SlideShare a Scribd company logo
1 of 95
Download to read offline
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying Social Discount Rates:
Uncertainty, Heterogeneity and Project Risk
Ben Groom (LSE)
Centre for Health Economics, University of York
December 7th, 2017
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Impatience, self-control and hyperbolic discounting
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Impatience, self-control and hyperbolic discounting
Figure: Source: The New Yorker.
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Ramsey Rule
SDR = δ + ηgc
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Ramsey Rule
SDR = δ + ηgc
gc = consumption growth
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Ramsey Rule
SDR = δ + ηgc
gc = consumption growth
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Ramsey Rule
SDR = δ + ηgc
gc = consumption growth
2 consumption side arguments for discounting, 3 parameters (δ,η, gc )
1 Utility discounting: pure time preference, δ.
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Discounted Utilitarian SWF
W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
Ramsey Rule
SDR = δ + ηgc
gc = consumption growth
2 consumption side arguments for discounting, 3 parameters (δ,η, gc )
1 Utility discounting: pure time preference, δ.
2 Societal ‘Wealth E¤ect’: ηgc
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Production side, opportunity cost arguments: SDR = r
Risk free projects: Risk-free interest rate, cost of borrowing
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Production side, opportunity cost arguments: SDR = r
Risk free projects: Risk-free interest rate, cost of borrowing
Risky Projects (systematic risk): Asset prices
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Production side, opportunity cost arguments: SDR = r
Risk free projects: Risk-free interest rate, cost of borrowing
Risky Projects (systematic risk): Asset prices
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Production side, opportunity cost arguments: SDR = r
Risk free projects: Risk-free interest rate, cost of borrowing
Risky Projects (systematic risk): Asset prices
Equilibrium
r = δ + ηgc (=STP)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Production side, opportunity cost arguments: SDR = r
Risk free projects: Risk-free interest rate, cost of borrowing
Risky Projects (systematic risk): Asset prices
Equilibrium
r = δ + ηgc (=STP)
Debate: which is appropriate when distortions exist (e.g.
Burgess and Zerbe 2014; Moore et al 2013; Spackman 2017)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
The Social Discount Rate
Risk Free Projects
Production side, opportunity cost arguments: SDR = r
Risk free projects: Risk-free interest rate, cost of borrowing
Risky Projects (systematic risk): Asset prices
Equilibrium
r = δ + ηgc (=STP)
Debate: which is appropriate when distortions exist (e.g.
Burgess and Zerbe 2014; Moore et al 2013; Spackman 2017)
Shadow cost of capital approach: convert to consumption and
discount using STP
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs for Risk Free Projects
Figure: Source Groom and Hepburn (2017)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Term Structure of SDR
Depends on the expected di¤usion of consumption growth
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Term Structure of SDR
Depends on the expected di¤usion of consumption growth
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Term Structure of SDR
Depends on the expected di¤usion of consumption growth
Growth Di¤usion: examples
Independent growth shocks: Brownian Motion
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Term Structure of SDR
Depends on the expected di¤usion of consumption growth
Growth Di¤usion: examples
Independent growth shocks: Brownian Motion
Persistence : drift, parameter uncertainty, regime switches,
‘jump risk’
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
Risk Free Projects
General Growth Uncertainty
SDR lower re‡ecting precautionary saving
SDRH = δ + η ¯g
Wealth E¤ect
f η, σ2
c,H , σ3
c,H , σ4
c,H
Precautionary Savings E¤ect
Term Structure of SDR
Depends on the expected di¤usion of consumption growth
Growth Di¤usion: examples
Independent growth shocks: Brownian Motion
Persistence : drift, parameter uncertainty, regime switches,
‘jump risk’
See Gollier (2012)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Example: Jump Risk
Suppose that GDP loss % of λ with probability p
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Example: Jump Risk
Suppose that GDP loss % of λ with probability p
SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Example: Jump Risk
Suppose that GDP loss % of λ with probability p
SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Example: Jump Risk
Suppose that GDP loss % of λ with probability p
SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
Example: Parameter Uncertainty
i.i.d. shocks, but uncertainty about the mean parameter µi
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Example: Jump Risk
Suppose that GDP loss % of λ with probability p
SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
Example: Parameter Uncertainty
i.i.d. shocks, but uncertainty about the mean parameter µi
˜xi N µi , σ2
c (i = 1, 2, ...n)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth (risk
free)
Example: Brownian Motion
ln (ct+1/ct ) = ˜x, ˜x N µ, σ2
c
SDR = δ + η ¯g
Wealth E¤ect
0.5η (η + 1) σ2
c
Prudence E¤ect
lower SDR, ‡at term structure
Example: Jump Risk
Suppose that GDP loss % of λ with probability p
SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
Example: Parameter Uncertainty
i.i.d. shocks, but uncertainty about the mean parameter µi
˜xi N µi , σ2
c (i = 1, 2, ...n)
SDRH = δ + H 1 ln [E exp ( η ˜gH H)]
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth
¯gL
1 , ¯gL
2 = (1%, 3%) ; ¯gH
1 , ¯gH
2 = (0%, 3.5%) ;
δ = 1%, η = 2, p1 = 1/3, p2 = 2/3
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertain interest rates
Expected NPV (Weitzman 2001, Newell and Pizer 2003, Freeman et al 2015)
exp ( RH H) = E [exp ( ˜rH)]
! RH = SDRH =
1
H
ln E [exp ( ˜rH)]
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertain interest rates
Expected NPV (Weitzman 2001, Newell and Pizer 2003, Freeman et al 2015)
exp ( RH H) = E [exp ( ˜rH)]
! RH = SDRH =
1
H
ln E [exp ( ˜rH)]
Gamma Discounting (Weitzman
2001, American Economic Review).
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertain interest rates
Expected NPV (Weitzman 2001, Newell and Pizer 2003, Freeman et al 2015)
exp ( RH H) = E [exp ( ˜rH)]
! RH = SDRH =
1
H
ln E [exp ( ˜rH)]
Gamma Discounting (Weitzman
2001, American Economic Review).
Time series applications of
Weitzman (1998) ENPV approach
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Di¤erences in expert opinion, or heterogeneous time preferences
0.05.1.15.2
Density
0 10 20 30
Weitzman Gamma
Weitzman’s ‘Gamma’Distibution of
the SDR for Climate Change
(Weitzman 2001) 0.2.4.6.8
Density
0 2 4 6 8
Rate of societal pure time preference (in %)
Pure rate of time preference, δ.
Discounting Expert Survey by
Drupp et al. (2015)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
ci is the optimised path for agent i.
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
ci is the optimised path for agent i.
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
ci is the optimised path for agent i.
Is there a Representative Pure Time Preference?
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
ci is the optimised path for agent i.
Is there a Representative Pure Time Preference?
Answer: Yes!
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
ci is the optimised path for agent i.
Is there a Representative Pure Time Preference?
Answer: Yes!
δη (H) =
h
∑i δi (wi exp ( δi H))
1
η
i
/
h
∑i (wi exp ( δi H))
1
η
i
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Welfare function with heterogeneous agents (H&M 2013)
W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
ci is the optimised path for agent i.
Is there a Representative Pure Time Preference?
Answer: Yes!
δη (H) =
h
∑i δi (wi exp ( δi H))
1
η
i
/
h
∑i (wi exp ( δi H))
1
η
i
Declines to the lowest value of δi as H goes to in…nity
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Heterogeneity
Heterogeneous pure time preference and the representative agent (Heal and Millner
2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015)
Figure: Representative Pure Time Preference: δ
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
r (β) = δ + ηµ η2σ2
c
Prudence
+ βησ2
c
Project Speci…c Risk Premium
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
r (β) = δ + ηµ η2σ2
c
Prudence
+ βησ2
c
Project Speci…c Risk Premium
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
r (β) = δ + ηµ η2σ2
c
Prudence
+ βησ2
c
Project Speci…c Risk Premium
Growth is Persistent: e.g. Parameter Uncertainty
r0 (β) = δ + η ¯µ + ησ2 (β 0.5η)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
r (β) = δ + ηµ η2σ2
c
Prudence
+ βησ2
c
Project Speci…c Risk Premium
Growth is Persistent: e.g. Parameter Uncertainty
r0 (β) = δ + η ¯µ + ησ2 (β 0.5η)
r∞ (β) =
δ + ηµmin + ησ2 (β 0.5η) if β 0
δ + ηµmax + ησ2 (β 0.5η) if β > η
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
r (β) = δ + ηµ η2σ2
c
Prudence
+ βησ2
c
Project Speci…c Risk Premium
Growth is Persistent: e.g. Parameter Uncertainty
r0 (β) = δ + η ¯µ + ησ2 (β 0.5η)
r∞ (β) =
δ + ηµmin + ησ2 (β 0.5η) if β 0
δ + ηµmax + ησ2 (β 0.5η) if β > η
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
Gollier (2012, 2012b)
Consumption CAPM
Growth is i.i.d
r (β) = δ + ηµ η2σ2
c
Prudence
+ βησ2
c
Project Speci…c Risk Premium
Growth is Persistent: e.g. Parameter Uncertainty
r0 (β) = δ + η ¯µ + ησ2 (β 0.5η)
r∞ (β) =
δ + ηµmin + ησ2 (β 0.5η) if β 0
δ + ηµmax + ησ2 (β 0.5η) if β > η
Term Structure of Risky Discount Rates in CCAPM
Precautionary e¤ect and the risk premium work in opposite
directions in most public investment cases: β > 0
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs with Risky Projects
δ = 0, η = 2, µ 2 [0%, 3%] , symmetric
Figure: Term Structure of Discount Rates for Risky Projects by β. Source:
Gollier (2012b)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Elasticity of Marginal Utility: η
Revealed Preference: risk or inequality aversion, smoothing c
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Elasticity of Marginal Utility: η
Revealed Preference: risk or inequality aversion, smoothing c
Experimental methods, expert surveys (which experts?)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Elasticity of Marginal Utility: η
Revealed Preference: risk or inequality aversion, smoothing c
Experimental methods, expert surveys (which experts?)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Elasticity of Marginal Utility: η
Revealed Preference: risk or inequality aversion, smoothing c
Experimental methods, expert surveys (which experts?)
Growth, gc and rates of return r
Historical data, econometrics (N&P 2003)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating the Parameters of the SDR
Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
Utility Discount Rate
Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
Agent relative ethics δ > 0 (e.g. Arrow 1999)
Catastrophic risk (e.g. Stern 0.1%), survival rates
Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
Elasticity of Marginal Utility: η
Revealed Preference: risk or inequality aversion, smoothing c
Experimental methods, expert surveys (which experts?)
Growth, gc and rates of return r
Historical data, econometrics (N&P 2003)
Expert surveys (Drupp et al. 2015, Pindyck 2017)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters
Utility discount rate as a survival rate (Fenichel et al. 2017)
Figure: Demographic δ : Survival hazard rate aggregated across the
population (Function of mortality rate and life expectancy at each age)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters
Revealed preference measures of the elasticity of marginal utility, UK (Groom and
Maddison 2017)
Table: Revealed Preference estimates of η in the UK
Methodology η StDev
Inequality Aversion
Progressive Taxes 1.52 0.047
Progressive Taxes (historical) 1.57 0.48
Consumption Smoothing
Euler Equation 1.58 0.21
Product Substitution
Frisch Parameter 3.56 2.19
Risk Aversion
Insurance Demand 2.19 0.24
Subjective Well-being
Happiness survey 1.32 0.17
Pooled Estimate
Fixed E¤ects 1.53
Parameter Homogeneity Chi-sq(5) = 9.98 (p=0.076)
Source: Groom and Maddison 2017
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters
Long-term discount rate: Evidence from housing ownership (Giglio et al 2015;
Fesselmeyer et al. 2017)
Figure: Declining Discount Rates in housing tenure: (Fesselmeyer et al.
2017)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Project Betas
French Guidelines (Gollier 2011)
Sector Estimated
consumption
Beta
Agriculture, Silviculture and Fisheries 0.85
Industry 2.09
Automobile Industry 4.98
Manufacture of Mechanical Equipment 3.00
Intermediate Industries 2.76
Energy 0.85
Construction 1,45
Transport 1.60
Administrative Services -0.09
Education 0.11
Health -0.24
Financial Services 0.15
Financial Intermediation 0.49
Assurance -0.36
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Term Structures
Gollier and Mahul 2017
Figure: Term Structure of Risk Free Rate (left) and Aggregate Risk
Premium (right) (Gollier and Mahul 2017).
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Term Structures
Gollier and Mahul 2017
Figure: Term Structure of Risk Free Rate (left) and Aggregate Risk
Premium (right) (Gollier and Mahul 2017).
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Risky Projects
Term structure for risky projects depends on the ‘beta’
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Risky Projects
Term structure for risky projects depends on the ‘beta’
Risk premium rises with the time horizon for β > 0
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Risky Projects
Term structure for risky projects depends on the ‘beta’
Risk premium rises with the time horizon for β > 0
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Risky Projects
Term structure for risky projects depends on the ‘beta’
Risk premium rises with the time horizon for β > 0
Practical Advice
SDR important (country speci…c), but so is valuation
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Conclusion
Project Appraisal in LMICs
Declining Discount Rates for risk free projects
TVSDRs? Empirics: persistence? variability? risk prefs?
Prudence and high variability: large prudence e¤ects
Low growth, low SDR: Liberia, DRC, (-2%) etc.
High growth, high SDR: Botswana, South Africa (+4%), etc
Risky Projects
Term structure for risky projects depends on the ‘beta’
Risk premium rises with the time horizon for β > 0
Practical Advice
SDR important (country speci…c), but so is valuation
Empirical work exists to help guide decision makers
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Time Varying SDRs: Uncertainty in growth:
Parameter uncertainty
Example from previous French Guidelines (Lebegue 2005, p 102)
¯g1 = 0.5%, ¯g2 = 2%,
δ = 1%, η = 2
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters using Expert Opinion:
Economists
Drupp et al (2015) ‘Discounting Disentangled’.
0.2.4.6.8
Density
0 2 4 6 8
Rate of societal pure time preference (in %)
0.1.2.3
Density
0 2 4 6 8 10
Real SDR (in %)
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters using Expert Opinion?
Drupp et al (2015) ‘Discounting Disentangled’.
1% 2%
0.2.4.6.81
Density
-5 0 5 10 15
Lower Bound of Range
3% SDR range 2% SDR range
0% SDR Range (point value)
92% of economists agree on long run SDR between 1% and 3%
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters using expert opinion:
Economists
Variable Mean StdDev Median Mode Min Max
Real growth rate per capita 1.70 0.91 1.60 2.00 -2.00 5.00
Rate of pure time preference 1.10 1.47 0.50 0.00 0.00 8.00
Elasticity of marginal utility 1.35 0.85 1.00 1.00 0.00 5.00
Real risk free interest rate 2.38 1.32 2.00 2.00 0.00 6.00
Normative weight 61.53 28.56 70.00 50.00 0.00 100.00
Positive weight 38.47 28.56 70.00 30.00 0.00 100.00
Social discount rate (SDR) 2.27 1.62 2.00 2.00 0.00 10.00
SDR lower bound 1.12 1.62 1.00 0.00 -3.00 8.00
SDR upper bound 4.14 2.80 3.50 3.00 0.00 20.00
Number of quantitative responses
Number of qualitative responses
Total number of respondents
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Estimating SDR Parameters: Which Experts? or
Public Opinion?
Table: Disagreement between Experts and Members of the Public? (%)
Source SDR PRTP η N
Economists
Mean 2.27 1.1 1.35
Median 2.00 0.50 1.00 186
StDev 1.62 1.47 0.85
Philosophers
Mean 2.1 1.3 1.70
Median 2.00 0.00 2.00 16
StDev 1.43 3.46 1.51
Public
Mean 1.85 1.43 1.67
Median 1.45 1.04 2.04 100
StDev 1.43 1.04 1.19
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Social Discounting: References
Cropper, M.,Freeman,M.,Groom,B.,Pizer,W.,2014.Declining
discount rates.Am.Econ.Rev.:Pap.Proc.104,538–543.
Drupp, M.A., Freeman,M.C. ,Groom,B., Nesje,F., 2015.
Discounting Disentangled: An Expert Survey on the
Determinants of the Long-Term Social Discount Rate.
Grantham Research Institute Working Paper No.172. London
School of Economics.
Fenichel et al (2017). Even the representative agent must die!....
NBER Working Paper No. w23591
Freeman,M.C.,Groom,B.,2015. Positively gamma discounting:
combining the opinions of experts on the social discount rate.
Econ.J. 125,1015–1024.
Freeman, et al, 2015. Declining discount rates and the Fisher
E¤ect: in‡ated past, discounted future? Journal of
Environmental Economics and Management, 73, pp. 32-39
Gollier, C., 2012. Pricing the Planet’s Future: The Economics of
Discounting in an Uncertain World. Princeton University Press,
Princeton.
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Social Discounting: References
Gollier, Christian. 2013. “Evaluation of Long-Dated Investments
Under Uncertain Growth Trend, Volatility and Catastrophes.”
Toulouse School of Economics TSE Working Papers 12-361.
Gollier, Christian. 2012b. Term Structures of discount rates for
risky investments IDEI, mimeo.
Groom B and Hepburn C (2017). Looking back at Social
Discount Rates..... Review of Environmental Economics and
Policy, Volume 11, Issue 2, 1 July 2017, Pages 336–356,
https://doi.org/10.1093/reep/rex015
Groom, B., Maddison,D.J. ,2013. Non-Identical Quadruplets:
Four New Estimates of the Elasticity of Marginal Utility for the
UK. Grantham Institute Centre for Climate Change Economics
and Policy Working Paper No.141.
Harberger A.C. and Jenkins G (2015). Musings on the Social
Discount Rate. Journal of bene…t-cost analysis, Vol. 6.2015, 1,
p. 6-32
Time Varying
SDRs
Ben Groom
Individual Time
Preferences
The Social
Discount Rate
Time Varying
Social Discount
Rates
Uncertainty
Heterogeneity
Risky Projects
Estimating the
Parameters of the
SDR
Conclusion
Additional
Materials
Social Discounting: References
Heal,G. and Millner, A.,2014. Agreeing to disagree on climate
policy. Proc. Natl. Acad. Sci. 111, 3695–3698.
Moore et al (2013). More Appropriate Social Discounting.....
Journal of Bene…t-Cost Analysis, 2013, vol. 4, issue 1, 1-16
Newell R and Pizer W (2003). Discounting the bene…ts of
climate change: How much do uncertain interest rates increase
valuations? Journal of Environmental Economics and
Management, 46(1), 52-74.
Weitzman,M.L.,1998.Why the far-distant future should be
discounted at its lowest possible rate.
J.Environ.Econ.Manag.36,201–208.
Weitzman,M.L.,2001.Gamma discounting.
Am.Econ.Rev.91,260–271.

More Related Content

Similar to Discounting future healthcare costs and benefits(Part 1)

Capital Budegting.pdf
Capital Budegting.pdfCapital Budegting.pdf
Capital Budegting.pdfsauravjain15
 
Impact Investing for the ESG and Metaverse Convergence
Impact Investing for the ESG and Metaverse ConvergenceImpact Investing for the ESG and Metaverse Convergence
Impact Investing for the ESG and Metaverse ConvergenceAlex G. Lee, Ph.D. Esq. CLP
 
How future cities will succeed
How future cities will succeedHow future cities will succeed
How future cities will succeedBob Prieto
 
Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...
Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...
Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...Global Infrastructure Basel Foundation
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Writing Mini Lesson 20- Dial. Online assignment writing service.
Writing Mini Lesson 20- Dial. Online assignment writing service.Writing Mini Lesson 20- Dial. Online assignment writing service.
Writing Mini Lesson 20- Dial. Online assignment writing service.Gladys Cepparulo
 
SCB analysis.pptx
SCB analysis.pptxSCB analysis.pptx
SCB analysis.pptxOeli3
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development MechanismNayan Bhatia
 
PROJ 420 Course Project
PROJ 420 Course ProjectPROJ 420 Course Project
PROJ 420 Course Projectgsb100
 
Using Cross Asset Information To Improve Portfolio Risk Estimation
Using Cross Asset Information To Improve Portfolio Risk EstimationUsing Cross Asset Information To Improve Portfolio Risk Estimation
Using Cross Asset Information To Improve Portfolio Risk Estimationyamanote
 
Risks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill InternationalRisks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill InternationalRoland_Nikles
 
Project finance emu
Project finance emuProject finance emu
Project finance emubejoylinp
 
Risk Mitigation Solution for Geothermal Projects –Way to support Financing
Risk Mitigation Solution for Geothermal Projects –Way to support FinancingRisk Mitigation Solution for Geothermal Projects –Way to support Financing
Risk Mitigation Solution for Geothermal Projects –Way to support FinancingIceland Geothermal
 

Similar to Discounting future healthcare costs and benefits(Part 1) (17)

Capital Budegting.pdf
Capital Budegting.pdfCapital Budegting.pdf
Capital Budegting.pdf
 
Impact Investing for the ESG and Metaverse Convergence
Impact Investing for the ESG and Metaverse ConvergenceImpact Investing for the ESG and Metaverse Convergence
Impact Investing for the ESG and Metaverse Convergence
 
How future cities will succeed
How future cities will succeedHow future cities will succeed
How future cities will succeed
 
feasibility study
 feasibility study feasibility study
feasibility study
 
Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...
Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...
Harvard Busniess School - Financing Infrastructure Projects in Cities by Prof...
 
edited copy
edited copyedited copy
edited copy
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Writing Mini Lesson 20- Dial. Online assignment writing service.
Writing Mini Lesson 20- Dial. Online assignment writing service.Writing Mini Lesson 20- Dial. Online assignment writing service.
Writing Mini Lesson 20- Dial. Online assignment writing service.
 
SCB analysis.pptx
SCB analysis.pptxSCB analysis.pptx
SCB analysis.pptx
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development Mechanism
 
PROJ 420 Course Project
PROJ 420 Course ProjectPROJ 420 Course Project
PROJ 420 Course Project
 
Cafe Swot Analysis
Cafe Swot AnalysisCafe Swot Analysis
Cafe Swot Analysis
 
Using Cross Asset Information To Improve Portfolio Risk Estimation
Using Cross Asset Information To Improve Portfolio Risk EstimationUsing Cross Asset Information To Improve Portfolio Risk Estimation
Using Cross Asset Information To Improve Portfolio Risk Estimation
 
Mod 3 construction economics
Mod 3 construction economicsMod 3 construction economics
Mod 3 construction economics
 
Risks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill InternationalRisks & Advantages of P3 Projects by Sid Scott, Hill International
Risks & Advantages of P3 Projects by Sid Scott, Hill International
 
Project finance emu
Project finance emuProject finance emu
Project finance emu
 
Risk Mitigation Solution for Geothermal Projects –Way to support Financing
Risk Mitigation Solution for Geothermal Projects –Way to support FinancingRisk Mitigation Solution for Geothermal Projects –Way to support Financing
Risk Mitigation Solution for Geothermal Projects –Way to support Financing
 

More from cheweb1

The value of Value of Information (VoI): When and how to use simpler or heuri...
The value of Value of Information (VoI): When and how to use simpler or heuri...The value of Value of Information (VoI): When and how to use simpler or heuri...
The value of Value of Information (VoI): When and how to use simpler or heuri...cheweb1
 
Dynamic survival models for predicting the future in health technology assess...
Dynamic survival models for predicting the future in health technology assess...Dynamic survival models for predicting the future in health technology assess...
Dynamic survival models for predicting the future in health technology assess...cheweb1
 
Withinfamily che presentation_200609
Withinfamily che presentation_200609Withinfamily che presentation_200609
Withinfamily che presentation_200609cheweb1
 
Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...
Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...
Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...cheweb1
 
Valuation in health economics: Reflections of a UK health economist… and patient
Valuation in health economics: Reflections of a UK health economist… and patientValuation in health economics: Reflections of a UK health economist… and patient
Valuation in health economics: Reflections of a UK health economist… and patientcheweb1
 
Health Research Authority Approval: Information for Sponsors
Health Research Authority Approval: Information for SponsorsHealth Research Authority Approval: Information for Sponsors
Health Research Authority Approval: Information for Sponsorscheweb1
 
Modeling the cost effectiveness of two big league pay-for-performance policies
Modeling the cost effectiveness of two big league pay-for-performance policiesModeling the cost effectiveness of two big league pay-for-performance policies
Modeling the cost effectiveness of two big league pay-for-performance policiescheweb1
 
Baker what to do when people disagree che york seminar jan 2019 v2
Baker what to do when people disagree che york seminar jan 2019 v2Baker what to do when people disagree che york seminar jan 2019 v2
Baker what to do when people disagree che york seminar jan 2019 v2cheweb1
 
The longest-lasting, most popular, and yet most thoroughly discredited idea i...
The longest-lasting, most popular, and yet most thoroughly discredited idea i...The longest-lasting, most popular, and yet most thoroughly discredited idea i...
The longest-lasting, most popular, and yet most thoroughly discredited idea i...cheweb1
 
Cost-effectiveness of diagnosis: tests, pay-offs and uncertainties
Cost-effectiveness of diagnosis: tests, pay-offs and uncertaintiesCost-effectiveness of diagnosis: tests, pay-offs and uncertainties
Cost-effectiveness of diagnosis: tests, pay-offs and uncertaintiescheweb1
 
Insights from actuarial science into HTA: Building joint models of random qua...
Insights from actuarial science into HTA: Building joint models of random qua...Insights from actuarial science into HTA: Building joint models of random qua...
Insights from actuarial science into HTA: Building joint models of random qua...cheweb1
 
The implications of parameter independence in probabilistic sensitivity analy...
The implications of parameter independence in probabilistic sensitivity analy...The implications of parameter independence in probabilistic sensitivity analy...
The implications of parameter independence in probabilistic sensitivity analy...cheweb1
 
Adjusting for treatment switching in randomised controlled trials
Adjusting for treatment switching in randomised controlled trialsAdjusting for treatment switching in randomised controlled trials
Adjusting for treatment switching in randomised controlled trialscheweb1
 
Discounting future healthcare costs and benefits (part 2)
Discounting future healthcare costs and benefits (part 2)Discounting future healthcare costs and benefits (part 2)
Discounting future healthcare costs and benefits (part 2)cheweb1
 
The reference ICER for the Australian health system: estimation and barriers ...
The reference ICER for the Australian health system: estimation and barriers ...The reference ICER for the Australian health system: estimation and barriers ...
The reference ICER for the Australian health system: estimation and barriers ...cheweb1
 
Valuing paediatric preference-based measures: using a discrete choice experim...
Valuing paediatric preference-based measures: using a discrete choice experim...Valuing paediatric preference-based measures: using a discrete choice experim...
Valuing paediatric preference-based measures: using a discrete choice experim...cheweb1
 
Does transfer to intensive care units reduce mortality for deteriorating ward...
Does transfer to intensive care units reduce mortality for deteriorating ward...Does transfer to intensive care units reduce mortality for deteriorating ward...
Does transfer to intensive care units reduce mortality for deteriorating ward...cheweb1
 
Economic evaluation of changes to the organisation and delivery of health ser...
Economic evaluation of changes to the organisation and delivery of health ser...Economic evaluation of changes to the organisation and delivery of health ser...
Economic evaluation of changes to the organisation and delivery of health ser...cheweb1
 
Quantifying the added societal value of public health interventions in reduci...
Quantifying the added societal value of public health interventions in reduci...Quantifying the added societal value of public health interventions in reduci...
Quantifying the added societal value of public health interventions in reduci...cheweb1
 
Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...
Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...
Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...cheweb1
 

More from cheweb1 (20)

The value of Value of Information (VoI): When and how to use simpler or heuri...
The value of Value of Information (VoI): When and how to use simpler or heuri...The value of Value of Information (VoI): When and how to use simpler or heuri...
The value of Value of Information (VoI): When and how to use simpler or heuri...
 
Dynamic survival models for predicting the future in health technology assess...
Dynamic survival models for predicting the future in health technology assess...Dynamic survival models for predicting the future in health technology assess...
Dynamic survival models for predicting the future in health technology assess...
 
Withinfamily che presentation_200609
Withinfamily che presentation_200609Withinfamily che presentation_200609
Withinfamily che presentation_200609
 
Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...
Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...
Healthy Minds: A Randomised Controlled Trial to Evaluate PHSE Curriculum Deve...
 
Valuation in health economics: Reflections of a UK health economist… and patient
Valuation in health economics: Reflections of a UK health economist… and patientValuation in health economics: Reflections of a UK health economist… and patient
Valuation in health economics: Reflections of a UK health economist… and patient
 
Health Research Authority Approval: Information for Sponsors
Health Research Authority Approval: Information for SponsorsHealth Research Authority Approval: Information for Sponsors
Health Research Authority Approval: Information for Sponsors
 
Modeling the cost effectiveness of two big league pay-for-performance policies
Modeling the cost effectiveness of two big league pay-for-performance policiesModeling the cost effectiveness of two big league pay-for-performance policies
Modeling the cost effectiveness of two big league pay-for-performance policies
 
Baker what to do when people disagree che york seminar jan 2019 v2
Baker what to do when people disagree che york seminar jan 2019 v2Baker what to do when people disagree che york seminar jan 2019 v2
Baker what to do when people disagree che york seminar jan 2019 v2
 
The longest-lasting, most popular, and yet most thoroughly discredited idea i...
The longest-lasting, most popular, and yet most thoroughly discredited idea i...The longest-lasting, most popular, and yet most thoroughly discredited idea i...
The longest-lasting, most popular, and yet most thoroughly discredited idea i...
 
Cost-effectiveness of diagnosis: tests, pay-offs and uncertainties
Cost-effectiveness of diagnosis: tests, pay-offs and uncertaintiesCost-effectiveness of diagnosis: tests, pay-offs and uncertainties
Cost-effectiveness of diagnosis: tests, pay-offs and uncertainties
 
Insights from actuarial science into HTA: Building joint models of random qua...
Insights from actuarial science into HTA: Building joint models of random qua...Insights from actuarial science into HTA: Building joint models of random qua...
Insights from actuarial science into HTA: Building joint models of random qua...
 
The implications of parameter independence in probabilistic sensitivity analy...
The implications of parameter independence in probabilistic sensitivity analy...The implications of parameter independence in probabilistic sensitivity analy...
The implications of parameter independence in probabilistic sensitivity analy...
 
Adjusting for treatment switching in randomised controlled trials
Adjusting for treatment switching in randomised controlled trialsAdjusting for treatment switching in randomised controlled trials
Adjusting for treatment switching in randomised controlled trials
 
Discounting future healthcare costs and benefits (part 2)
Discounting future healthcare costs and benefits (part 2)Discounting future healthcare costs and benefits (part 2)
Discounting future healthcare costs and benefits (part 2)
 
The reference ICER for the Australian health system: estimation and barriers ...
The reference ICER for the Australian health system: estimation and barriers ...The reference ICER for the Australian health system: estimation and barriers ...
The reference ICER for the Australian health system: estimation and barriers ...
 
Valuing paediatric preference-based measures: using a discrete choice experim...
Valuing paediatric preference-based measures: using a discrete choice experim...Valuing paediatric preference-based measures: using a discrete choice experim...
Valuing paediatric preference-based measures: using a discrete choice experim...
 
Does transfer to intensive care units reduce mortality for deteriorating ward...
Does transfer to intensive care units reduce mortality for deteriorating ward...Does transfer to intensive care units reduce mortality for deteriorating ward...
Does transfer to intensive care units reduce mortality for deteriorating ward...
 
Economic evaluation of changes to the organisation and delivery of health ser...
Economic evaluation of changes to the organisation and delivery of health ser...Economic evaluation of changes to the organisation and delivery of health ser...
Economic evaluation of changes to the organisation and delivery of health ser...
 
Quantifying the added societal value of public health interventions in reduci...
Quantifying the added societal value of public health interventions in reduci...Quantifying the added societal value of public health interventions in reduci...
Quantifying the added societal value of public health interventions in reduci...
 
Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...
Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...
Population-adjusted treatment comparisons: estimates based on MAIC (Matching-...
 

Recently uploaded

VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore EscortsVIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...hotbabesbook
 
Call Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Chandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD availableChandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD availableDipal Arora
 
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service AvailableDipal Arora
 
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort ServicePremium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Servicevidya singh
 
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...chandars293
 
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls DelhiRussian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls DelhiAlinaDevecerski
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeCall Girls Delhi
 
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...chandars293
 
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...narwatsonia7
 
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋TANUJA PANDEY
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...Taniya Sharma
 
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Recently uploaded (20)

VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore EscortsVIP Call Girls Indore Kirti 💚😋  9256729539 🚀 Indore Escorts
VIP Call Girls Indore Kirti 💚😋 9256729539 🚀 Indore Escorts
 
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
Night 7k to 12k Chennai City Center Call Girls 👉👉 7427069034⭐⭐ 100% Genuine E...
 
Call Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Jabalpur Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
 
Chandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD availableChandrapur Call girls 8617370543 Provides all area service COD available
Chandrapur Call girls 8617370543 Provides all area service COD available
 
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Gwalior Just Call 8617370543 Top Class Call Girl Service Available
 
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort ServicePremium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
Premium Call Girls Cottonpet Whatsapp 7001035870 Independent Escort Service
 
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Cuttack Just Call 9907093804 Top Class Call Girl Service Available
 
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
The Most Attractive Hyderabad Call Girls Kothapet 𖠋 6297143586 𖠋 Will You Mis...
 
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bareilly Just Call 9907093804 Top Class Call Girl Service Available
 
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls DelhiRussian Escorts Girls  Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
Russian Escorts Girls Nehru Place ZINATHI 🔝9711199012 ☪ 24/7 Call Girls Delhi
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
 
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...Top Rated  Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
Top Rated Hyderabad Call Girls Erragadda ⟟ 6297143586 ⟟ Call Me For Genuine ...
 
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...Bangalore Call Girls Nelamangala Number 7001035870  Meetin With Bangalore Esc...
Bangalore Call Girls Nelamangala Number 7001035870 Meetin With Bangalore Esc...
 
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
 
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
VIP Hyderabad Call Girls Bahadurpally 7877925207 ₹5000 To 25K With AC Room 💚😋
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
 
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Nagpur Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Dehradun Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Aurangabad Just Call 9907093804 Top Class Call Girl Service Available
 

Discounting future healthcare costs and benefits(Part 1)

  • 1. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying Social Discount Rates: Uncertainty, Heterogeneity and Project Risk Ben Groom (LSE) Centre for Health Economics, University of York December 7th, 2017
  • 2. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Impatience, self-control and hyperbolic discounting
  • 3. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Impatience, self-control and hyperbolic discounting Figure: Source: The New Yorker.
  • 4. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects
  • 5. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
  • 6. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ...
  • 7. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ... Ramsey Rule SDR = δ + ηgc
  • 8. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ... Ramsey Rule SDR = δ + ηgc gc = consumption growth
  • 9. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ... Ramsey Rule SDR = δ + ηgc gc = consumption growth
  • 10. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ... Ramsey Rule SDR = δ + ηgc gc = consumption growth 2 consumption side arguments for discounting, 3 parameters (δ,η, gc ) 1 Utility discounting: pure time preference, δ.
  • 11. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Discounted Utilitarian SWF W0 = u (c0) + exp ( δ) u (c1) + .... exp ( δT) u (cT ) + ... Ramsey Rule SDR = δ + ηgc gc = consumption growth 2 consumption side arguments for discounting, 3 parameters (δ,η, gc ) 1 Utility discounting: pure time preference, δ. 2 Societal ‘Wealth E¤ect’: ηgc
  • 12. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Production side, opportunity cost arguments: SDR = r Risk free projects: Risk-free interest rate, cost of borrowing
  • 13. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Production side, opportunity cost arguments: SDR = r Risk free projects: Risk-free interest rate, cost of borrowing Risky Projects (systematic risk): Asset prices
  • 14. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Production side, opportunity cost arguments: SDR = r Risk free projects: Risk-free interest rate, cost of borrowing Risky Projects (systematic risk): Asset prices
  • 15. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Production side, opportunity cost arguments: SDR = r Risk free projects: Risk-free interest rate, cost of borrowing Risky Projects (systematic risk): Asset prices Equilibrium r = δ + ηgc (=STP)
  • 16. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Production side, opportunity cost arguments: SDR = r Risk free projects: Risk-free interest rate, cost of borrowing Risky Projects (systematic risk): Asset prices Equilibrium r = δ + ηgc (=STP) Debate: which is appropriate when distortions exist (e.g. Burgess and Zerbe 2014; Moore et al 2013; Spackman 2017)
  • 17. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials The Social Discount Rate Risk Free Projects Production side, opportunity cost arguments: SDR = r Risk free projects: Risk-free interest rate, cost of borrowing Risky Projects (systematic risk): Asset prices Equilibrium r = δ + ηgc (=STP) Debate: which is appropriate when distortions exist (e.g. Burgess and Zerbe 2014; Moore et al 2013; Spackman 2017) Shadow cost of capital approach: convert to consumption and discount using STP
  • 18. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs for Risk Free Projects Figure: Source Groom and Hepburn (2017)
  • 19. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects
  • 20. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty
  • 21. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving
  • 22. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect
  • 23. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect
  • 24. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect Term Structure of SDR Depends on the expected di¤usion of consumption growth
  • 25. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect Term Structure of SDR Depends on the expected di¤usion of consumption growth
  • 26. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect Term Structure of SDR Depends on the expected di¤usion of consumption growth Growth Di¤usion: examples Independent growth shocks: Brownian Motion
  • 27. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect Term Structure of SDR Depends on the expected di¤usion of consumption growth Growth Di¤usion: examples Independent growth shocks: Brownian Motion Persistence : drift, parameter uncertainty, regime switches, ‘jump risk’
  • 28. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth Risk Free Projects General Growth Uncertainty SDR lower re‡ecting precautionary saving SDRH = δ + η ¯g Wealth E¤ect f η, σ2 c,H , σ3 c,H , σ4 c,H Precautionary Savings E¤ect Term Structure of SDR Depends on the expected di¤usion of consumption growth Growth Di¤usion: examples Independent growth shocks: Brownian Motion Persistence : drift, parameter uncertainty, regime switches, ‘jump risk’ See Gollier (2012)
  • 29. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free)
  • 30. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c
  • 31. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect
  • 32. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure
  • 33. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure
  • 34. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure Example: Jump Risk Suppose that GDP loss % of λ with probability p
  • 35. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure Example: Jump Risk Suppose that GDP loss % of λ with probability p SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
  • 36. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure Example: Jump Risk Suppose that GDP loss % of λ with probability p SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)]
  • 37. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure Example: Jump Risk Suppose that GDP loss % of λ with probability p SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)] Example: Parameter Uncertainty i.i.d. shocks, but uncertainty about the mean parameter µi
  • 38. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure Example: Jump Risk Suppose that GDP loss % of λ with probability p SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)] Example: Parameter Uncertainty i.i.d. shocks, but uncertainty about the mean parameter µi ˜xi N µi , σ2 c (i = 1, 2, ...n)
  • 39. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth (risk free) Example: Brownian Motion ln (ct+1/ct ) = ˜x, ˜x N µ, σ2 c SDR = δ + η ¯g Wealth E¤ect 0.5η (η + 1) σ2 c Prudence E¤ect lower SDR, ‡at term structure Example: Jump Risk Suppose that GDP loss % of λ with probability p SDRH = δ + H 1 ln [p(1 λ) + (1 p)E exp ( η ˜gH H)] Example: Parameter Uncertainty i.i.d. shocks, but uncertainty about the mean parameter µi ˜xi N µi , σ2 c (i = 1, 2, ...n) SDRH = δ + H 1 ln [E exp ( η ˜gH H)]
  • 40. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth ¯gL 1 , ¯gL 2 = (1%, 3%) ; ¯gH 1 , ¯gH 2 = (0%, 3.5%) ; δ = 1%, η = 2, p1 = 1/3, p2 = 2/3
  • 41. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertain interest rates Expected NPV (Weitzman 2001, Newell and Pizer 2003, Freeman et al 2015) exp ( RH H) = E [exp ( ˜rH)] ! RH = SDRH = 1 H ln E [exp ( ˜rH)]
  • 42. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertain interest rates Expected NPV (Weitzman 2001, Newell and Pizer 2003, Freeman et al 2015) exp ( RH H) = E [exp ( ˜rH)] ! RH = SDRH = 1 H ln E [exp ( ˜rH)] Gamma Discounting (Weitzman 2001, American Economic Review).
  • 43. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertain interest rates Expected NPV (Weitzman 2001, Newell and Pizer 2003, Freeman et al 2015) exp ( RH H) = E [exp ( ˜rH)] ! RH = SDRH = 1 H ln E [exp ( ˜rH)] Gamma Discounting (Weitzman 2001, American Economic Review). Time series applications of Weitzman (1998) ENPV approach
  • 44. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Di¤erences in expert opinion, or heterogeneous time preferences 0.05.1.15.2 Density 0 10 20 30 Weitzman Gamma Weitzman’s ‘Gamma’Distibution of the SDR for Climate Change (Weitzman 2001) 0.2.4.6.8 Density 0 2 4 6 8 Rate of societal pure time preference (in %) Pure rate of time preference, δ. Discounting Expert Survey by Drupp et al. (2015)
  • 45. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t)
  • 46. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t) ci is the optimised path for agent i.
  • 47. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t) ci is the optimised path for agent i.
  • 48. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t) ci is the optimised path for agent i. Is there a Representative Pure Time Preference?
  • 49. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t) ci is the optimised path for agent i. Is there a Representative Pure Time Preference? Answer: Yes!
  • 50. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t) ci is the optimised path for agent i. Is there a Representative Pure Time Preference? Answer: Yes! δη (H) = h ∑i δi (wi exp ( δi H)) 1 η i / h ∑i (wi exp ( δi H)) 1 η i
  • 51. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Welfare function with heterogeneous agents (H&M 2013) W (C (t) , t) = ∑i wi U ci (C (t) , t) exp ( δi t) ci is the optimised path for agent i. Is there a Representative Pure Time Preference? Answer: Yes! δη (H) = h ∑i δi (wi exp ( δi H)) 1 η i / h ∑i (wi exp ( δi H)) 1 η i Declines to the lowest value of δi as H goes to in…nity
  • 52. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Heterogeneity Heterogeneous pure time preference and the representative agent (Heal and Millner 2013, PNAS, Gollier and Zeckhauser 2005, Freeman and Groom 2015) Figure: Representative Pure Time Preference: δ
  • 53. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d
  • 54. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d r (β) = δ + ηµ η2σ2 c Prudence + βησ2 c Project Speci…c Risk Premium
  • 55. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d r (β) = δ + ηµ η2σ2 c Prudence + βησ2 c Project Speci…c Risk Premium
  • 56. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d r (β) = δ + ηµ η2σ2 c Prudence + βησ2 c Project Speci…c Risk Premium Growth is Persistent: e.g. Parameter Uncertainty r0 (β) = δ + η ¯µ + ησ2 (β 0.5η)
  • 57. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d r (β) = δ + ηµ η2σ2 c Prudence + βησ2 c Project Speci…c Risk Premium Growth is Persistent: e.g. Parameter Uncertainty r0 (β) = δ + η ¯µ + ησ2 (β 0.5η) r∞ (β) = δ + ηµmin + ησ2 (β 0.5η) if β 0 δ + ηµmax + ησ2 (β 0.5η) if β > η
  • 58. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d r (β) = δ + ηµ η2σ2 c Prudence + βησ2 c Project Speci…c Risk Premium Growth is Persistent: e.g. Parameter Uncertainty r0 (β) = δ + η ¯µ + ησ2 (β 0.5η) r∞ (β) = δ + ηµmin + ησ2 (β 0.5η) if β 0 δ + ηµmax + ησ2 (β 0.5η) if β > η
  • 59. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects Gollier (2012, 2012b) Consumption CAPM Growth is i.i.d r (β) = δ + ηµ η2σ2 c Prudence + βησ2 c Project Speci…c Risk Premium Growth is Persistent: e.g. Parameter Uncertainty r0 (β) = δ + η ¯µ + ησ2 (β 0.5η) r∞ (β) = δ + ηµmin + ησ2 (β 0.5η) if β 0 δ + ηµmax + ησ2 (β 0.5η) if β > η Term Structure of Risky Discount Rates in CCAPM Precautionary e¤ect and the risk premium work in opposite directions in most public investment cases: β > 0
  • 60. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs with Risky Projects δ = 0, η = 2, µ 2 [0%, 3%] , symmetric Figure: Term Structure of Discount Rates for Risky Projects by β. Source: Gollier (2012b)
  • 61. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates
  • 62. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc)
  • 63. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999)
  • 64. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates
  • 65. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
  • 66. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%)
  • 67. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%) Elasticity of Marginal Utility: η Revealed Preference: risk or inequality aversion, smoothing c
  • 68. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%) Elasticity of Marginal Utility: η Revealed Preference: risk or inequality aversion, smoothing c Experimental methods, expert surveys (which experts?)
  • 69. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%) Elasticity of Marginal Utility: η Revealed Preference: risk or inequality aversion, smoothing c Experimental methods, expert surveys (which experts?)
  • 70. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%) Elasticity of Marginal Utility: η Revealed Preference: risk or inequality aversion, smoothing c Experimental methods, expert surveys (which experts?) Growth, gc and rates of return r Historical data, econometrics (N&P 2003)
  • 71. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating the Parameters of the SDR Utility discount rate, Elasticity of Marginal Utility, growth and interest rates Utility Discount Rate Ethics: Impartial Consequentialism δ = 0 (Ramsey, Stern.. etc) Agent relative ethics δ > 0 (e.g. Arrow 1999) Catastrophic risk (e.g. Stern 0.1%), survival rates Calibration to the interest rate (Nordhaus, IAMs, 3%-1.5%) Elasticity of Marginal Utility: η Revealed Preference: risk or inequality aversion, smoothing c Experimental methods, expert surveys (which experts?) Growth, gc and rates of return r Historical data, econometrics (N&P 2003) Expert surveys (Drupp et al. 2015, Pindyck 2017)
  • 72. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters Utility discount rate as a survival rate (Fenichel et al. 2017) Figure: Demographic δ : Survival hazard rate aggregated across the population (Function of mortality rate and life expectancy at each age)
  • 73. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters Revealed preference measures of the elasticity of marginal utility, UK (Groom and Maddison 2017) Table: Revealed Preference estimates of η in the UK Methodology η StDev Inequality Aversion Progressive Taxes 1.52 0.047 Progressive Taxes (historical) 1.57 0.48 Consumption Smoothing Euler Equation 1.58 0.21 Product Substitution Frisch Parameter 3.56 2.19 Risk Aversion Insurance Demand 2.19 0.24 Subjective Well-being Happiness survey 1.32 0.17 Pooled Estimate Fixed E¤ects 1.53 Parameter Homogeneity Chi-sq(5) = 9.98 (p=0.076) Source: Groom and Maddison 2017
  • 74. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters Long-term discount rate: Evidence from housing ownership (Giglio et al 2015; Fesselmeyer et al. 2017) Figure: Declining Discount Rates in housing tenure: (Fesselmeyer et al. 2017)
  • 75. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Project Betas French Guidelines (Gollier 2011) Sector Estimated consumption Beta Agriculture, Silviculture and Fisheries 0.85 Industry 2.09 Automobile Industry 4.98 Manufacture of Mechanical Equipment 3.00 Intermediate Industries 2.76 Energy 0.85 Construction 1,45 Transport 1.60 Administrative Services -0.09 Education 0.11 Health -0.24 Financial Services 0.15 Financial Intermediation 0.49 Assurance -0.36
  • 76. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Term Structures Gollier and Mahul 2017 Figure: Term Structure of Risk Free Rate (left) and Aggregate Risk Premium (right) (Gollier and Mahul 2017).
  • 77. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Term Structures Gollier and Mahul 2017 Figure: Term Structure of Risk Free Rate (left) and Aggregate Risk Premium (right) (Gollier and Mahul 2017).
  • 78. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs?
  • 79. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects
  • 80. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc.
  • 81. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc
  • 82. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc
  • 83. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc Risky Projects Term structure for risky projects depends on the ‘beta’
  • 84. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc Risky Projects Term structure for risky projects depends on the ‘beta’ Risk premium rises with the time horizon for β > 0
  • 85. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc Risky Projects Term structure for risky projects depends on the ‘beta’ Risk premium rises with the time horizon for β > 0
  • 86. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc Risky Projects Term structure for risky projects depends on the ‘beta’ Risk premium rises with the time horizon for β > 0 Practical Advice SDR important (country speci…c), but so is valuation
  • 87. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Conclusion Project Appraisal in LMICs Declining Discount Rates for risk free projects TVSDRs? Empirics: persistence? variability? risk prefs? Prudence and high variability: large prudence e¤ects Low growth, low SDR: Liberia, DRC, (-2%) etc. High growth, high SDR: Botswana, South Africa (+4%), etc Risky Projects Term structure for risky projects depends on the ‘beta’ Risk premium rises with the time horizon for β > 0 Practical Advice SDR important (country speci…c), but so is valuation Empirical work exists to help guide decision makers
  • 88. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Time Varying SDRs: Uncertainty in growth: Parameter uncertainty Example from previous French Guidelines (Lebegue 2005, p 102) ¯g1 = 0.5%, ¯g2 = 2%, δ = 1%, η = 2
  • 89. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters using Expert Opinion: Economists Drupp et al (2015) ‘Discounting Disentangled’. 0.2.4.6.8 Density 0 2 4 6 8 Rate of societal pure time preference (in %) 0.1.2.3 Density 0 2 4 6 8 10 Real SDR (in %)
  • 90. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters using Expert Opinion? Drupp et al (2015) ‘Discounting Disentangled’. 1% 2% 0.2.4.6.81 Density -5 0 5 10 15 Lower Bound of Range 3% SDR range 2% SDR range 0% SDR Range (point value) 92% of economists agree on long run SDR between 1% and 3%
  • 91. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters using expert opinion: Economists Variable Mean StdDev Median Mode Min Max Real growth rate per capita 1.70 0.91 1.60 2.00 -2.00 5.00 Rate of pure time preference 1.10 1.47 0.50 0.00 0.00 8.00 Elasticity of marginal utility 1.35 0.85 1.00 1.00 0.00 5.00 Real risk free interest rate 2.38 1.32 2.00 2.00 0.00 6.00 Normative weight 61.53 28.56 70.00 50.00 0.00 100.00 Positive weight 38.47 28.56 70.00 30.00 0.00 100.00 Social discount rate (SDR) 2.27 1.62 2.00 2.00 0.00 10.00 SDR lower bound 1.12 1.62 1.00 0.00 -3.00 8.00 SDR upper bound 4.14 2.80 3.50 3.00 0.00 20.00 Number of quantitative responses Number of qualitative responses Total number of respondents
  • 92. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Estimating SDR Parameters: Which Experts? or Public Opinion? Table: Disagreement between Experts and Members of the Public? (%) Source SDR PRTP η N Economists Mean 2.27 1.1 1.35 Median 2.00 0.50 1.00 186 StDev 1.62 1.47 0.85 Philosophers Mean 2.1 1.3 1.70 Median 2.00 0.00 2.00 16 StDev 1.43 3.46 1.51 Public Mean 1.85 1.43 1.67 Median 1.45 1.04 2.04 100 StDev 1.43 1.04 1.19
  • 93. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Social Discounting: References Cropper, M.,Freeman,M.,Groom,B.,Pizer,W.,2014.Declining discount rates.Am.Econ.Rev.:Pap.Proc.104,538–543. Drupp, M.A., Freeman,M.C. ,Groom,B., Nesje,F., 2015. Discounting Disentangled: An Expert Survey on the Determinants of the Long-Term Social Discount Rate. Grantham Research Institute Working Paper No.172. London School of Economics. Fenichel et al (2017). Even the representative agent must die!.... NBER Working Paper No. w23591 Freeman,M.C.,Groom,B.,2015. Positively gamma discounting: combining the opinions of experts on the social discount rate. Econ.J. 125,1015–1024. Freeman, et al, 2015. Declining discount rates and the Fisher E¤ect: in‡ated past, discounted future? Journal of Environmental Economics and Management, 73, pp. 32-39 Gollier, C., 2012. Pricing the Planet’s Future: The Economics of Discounting in an Uncertain World. Princeton University Press, Princeton.
  • 94. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Social Discounting: References Gollier, Christian. 2013. “Evaluation of Long-Dated Investments Under Uncertain Growth Trend, Volatility and Catastrophes.” Toulouse School of Economics TSE Working Papers 12-361. Gollier, Christian. 2012b. Term Structures of discount rates for risky investments IDEI, mimeo. Groom B and Hepburn C (2017). Looking back at Social Discount Rates..... Review of Environmental Economics and Policy, Volume 11, Issue 2, 1 July 2017, Pages 336–356, https://doi.org/10.1093/reep/rex015 Groom, B., Maddison,D.J. ,2013. Non-Identical Quadruplets: Four New Estimates of the Elasticity of Marginal Utility for the UK. Grantham Institute Centre for Climate Change Economics and Policy Working Paper No.141. Harberger A.C. and Jenkins G (2015). Musings on the Social Discount Rate. Journal of bene…t-cost analysis, Vol. 6.2015, 1, p. 6-32
  • 95. Time Varying SDRs Ben Groom Individual Time Preferences The Social Discount Rate Time Varying Social Discount Rates Uncertainty Heterogeneity Risky Projects Estimating the Parameters of the SDR Conclusion Additional Materials Social Discounting: References Heal,G. and Millner, A.,2014. Agreeing to disagree on climate policy. Proc. Natl. Acad. Sci. 111, 3695–3698. Moore et al (2013). More Appropriate Social Discounting..... Journal of Bene…t-Cost Analysis, 2013, vol. 4, issue 1, 1-16 Newell R and Pizer W (2003). Discounting the bene…ts of climate change: How much do uncertain interest rates increase valuations? Journal of Environmental Economics and Management, 46(1), 52-74. Weitzman,M.L.,1998.Why the far-distant future should be discounted at its lowest possible rate. J.Environ.Econ.Manag.36,201–208. Weitzman,M.L.,2001.Gamma discounting. Am.Econ.Rev.91,260–271.