DLF THE CREST
Is Ready To Welcome Its First Possession Soon,The Crest Offered 3 & 4 BHK Apartments,
Pay only 10% Now
➔ OVERVIEW
➔ HIGHLIGHTS
➔ SPECIFICATIONS
➔ PRICE LIST
➔ LOCATION
➔ MASTER PLAN
➔ CONNECT WITH US
➔ DISCLAIMER
OVERVIEW
Highlight of the project, it promises breathtaking views of the never-ending greenery
with renowned creations like DLF Park Place, The Summit, The Belaire, Horizon Centre,
The Pinnacle, The Magnolias, The Aralias, all in one look, that keep buyers spellbound
completely.
This iconic project location in sector 54, Gurgaon, which is one of the demanding
sectors of Gurgaon, due to its excellent connectivity to many major projects and even to
essential places like school, office, retail space, shopping centre, bank & ATMs and
a far more places are within the distance, Undoubtedly, Gurgaon is developing at a high
speed in terms of infrastructure development.
HIGHLIGHTS
➔ Builder DLF Limited
➔ Location Sector 54 ( Gurgaon )
➔ Property Type Residential
➔ Sub - Type Apartments
➔ Site Area 8.822 Acres
➔ Tower 6 Towers
➔ Sizes 2686 - 6160 Sq.Ft
➔ Bedroom 2 BHK, 3 BHK, 4 BHK, 5 BHK, Penthouse
➔ Price 5.23 Cr. Onwards
➔ Project Status Under Construction
➔ Completion 2018 (Expected)
➔ Availability Booking Open
SPECIFICATIONS
● Structure designed for the highest seismic considerations of zone-V, against zone-IV as
stipulated by the BIS codes, for better safety.
● Air conditioned apartments with energy efficient VRF or VRV system including the kitchen and
the utility room but excluding the toilets.
● Air conditioned entrance halls and lift lobbies.
● Eco friendly environment with proposed rain water harvesting system to recharge aquifer, and
proposed use of metered treated water from STP for flushing and horticulture.
● Proposed metered water supply for individual apartments.
● Heated water supply through geysers/ boilers in toilets, kitchens and additionally through solar
water heaters in the kitchens.
● High speed passenger elevators with additional service elevator.
● Pressurized staircases, lift lobbies and lift shafts, for better fire safety.
● Air conditioning in the utility room.
● Double-glazed tinted windows to minimize demands on air conditioning and eliminate sound
pollution.
● As a special security feature, shuttle elevators from the basement can only access the lobby.
● Floor to floor height : 3.2 mts (approx 10 feet 6 inches).
PRICE LIST
Unit Type Basic Sale Price
Apartments Rs. 19,500/- Per Sq. Ft
Penthouse Rs. 20,500/- Per Sq. Ft
● Rs. 1,500/- Per Sq. Ft. For Construction Linked & Down Payment Plans
● Rs. 500/- Per Sq. Ft. For Possession Linked Payment Plan
Payment Plan
■ Possession Linked Payment Plan
■ Subvention Plan
■ Down Payment Plan
■ Construction Linked Payment Plan
Gallery
LOCATION
MASTER PLAN
CONNECT WITH
US
Website :
www.dlfcrestgurgaon.org.in
Phone :
+91 9811 999 666
This Website belongs to Honey Money Associates Ltd. This is not Builder site.
Disclaimer : This website is in the process of being updated. By accessing this website, the viewer
confirms that the information including brochures and marketing collaterals on this website are solely for
informational purposes only and the viewer has not relied on this information for making any
booking/purchase in any project of the Company. Nothing on this website, constitutes advertising,
marketing, booking, selling or an offer for sale, or invitation to purchase a unit in any project by the
Company. The Company is not liable for any consequence of any action taken by the viewer relying on such
material/ information on this website.
DISCLAIMER

Dlf the crest

  • 1.
    DLF THE CREST IsReady To Welcome Its First Possession Soon,The Crest Offered 3 & 4 BHK Apartments, Pay only 10% Now
  • 2.
    ➔ OVERVIEW ➔ HIGHLIGHTS ➔SPECIFICATIONS ➔ PRICE LIST ➔ LOCATION ➔ MASTER PLAN ➔ CONNECT WITH US ➔ DISCLAIMER
  • 3.
    OVERVIEW Highlight of theproject, it promises breathtaking views of the never-ending greenery with renowned creations like DLF Park Place, The Summit, The Belaire, Horizon Centre, The Pinnacle, The Magnolias, The Aralias, all in one look, that keep buyers spellbound completely. This iconic project location in sector 54, Gurgaon, which is one of the demanding sectors of Gurgaon, due to its excellent connectivity to many major projects and even to essential places like school, office, retail space, shopping centre, bank & ATMs and a far more places are within the distance, Undoubtedly, Gurgaon is developing at a high speed in terms of infrastructure development.
  • 4.
    HIGHLIGHTS ➔ Builder DLFLimited ➔ Location Sector 54 ( Gurgaon ) ➔ Property Type Residential ➔ Sub - Type Apartments ➔ Site Area 8.822 Acres ➔ Tower 6 Towers ➔ Sizes 2686 - 6160 Sq.Ft ➔ Bedroom 2 BHK, 3 BHK, 4 BHK, 5 BHK, Penthouse ➔ Price 5.23 Cr. Onwards ➔ Project Status Under Construction ➔ Completion 2018 (Expected) ➔ Availability Booking Open
  • 5.
    SPECIFICATIONS ● Structure designedfor the highest seismic considerations of zone-V, against zone-IV as stipulated by the BIS codes, for better safety. ● Air conditioned apartments with energy efficient VRF or VRV system including the kitchen and the utility room but excluding the toilets. ● Air conditioned entrance halls and lift lobbies. ● Eco friendly environment with proposed rain water harvesting system to recharge aquifer, and proposed use of metered treated water from STP for flushing and horticulture. ● Proposed metered water supply for individual apartments. ● Heated water supply through geysers/ boilers in toilets, kitchens and additionally through solar water heaters in the kitchens. ● High speed passenger elevators with additional service elevator. ● Pressurized staircases, lift lobbies and lift shafts, for better fire safety. ● Air conditioning in the utility room. ● Double-glazed tinted windows to minimize demands on air conditioning and eliminate sound pollution. ● As a special security feature, shuttle elevators from the basement can only access the lobby. ● Floor to floor height : 3.2 mts (approx 10 feet 6 inches).
  • 6.
    PRICE LIST Unit TypeBasic Sale Price Apartments Rs. 19,500/- Per Sq. Ft Penthouse Rs. 20,500/- Per Sq. Ft ● Rs. 1,500/- Per Sq. Ft. For Construction Linked & Down Payment Plans ● Rs. 500/- Per Sq. Ft. For Possession Linked Payment Plan Payment Plan ■ Possession Linked Payment Plan ■ Subvention Plan ■ Down Payment Plan ■ Construction Linked Payment Plan
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
    This Website belongsto Honey Money Associates Ltd. This is not Builder site. Disclaimer : This website is in the process of being updated. By accessing this website, the viewer confirms that the information including brochures and marketing collaterals on this website are solely for informational purposes only and the viewer has not relied on this information for making any booking/purchase in any project of the Company. Nothing on this website, constitutes advertising, marketing, booking, selling or an offer for sale, or invitation to purchase a unit in any project by the Company. The Company is not liable for any consequence of any action taken by the viewer relying on such material/ information on this website. DISCLAIMER