SlideShare a Scribd company logo
Blister optimization initiative reduces materials and cost
Marcelo Costa, Process Engineering Coordinator
December 2012
Welcome to Cambé




                              Cambé (PR) – Såo Paulo (SP) 550km




  Capital: Brasilia (DF)                                                                  Local market
  Area: 8.5 million m2                                                                    Regional packaging center
  Population: 190 million (2010)                                                          Global plant for Hormones & other (eg. Diclofenac, Atenolol)
  Population growth: 1.17% (2000 – 2010)                                                  Oral Solids capacity: 2.0 Bi SDU | 75 million packs


2 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Basic principles of the project
Blister Optimization Initiative                                                           Before                           After

Launch: 2007
Goal:          Reduce consumption of
               primary packaging material
               (blister)
                                                                               10                  3             15                2
                                                                             tablets            blisters      tablets            blisters
                                                                            per blister        per carton    per blister        per carton
Low volume occupancy per dose/tab
opportunity


Optimized operations
Higher output
Reduced cycle time


Results
                                   Waste reduction                0.5 tons of aluminum | 2.5 tons of PVC foils
    Trilax                                                                                                                   USD 17 300
    12 Tab                                                                                                                   material savings
                                   Packaging weight reduction                        9% on product weight

3 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Challenges

                                                                           Packaging
•   Develop a viable, sustainable                                           Machine
                                                                            Supplier
    packaging design

•   Ensure a collaborative dialogue
    between product design, marketing,
    operational teams and suppliers                Benchmarking
                                                       New                                       Marketing
                                                    Technologies
•   Challenge existing packaging
    machines

•   Identify opportunities

•   Test potential new ways to find the
    best possible packaging solution

                                                              Operations               Quality
                        Stakeholders
                             External   Internal



4
Achievements

Summary of annual savings
                                                                      Cost savings           USD 201 200
The 27 SKUs blister improvement
initiatives completed to date                                                                3.3 tons aluminum (lidding material)
                                                                      Material reduction
                                                                                             7.7 tons PVC | 12.9 tons PVdC (forming material)
represent a significant
                                                                      Packaging weight       SKUs specific: -9% for Trilax c/12 (3.6 tons/year);
improvement in sustainable                                            reduction              -5% for Doxuran 30 FCT (1 ton/year)
packaging versus the packaging
                                                                      GHG emissions
solutions that existed in 2007                                        from transport
                                                                                             1.0 ton CO2e (from natural material only)


                                                                      Other savings          Waste reduction, improved packaging leadtime



                                                                       Energy savings*              kWh               GJ              tCO2
                                                                       Electricity Pack. Machine    110.309           397             8
                    * Yearly figures based on 2011 volumes
                                                                       Chilled Water                96.521            347             7
      Besides blister / carton optimization, other enhancements
     contributed for speed increase (e.g. Line 3 new secondary         Compressed Air               161.522           581             12
 packaging machine, Line 4 primary packaging machine retrofit)
                                                                       Total                        368.352           1.326           27




5 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Cambé's "environmental heros"!


                                                                                          2012
    2011 TechOps                                                                          Winner
                                                                                          Sustainable
    Team Excellence
                                                                                          Packaging
    Award


Energy Team




6 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Back up
2-day visit Photos




8 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Ceremony Photos




9 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Ceremony Photos




10 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Ceremony Photos




11 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
Ceremony Photos




12 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only

More Related Content

Similar to Novartis Environment Awards 2012

Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...
Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...
Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...
Ata Zad, Ph.D.
 
Digiworld - Séminaire Green ITC - Présentation Bouygues Telecom
Digiworld  - Séminaire Green ITC - Présentation Bouygues TelecomDigiworld  - Séminaire Green ITC - Présentation Bouygues Telecom
Digiworld - Séminaire Green ITC - Présentation Bouygues Telecom
Fédération Française des Télécoms
 
Mr Abgrall Bouygues Telecom Green ICT
Mr Abgrall Bouygues Telecom Green ICTMr Abgrall Bouygues Telecom Green ICT
Mr Abgrall Bouygues Telecom Green ICTIDATE DigiWorld
 
Patricia Calkins, Xerox
Patricia Calkins, XeroxPatricia Calkins, Xerox
Patricia Calkins, Xerox
Xerox Corporation
 
Cambond Ltd
Cambond LtdCambond Ltd
Cambond Ltd
CleantechInnovate
 
Sustainable Packaging: The Tetra Pak Way
Sustainable Packaging: The Tetra Pak Way Sustainable Packaging: The Tetra Pak Way
Sustainable Packaging: The Tetra Pak Way Tetra Pak Canada
 
Cradle to Cradle as Business approach – The view from the frontrunners
Cradle to Cradle as Business approach – The view from the frontrunnersCradle to Cradle as Business approach – The view from the frontrunners
Cradle to Cradle as Business approach – The view from the frontrunners
Academic Chair ‘Cradle to Cradle for Innovation and Quality’
 
Crystal Group Best Practice
Crystal Group Best PracticeCrystal Group Best Practice
Crystal Group Best PracticeJun Villoria
 
Ibe group 6
Ibe group 6Ibe group 6
CEO awards Operational Excellence 2009
CEO awards  Operational Excellence 2009CEO awards  Operational Excellence 2009
CEO awards Operational Excellence 2009
Marcelo Costa
 
Carbios : le recyclage enzymatique des plastiques
Carbios  : le recyclage enzymatique des plastiquesCarbios  : le recyclage enzymatique des plastiques
Carbios : le recyclage enzymatique des plastiques
PROHELIO
 
Paperseal - when sustainability is good for your business
Paperseal - when sustainability is good for your businessPaperseal - when sustainability is good for your business
Paperseal - when sustainability is good for your business
Alessandra Zanetti
 
"Eco-conscious design" for printed matters
"Eco-conscious design" for printed matters "Eco-conscious design" for printed matters
"Eco-conscious design" for printed matters Shimizu Printing Inc.
 
TEEB and The Policy Level D1 Introduction 5 Dec 08 Version Short
TEEB and The Policy Level D1 Introduction 5 Dec 08 Version ShortTEEB and The Policy Level D1 Introduction 5 Dec 08 Version Short
TEEB and The Policy Level D1 Introduction 5 Dec 08 Version Short
Institute for European Environmental Policy IEEP
 
Supplier sustainability training spring 2013 - final
Supplier sustainability training   spring 2013 - finalSupplier sustainability training   spring 2013 - final
Supplier sustainability training spring 2013 - finalMosaic_EFA
 
Supplier sustainability training spring 2013 - final2
Supplier sustainability training   spring 2013 - final2Supplier sustainability training   spring 2013 - final2
Supplier sustainability training spring 2013 - final2Mosaic_EFA
 
Cisco Sustainable Packaging Update
Cisco Sustainable Packaging UpdateCisco Sustainable Packaging Update
Cisco Sustainable Packaging Updatescmgreen
 
CDM - A Quick Overview
CDM - A Quick OverviewCDM - A Quick Overview
CDM - A Quick Overview
Priyanka Abbi
 

Similar to Novartis Environment Awards 2012 (20)

Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...
Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...
Practical Methods to Manufacture Sustainable Plastics Products I. Partial Foa...
 
Digiworld - Séminaire Green ITC - Présentation Bouygues Telecom
Digiworld  - Séminaire Green ITC - Présentation Bouygues TelecomDigiworld  - Séminaire Green ITC - Présentation Bouygues Telecom
Digiworld - Séminaire Green ITC - Présentation Bouygues Telecom
 
Mr Abgrall Bouygues Telecom Green ICT
Mr Abgrall Bouygues Telecom Green ICTMr Abgrall Bouygues Telecom Green ICT
Mr Abgrall Bouygues Telecom Green ICT
 
Patricia Calkins, Xerox
Patricia Calkins, XeroxPatricia Calkins, Xerox
Patricia Calkins, Xerox
 
Cambond Ltd
Cambond LtdCambond Ltd
Cambond Ltd
 
Sustainable Packaging: The Tetra Pak Way
Sustainable Packaging: The Tetra Pak Way Sustainable Packaging: The Tetra Pak Way
Sustainable Packaging: The Tetra Pak Way
 
In novation veritas
In novation veritasIn novation veritas
In novation veritas
 
Cradle to Cradle as Business approach – The view from the frontrunners
Cradle to Cradle as Business approach – The view from the frontrunnersCradle to Cradle as Business approach – The view from the frontrunners
Cradle to Cradle as Business approach – The view from the frontrunners
 
Green At Heart E 091124
Green At Heart E 091124Green At Heart E 091124
Green At Heart E 091124
 
Crystal Group Best Practice
Crystal Group Best PracticeCrystal Group Best Practice
Crystal Group Best Practice
 
Ibe group 6
Ibe group 6Ibe group 6
Ibe group 6
 
CEO awards Operational Excellence 2009
CEO awards  Operational Excellence 2009CEO awards  Operational Excellence 2009
CEO awards Operational Excellence 2009
 
Carbios : le recyclage enzymatique des plastiques
Carbios  : le recyclage enzymatique des plastiquesCarbios  : le recyclage enzymatique des plastiques
Carbios : le recyclage enzymatique des plastiques
 
Paperseal - when sustainability is good for your business
Paperseal - when sustainability is good for your businessPaperseal - when sustainability is good for your business
Paperseal - when sustainability is good for your business
 
"Eco-conscious design" for printed matters
"Eco-conscious design" for printed matters "Eco-conscious design" for printed matters
"Eco-conscious design" for printed matters
 
TEEB and The Policy Level D1 Introduction 5 Dec 08 Version Short
TEEB and The Policy Level D1 Introduction 5 Dec 08 Version ShortTEEB and The Policy Level D1 Introduction 5 Dec 08 Version Short
TEEB and The Policy Level D1 Introduction 5 Dec 08 Version Short
 
Supplier sustainability training spring 2013 - final
Supplier sustainability training   spring 2013 - finalSupplier sustainability training   spring 2013 - final
Supplier sustainability training spring 2013 - final
 
Supplier sustainability training spring 2013 - final2
Supplier sustainability training   spring 2013 - final2Supplier sustainability training   spring 2013 - final2
Supplier sustainability training spring 2013 - final2
 
Cisco Sustainable Packaging Update
Cisco Sustainable Packaging UpdateCisco Sustainable Packaging Update
Cisco Sustainable Packaging Update
 
CDM - A Quick Overview
CDM - A Quick OverviewCDM - A Quick Overview
CDM - A Quick Overview
 

More from Marcelo Costa

CMO critical assessment to support EU FMD readiness
CMO critical assessment to support EU FMD readinessCMO critical assessment to support EU FMD readiness
CMO critical assessment to support EU FMD readiness
Marcelo Costa
 
Using VSM to support the definition of Production Planning strategies of a ne...
Using VSM to support the definition of Production Planning strategies of a ne...Using VSM to support the definition of Production Planning strategies of a ne...
Using VSM to support the definition of Production Planning strategies of a ne...
Marcelo Costa
 
Case study: Introducing a Changeover Program which fulfills a company-wide Pr...
Case study: Introducing a Changeover Program which fulfills a company-wide Pr...Case study: Introducing a Changeover Program which fulfills a company-wide Pr...
Case study: Introducing a Changeover Program which fulfills a company-wide Pr...
Marcelo Costa
 
Process and operational excellence synergies
Process and operational excellence synergiesProcess and operational excellence synergies
Process and operational excellence synergies
Marcelo Costa
 
2012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v02012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v0Marcelo Costa
 
Maintenance organization roles for enabling Operational Excellence
Maintenance organization roles for enabling Operational ExcellenceMaintenance organization roles for enabling Operational Excellence
Maintenance organization roles for enabling Operational Excellence
Marcelo Costa
 
Marcelo Costa - Pharma Talk 2013 Berlin
Marcelo Costa - Pharma Talk 2013 BerlinMarcelo Costa - Pharma Talk 2013 Berlin
Marcelo Costa - Pharma Talk 2013 BerlinMarcelo Costa
 
Sandoy Cambé 2012: Energy Management Results
Sandoy Cambé 2012: Energy Management ResultsSandoy Cambé 2012: Energy Management Results
Sandoy Cambé 2012: Energy Management ResultsMarcelo Costa
 
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing OperationsTPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
Marcelo Costa
 
PDCA cycle applied for Sustainable Management of Energy Efficiency Policy
PDCA cycle applied for Sustainable Management of Energy Efficiency PolicyPDCA cycle applied for Sustainable Management of Energy Efficiency Policy
PDCA cycle applied for Sustainable Management of Energy Efficiency PolicyMarcelo Costa
 
TPM in pilot packaging line
TPM in pilot packaging lineTPM in pilot packaging line
TPM in pilot packaging lineMarcelo Costa
 
Improvement Projects 2008
Improvement Projects 2008Improvement Projects 2008
Improvement Projects 2008Marcelo Costa
 

More from Marcelo Costa (12)

CMO critical assessment to support EU FMD readiness
CMO critical assessment to support EU FMD readinessCMO critical assessment to support EU FMD readiness
CMO critical assessment to support EU FMD readiness
 
Using VSM to support the definition of Production Planning strategies of a ne...
Using VSM to support the definition of Production Planning strategies of a ne...Using VSM to support the definition of Production Planning strategies of a ne...
Using VSM to support the definition of Production Planning strategies of a ne...
 
Case study: Introducing a Changeover Program which fulfills a company-wide Pr...
Case study: Introducing a Changeover Program which fulfills a company-wide Pr...Case study: Introducing a Changeover Program which fulfills a company-wide Pr...
Case study: Introducing a Changeover Program which fulfills a company-wide Pr...
 
Process and operational excellence synergies
Process and operational excellence synergiesProcess and operational excellence synergies
Process and operational excellence synergies
 
2012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v02012 Latin American HSE Conference - Cambe Site_v0
2012 Latin American HSE Conference - Cambe Site_v0
 
Maintenance organization roles for enabling Operational Excellence
Maintenance organization roles for enabling Operational ExcellenceMaintenance organization roles for enabling Operational Excellence
Maintenance organization roles for enabling Operational Excellence
 
Marcelo Costa - Pharma Talk 2013 Berlin
Marcelo Costa - Pharma Talk 2013 BerlinMarcelo Costa - Pharma Talk 2013 Berlin
Marcelo Costa - Pharma Talk 2013 Berlin
 
Sandoy Cambé 2012: Energy Management Results
Sandoy Cambé 2012: Energy Management ResultsSandoy Cambé 2012: Energy Management Results
Sandoy Cambé 2012: Energy Management Results
 
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing OperationsTPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
TPM BPN F2F3_Sandoz BR_Increasing OEE throughout Manufacturing Operations
 
PDCA cycle applied for Sustainable Management of Energy Efficiency Policy
PDCA cycle applied for Sustainable Management of Energy Efficiency PolicyPDCA cycle applied for Sustainable Management of Energy Efficiency Policy
PDCA cycle applied for Sustainable Management of Energy Efficiency Policy
 
TPM in pilot packaging line
TPM in pilot packaging lineTPM in pilot packaging line
TPM in pilot packaging line
 
Improvement Projects 2008
Improvement Projects 2008Improvement Projects 2008
Improvement Projects 2008
 

Novartis Environment Awards 2012

  • 1. Blister optimization initiative reduces materials and cost Marcelo Costa, Process Engineering Coordinator December 2012
  • 2. Welcome to Cambé Cambé (PR) – Såo Paulo (SP) 550km Capital: Brasilia (DF) Local market Area: 8.5 million m2 Regional packaging center Population: 190 million (2010) Global plant for Hormones & other (eg. Diclofenac, Atenolol) Population growth: 1.17% (2000 – 2010) Oral Solids capacity: 2.0 Bi SDU | 75 million packs 2 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 3. Basic principles of the project Blister Optimization Initiative Before After Launch: 2007 Goal: Reduce consumption of primary packaging material (blister) 10 3 15 2 tablets blisters tablets blisters per blister per carton per blister per carton Low volume occupancy per dose/tab opportunity Optimized operations Higher output Reduced cycle time Results Waste reduction 0.5 tons of aluminum | 2.5 tons of PVC foils Trilax USD 17 300 12 Tab material savings Packaging weight reduction 9% on product weight 3 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 4. Challenges Packaging • Develop a viable, sustainable Machine Supplier packaging design • Ensure a collaborative dialogue between product design, marketing, operational teams and suppliers Benchmarking New Marketing Technologies • Challenge existing packaging machines • Identify opportunities • Test potential new ways to find the best possible packaging solution Operations Quality Stakeholders External Internal 4
  • 5. Achievements Summary of annual savings Cost savings USD 201 200 The 27 SKUs blister improvement initiatives completed to date 3.3 tons aluminum (lidding material) Material reduction 7.7 tons PVC | 12.9 tons PVdC (forming material) represent a significant Packaging weight SKUs specific: -9% for Trilax c/12 (3.6 tons/year); improvement in sustainable reduction -5% for Doxuran 30 FCT (1 ton/year) packaging versus the packaging GHG emissions solutions that existed in 2007 from transport 1.0 ton CO2e (from natural material only) Other savings Waste reduction, improved packaging leadtime Energy savings* kWh GJ tCO2 Electricity Pack. Machine 110.309 397 8 * Yearly figures based on 2011 volumes Chilled Water 96.521 347 7 Besides blister / carton optimization, other enhancements contributed for speed increase (e.g. Line 3 new secondary Compressed Air 161.522 581 12 packaging machine, Line 4 primary packaging machine retrofit) Total 368.352 1.326 27 5 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 6. Cambé's "environmental heros"! 2012 2011 TechOps Winner Sustainable Team Excellence Packaging Award Energy Team 6 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 8. 2-day visit Photos 8 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 9. Ceremony Photos 9 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 10. Ceremony Photos 10 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 11. Ceremony Photos 11 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only
  • 12. Ceremony Photos 12 | 2012 EEA | Sandoz Cambé, Brazil | Marcelo Costa | December 2012 | Business Use Only