing and
Engineering Institute) Delhi from FEB-2016 to JULY-2016
 Module 1-System planning.
 Module 2-Cost Estimation.
 Module 3-Lighting Design.
 Module 4-Cable sizing and Selection.
 Module 5-Internal Electrification Design.
 Module 6-Protection of buildings and allied structures against lighting.
 Module 7-Earthing design and calculation of power plants.
 Module 8-Design and engineering of Transmission line.
 Module 9-Design and Engineering of Switchyards.
 Software skill
Electrical AutoCAD.
Power system software.
Lighting software.
2. Residential Electrical Lighting Engineer from Oct-2015 to JAN-2016.
Responsibilities
 Supervision of Site Works and Installation Works.
 Responsible for maintaining complete information of lighting database system.
 Perform responsibilities of monitoring the performance of the lighting asset and identify areas
of weakness.
 Project management and supervising the work of contractors.
 Selection and designing of the Electrical Main Distribution Boards.
 Designing of Main Distribution Boards, Final Distribution Boards, Selection of Circuit Breaker
According to the Load, Determine The Sizes Of Cables & Sleeves.
3. Gillanders Arbuthnot Co Ltd (Micco Div.) 6.3 MTPA Expansion project/Reheating furnace as an
Electrical Site Engineer at Vizag and Durgapur steel Plant Site from May-2013 to Sep-2015
Responsibilities
 Skillfully managed Erection, testing and commissioning of HT/LT, PLC, UPS and VFD panels.
 Skillfully managed HT, LT and Control cable laying and termination.
 Skillfully managed HT/LT Bus Duct erection and commissioning.
 Skillfully managed erection and commissioning of distribution, converter and isolation
transformer.
 Skillfully managed Erection, testing and commissioning of HT/LT motors.
 Skillfully managed erection and commissioning of Lesser, LDT, HMD CCTV camera, Pyrometer
at Reheating Furnace.
 Skillfully managed Erection and commissioning of Lighting of Substation, Pulpit and Pump
house.
 Skillfully managed modification of Drawing at site with AutoCAD.
4. L&T Construction (ECC DIV) 3.0 MTPA Expansion project RMHS Site Tata Steel as an Electrical
Site Engineer from Dec-2010 to April-2013
Responsibilities
 Skillfully managed Erection, testing and commissioning of HT/LT, PLC and UPS panels.
 Skillfully managed HT/LT, Control and instrument cable erection and termination.
 Skillfully managed erection and commissioning of distribution, converter and isolation
transformer.
 Skillfully managed Erection, testing and commissioning of LT motors.
 Skillfully managed Erection and commissioning of Lighting of Substation and Conveyors.
Academics
1. Bachelor of Electrical Engineering from Priyadarshini college of Eng. Nagpur (2010)
2. 12th
(Science) from Mrs K.M.P.M Inter College, Jamshedpur (2004)
3. 10th
from Kadma Boys High School Jamshedpur (2001)

More Related Content

What's hot

Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqa
ahmadalsaqqa1
 
Abu bakar electrical engr
Abu bakar electrical engrAbu bakar electrical engr
Abu bakar electrical engr
Abubakar Qureshi
 
Cv updated siddhartha on 11 july2019 (1) (1) (1) (1)
Cv updated siddhartha on     11  july2019 (1) (1) (1) (1)Cv updated siddhartha on     11  july2019 (1) (1) (1) (1)
Cv updated siddhartha on 11 july2019 (1) (1) (1) (1)
siddharthasenguptaSi
 
Abu bakar electrical engr
Abu bakar electrical engrAbu bakar electrical engr
Abu bakar electrical engr
Abubakar Qureshi
 
Dhirender electrical engineer
Dhirender electrical engineerDhirender electrical engineer
Dhirender electrical engineerDHIRENDRA KUMAR
 

What's hot (20)

KISHAN RESUME
KISHAN RESUMEKISHAN RESUME
KISHAN RESUME
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume new
Resume newResume new
Resume new
 
amit
amitamit
amit
 
project engineer
project engineerproject engineer
project engineer
 
Vishnu Resume
Vishnu ResumeVishnu Resume
Vishnu Resume
 
Rajat
RajatRajat
Rajat
 
danish resume
danish resumedanish resume
danish resume
 
Cv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqaCv, electrical engineer, ahmad saqqa
Cv, electrical engineer, ahmad saqqa
 
resume
resumeresume
resume
 
L.jagadesh
L.jagadeshL.jagadesh
L.jagadesh
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
utsav cv
utsav cvutsav cv
utsav cv
 
Abu bakar electrical engr
Abu bakar electrical engrAbu bakar electrical engr
Abu bakar electrical engr
 
Cv updated siddhartha on 11 july2019 (1) (1) (1) (1)
Cv updated siddhartha on     11  july2019 (1) (1) (1) (1)Cv updated siddhartha on     11  july2019 (1) (1) (1) (1)
Cv updated siddhartha on 11 july2019 (1) (1) (1) (1)
 
Abu bakar electrical engr
Abu bakar electrical engrAbu bakar electrical engr
Abu bakar electrical engr
 
RAMURESUME
RAMURESUMERAMURESUME
RAMURESUME
 
Naresh Resume
Naresh ResumeNaresh Resume
Naresh Resume
 
newRESUME
newRESUMEnewRESUME
newRESUME
 
Dhirender electrical engineer
Dhirender electrical engineerDhirender electrical engineer
Dhirender electrical engineer
 

Viewers also liked

Modernity's Storm_201108
Modernity's Storm_201108Modernity's Storm_201108
Modernity's Storm_201108Robinson Warner
 
Testimonial_NLP
Testimonial_NLPTestimonial_NLP
Testimonial_NLPnurul huda
 
LBS WT Core Elements
LBS WT Core ElementsLBS WT Core Elements
LBS WT Core ElementsColleen Drew
 
Historia de la mente
Historia de la menteHistoria de la mente
Historia de la mente
Wilbert Tapia
 
How to Build An Accountable PPC Team
How to Build An Accountable PPC TeamHow to Build An Accountable PPC Team
How to Build An Accountable PPC Team
Workshop Digital
 
Hans Jonas. Tanta responsabilidad como poder técnico
Hans Jonas. Tanta responsabilidad como poder técnicoHans Jonas. Tanta responsabilidad como poder técnico
Hans Jonas. Tanta responsabilidad como poder técnico
Wilbert Tapia
 
Radiografia de tórax
Radiografia de tóraxRadiografia de tórax
Radiografia de tórax
Thais Benetti
 
Diálogo filosófico, principios y reglas
Diálogo filosófico, principios y reglasDiálogo filosófico, principios y reglas
Diálogo filosófico, principios y reglas
Wilbert Tapia
 
FUTURE MILITARY WEAPONS study guide
FUTURE MILITARY WEAPONS study guideFUTURE MILITARY WEAPONS study guide
FUTURE MILITARY WEAPONS study guideZain Azzaino
 
Carocca alex_-_el_nuevo_sistema_procesal_penal
Carocca  alex_-_el_nuevo_sistema_procesal_penalCarocca  alex_-_el_nuevo_sistema_procesal_penal
Carocca alex_-_el_nuevo_sistema_procesal_penal
en una pagina
 
Terminos, Vano, Viga Riostra y Bloque
Terminos, Vano, Viga Riostra y Bloque Terminos, Vano, Viga Riostra y Bloque
Terminos, Vano, Viga Riostra y Bloque
Maria Boss
 

Viewers also liked (13)

Www
WwwWww
Www
 
headlines.6.16
headlines.6.16headlines.6.16
headlines.6.16
 
Modernity's Storm_201108
Modernity's Storm_201108Modernity's Storm_201108
Modernity's Storm_201108
 
Testimonial_NLP
Testimonial_NLPTestimonial_NLP
Testimonial_NLP
 
LBS WT Core Elements
LBS WT Core ElementsLBS WT Core Elements
LBS WT Core Elements
 
Historia de la mente
Historia de la menteHistoria de la mente
Historia de la mente
 
How to Build An Accountable PPC Team
How to Build An Accountable PPC TeamHow to Build An Accountable PPC Team
How to Build An Accountable PPC Team
 
Hans Jonas. Tanta responsabilidad como poder técnico
Hans Jonas. Tanta responsabilidad como poder técnicoHans Jonas. Tanta responsabilidad como poder técnico
Hans Jonas. Tanta responsabilidad como poder técnico
 
Radiografia de tórax
Radiografia de tóraxRadiografia de tórax
Radiografia de tórax
 
Diálogo filosófico, principios y reglas
Diálogo filosófico, principios y reglasDiálogo filosófico, principios y reglas
Diálogo filosófico, principios y reglas
 
FUTURE MILITARY WEAPONS study guide
FUTURE MILITARY WEAPONS study guideFUTURE MILITARY WEAPONS study guide
FUTURE MILITARY WEAPONS study guide
 
Carocca alex_-_el_nuevo_sistema_procesal_penal
Carocca  alex_-_el_nuevo_sistema_procesal_penalCarocca  alex_-_el_nuevo_sistema_procesal_penal
Carocca alex_-_el_nuevo_sistema_procesal_penal
 
Terminos, Vano, Viga Riostra y Bloque
Terminos, Vano, Viga Riostra y Bloque Terminos, Vano, Viga Riostra y Bloque
Terminos, Vano, Viga Riostra y Bloque
 

Similar to electrical engineer 5 years exp

Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
Engr.Arsalan .
 
Bharat Verma (Electrical engineer)
Bharat Verma (Electrical  engineer)Bharat Verma (Electrical  engineer)
Bharat Verma (Electrical engineer)bharat verma
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
Khalid Eltahir
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
Khalid Eltahir
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdAritra Ghosh
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
nijaz aboobacker
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
Suvendu Senapati
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg manzoor ali
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG yogesh kumar
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
Ajith Chandramohan
 

Similar to electrical engineer 5 years exp (20)

Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Bharat Verma (Electrical engineer)
Bharat Verma (Electrical  engineer)Bharat Verma (Electrical  engineer)
Bharat Verma (Electrical engineer)
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Satish_Reddy_resume
Satish_Reddy_resumeSatish_Reddy_resume
Satish_Reddy_resume
 
my_updated_CV_14_3_16
my_updated_CV_14_3_16my_updated_CV_14_3_16
my_updated_CV_14_3_16
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
Nijaz cv .
Nijaz cv .Nijaz cv .
Nijaz cv .
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
MY RESUME E ENGR
MY RESUME E ENGRMY RESUME E ENGR
MY RESUME E ENGR
 
Resume of suvendu senapati
Resume of suvendu senapatiResume of suvendu senapati
Resume of suvendu senapati
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
manzoorali.project engg
manzoorali.project engg manzoorali.project engg
manzoorali.project engg
 
CV_Krishnanand
CV_KrishnanandCV_Krishnanand
CV_Krishnanand
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Final CV3 -
Final CV3 -Final CV3 -
Final CV3 -
 
YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG YOGESH ELECTRICAL ENGG
YOGESH ELECTRICAL ENGG
 
RAVI SONI
RAVI SONIRAVI SONI
RAVI SONI
 
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CVELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
ELECTRICAL ENGINEER CV, SITE ENGINEER CV, PROJECT ENGINEER CV
 

electrical engineer 5 years exp

  • 1. PARITOSH KUMAR Mob: - 8016763271/9205803664 Email: - kumar6156@gmail.com Add:- J&K Block , Laxmi nagar Delhi -110092 OBJECTIVES To work in a challenging environment demanding all my skill and efforts to contribute to the development of my organization and myself with impressive performance. AN OVERVIEW  Bachelor of Electrical Engineering from Priyadarshini college of Eng. Nagpur with 5 years of experience in Erection, Testing, Commissioning ,Designing and Maintenance.  Successfully completed Electrical Design Engineering Course from Delhi  Successfully completed AutoCAD course from Delhi.  Successfully completed Certified Automation Engineer Certification (CAE).  Well versed with Erection & Commissioning, Designing, Cost Control, Project Execution and Coordination.  Acquired extensive knowledge of subjects like Transmission & Distribution System, 6.6/11 /33KV Switchgear and Protection.  Proficient in DOS, MS Office and Operating system.  Ability to manage various operations as per the set parameters & standards and in developing procedures for operational excellence.  Possess strong communication, planning and team management skills with abilities in handling multiple tasks/ projects simultaneously. WORK EXPERIENCE 1. Electrical Design Engineering Course and Project (Advance Electrical Designing and Engineering Institute) Delhi from FEB-2016 to JULY-2016  Module 1-System planning.  Module 2-Cost Estimation.  Module 3-Lighting Design.  Module 4-Cable sizing and Selection.  Module 5-Internal Electrification Design.  Module 6-Protection of buildings and allied structures against lighting.  Module 7-Earthing design and calculation of power plants.  Module 8-Design and engineering of Transmission line.  Module 9-Design and Engineering of Switchyards.  Software skill Electrical AutoCAD. Power system software.
  • 2. Lighting software. 2. Residential Electrical Lighting Engineer from Oct-2015 to JAN-2016. Responsibilities  Supervision of Site Works and Installation Works.  Responsible for maintaining complete information of lighting database system.  Perform responsibilities of monitoring the performance of the lighting asset and identify areas of weakness.  Project management and supervising the work of contractors.  Selection and designing of the Electrical Main Distribution Boards.  Designing of Main Distribution Boards, Final Distribution Boards, Selection of Circuit Breaker According to the Load, Determine The Sizes Of Cables & Sleeves. 3. Gillanders Arbuthnot Co Ltd (Micco Div.) 6.3 MTPA Expansion project/Reheating furnace as an Electrical Site Engineer at Vizag and Durgapur steel Plant Site from May-2013 to Sep-2015 Responsibilities  Skillfully managed Erection, testing and commissioning of HT/LT, PLC, UPS and VFD panels.  Skillfully managed HT, LT and Control cable laying and termination.  Skillfully managed HT/LT Bus Duct erection and commissioning.  Skillfully managed erection and commissioning of distribution, converter and isolation transformer.  Skillfully managed Erection, testing and commissioning of HT/LT motors.  Skillfully managed erection and commissioning of Lesser, LDT, HMD CCTV camera, Pyrometer at Reheating Furnace.  Skillfully managed Erection and commissioning of Lighting of Substation, Pulpit and Pump house.  Skillfully managed modification of Drawing at site with AutoCAD. 4. L&T Construction (ECC DIV) 3.0 MTPA Expansion project RMHS Site Tata Steel as an Electrical Site Engineer from Dec-2010 to April-2013 Responsibilities  Skillfully managed Erection, testing and commissioning of HT/LT, PLC and UPS panels.  Skillfully managed HT/LT, Control and instrument cable erection and termination.  Skillfully managed erection and commissioning of distribution, converter and isolation transformer.  Skillfully managed Erection, testing and commissioning of LT motors.  Skillfully managed Erection and commissioning of Lighting of Substation and Conveyors. Academics 1. Bachelor of Electrical Engineering from Priyadarshini college of Eng. Nagpur (2010) 2. 12th (Science) from Mrs K.M.P.M Inter College, Jamshedpur (2004) 3. 10th from Kadma Boys High School Jamshedpur (2001)